KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
PROPOSAL FOR
SEWAGE WASTEWATER TREATMENT PLANT
Submitted to:
M/s. MAGNA HOSPITAL ,
PUDUKADAI.
By,
KARUNA ENVIRO SERVICES
PUDUCHERRY- 605 109
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
Ref: KES/OTS/045 / 2022 - 2023 02.02.2023
To
Dr. ALWIN LAL,
M/s. MAGNA HOSPITAL,
Pudukadai,
Kanniyakumari ( Dist), India
Sub: Offer for the Supply of SEWAGE WASTEWATER Treatment plant – Reg.
Dear Sir,
This has reference to the above-mentioned subject and the relevant discussion had with you on behalf
of M/s. Karuna Enviro Services at your office. We are herewith pleased to submit our Offer for the
Sewage waste water Treatment Plant - 15.0 KLD in your unit, which is given as follows:
Annexure – Details of requirement, Supply & Commissioning and
Cost to complete the works.
Trust our offer is in line with your requirement and in case, if you need any further clarifications
please feel free to contact the undersigned at any time. As your good selves aware, we have extensive
experience in the Supplying of all Type of New Plants and AMC of above subject Plants.
Thanking you and assuring you our best services at all times,
Yours faithfully,
Karuna Enviro Services
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
DESIGN BASIS
The Sewage treatment plant is designed to treat the Waste water from M/s. MAGNA HOSPITAL ,
which has the following characteristics. The plant Blower should be operated for 24 hrs.
No. of Beds = 50
No.of Attenders = 50
Total - 100 X 100 Liters ( As per the TNPCB Norms) = 10,000 Liters
No of Staffs – 20 X 30 Liters ( As per the TNPCB Norms) = 600 Liters
Total waste water Discharge Capacity = 10,600 Liters
For Peak waste water discharge ( assume additional ) shall be = 4,400 Liters
Quantity of Sewage Waste Water – 15,000 Liters Per Day
Hence the Plant Designed shall be = 16,000 Liters Per Day
SEWAGE CHARACTERISTICS
SL. NO. PARAMETERS AVERAGE VALUE
1. PH 6-8
2. Total Suspended Solids 300 mg / l Max
3. BOD (3 days) 600 mg / l Max
4. COD 250 mg / l Max
5. Oil and Grease 19 mg / l Max
ASSUMPTIONS
1. No other parameters, which exceed the disposal standard or hazardous in nature.
2. No TDS removal system is envisaged herewith.
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
SUGGESTED TREATMENT SYSTEM
THE ABOVE PARAMETERS
The Treatment System Consists of
Primary Treatment followed by
Secondary bio-treatment process
Tertiary Treatment as Filtration Process
The Primary Treatment Consists of
Collection cum Equalization Tank
The Secondary Bio -Treatment consists of
MBBR Based Bio -Treatment System ( Advanced MBBR Technology )
Settling Zone
Sludge recycling
Treated water collection tank.
The Tertiary Treatment consists of
Pressure Sand Filter
Activated Caron Filter
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
PROCESS DESCRIPTION AND OPERATION DETAILS
The raw Sewage wastewater from the M/s. MAGNA HOSPITAL is collected in a Under
Ground Septic tank. The Overflow water is collected in a collection Tank . From the
Tank the Waste water Pumped to the Aeration tank from the aeration tank is passed to a
clarifier tank for separation of bio mass and the settled bio-mass and the settled bio-
sludge are re-circulated to the aeration tank to maintain the MLSS (Mixed Liquor
Suspended Solids) level in the desired range. Recirculation from the clarifier tank bio
sludge is 40-50% of the Sewage flow rate to the aeration tank. If MLSS is more than
4500 mg/l the excess bio sludge from the clarifier tank is Drain the Sludge Drying bed.
Here the sludge separated and the clear water goes to the collection tank.
MLSS level in the aeration tank will be maintained in the range of 3000-4000 mg/l and
a sludge age of 15-20 days is maintained by regulation of the return sludge. While
keeping in a measuring cylinder, the slurry in the aeration tank is brown color and the
settlability of suspended solids is fast. Healthy bacterial sludge will settle fast and
occupy nearly ¼ of total volume of the cylinder in 30 minutes. The clear overflow from
the clarifier Tank is collected by Final collection sump.
From this collection sump, the treated Sewage is pumped to pressure Sand Filter
followed by Activated Carbon Filter to another collection tank for the removal of very
fine suspended solids, odor and turbidity. The outlet from collection tank will be send
to the Gardening Purpose / Flushing .
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
EXPECTED CHARACTERISTICS OF THE TREATED WASTE WATER
EXPECTED VALUE TNPCB
SL.NO. PARAMETERS AFTER STANDARDS
FILTRATION
1 PH 6.5 – 7.5 5.5-9.0
2 Total suspended Solids <20 mg/l <100mg/l
3 BOD (5days at 20ºC) <10 mg/l <30mg/l
Daily Sampling Schedule
Sl.NO. SAMPLE LOCATION SAMPLING PH MLSS
TYPE
1. Collection Tank Composite *
2. Aeration Tank Composite *
3. Settling Tank Composite *
4. Outlet from Pressure Sand Filter Composite *
Note: The parameters from different sampling points shown above are required to be tested as follows.
► PH – Every one hour
►MLSS – Once in four hours
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
TECHNICAL DATA AND DETAILS
1. MECHANICAL ITEMS – ( Karuna Enviro Scope )
A). COLLECTION TANK – TRANSFER PUMP
MAKE - KIRLOSKAR / CNG / Eql
FLOW - 1.5 m3/hr
MOC - SS
Model - Submergible
Motor HP - 1.0 H.P – Three Phase Heavy Duty
QTY - 1 No
B ). RE – CYCLING TRANSFER PUMP
MAKE - KIRLOSKAR / CNG / Eql
FLOW - 1.5 m3/hr
TYPE - Food Mounted
Model - Self Priming
POWER - 1.0 H.P. – Three Phase Heavy Duty
QTY - 1 No
C ). AIR BLOWERS WITH AUTO TIMERS
Make – Airvac / Nan Fang / Eql
Type – Jet Aeration
Capacity – 135.0 Cu.m / Hr @ 0.4 m Head
RPM – 1250 @ BHP 5.0
Qty – 2 Nos ( 1 working + 1 Standby)
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
D ). FILTER FEED PUMP
MAKE - KIRLOSKAR
MOC - CI
MODEL - Self Priming.
POWER - 1.0 H.P – Three Phase Heavy Duty
QTY - 2 Nos
E ). PRESSURE SAND FILTER
MAKE - AVENTURA / TATA / Eql
MOC - FRP with Multi port Valve with Frontal Pipe lines
Flow rate - 1.5 Cu.m / Hr
QTY - 1 No
SIZE - Dia 530 mm X Height 1574 mm
MEDIAS - VARIOUS Graded of Sand and Gravels
F ). ACTIVATED CARBON FILTER
MAKE - AVENTURA / TATA / Eql
MOC - FRP with Multi port Valve with Frontal Pipe lines
Flow rate - 1.0 – 1.5 Cu.m / Hr
QTY - 1No
SIZE - Dia 600 mm X Height 1828 mm
MEDIAS - Activated Carbon
G ). ELECTRONIC CONTROL PANEL BOARD - (with All Accessories) – 1 Set
DIGITAL TIMERS for Semi – Automatic Operation with Indication Lamps
MAIN SWITCHES all the above accessories are L &T / ABB
With Electrical wiring and Cabling, Installation MS Bracket of the offered equipment shall be
carried out by us.
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
H ). PVC PIPES / FITTINGS
MAKE - ASTRAL / Eql
SIZES - As Required
QTY - 1 LOT
MOC - UPVC
SCHEDULE _ 40
CLIENT’S SCOPE
SCHEDULE OF EXCLUSIONS
1. Required Civil works, such as Tanks and Top cover Slab as per the Civil Drawing etc
2. All incoming Electrical works, such as plant Power cabling to the Panel Board, lighting
arrangements, Earthing, etc
3. Fuel, Feed water, Dosing Chemicals, First Charge Lubricants etc
4. All incoming / Outgoing water Pipe line works
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999
KARUNA ENVIRO SERVICES
Project Consulting Engineers in Industrial Pollution Control & Environmental Safety Services
PAYMENT
The Offer is Design and Supply of the Capacity of 20,000 Liters per Day
Of SEWAGE TREATMENT PLANT with
Electrical, Mechanical with Piping Charges shall be Rs. 6, 57,000.00
(Including Necessary Standby Equipments)
Inclusive of Erection & Commissioning Charges
TERMS AND CONDITIONS
Ex Works : Pondicherry.
GST : As applicable Extra
Transportation : Included
Project Duration : 15 days ( Excluding Climatic Conditions )
Warranty : 12 Months from the Date of Supply against
Inherent Manufacturing defects.
This warranty does not cover any electrical Items
The mode of Payment shall be as follows
40 % along with the purchase order
50 % After Supply of Equipment
10 % After Erection & Commissioning
THE ENVIRONMENTAL PEOPLE
No. 133A, MIG,Avalapalli Hudco, Hosur – 635 109.
Mobile : 99444 36999