Commissioning Report Fans: Company: Contact Person: Street: Postal Code / City: Tel. No.: Email

This document is a commissioning report for fans. It records information about the installer, equipment, operator location, documentation provided, visual inspection of installation and equipment, electrical connection details, instruction provided, functioning tests, defects or modifications noted, and sign off from the commissioning company and operator. Key details recorded include the equipment description and serial number, installation and commissioning dates, electrical specifications, and confirmation that commissioning was successfully completed.

Uploaded by

Belal Ameen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views3 pages

Commissioning Report Fans: Company: Contact Person: Street: Postal Code / City: Tel. No.: Email

This document is a commissioning report for fans. It records information about the installer, equipment, operator location, documentation provided, visual inspection of installation and equipment, electrical connection details, instruction provided, functioning tests, defects or modifications noted, and sign off from the commissioning company and operator. Key details recorded include the equipment description and serial number, installation and commissioning dates, electrical specifications, and confirmation that commissioning was successfully completed.

Uploaded by

Belal Ameen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Commissioning report fans

Installer / Installation constructor


Company: Equipment:
Contact person:
Street: Equipment description:
Postal code / City:
Tel. no.: Type:
Email:

Serial no.:
Operator / Location
Company:
Contact person:
Street:
Postal code / City:
Tel. no.:
Email:
Installing date:
Commissioning date:

Documentation
 Installation, operation and maintenance instructions handed over  yes  no
 EC Declaration handed over  yes  no
 Air flow measuring report available  yes  no

Visual inspection
 Warning signs / Name plate present  yes  no
 Housing damages  yes  no
 Installation site according to the equipment specifications  yes  no
 Suitable weatherproof for outdoor installation  yes  no
 Electrical installation completed  yes  no
 Installation performed according to installation instructions  yes  no
 Transported medium characteristics according to the equipment specifications  yes  no
 Filter status at commissioning
 new  slightly dirty  replacement required  unavailable

Dokument: DF017e Version: 1 Seite 1/3


Commissioning report fans
Electrical connection
Voltage: V
Frequency: Hz
Number of phases: phases
Fuse: A

Connection type
 Direct on the network  yes  no
 With protection circuit  yes  no
 Frequency converter  yes  no
 Voltage control 0...10V (EC motor)  yes  no
 Step transformer / voltage control  yes  no
 Device switch present / separator for all phases  yes  no

Instruction
 Device / system function explained and instructed  yes  no
 Control unit explained and instructed  yes  no
 Filter replacement explained and instructed  yes  no
 Maintenance operations explained and instructed  yes  no

Functioning control
 Fan impeller can be easily rotated by hand  yes  no
 Fan impeller / motor has the correct direction of rotation  yes  no
 There are vibrations / grinding noises  yes  no
 Equipment tested at nominal flow  yes  no
 Operation via no control unit available  yes  no
3-step switch MTS I  yes  no
potentiometer MTP I  yes  no
electronic controller MTY I  yes  no
electronic controller ETY I  yes  no
external control unit  yes  no

Dokument: DF017e Version: 1 Seite 2/3


Commissioning report fans
Defects / Modifications / Features / Observations:

Equipment commissioning successfully completed


 yes  no

Equipment defects
 no defects
 minor defects, repairs without recommissioning
 serious defects, recommissioning required

Date, Signature of the commissioning company

Date, Signature of the system operator / client

ruck Ventilatoren reserves the right to operate changes and improvements on the content of
this commissioning report without previous notice.

ruck Ventilatoren GmbH


Max-Planck-Str. 5
D-97944 Boxberg-Windischbuch
Tel.+49 (0)7930 9211-300
Fax.+49 (0)7930 9211-166
info@ruck.eu
www.ruck.eu

Dokument: DF017e Version: 1 Seite 3/3