A-Star Testing & Inspection (S) Pte LTD: Magnetic Particle Testing Report

1. A-Star Testing & Inspection conducted magnetic particle testing on welded joints of Type 1B Top Structure 1B-T-3 for Trelleborg Singapore Pte Ltd. 2. The testing was performed on 100% of the welded joints using the continuous wet method with yoke type magnetization. 3. No relevant indications were detected during the inspection, and the item tested was found to comply with acceptance criteria.

Uploaded by

Hari Karthick
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
306 views4 pages

A-Star Testing & Inspection (S) Pte LTD: Magnetic Particle Testing Report

1. A-Star Testing & Inspection conducted magnetic particle testing on welded joints of Type 1B Top Structure 1B-T-3 for Trelleborg Singapore Pte Ltd. 2. The testing was performed on 100% of the welded joints using the continuous wet method with yoke type magnetization. 3. No relevant indications were detected during the inspection, and the item tested was found to comply with acceptance criteria.

Uploaded by

Hari Karthick
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

A-Star Testing & Inspection (S) Pte Ltd

No 5, Soon Lee Street #03-37 | Pioneer Point


Singapore 627607 |Tel: +65 62616162 / +65 62616169
Email: enquiry@astartesting.com.sg | www.astargroup.com

MAGNETIC PARTICLE TESTING REPORT


Owner : NA Report No. : ATI/TRELLEBORG/BAROSSA FPSO/MT/S-064

Client : TRELLEBORG SINGAPORE PTE LTD Request No. : NA

Address : 4 JALAN PESAWAT,SINGAPORE,619362 Tested Date : 14-Mar-2023

WON No : NA PO Number : NA

Project : BAROSSA FPSO Specification : DNVGL-CG-0051 ( Ed: 2015 )

Site / Location : TRELLEBORG WORKSHOP Procedure No / Revision : ATI/QCP/MT/61; REV:06A

Description : TYPE 1B TOP STRUCTURE / 1B-T-3 Acceptance Criteria : Level 2X of ISO 23278 (Ed : 2015)

Surface Condition : AS WELDED & CLEANED Material Specification : CARBON STEEL

Stage of Examination : AFTER 48 HOUR'S OF WELDING Surface Temperature : Ambient

PURPOSE AND TECHNIQUE

Purpose of Examination : To Detect Surface & Near Surface Discontinuity

Evaluation of Indication : Discontinuity on the surface will be indicated by the retention of magnetic particles

Test Method : Continuous Wet Method (Visible)

Magnetization Technique : Yoke Type (Longitudinal Magnetization)

Lighting Equipment : Artificial Lighting Using Head lamp / Torch Light (If Applicable)

EQUIPMENT AND CALIBRATION


Equipment Model : MAGNAFLUX / Y-1 220 V A/C Testing Medium : NABAKEM (220221/6)

Equipment Sl. No. : 1036 Contrast Medium : NABAKEM (220503/1A)

Lifting Block Sl.No. : 202278 Application Method : SPRAYING

Lifting Capacity : 10 Lbs. (4.5 kgs) Pole Spacing : 3" to 6"

Lighting Illumination Level : 1750 LUX


Field Indicator : CASTROL STRIP
Light Meter Sr.No : C220778645

RESULT OF EXAMINATION
Scope of Examination : 100% Magnetic particle testing was carried out on welded joints

(Please refer to the attached data sheet and drawings for test details)

Interpretaion : No Relevant indication were detected at the time of Inspection

Item Tested comply with the above Code and Acceptance criteria

Result of Examination : Acceptable

MARUTHAI VEERAN PANDIYAN SACHIN SAJEEV


NDT INSPECTOR Approved Signatory Reviewed/Witnessed by: Reviewed/Witnessed by: Reviewed/Witnessed by:
PCN LEVEL 2 (PCN NO:328018) NDT LEVEL III Date: Date: Date:
Date: 15-Mar-2023 Date: 15-Mar-2023

This report shall not be reproduced except in full, without the written approval of A-Star Testing & Inspection (S) Pte Ltd

Form No : ATI-FORM-MT-02, Rev 00 Page No: 1 of 4

No 5, Soon Lee Street | Pioneer Point #03-37 | Singapore 627607 | Tel +65 62616162 | Email:Enquiry@astartesting.com.sg
MAGNETIC PARTICLE TESTING REPORT

CLIENT: TRELLEBORG SINGAPORE PTE LTD REPORT NO: ATI/TRELLEBORG/BAROSSA FPSO/MT/S-064

WELDING
S/NO MARK NO. Qty Joint No Size SCH / THK WELDER NO. TYPE OF WELD RESULT REMARKS
PROCESS

4477-TRB-N-XS-00002.001 REV-A (SHT 02


OF 17)/ STIFFENER A & B - TOP PLATE /
1 3 PLACES 1B-WJ-1 - 65mm TS-L11 FCAW - ACCEPTABLE
WPS NO: TS-WPS-11+14 / TAG NO: TP-3 &
STI-A-3 & STI-B-5, 6

4477-TRB-N-XS-00002.001 REV-A (SHT 02


OF 17)/ STIFFENER A - STIFFENER B / WPS
2 2 PLACES 1B-WJ-2 - 65mm TS-L11 FCAW - ACCEPTABLE
NO: TS-WPS-11+14 / TAG NO: STI-A-3 &
STI-B-5, 6

4477-TRB-N-XS-00002.001 REV-A (SHT 02


OF 17)/ STIFFENER A & B - SIDE PLATE /
3 4 PLACES 1B-WJ-3 - 65mm TS-L11 FCAW - ACCEPTABLE
WPS NO: TS-WPS-11+14 / TAG NO: STI-A-3
& STI-B-5, 6 & SP-9, 10, 11, 12

4477-TRB-N-XS-00002.001
REV-A (SHT 02 OF 17) /
4 SIDE PLATE & TOP PLATE / 4 PLACES 1B-WJ-4 - 65mm TS-L11 FCAW - ACCEPTABLE
WPS NO: TS-WPS-11+14 /
TAG NO: SP-9, 10, 11, 12 & TP-3

4477-TRB-N-XS-00002.001 REV-A (SHT 02


OF 17)/ STIFFENER A & B - BASE PLATE /
5 3 PLACES 1B-WJ-5 - 65mm TS-C02 FCAW - ACCEPTABLE
WPS NO: TS-WPS-11+14 / TAG NO: STI-A-3
& STI-B-5, 6 & BP-3

4477-TRB-N-XS-00002.001
REV-A (SHT 02 OF 17) /
6 BASE PLATE & SIDE PLATE / 4 PLACES 1B-WJ-6 - 65mm TS-C02 FCAW - ACCEPTABLE
WPS NO: TS-WPS-11+14 /
TAG NO: SP-9, 10, 11, 12 & BP-3

4477-TRB-N-XS-00002.001 REV-A (SHT 02


OF 17)/ SIDE STIFFENER PLATE SIDE PLATE
7 4 PLACES 1B-WJ-7 - 65mm TS-C02 FCAW - ACCEPTABLE
/ WPS NO: TS-WPS-11+14 / TAG NO: SSTIP-
9, 10, 11, 12 & SP-9, 10, 11, 12

4477-TRB-N-XS-00002.001 REV-A (SHT 02


OF 17)/ SIDE STIFFENER PLATE TOP PLATE
8 4 PLACES 1B-WJ-8 - 65mm TS-C02 FCAW - ACCEPTABLE
/ WPS NO: TS-WPS-11+14 / TAG NO: SSTIP-
9, 10, 11, 12 & TP-3

This report shall not be reproduced except in full, without the written approval of A-Star Testing & Inspection (S) Pte Ltd

Form No: ATI-FORM-MT-02, Rev 00 Page No: 2 of 4

No 5, Soon Lee Street | Pioneer Point #03-37 | Singapore 627607 | Tel +65 62616162 | Email:Enquiry@astartesting.com.sg
Report No: ATI/TRELLEBORG/BAROSSA FPSO/MT/S-064 Page No: 3 of 4
Report No: ATI/TRELLEBORG/BAROSSA FPSO/MT/S-064 Page No: 4 of 4