1) The document assesses risks associated with housekeeping and cleaning activities, identifying hazards such as dust inhalation, chemical exposure, and liquid spills. 2) Control measures to address the risks include using trained personnel, PPE like masks and goggles, proper ventilation, MSDS reviews, spill containment, and barricading areas. 3) Residual risks after controls are medium for chemical exposure and dust inhalation risks involving employees, with proper PPE and training cited as ways to manage those risks.

Uploaded by

halisa kurniati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
343 views3 pages

Housekeeeping JSA

1) The document assesses risks associated with housekeeping and cleaning activities, identifying hazards such as dust inhalation, chemical exposure, and liquid spills. 2) Control measures to address the risks include using trained personnel, PPE like masks and goggles, proper ventilation, MSDS reviews, spill containment, and barricading areas. 3) Residual risks after controls are medium for chemical exposure and dust inhalation risks involving employees, with proper PPE and training cited as ways to manage those risks.

Uploaded by

halisa kurniati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Dust High Yes Yes Yes Prior to the ✔ Project Site Engineer E
29 Inhalation, commencement nsure that trained Manager
Foreign of the activity personnel will do the Supervisor
material task. Construction
House caught Manager Foreman
Keeping inside the ✔ P
Cleaning Eye. rovision for Personal Site Manager Charge hand
Protective Equipment
such as, mask intended Workers
Chemical High Yes Yes Yes for chemicals, goggles
exposure and cover-all clothing. HSE Manager Helpers Medium
( Fume
inhalation ) ✔ E
nsure that a personnel
doing the task is well
familiar with the
chemical, Material Safety
Data Sheets must be
reviewed thoroughly.

✔ P
Liquid Spill_ High Yes Yes Yes rovide proper ventilation
Slip, Trip on the area.
hazard
✔ B
arricade the area and
immediately contain /
remove spill.

1
RISK RATING MATRIX E = employees
C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely
P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

✔ P
latform should be used to
carry out minor jobs at
height less than 2 meters.
Fall from High Yes Yes Only one person is
Height allowed working on step Low
ladder at a time.

House ✔ T
Keeping ool Box Talk should be
Cleaning given prior commencing
the activity.

✔ E
nsure that the person
Prolong skin High Yes Yes Yes doing the task is mentally
exposure/co and physical fit for the
ntact of job.
chemical,
skin ✔ P
irritation rovide Personal Protective
Equipment( Dust mask,
safety glass, rubber
Fire gloves)

✔ F
irefighting equipment to
be in place and accessible.

2
RISK RATING MATRIX E = employees
C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely
P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

3
RISK RATING MATRIX E = employees
C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely
P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009