GACA Construction Notice Guide

This document provides instructions for submitting supplemental notices for construction or alteration projects as required by GACA Regulation Part 77. It outlines when supplemental notice is required, including for projects over 200 feet tall, if requested by GACA, or if the structure reaches its greatest height. It specifies the information and certifications that must be provided to GACA, such as obstacle attributes, construction details, and signatures of the owner and representative. The regulations provide timelines for submitting supplemental notice during different stages of construction projects.

Uploaded by

zaid darwish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
250 views4 pages

GACA Construction Notice Guide

This document provides instructions for submitting supplemental notices for construction or alteration projects as required by GACA Regulation Part 77. It outlines when supplemental notice is required, including for projects over 200 feet tall, if requested by GACA, or if the structure reaches its greatest height. It specifies the information and certifications that must be provided to GACA, such as obstacle attributes, construction details, and signatures of the owner and representative. The regulations provide timelines for submitting supplemental notice during different stages of construction projects.

Uploaded by

zaid darwish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SUPPLEMENTAL NOTICE

NOTICE OF ACTUAL CONSTRUCTION OR ALTERATION


Submission Instructions:
 For advance notice of actual construction or alteration, complete items 1, 2A (1), 2A(2) and 4. If applicable, provide previous
 For structure reached its greatest height, complete items 1, 2A (3), 3 and 4 then submit to GACA approval:
GACA within 5 days after the structure reaches its greatest height. Memo No.: ………………….….…..
 For existing object, including a mobile object, is, and a future object would be, an obstruction Dated: ……….………………………
to air navigation as prescribed in GACAR Part 77 § 77.25 Standards for Determining Hazards
and if aeronautical study is required, complete items 1, 2C, 3 and 4. .
 For enquiries, call Tel: 0115253549 or 0115253343
1- Construction’s type: New construction Alteration Existing
Nearest City: ……….…………………………………………. Nearest Airport or Heliport:….……………………………………………
2- Construction Notifications (* Notice Is Critical to Flight Safety --- GACAR Part 77 Required)
A. Notification B. Construction/Project C. Aeronautical study requirement’s
* (1) Construction will start (1) Project Abandoned Information required by Aeronautical study
(Submit at least 48 hrs. in advance) requested by GACA reference:
(2) Estimated Completion on: (2) Construction Dismantled Memo No.: …………………….…..……
(Add date) ……….…………… Dated: ………..……………………………..
* (3) Structure reached greatest height
(Submit within 5 days).
3- Obstacle attributes provision requirements.
Horizontal accuracy …………………..……(5 m max) Vertical accuracy ………………………… (3m max)
Horizontal confidence level Vertical confidence level
Horizontal position Vertical resolution
Horizontal resolution Vertical reference system
Horizontal extent Obstacle type
Horizontal reference system Geometry type point line polygon
Elevation .……….… (m) …………… (ft) Integrity
Height ……..…… (m) .……...…… (ft) Material
4- Preparer’s Certification
A. Owner of the Structure B. Construction Representative
Name:.………….………..………….……………………………... Name:.………….………..………….……………………………...

Address: .………………………..……………..………………….. Address: .………………………..……………..…………………..

….………….…………………………………………………..….. ….………….…………………………………………………..…..

Tel. No.: ….…………………… Fax No.: ….…………………… Tel. No.: ….…………………… Fax No.: ….……………………

Email: ….………….……………………………..…………..……. Email: ….………….……………………………..…………..…….


I hereby certify that the information provided is true, complete, correct and according to GACA Requirements to the best of my knowledge.
Title: Date: Stamp
Signature of the Structure
Owner:

I hereby certify that the information provided is true, complete, correct and according to GACA Requirements to the best of my knowledge.
Title: Date: Stamp
Signature of the construction
Representative:

GACA address: P.O. Box 47360 Riyadh 11552 Email: aisd@gaca.gov.sa Website: www.gaca.gov.sa Tel: 0115253549 or 0115253343
‫‪GACA Regulation Part 77‬‬ ‫اﻟﻼﺋﺣﺔ اﻟﺗﻧﻔﯾذﯾﺔ ﻟﻠﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران اﻟﻣدﻧﻲ رﻗم ‪۷۷‬‬

‫‪§ 77.17 Supplemental Notice Requirements.‬‬ ‫§‪ ۷۷٫۱۷‬ﻣﺗطﻠﺑﺎت اﻻﺑﻼغ اﻻﻟﺣﺎﻗﻲ‬


‫‪(a) A person must file supplemental notice‬‬ ‫أ( ﯾﺟب ﻋﻠﻰ ﻣﻘدم اﻟطﻠب ﺗﻌﺑﺋﺔ ﻧﻣوذج اﻻﺑﻼغ‬
‫—‪with the President when‬‬ ‫اﻻﻟﺣﺎﻗﻲ ﻓﻲ اﻟﺣﺎﻻت اﻟﺗﺎﻟﯾﺔ‪:‬‬
‫‪(1) The construction or alteration is more‬‬ ‫‪ -۱‬اي ﺑﻧﺎء او اي ﺗﻐﯾر ﻓﻲ ارﺗﻔﺎع أﻛﺛر ﻣن ‪۲۰۰‬‬
‫‪than 200 ft (60 m) in height AGL at‬‬ ‫ﻗدم )‪٦۰‬م( ﻣن ﺳطﺢ اﻻرض‪.‬‬
‫‪ -۲‬طﻠب ﻣن رﺋﯾس اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران اﻟﻣدﻧﻲ‪.‬‬
‫‪its site; or‬‬ ‫وﯾﻣﻛن ﯾﻛون اﻟطﻠب ﺑﻌﻣل دراﺳﺔ ﻣﻼﺣﯾﺔ‪.‬‬
‫‪(2) Requested by the President.‬‬ ‫)إذا ﻛﺎن اﻟﺑﻧﺎء ﻗﺎﺋم ﯾﺟب ﻋﻠﻰ ﻣﻘدم اﻟطﻠب‬
‫‪(b) A person must file supplemental notice on‬‬ ‫ﺗﻌﺑﺋﺔ ﻧﻣوذج اﻻﺑﻼغ اﻻﻟﺣﺎﻗﻲ وﯾﺗم ﺗﻘدﯾﻣﮫ‬
‫‪a prescribed GACA form to be received‬‬ ‫ﻟﻠﮭﯾﺋﺔ ﻣﻊ اﻟدراﺳﺔ اﻟﻣﻼﺣﯾﺔ(‪.‬‬
‫‪within the time limits specified in the‬‬
‫‪GACA determination. If no time limit has‬‬ ‫ب( ﯾﺟب ﻋﻠﻰ ﻣﻘدم اﻟطﻠب ﺗﻌﺑﺋﺔ ﻧﻣوذج اﻻﺑﻼغ‬
‫‪been specified, the person must submit‬‬ ‫اﻻﻟﺣﺎﻗﻲ ﻓﻲ ﺣﺎﻟﺔ ﺗﺣدﯾد وﻗت ﻣن ﻗﺑل اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ‬
‫‪supplemental notice of construction to the‬‬ ‫ﻟﻠطﯾران اﻟﻣدﻧﻲ ﻋﻧد اﻟوﺻول اﻟﻰ اﻋﻠﻰ ارﺗﻔﺎع‬
‫وإذا ﻟم ﯾﺗم ﺗﺣدﯾد اﻟوﻗت ﻣن ﻗﺑل اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ‬
‫‪President within 5 days after the structure‬‬ ‫ﻟﻠطﯾران اﻟﻣدﻧﻲ ﯾﺗم ﺗﻘدﯾﻣﮫ ﻓﻲ ﺧﻼل ﺧﻣﺳﺔ )‪(٥‬‬
‫‪reaches its greatest height.‬‬ ‫اﯾﺎم ﻣن وﺻول اﻟﺑﻧﺎء اﻟﻰ اﻋﻠﻰ ارﺗﻔﺎع‪.‬‬
‫‪(c) If a person abandons a construction or‬‬ ‫ﯾﺟب ﻋﻠﻰ ﻣﻘدم اﻟطﻠب واﻟﺣﺎﺻل ﻋﻠﻰ اﻟﻣواﻓﻘﺔ ﻣن‬
‫‪alteration‬‬ ‫‪proposal‬‬ ‫‪that‬‬ ‫‪requires‬‬ ‫اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران اﻟﻣدﻧﻲ ﺗﻌﺑﺋﺔ ﻧﻣوذج اﻻﺑﻼغ‬
‫‪supplemental notice, it must submit‬‬ ‫اﻻﻟﺣﺎﻗﻲ وإرﺳﺎﻟﮫ إﻟﻰ اﻟﮭﯾﺋﺔ ﻗﺑل اﻟﺑدء ﺑﺎﻟﺑﻧﺎء ﺑـ‬
‫‪notice to the President within 5 days after‬‬ ‫)‪ (٤۸‬ﺳﺎﻋﺔ‪.‬‬
‫‪the project is abandoned.‬‬
‫‪(d) If the construction or alteration is‬‬ ‫ت( ﯾﺟب ﺗﻌﺑﺋﺔ ﻧﻣوذج اﻻﺑﻼغ اﻻﻟﺣﺎﻗﻲ ﻓﻲ ﺣﺎﻟﺔ اﻟﻐﺎء‬
‫‪dismantled or destroyed, the person must‬‬
‫اﻟﺑﻧﺎء او اﻟﺗﻐﯾر وﯾﺗم ﺗﻘدﯾﻣﮫ إﻟﻰ اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ‬
‫ﻟﻠطﯾران اﻟﻣدﻧﻲ ﻓﻲ ﺧﻼل ﺧﻣﺳﺔ )‪ (٥‬اﯾﺎم ﻣن ﺑﻌد‬
‫‪submit notice to the President within 5‬‬ ‫اﻹﻟﻐﺎء او اﻟﺗﻐﯾر‪.‬‬
‫‪days after the construction or alteration is‬‬
‫‪dismantled or destroyed.‬‬ ‫ث( ﯾﺟب ﺗﻌﺑﺋﺔ ﻧﻣوذج اﻻﺑﻼغ اﻻﻟﺣﺎﻗﻲ ﻓﻲ ﺣﺎﻟﺔ ھدم‬
‫او ﺗﻔﻛﯾك او ﺗﻐﯾر اﻟﺑﻧﺎء وﯾﺗم ﺗﻘدﯾﻣﮫ إﻟﻰ اﻟﮭﯾﺋﺔ‬
‫اﻟﻌﺎﻣﺔ ﻟﻠطﯾران اﻟﻣدﻧﻲ ﻓﻲ ﺧﻼل ﺧﻣﺳﺔ )‪ (٥‬اﯾﺎم‬
‫ﻣن اﻟﮭدم او اﻟﺗﻔﻛﯾك او اﻟﺗﻐﯾر‪.‬‬

‫‪§ 77.49 Effective Period of Determinations.‬‬ ‫§‪ ۷۷٫٤۹‬اﻟﻔﺗرة اﻟزﻣﻧﯾﺔ اﻟﺧﺎﺻﺔ ﺑﺎﻟﻣواﻓﻘﺔ‬
‫‪(a) The effective date of a determination for‬‬ ‫أ( ﺗﻛون اﻟﻣواﻓﻘﺔ ﻋﻠﻰ اﻻرﺗﻔﺎع اﻟﻣﺳﻣوح ﺑﮫ ﻟﺑﻧﺎء‬
‫‪a proposed or existing structure is 40 days‬‬ ‫ﻣﻘﺗرح او ﻣﻘﺎم ﺣﺎﻟﯾﺎ ﺳﺎرﯾﺔ ﺑﻌد )‪ (٤۰‬ﯾوم ﻣن‬
‫‪from the date of issuance, provided a‬‬ ‫اﺳﺗﻼم اﻟﻣواﻓﻘﺔ ﻣﺎﻟم ﺗﺗﻠﻘﻰ اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران‬
‫‪valid petition for review has not been‬‬ ‫اﻟﻣدﻧﻲ اي ﺗﻌﺎرض ﯾوﺟب وﻗف اﻟﻣواﻓﻘﺔ ﻋﻠﻰ‬
‫اﻻرﺗﻔﺎع اﻟﻣﺳﻣوح ﺑﮫ واﻋﺎدة اﻟﻧظر ﻓﻲ ﺗﻠك‬
‫‪received by the President. If a valid‬‬ ‫اﻟﻣواﻓﻘﺔ‪.‬‬
‫‪petition for review is filed, the‬‬
‫‪determination will not become final,‬‬ ‫ب( ﻓﺗرة ﺻﻼﺣﯾﺔ اﻟﻣواﻓﻘﺔ ﻋﻠﻰ اﻻرﺗﻔﺎع اﻟﻣﺳﻣوح ﺑﮫ‬
‫‪pending disposition of the petition.‬‬ ‫ﻓوق ﺳطﺢ اﻻرض ﻟﻠﺑﻧﺎء اﻟﻣﻘﺗرح ھﻲ )‪ (۱۸‬ﺷﮭر‬
‫‪(b) Unless extended, revised, or terminated,‬‬ ‫ﻣن ﺗﺎرﯾﺦ اﺳﺗﻼم اﻟﻣواﻓﻘﺔ ﻣﺎﻟم ﯾﺗم ﺗﻣدﯾده او اﻧﮭﺎﺋﮫ‬
‫‪each Determination of No Hazard to Air‬‬ ‫ﻗﺑل ذﻟك وﯾﺗم اﻟﺗﻘدﯾم ﻋﻠﻰ اﻟﻣواﻓﻘﺔ ﻋﻠﻰ اﻻرﺗﻔﺎع‬
‫‪Navigation issued under this subpart‬‬ ‫ﻟﻠﺑﻧﺎء ﻣﻘﺗرح ﺑطﻠب ﺟدﯾد‪.‬‬
‫‪expires 18 months after the effective date‬‬ ‫ج( ﻓﻲ ﺣﺎﻟﺔ ﺗﺄﺛﯾر اﻟﺑﻧﺎء ﻋﻠﻰ اﻟﺣرﻛﺔ اﻟﺟوﯾﺔ ﻻ ﯾﺗم‬
‫‪of the determination, or on the date the‬‬ ‫ﺗﺣدﯾد ﺗﺎرﯾﺦ اﻧﺗﮭﺎء ﻓﻲ رد اﻟﮭﯾﺋﺔ وذﻟك ﻟﺗﺄﺛﯾر اﻟﺑﻧﺎء‬
‫‪proposed construction or alteration is‬‬ ‫ﻋﻠﻰ اﻟﺣرﻛﺔ اﻟﺟوﯾﺔ‪.‬‬
‫‪abandoned, whichever is earlier.‬‬
‫‪(c) A Determination of Hazard to Air‬‬
‫‪Navigation has no expiration date.‬‬
IMPORTANT :‫ھﺎم‬
1. The requested data must be determined by specialist .‫ﯾﺟب ﺗﻌﺑﺋﺔ اﻟﻧﻣوذج ﻣن ﻗﺑل ﺷﺧص ﻣﺧﺗص‬ .۱
engineer. .‫ﯾﺟب اﻟﺗﺄﻛد ﻣن أن اﻟﺑﯾﺎﻧﺎت ﻓﻲ اﻟﻧﻣوذج ﺻﺣﯾﺣﺔ‬
2. The proponent must send the original form after it ‫ﯾﺟب ارﺳﺎل اﻟﻧﻣوذج اﻻﺻل ﻣﻊ اﻟﺗﺄﻛﯾد ﻋﻠﻰ‬ .۲
has been signed and stamped. .‫اﻟﺧﺗم واﻟﺗوﻗﯾﻊ‬
3. For enquiries, call Tel: 0115253549 or 0115253343 :‫ﻟﻼﺳﺗﻔﺳﺎرات ﯾﻣﻛن اﻻﺗﺻﺎل ﻋﻠﻰ اﻻرﻗﺎم‬ .۳
4. The evaluation of obstacles and obstructions in the .(۰۱۱٥۲٥۳۳٤۳) ،(۰۱۱٥۲٥۳٥٤۹)
vicinity of airports is CRITICAL TO AIR ‫ﺗﻘﯾﯾم اﻟﻌواﺋﻖ ھﻲ ﻋﻣﻠﯾﺔ دﻗﯾﻘﺔ ﻟﻠﻣﺣﺎﻓظﺔ ﻋﻠﻰ‬ .٤
SAFETY. Refer to GACAR Part 77 and provide all ‫ ﻋﻠﯾﮫ ﯾﺟب اﻻﺳﺗﻧﺎد إﻟﻰ‬.‫ﺳﻼﻣﺔ اﻟﺣرﻛﺔ اﻟﺟوﯾﺔ‬
information that may assist in proper evaluation. ‫( وﺗﻘدﯾم ﻛل اﻟﻣﻌﻠوﻣﺎت‬۷۷) ‫اﻟﻼﺋﺣﺔ اﻟﺗﻧﻔﯾذﯾﺔ رﻗم‬
‫إﻟﻰ اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران اﻟﻣدﻧﻲ ﻟﻠﻣﺳﺎﻋدة ﻋﻠﻰ‬
.‫اﻟﺗﻘﯾﯾم‬

Address: :‫اﻟﻌﻧوان‬
General Authority of Civil Aviation ‫اﻟﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران اﻟﻣدﻧﻲ‬
Aviation Standards Sector ‫ﻗطﺎع ﻣﻌﺎﯾﯾر اﻟطﯾران‬
Directorate of Aviation Information Standards ‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻣﻌﺎﯾﯾر ﻣﻌﻠوﻣﺎت‬
Riyadh - Eastern Ring Road - Exit 6 - Al Nafl ‫ ﺣﻲ اﻟﻧﻔل‬-٦ ‫ ﻣﺧرج‬-‫اﻟرﯾﺎض –اﻟداﺋري اﻟﺷرﻗﻲ‬
District ۱۱٥٥۲ ‫ اﻟرﯾﺎض‬٤۷۳٦۰.‫ب‬.‫ص‬
P.O.Box 47360 Riyadh 11552 aisd@gaca.gov.sa ‫اﻟﺑرﯾد اﻻﻟﻛﺗروﻧﻲ‬
Email : aisd@gaca.gov.sa

This form does not constitute authority for .‫ﻻ ﯾﻌﺗﺑر ﺗﻌﺑﺋﺔ اﻟﻧﻣوذج ﻣواﻓﻘﺔ ﻋﻠﻰ ﺑﻧﺎء ﺟدﯾد او ﺑﻧﺎء ﻗﺎﺋم‬-
construction.
‫ﻻ ﯾﻌﺗﺑر ﺗﻌﺑﺋﺔ اﻟﻧﻣوذج وﺗﺳﻠﯾﻣﮫ ﻟﻠﮭﯾﺋﺔ اﻟﻌﺎﻣﺔ ﻟﻠطﯾران‬-
Filing this information with the GACA does ‫اﻟﻣدﻧﻲ إﻋﻔﺎء اﻟﻣﻘدم وﺻﺎﺣب اﻟﺑﻧﺎء ﻣن اﻻﻣﺗﺛﺎل إﻟﻰ اي‬
not relieve the sponsor of this construction or .‫ﻟواﺋﺢ ﺣﻛوﻣﯾﺔ اﺧرى‬
alteration from complying with any other
government rules or regulations.