Salient Features of Deras M.I.P. (Reservoir) : 1 Location

This document provides details about the Deras M.I.P. reservoir project located near Barhapita village in Odisha, India. The key features include a catchment area of 33.50 square km, total storage capacity of 2.7168 cubic meters, and the project irrigating a gross command area of 960 hectares annually. The main components are an earthen dam measuring 457.20 meters long and 16.46 meters high, and a network of canals totaling 8300 meters in length serving 31 outlets. The project was constructed between 1947-1951 to provide irrigation and other benefits to 6 local villages.

Uploaded by

Antariksha Nayak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
247 views3 pages

Salient Features of Deras M.I.P. (Reservoir) : 1 Location

This document provides details about the Deras M.I.P. reservoir project located near Barhapita village in Odisha, India. The key features include a catchment area of 33.50 square km, total storage capacity of 2.7168 cubic meters, and the project irrigating a gross command area of 960 hectares annually. The main components are an earthen dam measuring 457.20 meters long and 16.46 meters high, and a network of canals totaling 8300 meters in length serving 31 outlets. The project was constructed between 1947-1951 to provide irrigation and other benefits to 6 local villages.

Uploaded by

Antariksha Nayak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

SALIENT FEATURES OF DERAS M.I.P.

( RESERVOIR )
1 LOCATION :-
Project site near Village : Barhapita , Kantabada
Gram Panchayat : Mendhasal
Block / Tahasil : Bhubaneswar
Sub-Division : Bhubaneswar
Distance from Block HQ : 25 Km.
River / Nalla : Deras Nalla ( tributary of River Daya )
Longitude : 85 o 41' 17'' E
Latitude : 20 o 18' 51 '' N
Topo Sheet No. : 73 H/11
River Basin : Mahanadi
Reservoir / Diversion Weir : Reservoir
2 PROJECT ID :-
As per M.I. Booklet-2015 : 1903004
3 HYDROLOGY :-
Catchment Area : 33.50 Sq Km.
Catchment characteristic : Hilly terrain / Average
Land use pattern of Catchment : Forest Area & Field
4 RAINFALL :-
Nearest Rain Gauge Station : ICAR , MENDHASAL
Maximum Rainfall : 1473 mm
Average Monsoon Rainfall : 1143 mm
75% Dep. Rainfall :
Design Project Flood :
Design Flood Level :
5 RESERVOIR :-
D.S.L. : R.L. 66.900 Mtr
F.R.L. : R.L. 73.150 Mtr
M.W.L. / H.F.L. : R.L. 74.370 Mtr
T.B.L. : R.L. 76.200 Mtr
Free Board : 1.83 Mtr
Dead Storage Capacity : 0.2773 M cum
Live Storage Capacity : 2.4395 M cum
Gross Storage capacity : 2.7168 M cum
Water Spread Area : 96.29 Ha
Live Storage / Ayacut (M3/Ha) : 3811.72
6 MAIN DAM OR D/W :-
Type : Homogenous Earth Fill
Length : 457.20 Mtr
Top Width : 3.65 Mtr
Side Slope : U/S 2 : 1
D/s Slope : D/S 2.5 : 1
Height at deepest Bed level : 16.46 Mtr
Deepest bed level of the nalla at Dam R.L. 59.740 Mtr
axis :
7 SURPLUS ESCAPE :-
Type : Ungated Ogee shaped
Length : 55.00 Mtr
Crest Level : R.L. 73.150 Mtr
Flood Lift : 1.22 Mtr
Free Board : 1.83 Mtr
Height of Fall : 6.00
Energy dissipation arrangement : Stepped basin, devide walls, Baffle blocks
Maximum Design Flood Discharge : 260.69 Cumec ( 9212.00 Cusec )
Length of Surplus Channel : 950.00 Mtr
Width of Surplus Channel : 60.00 Mtr
No. of Falls in the Channel : 2.00
8 HEAD REGULATOR :-
No. of H/R Sluice : 2.00
Position : Left H/R at R.D. 135.00 Mtr ,
Right H/R at R.D. 396.00 Mtr

No. of Sluice working : 2.00


Vent size : Both 0.90 Mtr dia NP3 Hume Pipe
Sill Level of H/R : Left H/R : R.L. 65.440 Mtr
Right H/R : R.L. 66.900 Mtr
Design Discharge : Left H/R : 0.61 Cumec
Right H/R : 0.61 Cumec

Slab top level of H/R well : Left H/R : R.L. 74.680Mtr


Right H/R : R.L. 74.680 Mtr

9 DETAILS OF CANALS :-
Length Lining Done No. of No. of
Canal
in Rmt. in Rmt. Structures Outlets
From Left H/R :-
Left Main Canal : 1850.00 1700.00 12.00 9.00
Minor canal : 150.00 2.00
Total = 2000.00 1700.00 12.00 11.00
From Right H/R :-
Right Main Canal : 4800.00 3500.00 25.00 15.00
Kalajhar Minor canal : 630.00 230.00 3.00 2.00
Farm Minor canal : 750.00 2.00 3.00
Left Minor canal 120.00
Total = 6300.00 3730.00 30.00 20.00
Total Length of Canal in Mtr. : 8300.00
No. of Structures : 42.00
No. of Outlets : 31.00
10 IRRIGATION :-
G.C.A. : 960.00 Ha
C.C.A. : 730.00 Ha
Annual Irrigation Potential 640.00 Ha
C.C.A. to G.C.A. ( % ) : 76
Design Ayacut : Khariff (in Ha) Rabi (in Ha)
Right Main Canal : 430.00 103.50
left Main Canal 210.00 77.50
TOTAL 640.00 181.00
11 CONSTRUCTION :-
year of Commencement : 1947
Year of Completion : 1951
Date of first full impoundment : 14.07.1952
12 PROJECT BENEFICIARIES :-
Villages : Giringaput , Haridamada , Haripur , Barhapita ,
Kantabada and Bhagabatipur.
Government Farms : State Agriculture Farm and I.C.A.R.
Other Activities : Bathing and drinking of wild animals in the wild life
Sanctuary area, Picnic and tourist spot, special
attraction eco-tourism facilities provided both by
M.I. and Forest Dept. and technical tours by
Technical Institutes .

Asst. Engineer Asst. Executive Engineer