Building Construction Cost Estimate

This document is a detailed estimate and abstract of costs for a building construction project in Pokhara, Nepal. It provides specifications for various construction elements including excavation, stone masonry walls, cement concrete blocks, doors, windows, roofing, and piping. The total estimated project cost is NPR 7,80,000 (Nepalese Rupees seven hundred eighty thousand). Line items include quantities, units, rates, and amounts for each construction component.

Uploaded by

Deepa Subedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views36 pages

Building Construction Cost Estimate

This document is a detailed estimate and abstract of costs for a building construction project in Pokhara, Nepal. It provides specifications for various construction elements including excavation, stone masonry walls, cement concrete blocks, doors, windows, roofing, and piping. The total estimated project cost is NPR 7,80,000 (Nepalese Rupees seven hundred eighty thousand). Line items include quantities, units, rates, and amounts for each construction component.

Uploaded by

Deepa Subedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 36

POKHARA LEKHNATH METROPOLITAN CITY

Officec of the Municipal Executive


Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
A Building Construction Works
E/W Exacavation in soft soil including
1
10m lead & 1.5m
For wall
Long wall 2.00 8.53 0.40 0.50 3.41
short wall 2.00 5.80 0.40 0.50 2.32 .
north side wall 1.00 2.75 0.40 0.50 0.55
For Peti
Front 1.00 6.50 0.30 0.15 0.29
Rear 1.00 5.80 0.30 0.15 0.26
6.83 Cum 504.7 3447.10
2 Boulder Soling and levelling
Long wall 2.00 8.53 0.45 0.10 0.76
short wall 2.00 5.80 0.45 0.10 0.52
north side wall 1.00 2.75 0.45 0.10 0.12
For Peti
Front 1.00 6.50 0.30 0.15 0.29
Rear 1.00 5.80 0.30 0.15 0.26
1.95 Cum 3210 6259.50
3 P.C.C. (1:2:4 ) work in lintel / sill
Long wall 2.00 8.53 0.15 0.08 0.20
short wall 2.00 5.80 0.15 0.08 0.13
north side wall 1.00 2.75 0.15 0.08 0.03
0.36 Cum 12256.46 4412.32
4 R/R stone Masonary Wall 1:4 c/s
Upto Ground level
Long wall 2.00 8.53 0.45 0.30 2.30
short wall 2.00 5.80 0.45 0.30 1.56

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
north side wall 1.00 2.75 0.45 0.30 0.37
Upto P.L
Long wall 2.00 8.50 0.30 0.30 1.53
short wall 2.00 5.35 0.30 0.30 0.96
north side wall 1.00 2.75 0.30 0.30 0.24
eastside wall( above drain wall) 1.00 3.00 0.30 0.30 0.27
Sum 7.23 Cum 10862.93 78538.98

5 6"and 4" th. Cement conctre Block wall


work in 1:4 c/s ratio with all complete work
i wall 2.00 8.53 0.15 2.89 7.39
1.00 3.00 0.15 2.89 1.30
2.00 6.09 0.15 2.89 5.28
Rear Above Drain 1.00 3.00 0.15 2.89 1.30
4" thick 1.00 3.00 0.10 2.89 0.86
1.00 1.50 0.10 2.80 0.42
for peti 1.00 11.00 0.10 0.20 0.22
for kitchen 1.00 14.00 0.15 2.13 4.47
sum 21.24
Deduction for doors and windows
door(D) 5.00 0.91 0.15 2.13 1.45
door(D1) 2.00 0.83 0.10 1.82 0.30
window(w) 4.00 1.21 0.15 1.21 0.87
total 2.62
Total Deduction 18.62 Cu.m 7582.15 141179.63

6
S/F sal woodfor door & window frame
door(D) 5.00 5.16 0.08 0.10 0.20

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
door(D1) 2.00 4.40 0.08 0.10 0.07
window 5.00 7.26 0.08 0.10 0.29
0.56 Cum 242062.57 135555.03
7 s/f Flush door shutter
door(D) 5.00 0.78 2.00 7.80
door(D1) 2.00 2.00 0.63 2.52
10.32 Cum 7635.12 78794.43
s/f Glazed window shutters with 4mm
8 5.00 1.00 5.45
th. Glass 1.09 sqm 9093.03 49557.01
9 s/f grill for window 5.00 1.00 1.00 5.00
67.25 kg 152.55 10258.98 (1.25x10.76)kg/m2
10 Roofing Works
a. black pipe
2" dia black pipe
front part 4.00 3.75 15.00
rear part 4.00 3.75 15.00
for kitchen 4.00 3.00 12.00
42.00 r/m 2.25/m
94.50 kgs.
1.5" dia black pipe
front part 4.00 6.00 24.00
rear part 3.00 6.00 18.00
for kitchen 4.00 4.10 16.40
58.40 r/m 1.83/m
106.87 kg
total 201.37 kg 163.85 32994.47

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
S/f 26 BWG Colour C.G.I Sheet including
b. J hook & Bitumen washer ,nutbolt etc. all
complete
Front Side 1 6.70 3.60 24.12
Rear 1 6.09 3.60 21.92
for kitchen 1 4.2 3.60 15.12
61.16 Sqm 1005.12 61473.13
11 Frooring Works
i Stone soiling works
front side room 2.00 3.00 3.00 0.10 1.80
back side room 1.00 5.70 3.00 0.10 1.71
3.51 Cum 3210.00 11267.10
38mm thick 1:2:4 cement concrete floor
ii carting including finishing by rubbing
cement (Excluding Toilet)
back side room 1.00 4.70 3.00 14.10
in front room 2.00 3.00 3.00 18.00
for kitchen 1.00 4.20 3.00 12.60
44.70 Sqm 609.99 27266.55
iii Tiles works

toilet floor 2.00 1.52 1.22 3.71

toilet long wall 4.00 1.22 1.20 5.86


toilet Short wall 4.00 1.37 1.20 6.58
Total 16.15
Deduction for door side 2.00 0.90 1.20 2.16
Total after deduction 13.99 Sq.m 2631.57 36815.66
Total

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
12.5 mm th. Cement plaster works in on
12
Wall 1:4 C/S motar
wall 2.00 9.25 2.89 53.46
1.00 3.35 2.89 9.68
2.00 6.09 2.89 35.20
Rear Above Drain 1.00 3.04 2.89 8.78
for kitchen 1.00 14.00 2.89 40.46
Sum 147.58
door(D) 5.00 0.91 2.13 9.69
door(D1) 2.00 0.83 1.82 3.02
deduction, window 4.00 1.21 1.21 5.85
Sum 18.56
Total Deduction 18.56
Total 129.02 sqm 364.43 47018.75
13 M.S Rod 1.00 10.00 kg 104.52 1045.20
14 Painting Works
Two Coat distemper painting over one coat
i
primer
wall 2.00 9.25 2.89 53.46
1.00 3.35 2.89 9.68
2.00 6.09 2.89 35.20
Rear Above Drain 1.00 3.04 2.89 8.78
for kitchen 1.00 14.00 2.89 40.46
Sum 147.58
Deduction
door(D) 4.00 0.91 2.13 7.75
door(D1) 2.00 0.83 1.82 3.02

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
window 4.00 1.21 1.21 5.85
Sum 16.62
Total Deduction 16.62
Total 130.96 sqm 107.77 14113.55

ii Two coat Readymade enamel paints over


one coat of wood primer for door & window
window 4.00 1.21 1.21 5.85
door(D) 8.00 0.90 2.13 15.33
door(D1) 4.00 0.75 1.80 5.40
26.58 Sqm 286.19 7606.93

15 Dress Stone Cladding Works


1 6.10 2.89 17.63
Deduction
window 3.00 1.21 1.21 4.39
door(D) 3.00 0.91 1.82 4.96
door(D) 1.00 0.83 1.82 1.51
total deduction 10.86
Total 6.77 Sqm 2206.80 14940.03
16 Sanitary Works
s/f 1000Ltr Poly Water Tank with all
i
complete set 1 1.00 pcs 18694.00 18694.00
S/f of 20" polorized orissa pan with 10lts
ii
plastic cystern with all complete set 1 1.00 set 9876.65 9876.65
S/f of 20"x16" hand wash basin with all
iii
complete set 2 2.00 set 7417.94 14835.88

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
iv s/f Commode all complete set 1 1.00 set 11582.95 11582.95
v s/f Commode spray 1 1.00 pcs 850.00 850.00
vi Angle Stop cock 3 3.00 pcs 5251.00 15753.00
vii s/f 4" PVC pipe 1 6.00 6.00 rm 541.34 3248.04
viii 4" PVC Tee 2.00 2.00 pcs 630.00 1260.00
ix 4" PVC Shocket 1.00 1.00 pcs 125.00 125.00
x s/f 1.5" PVC pipe 5.00 5.00 rm 220.00 1100.00
xi 20x16" looking mirror 1.00 1.00 set 938.25 938.25
xii 3" dis. Resolving shower 1.00 1.00 set 1053.20 1053.20
8'x6'
17 Septic Tank Construction Works
a E/W excavation in B.M.S. soil 1.00 2.44 1.83 2.44 10.90 Cum 504.70 5501.23
b Bolder soling and levelling works 1.00 2.44 1.83 0.10 0.45 Cum 3210.00 1444.50
c
L/w 2.00 2.44 0.23 2.00 2.24
S/w 2.00 1.37 0.23 2.00 1.26
3.50 Cum 9909.23 34682.31
PCC for RCC including material collection
d (1:2:4) 1.00 2.44 1.83 0.10 0.44 Cum 12256.46 5392.84
e Form work with local wood 1.00 2.44 1.83 4.46 Sqm 640.40 2856.18
f Ms Works
Main bar 10mm dia.Re bar @100mm c/c 24.00 1.83 0.61 26.79
Dis bar 10mm dia.Re bar @100mm c/c 18.00 2.44 0.61 26.79
53.58 Kg 104.52 5600.18
18 Soak pit Construction Works
a E/W excavation in B.M.S. soil 1.00 1.83 1.22 1.83 4.08 Cum 504.70 2059.17
b Bolder soling and levelling works 1.00 1.83 1.22 0.10 0.22 Cum 3210.00 706.20

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
PCC for RCC including material collection
c (1:2:4) 1.00 5.60 0.30 0.08 0.13 Cum 12256.46
d Form work with local wood 1.00 1.83 1.22 2.23 Sqm 640.40 1428.09
e 1.00 6.10 0.10 1.22 0.74 Cum 15088.33 11165.36
f steel Work
Main bar 10mm dia.Re bar @100mm c/c 18.00 1.22 0.61 13.39
Dis bar 10mm dia.Re bar @100mm c/c 12.00 1.83 0.61 13.39
26.78 Kg 104.52 2799.04
Compound wall construction Works(For
19
Children Park)
i E/W excavation on BMS 1.00 32.00 0.30 0.30 2.88 Cum 504.70 1453.53
ii Bouler Soling & Leveling work 1.00 32.00 0.30 0.10 0.96 Cum 3210.00 3081.60
iii Rubble stone masonary 1:6 c/s (side) 1.00 32.00 0.30 1.22 11.71
front column 7.00 0.30 0.30 0.60 0.37
12.08 Cum 9909.23 119703.49 1593.33
10 gauge Fencing Jali 75x75 With angle
iv 1.00 32.00 1.90 60.80 sqm 400.00 24320.00
Frame
12.5 mm th. Cement plaster works in on
v 1.00 32.00 1.22 39.04 sqm 364.43 14227.35
Wall 1:4 C/S motar
Compound wall construction Works(For
20
trafic Building)
i E/W excavation on BMS 1.00 10.00 0.30 0.30 0.90 Cum 504.70 454.23
ii Bouler Soling & Leveling work 1.00 10.00 0.30 0.10 0.30 Cum 3210.00 963.00
6" th. Cement conctre Block wall work with
iii 1.00 10.00 0.15 1.22 1.83 Cum 9909.23 18133.89
1:4 c/s ratio with all complete work
10 gauge Fencing Jali 75x75 With angle
iv 1.00 10.00 1.90 19.00 sqm 400.00 7600.00
Frame
21 S/F gyp. Board ceailing works 2.00 3.00 3.00 18.00 Sqm 1276.67 22980.06

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA LEKHNATH METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
Detail Estimate and Abstract of Cost
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-06-26
Project code : 1734 , 71, Metropolitan level programme
Project cost : 5,46,000+2,34,000=7,80,000
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
Flooring works
i Bouler Soling & Leveling work 1.00 6.00 8.50 0.10 5.10 Cum 3210.00 16371.00
ii P.C.C. (1:3:6 ) work 1.00 6.00 8.50 0.10 5.10 Cum 10510.45 53603.29
total civil works 1198387.86
Electrification works on building and
22 3% of civil works 35951.64
supply from service line to building
Watersupply works from main line to
23
building
i Road cutting deposite 20500.00
E/w in excavation for pipe laying in pitch
ii 1.00 30.00 0.30 0.45 4.05 Cum 576.80 2336.04
cutting
iii 1/2" dia. G.I Pipe 40.00 r/m 545.46 21818.40
iv G.I Shocket 8.00 Nos 59.89 479.12
v water meter 1.00 Nos 2200.00 2200.00
vi 3" long nipple 6.00 Nos 30.51 183.06
vii 1/2"G.m Gate valve 1.00 set 1038.86 1038.86
ix 1/2" union socket 3.00 Nos 198.88 596.64

24 site clearance works L.S. L.S. 3000.00 3000.00


Total 1,286,491.62
3% Contengencies charge 38,594.75
Total 1,325,086.37

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
`

.76)kg/m2

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
A Building Construction Works
E/W Exacavation in soft soil including
1
10m lead & 1.5m
For wall
Long wall 2.00 8.53 0.40 0.50 3.41
short wall 2.00 5.80 0.40 0.50 2.32 .
north side wall 1.00 2.75 0.40 0.50 0.55
For Peti
Front 1.00 6.50 0.30 0.15 0.29
Rear 1.00 5.80 0.30 0.15 0.26
6.83 Cum 504.7 3447.10
2 Boulder Soling and levelling
Long wall 2.00 8.53 0.45 0.10 0.76
short wall 2.00 5.80 0.45 0.10 0.52
north side wall 1.00 2.75 0.45 0.10 0.12
For Peti
Front 1.00 6.50 0.30 0.15 0.29
Rear 1.00 5.80 0.30 0.15 0.26
1.95 Cum 3210 6259.50
3 P.C.C. (1:2:4 ) work in lintel / sill
Long wall 2.00 8.53 0.15 0.08 0.20
short wall 2.00 5.80 0.15 0.08 0.13
north side wall 1.00 2.75 0.15 0.08 0.03
0.36 Cum 12256.46 4412.32
4 R/R stone Masonary Wall 1:4 c/s
Upto Ground level
Long wall 2.00 8.53 0.40 0.30 2.04
short wall 2.00 5.80 0.40 0.30 1.39
north side wall 1.00 2.75 0.40 0.30 0.33
Upto P.L

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
Long wall 2.00 8.50 0.30 0.30 1.53
short wall 2.00 5.35 0.30 0.30 0.96
north side wall 1.00 2.75 0.30 0.30 0.24
eastside wall( above drain wall) 1.00 3.00 0.30 0.30 0.27
Sum 6.76 Cum 10862.93 73433.40
6"and 4" th. Cement conctre Block wall
5 work in 1:4 c/s ratio with all complete
work
i wall 2.00 8.53 0.15 2.89 7.39
1.00 3.00 0.15 2.89 1.30
2.00 6.09 0.15 2.89 5.28
Rear Above Drain 1.00 3.00 0.15 2.89 1.30
4" thick 1.00 3.00 0.10 2.89 0.86
1.00 1.50 0.10 2.80 0.42
for peti 1.00 11.00 0.10 0.20 0.22
for kitchen 1.00 9.00 0.15 1.82 2.45
sum 19.22
Deduction for doors and windows
door(D) 5.00 0.91 0.15 2.13 1.45
door(D1) 2.00 0.83 0.10 1.82 0.30
window(w) 5.00 1.21 0.15 1.21 1.09
total 2.84
Total Deduction 16.38 Cu.m 7582.15 124195.61

6
S/F sal woodfor door & window frame
door(D) 5.00 5.16 0.08 0.10 0.20
door(D1) 2.00 4.40 0.08 0.10 0.07
window 5.00 7.26 0.08 0.10 0.29
0.56 Cum 242062.57 135555.03
7 s/f Flush door shutter

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
door(D) 5.00 0.78 2.00 7.80
door(D1) 2.00 2.00 0.63 2.52
10.32 Cum 7635.12 78794.43
s/f Glazed window shutters with 4mm
8 5.00 1.00 5.45
th. Glass 1.09 sqm 9093.03 49557.01
9 s/f grill for window 5.00 1.00 1.00 5.00
67.25 kg 152.55 10258.98 (1.25x10.76)kg/m2
10 Roofing Works N
a. black pipe
2" dia black pipe
front part 10.00 4.10 41.00
rear part 6.00 4.50 27.00
for kitchen 6.00 3.50 21.00
89.00 r/m 2.25/m
total 200.25 kgs 163.85 32810.96

S/f 26 BWG Colour C.G.I Sheet including


b. J hook & Bitumen washer ,nutbolt etc. all
complete
Front Side 1 6.70 3.60 24.12
Rear 1 6.09 3.60 21.92
for kitchen 1 4.2 3.60 15.12
61.16 Sqm 1005.12 61473.13
11 Frooring Works
i Stone soiling works
front side room 2.00 3.00 3.00 0.10 1.80
back side room 1.00 5.70 3.00 0.10 1.71
3.51 Cum 3210.00 11267.10

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
38mm thick 1:2:4 cement concrete floor
ii carting including finishing by rubbing
cement (Excluding Toilet)
back side room 1.00 4.70 3.00 14.10
in front room 2.00 3.00 3.00 18.00
for kitchen 1.00 4.20 3.00 12.60
44.70 Sqm 609.99 27266.55
iii Tiles works

toilet floor 2.00 1.52 1.22 3.71

toilet long wall 4.00 1.22 1.20 5.86


toilet Short wall 4.00 1.37 1.20 6.58
Total 16.15
Deduction for door side 2.00 0.90 1.20 2.16
Total after deduction 13.99 Sq.m 2631.57 36815.66
Total
12.5 mm th. Cement plaster works in on
12
Wall 1:4 C/S motar
wall 2.00 9.25 2.89 53.46
1.00 3.35 2.89 9.68
2.00 6.09 2.89 35.20
Rear Above Drain 1.00 3.04 2.89 8.78
for kitchen 1.00 9.00 2.89 26.01
Sum 133.13
door(D) 5.00 0.91 2.13 9.69
door(D1) 2.00 0.83 1.82 3.02
deduction, window 4.00 1.21 1.21 5.85
Sum 18.56
Total Deduction 18.56

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
Total 114.57 sqm 364.43 41752.74
13 M.S Rod 1.00 10.00 kg 104.52 1045.20
14 Painting Works
Two Coat distemper painting over one coat
i
primer
wall 2.00 9.25 2.89 53.46
1.00 3.35 2.89 9.68
2.00 6.09 2.89 35.20
Rear Above Drain 1.00 3.04 2.89 8.78
for kitchen 1.00 9.00 2.89 26.01
Sum 133.13
Deduction
door(D) 4.00 0.91 2.13 7.75
door(D1) 2.00 0.83 1.82 3.02
window 4.00 1.21 1.21 5.85
Sum 16.62
Total Deduction 16.62
Total 116.51 sqm 107.77 12556.28

ii Two coat Readymade enamel paints over


one coat of wood primer for door & window
window 4.00 1.21 1.21 5.85
door(D) 8.00 0.90 2.13 15.33
door(D1) 4.00 0.75 1.80 5.40
26.58 Sqm 286.19 7606.93

15 Dress Stone Cladding Works


1 6.10 2.89 17.63
Deduction

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
window 3.00 1.21 1.21 4.39
door(D) 3.00 0.91 1.82 4.96
door(D) 1.00 0.83 1.82 1.51
total deduction 10.86
Total 6.77 Sqm 2206.80 14940.03
16 Sanitary Works
s/f 1000Ltr Poly Water Tank with all
i
complete set 1 1.00 pcs 18694.00 18694.00
S/f of 20" polorized orissa pan with 10lts
ii
plastic cystern with all complete set 1 1.00 set 9876.65 9876.65
S/f of 20"x16" hand wash basin with all
iii
complete set 2 2.00 set 7417.94 14835.88
iv s/f Commode all complete set 1 1.00 set 11582.95 11582.95
v s/f Commode spray 1 1.00 pcs 850.00 850.00
vi Angle Stop cock 1 1.00 pcs 5251.00 5251.00
vii s/f 4" PVC pipe 1 5.00 5.00 rm 541.34 2706.70
viii 4" PVC Tee 2.00 2.00 pcs 630.00 1260.00
ix 4" PVC Shocket 1.00 1.00 pcs 125.00 125.00
x s/f 1.5" PVC pipe 5.00 5.00 rm 220.00 1100.00
xi 20x16" looking mirror 1.00 1.00 set 938.25 938.25
xii 3" dis. Resolving shower 1.00 1.00 set 1053.20 1053.20
8'x6'
17 Septic Tank Construction Works
a E/W excavation in B.M.S. soil 1.00 2.44 1.83 2.44 10.90 Cum 504.70 5501.23
b Bolder soling and levelling works 1.00 2.44 1.83 0.10 0.45 Cum 3210.00 1444.50
c
L/w 2.00 2.44 0.23 2.00 2.24
S/w 2.00 1.37 0.23 2.00 1.26
3.50 Cum 9909.23 34682.31

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
PCC for RCC including material collection
d (1:2:4) 1.00 2.44 1.83 0.10 0.44 Cum 12256.46 5392.84
e Form work with local wood 1.00 2.44 1.83 4.46 Sqm 640.40 2856.18
f Ms Works
Main bar 10mm dia.Re bar @100mm c/c 24.00 1.83 0.61 26.79
Dis bar 10mm dia.Re bar @100mm c/c 18.00 2.44 0.61 26.79
53.58 Kg 104.52 5600.18
18 Soak pit Construction Works
a E/W excavation in B.M.S. soil 1.00 1.83 1.22 1.83 4.08 Cum 504.70 2059.17
b Bolder soling and levelling works 1.00 1.83 1.22 0.10 0.22 Cum 3210.00 706.20
PCC for RCC including material collection
c (1:2:4) 1.00 5.60 0.30 0.08 0.13 Cum 12256.46 1593.33
d Form work with local wood 1.00 1.83 1.22 2.23 Sqm 640.40 1428.09
e 1.00 6.10 0.10 1.22 0.74 Cum 15088.33 11165.36
f steel Work
Main bar 10mm dia.Re bar @100mm c/c 18.00 1.22 0.61 13.39
Dis bar 10mm dia.Re bar @100mm c/c 12.00 1.83 0.61 13.39
26.78 Kg 104.52 2799.04
Compound wall construction Works(For
19
Children Park)
i E/W excavation on BMS 1.00 24.00 0.40 0.30 2.88 Cum 504.70 1453.53
ii Bouler Soling & Leveling work 1.00 24.00 0.40 0.10 0.96 Cum 3210.00 3081.60
iii Rubble stone masonary 1:6 c/s (side) 1.00 16.00 0.40 1.10 7.04
Kitchen side wall 1.00 8.00 0.40 0.60 1.92
front column 5.00 0.30 0.40 0.60 0.36
9.32 Cum 9909.23 92354.02
12.5 mm th. Cement plaster works in on
v 1.00 24.00 1.10 26.40 sqm 364.43 9620.95
Wall 1:4 C/S motar
Compound wall construction Works(For
20
trafic Building)

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
i E/W excavation on BMS 1.00 10.00 0.30 0.30 0.90 Cum 504.70 454.23
ii Bouler Soling & Leveling work 1.00 10.00 0.30 0.10 0.30 Cum 3210.00 963.00

iii 6" th. Cement conctre Block wall work 1.00 10.00 0.15 1.00 1.50 Cum 9909.23 14863.84
with 1:4 c/s ratio with all complete work
10 gauge Fencing Jali 75x75 With angle
iv 1.00 10.00 0.65 6.50 sqm 400.00 2600.00
Frame
21 S/F gyp. Board ceailing works 2.00 3.00 3.00 18.00 Sqm 1276.67 22980.06
Flooring works
i Bouler Soling & Leveling work 1.00 6.00 8.50 0.10 5.10 Cum 3210.00 16371.00
ii P.C.C. (1:3:6 ) work 1.00 6.00 0.10 0.60 Cum 10510.45 6306.27
total civil works 1047998.52
Electrification works on building and
22
supply from service line to building
1 7x22 wire 2.00 2.00 2300.00 4600.00
2 3x22 4.00 4.00 1040.00 4160.00
3 20mm listi 30.00 30.00 30.00 900.00
4 swich socket 25.00 25.00 30.00 750.00
5 lead bulb 12.00 12.00 170.00 2040.00
6 M.C.B 6.00 6.00 500.00 3000.00
7 Submeter 1.00 1.00 1200.00 1200.00
16650.00
Watersupply works from main line to
23 18814.50
building
iii 1/2" dia. G.I Pipe 15.00 r/m 545.46 8181.90
iv G.I Shocket 8.00 Nos 59.89 479.12
vi 3" long nipple 4.00 Nos 30.51 122.04
vii 1/2"G.m Gate valve 1.00 set 1038.86 1038.86
ix 1/2" union socket 2.00 Nos 198.88 397.76
10219.68

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
POKHARA METROPOLITAN CITY
Officec of the Municipal Executive
Newroad , Pokhara
Province No.4, Nepal
MEASUREMENT BOOK
Name of project :- Building Construction Works F/Y :- 075/76
Site :- PLMC - 05 (inside children park) Date:- 2075-07-26
S.N Description No. Length Breadth Height Quantity Unit Rate Amount Remarks
Total 1,077,032.70
3% Contengencies charge 38,643.98
Total 1,115,676.68

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
`

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
.76)kg/m2

Prepared By: Checked By: Recommended By: Approved By:


Jr.Er.Dipa Chapagain Er. Shyam Jee Bastola Sr.Er.Sharada Mohan Kafle.
Project :- Building Construction Work

POKHARA LEKHANTHA METROPOLITAN CITY OFFICE


MEASUREMENT BOOK
Issued To:
Site Incharge: Dipa Chapagain

Site Name: Ward Office ,PLMC - 05


Building Construction Work

Issuing Officer :

Date of first entry:


Date of last entry: 075-07-26

Certified that this books contains 2 Page of pre - numbered measurement sheets.

Engineer Executive officer


INDEX OF MEASUREMENTS ENTERED

Pages Measured By Checked By Remarks


Name of work Done By
From To Name signature & date Name Signature & date

Er.
Jr.Er.Dipa
1 2 Building Construction Works User's Commettee Shyam Jee
Chapagain
Bastola
पोखरा लेखनाथ
25
महानगरपालिका
नगरपालिकाको कायार्लय
न्यूरोड, कास्की
४ नं प्रदेश, नेपाल
–Renovation of shed & Const. of Compound wall sfo{ k'/f ug]{ ldlt – sfo{
2063/;DkGg
/ k|ltj]bg v'b nfu]sf] vr{ :- 98349.82
sfof{:yfg M–Parsyang Children Park ,PLMC - 05 Estimate eGbf a9L jf 36L M–
sfo{ ;"? ldlt M– 2075-06-16 Estimated Amount :- 1326776.7 36L jf a9Lsf] k|ltzt –
v'b nfu]sf] vr{ 1115676.7 sfo{ ;DkGg ug]{ dfWod M– User's Commette
l;=g+= ljj/0f O{li6d]6 cg';f/ v'b nfu]sf] vr{ km/s kg{ cfPsf]
परिमाण दर रकम परिमाण दर रकम परिमाण प्रतिशत रकम
A Building Construction Works
E/W Exacavation in soft soil
1 6.83 504.7 3447.10 6.83 504.7 3447.10
including 10m lead & 1.5m
2 Boulder Soling and levelling 1.95 3210 6259.50 1.95 3210 6259.50
3 P.C.C. (1:2:4 ) work in lintel / sill 0.36 12256.46 4412.32 0.36 12256.46 4412.32
4 R/R stone Masonary Wall 1:4 c/s 7.23 10862.93 78538.98 6.76 10862.93 73433.40 0.47 5105.5771
6"and 4" th. Cement conctre Block
6 wall work in 1:4 c/s ratio with all
complete work 18.62 7582.15 141179.63 16.38 7582.15 124195.61 2.24 16984.016
S/F sal woodfor door & window
7
frame 0.56 242062.57 135555.03 0.56 242062.57 135555.03
8 s/f Flush door shutter 10.32 7635.12 78794.43 10.32 7635.12 78794.43
s/f Glazed window shutters with
9 5.45 9093.03 49557.01 5.45 9093.03 49557.01
4mm th. Glass
10 s/f grill for window 67.25 152.55 10258.98 67.25 152.55 10258.98
11 Roofing Works (Black Pipe) 201.37 163.85 32994.47 200.25 163.85 32810.96 1.12 183.512
S/f 26 BWG Colour C.G.I Sheet
including J hook & Bitumen
washer ,nutbolt etc. all complete 61.16 1005.12 61473.13 61.16 1005.12 61473.13
12 Frooring Works
i Stone soiling works 3.51 3210.00 11267.10 3.51 3210.00 11267.10
38mm thick 1:2:4 cement concrete
ii floor carting including finishing by
rubbing cement (Excluding Toilet) 44.7 609.99 27266.55 44.70 609.99 27266.55
iii Tiles works 13.99 2631.57 36815.66 13.99 2631.57 36815.66
12.5 mm th. Cement plaster works
13
in on Wall 1:4 C/S motar 129.02 364.43 47018.75 114.57 364.43 41752.74 14.45 5266.0135
पोखरा लेखनाथ
26
महानगरपालिका
नगरपालिकाको कायार्लय
न्यूरोड, कास्की
४ नं प्रदेश, नेपाल
sfo{ ;DkGg k|ltj]bg
14 M.S Rod 10 104.52 1045.20 10.00 104.52 1045.20
15 Painting Works
Two Coat distemper painting over
i
one coat primer 130.96 107.77 14113.55 116.51 107.77 12556.28 14.45 1557.2765
Two coat Readymade enamel paints
ii over one coat of wood primer for door
& window 26.58 286.19 7606.93 26.58 286.19 7606.93
16 Dress Stone Cladding Works 6.77 2206.80 14940.03 6.77 2206.80 14940.03
17
s/f Sanitary Works
S/f 1000Ltr Poly Water
of 20" polorized Tank
orissa pan with
withall
i complete setcystern with all complete
10lts plastic
1.00 18694.00 18694.00 1.00 18694.00 18694.00
ii set
S/f of 20"x16" hand wash basin with 1.00 9876.65 9876.65 1.00 9876.65 9876.65
iii all complete set 2.00 7417.94 14835.88 2.00 7417.94 14835.88
iv s/f Commode all complete set 1.00 11582.95 11582.95 1.00 11582.95 11582.95
v s/f Commode spray 1.00 850.00 850.00 1.00 850.00 850.00
vi Angle Stop cock 3.00 5251.00 15753.00 1.00 5251.00 5251.00
vii s/f 4" PVC pipe 5.00 541.34 2706.70 5.00 541.34 2706.70
viii 4" PVC Tee 2.00 630.00 1260.00 2.00 630.00 1260.00
ix 4" PVC Shocket 1.00 125.00 125.00 1.00 125.00 125.00
x s/f 1.5" PVC pipe 6.00 220.00 1320.00 5.00 220.00 1100.00
xi 20x16" looking mirror 1.00 938.25 938.25 1.00 938.25 938.25
xii 3" dis. Resolving shower 1.00 1053.20 1053.20 1.00 1053.20 1053.20
17 Septic Tank Construction Works
a E/W excavation in B.M.S. soil 10.90 504.70 5501.23 10.90 504.70 5501.23
b Bolder soling and levelling works 0.45 3210.00 1444.50 0.45 3210.00 1444.50
c Stone masonary works in 1:6 c/s mortar 3.50 9909.23 34682.30 3.50 9909.23 34682.30
PCC for RCC including material
d collection (1:2:4) 0.44 12256.46 5392.84 0.44 12256.46 5392.84
e Form work with local wood 4.46 640.40 2856.18 4.46 640.40 2856.18
Ms Works 53.58 104.52 5600.18 53.58 104.52 5600.18
18 Soak pit Construction Works
पोखरा लेखनाथ
27
महानगरपालिका
नगरपालिकाको कायार्लय
न्यूरोड, कास्की
४ नं प्रदेश, नेपाल
sfo{ ;DkGg k|ltj]bg
a E/W excavation in B.M.S. soil 4.08 504.70 2059.17 4.08 504.70 2059.17
b Bolder soling and levelling works 0.22 3210.00 706.20 0.22 3210.00 706.20
PCC for RCC including material
c collection (1:2:4) 0.13 12256.46 1593.33 0.13 12256.46 1593.33
d Form work with local wood 2.23 640.40 1428.09 2.23 640.40 1428.09
Brick masonary works in 1:6 c/s
e mortar 0.74 15088.33 11165.36 0.74 15088.33 11165.36
f Ms work Work 26.78 104.52 2799.04 26.78 104.52 2799.04
Compound wall construction
19
Works(For Children Park)
i E/W excavation on BMS 2.88 504.70 1453.53 2.88 504.70 1453.53
ii Bouler Soling & Leveling work 0.96 3210.00 3081.60 0.96 3210.00 3081.60
iii Rubble stone masonary 1:6 c/s (side) 12.08 9909.23 119703.49 9.32 9909.23 92354.02 2.76 27349.475
10 gauge Fencing Jali 75x75 With
iv 400.00 400.00
angle Frame 60.80 24320.00 - 60.80 24320
12.5 mm th. Cement plaster works in
v on Wall 1:4 C/S motar 39.04 364.43 14227.34 26.40 364.43 9620.95 12.64 4606.3952
Compound wall construction
20
Works(For trafic Building) 0.00 0.00
i E/W excavation on BMS 0.9 504.70 454.23 0.90 504.70 454.23
ii Bouler Soling & Leveling work 0.3 3210.00 963.00 0.30 3210.00 963.00
6" th. Cement conctre Block wall
iii work with 1:4 c/s ratio with all 9909.23 9909.23
complete work 1.83 18133.89 1.50 14863.84 0.33 3270.0459
10 gauge Fencing Jali 75x75 With
iv
angle Frame 19 400.00 7600.00 6.50 400.00 2600.00 12.50 5000
21 S/F gyp. Board ceailing works 18 1276.67 22980.06 18.00 1276.67 22980.06
Flooring works
i Bouler Soling & Leveling work 5.1 3210.00 16371.00 5.10 3210.00 16371.00
ii P.C.C. (1:3:6 ) work 5.1 10510.45 53603.29 0.60 10510.45 6306.27 4.50 47297.025
पोखरा लेखनाथ
28
महानगरपालिका
नगरपालिकाको कायार्लय
न्यूरोड, कास्की
४ नं प्रदेश, नेपाल
sfo{ ;DkGg k|ltj]bg
1199981.19 1047998.51
Electrification works on building
22 and supply from service line to 3% of civil works 35999.44
building
1 7x22 wire 2.00 2300.00 4600.00
2 3x22 4.00 1040.00 4160.00
3 20mm listi 30.00 30.00 900.00
4 swich socket 25.00 30.00 750.00
5 lead bulb 12.00 170.00 2040.00
6 M.C.B 6.00 500.00 3000.00
7 Submeter 1.00 1200.00 1200.00
18814.50
Watersupply works from main line
23
to building
i Road cutting deposite 20500.00 -
E/w in excavation for pipe laying in
ii
pitch cutting 4.05 576.80 2336.04 -
iii 1/2" dia. G.I Pipe 40 545.46 21818.40 15 545.46 8181.90 25.00 13636.5
iv G.I Shocket 8 59.89 479.12 8 59.89 479.12
v water meter 1 2200.00 2200.00 -
vi 3" long nipple 6 30.51 183.06 4 30.51 122.04 2.00 61.02
vii 1/2"G.m Gate valve 1 1038.86 1038.86 1 1038.86 1038.86
ix 1/2" union socket 3 198.88 596.64 2 198.88 397.76 1.00 198.88
24 site clearance works L.S. 3000.00 3000.00
10219.68
Total 1288132.75 1,077,032.70 211100.05
Contengencies @ 3 % 38,643.98 38,643.98
Grand Total 1326776.73 1,115,676.68 211100.05
पोखरा लेखनाथ
29
महानगरपालिका
नगरपालिकाको कायार्लय
न्यूरोड, कास्की
४ नं प्रदेश, नेपाल
sfo{ ;DkGg k|ltj]bg

;fO6 O{Grfh{sf] ;xLM O{lGhlgo/ M ब O{lGhlgo/ M sfo{sf/L clws[tM


जु ई दिपा चापागाई श्याम जी बासतोला शारदा मोहन काफ्ले
30

less

dfWod M– User's Commettee


s}lkmot
31
32
33
Compatibility Report for Bastola Samaj Ghar.xls
Run on 1/28/2018 11:19

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 24
by the selected file format. These formats will be converted to the closest
format available.
Compatibility Report for building work in children park.xls
Run on 9/25/2018 20:39

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 14
by the selected file format. These formats will be converted to the closest
format available.
Compatibility Report for building work in children park.xls
Run on 9/25/2018 20:43

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 14
by the selected file format. These formats will be converted to the closest
format available.

You might also like