0% found this document useful (0 votes)
77 views2 pages

Tesda PDF

Uploaded by

Arnold Jimeno
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
77 views2 pages

Tesda PDF

Uploaded by

Arnold Jimeno
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
email add: jsindobuitderops@emaiicom Contact Nos. 09376295699/ 09173151057 PROJECT _ INSTALLATION OF AUTOMATIC FIRE SPRINKLER SYSTEM LOCATION. GRANLAND BUILDING R.CASTILLO STREET DAVAO CITY Renovation of 3 Storey Bldg, with Mezzanine January 25,2023 -TESDA, MATERIAL COSTS TABOR COSTS AMOUNT cee Seren Gry | uN |~gnircost_[_AMOUNTIC] UNIT Costs | AMOUNT PROFESSIONAL FEE (PME Signed & Sealed) Plan Design SUBTOTAL z Ei Pipe seh. 40 ASTM A-53 (SUPERIOR) 0ommdx 6m (4°) 7_| engi [730000 | apaatooeo | 2.190000 | 3723000 | 76135000) [rem 6m (3°), '3 [engin | 6,600.00 | aso0.00| 1,580.00 | — 5,590.00] 25,740.00. [Sommdx 6m (2°) | tengen | 4,800.00 |—-a4g0000,| 1,440.00 | 7,200.00 | 31,200.00 [ssmmdx 6m (1 35_[ feng | 2,800.00 | s8.000.00] ‘240.00 | 79,400.00 | 127,400.00 [Sammdx 6m (14/4" 36 [feng | 1,000.00 | 009.00 570.00] 9,120.00] 39,520.00, [2Smmgx 6m (1°) 34 [Hength | 1,600.00 | 34400000] 380.00 | 40 320.00 | 174,720.00 SoRTOTAL, 1359.90.00 |__[Foor Control Valves/Switches, [OS snd’ Gate Vawve Sommd () pa] 650000 =| TR = = [OS and'¥ Gate Valve 100mm@ (2°) 2 | pes. [32,000.00 | = jo00.00]| 3,500.00 | 7.30006 | 33,200.00; [sabe vane 6 | pes | 1500.00 so0000| 45000] 2.70000] —13.70000 Water Flow switch 2| pes [8900.00 | aygoo.00,| 2,670.00 | 5,340.00] —73.140.00 Supervisor Switch 2 pes. [6,200.00 | azaoo.00 | —i.360.00 | 3.72000] 36,120.00 Sprinkler Heads 2 | pes ‘650.00 | 477,480.00 195.00 | 53,235.00 | 230,685.00 Fre Hose Cabinet [200R7wth accessories] “4 [set] 5,000.00 |-__e0,90000] — 4500.00 | —18,000.00| — 72,000.00 Fre Bxinguisher Tank 201s /ABCOr) 3 | pcs | 2500.00 | 750000] 750.00] 2.25000] 9,750.00 E ‘SUB-TOTAL "400,595.00 [Suttweid 6 Fitings [st Weldabe lbows, Elbows Reducer, Tees, | er [aa a32:00 | aaasa0 | 25398 60 | 2532960 | i08 76L [Coupling Reducers, sip on anges, ‘SUB-TOTAL 3 zi =| aaa 1 [Screwed 61 Fittings = : al Threadabe elbows Tees Ranta, Teo reducer, |r| 165 605.00 | —_aes,605.00| woe so | ao_oans0 | 77 686 bIUnion, End Cap, 6 Couping Reducers, Clamp = 2 : SoSTOTAL z = =| as, 'V_—|Mangers, uppons and other Consumables a | t_|- 210880.00 | ai080.00] 63,264.00] 6326800] 274,144.00 [angle ar, tba, Fat bar, GI Full Traded : : ei Expansion Shel, Primer red oude, it red pan z = [Teflon tape, Welding rod 6013/6013 Grinding tone, = = = [xygen/Accetvlene, Bolts Nuts & Washer, Grinding Dis = = = Guting Oise, Cut-off Ose Achor Gps ‘SUB-TOTAL, = = To ars Vi__[Pump Electric Motor 1 [et 5 = Fire Pump SOHP = z Non-UL Fire Pump (NFPA30 Company Streamplus Cast ron Bronze Fitted Frame Mounted Pump Motor Rating SON? Pie Tapping Se (Sucion x Dacharge) 72 17 Motor Volage 230 ots [Rated Speed: 450K, Phase/M: The (3) / 60 [Rated to deliver 4O0GPWagaina 2008. TOM Standard FRE PUMP CONTROWER Rated fr SOAP 220Voke 3Phase GOR: [Complete with creuitbreaker,thermal overload rel HOA selector switch, dieting pot ight, sar/stop [push Button industrial pressure switch wired in NEMA [watertight encosur, [SAP OCKEY PUM BAUER” CVF Series Saris Steel Vercal Mult Stage Pumps [Motor Rating: HP. [Pine Tapping Size Suction x Ducharme VER TE [Motor Voage: 230VoKs [Rated Speed: 34508°M fee ee iC Standard" JOCKEY PUMP CONTROLER Rated for SHP 230vols 1Phase SOME [Complete with eeu breaker thermal overload ray, [HOA selector switch indicating plot gts, stars ush butt timer and industrial pressure switch wie in NEMA 4 wateright enclosure [FRE PUMP Elecrcals and Consummables INDIRECT COSTS ve on Tranaporstation ‘Misellaneous/Permits/ Working area set up/Profit ‘ncloing Instalation Clerance TEE Government Tax ‘Submitted by: per. JONESR LINDO ‘conronmen: inch "“TERMS AND CONDITIONS: 50% DOWNPAYMENT/ 50% PROGRESS BILLING Please make check payment 92yabe to "IDLINDO BUILDER OPC" POWER AND WATER SUPPLY WILL BE PROVIDED BY THE OWNER |ANY CHANGES OF CONSTRUCTION APPROVED PLAN ARE ADOYTIONAL COST IN OUR OFFER CISTERN TANK FOR THE FIRE SPRINKLER SYSTEM WATER SUPPLY IS NOT INCLUDED IN THIS PROPOSAL \Wirking Hours 's Mondays to Saturdays 8:00 am to 5:00 pm "WARRANTY* This projects warranted for One (1) year tobe free from defects on workmanships from dat of completion & Turnover This warranty does na cover: Damages caused by forced majeute and other acts of God that i beyond human coatrl Damages cused by improper use carelessness, unjustifiable repair and modification EXCLUSIONS: ‘TESTING AND COMMISSIONING POWER SUPPLY LINE CIRCUIT BREAKERS AND FACILITIES TO FIRE PUMPS. LEAKTESTING FIRE TANK CONSTRUCTION AND PUMP ROOM WORKS. ORY RUN OF EQUIPMENT COSTERN TANK TURNOVER INCLUSIONS: FP instalation Clearance Assistance for BFP FSIC Approval

You might also like