Dormitory Bldg. 1 EC

This document appears to be a floor plan layout with various rooms labeled with letters and measurements in meters. It shows 6 sections with various rooms branching off of a main area. The rooms are labeled with letters or names and have corresponding measurements listed. An overall area of 33 square meters is noted at the top.

Uploaded by

Rianne Gamboa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
644 views10 pages

Dormitory Bldg. 1 EC

This document appears to be a floor plan layout with various rooms labeled with letters and measurements in meters. It shows 6 sections with various rooms branching off of a main area. The rooms are labeled with letters or names and have corresponding measurements listed. An overall area of 33 square meters is noted at the top.

Uploaded by

Rianne Gamboa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

A' A B C D E F G H I J J'

33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

1.70
DN

1 FACP

1.83
SD

DORM MANAGER

2 FACP

ISO. RM. PWD PWD

UP UP SD SD SD
EE
RM.
3.90

SD SD SD SD PWD C.R.

FACP
PWD PWD ISO. RM.
MECH. RM.

3 FACP
13.85

2.40

SD SD SD SD SD SD

HALLWAY

4
1.33

FB

M
UP UP

FB
M
4' VIP AREA
SD
3.90

UP UP
2.57

SD
F.E. FACP F.E.
SD SD
REFLECTION ROOM PANTRY
OFFICE.
5 SD SD SD SD
1.83

GADGET ROOM

PANTRY

0.13
1.05
6

0.57 1.20
MAIN ENTRANCE
5.40

5.90
3.00
DRIVEWAY

6'

GROUND FLOOR
1 FDAS LAYOUT
EC 1 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 1 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

1.70
BALC. BALC.
W W W
3 3 5

1 SHO. SHO.
WC READING
1.83 SD SD
AREA
SD
WC
SHO. SHO.

2 WC
SD
DORMER RM.
SD READING
AREA
SD SD FACP

SHO. SHO.
DORMER RM. DORMER RM.
SD SD

COMMON TOILET
3.90

URINAL FACP URINAL

COMMON TOILET
SD
FB FB
HALLWAY
SD SD DN DN SD SD

3
M M
HALLWAY
13.85

2.40

W
6
DN UP UP DN

4
1.33

4' UP UP
3.90

2.57

LOFT AREA OPEN ABOVE LOFT AREA

5
1.83

6
5.40

6'

MEZZANINE FLOOR
1 FDAS LAYOUT
EC 2

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 2 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

CANOPY IN ALUMINUM COMPOSITE PANEL


(ACP)
1.80

0.85
1.83
2
STORAGE EE
3.90

SD SD SD SD SD SD SD SD SD SD
RM.
DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM.

3 FACP FACP

D
13.85

3
2.40

FIRE SD SD SD SD SD SD SD SD SD SD FIRE
EXIT EXIT
CORRIDOR CORRIDOR

DN DN

4 DN DN
1.33

FB

M
FB
M
4'
3.90

DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM.

SD SD SD SD SD SD
2.57

OPEN BELOW

ATRIUM

5
1.83

6 GUTTER
5.40

5.80

6'

10.03

SECOND FLOOR
1 FDAS LAYOUT
EC 3 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 3 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

CANOPY IN ALUMINUM COMPOSITE PANEL


(ACP)
1.80

0.85
1.83
2
3.90 STORAGE DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. EE
SD SD SD SD SD SD SD SD SD SD RM.

3 FACP FACP
13.85

2.40

FIRE SD SD SD SD SD SD SD SD SD SD FIRE
CORRIDOR CORRIDOR
EXIT EXIT

DN DN

FB
DN

M
1.33

FB
M
4'
3.90

SD SD SD SD SD SD
2.57

DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM.
OPEN BELOW

ATRIUM

5
1.83

6 GUTTER
5.40

5.80
CANOPY IN ALUMINUM COMPOSITE PANEL
(ACP)

6'

10.03

THIRD FLOOR
1
FDAS
SCALE
LAYOUT 1:150MTS
EC 4

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 4 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
USE: 1.25 mm Twisted Pair
Shielded Cable, 15mm PVC

SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD M BELL

DORMER RM 1 DORMER RM 2 DORMER RM 3 DORMER RM 4 DORMER RM 5 DORMER RM 6 DORMER RM 7 DORMER RM 8 DORMER RM 9 DORMER RM 10 DORMER RM 11 DORMER RM 12 DORMER RM 13 DORMER RM 13 DORMER RM 13 DORMER RM 13 HALLWAY

ZONE 4
USE: 1.25 mm2 Twisted
Pair Shielded Cable,
15mm PVC

SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD M BELL

DORMER RM 1 DORMER RM 2 DORMER RM 3 DORMER RM 4 DORMER RM 5 DORMER RM 6 DORMER RM 7 DORMER RM 8 DORMER RM 9 DORMER RM 10 DORMER RM 11 DORMER RM 12 DORMER RM 13 DORMER RM 13 DORMER RM 13 DORMER RM 13 HALLWAY

ZONE 3
USE: 1.25 mm2 Twisted
Pair Shielded Cable,
15mm PVC

SD SD SD SD SD SD SD SD M BELL

FEMALE CR DORMER RM 7 READING AREA HALLWAY READING AREA DORMER RM 10 DORMER RM 11 MALE COMMON
CR

ZONE 2 USE: 1.25 mm2 Twisted


Pair Shielded Cable,
15mm PVC

SD SD SD SD SD SD SD SD SD SD SD SD SD SD M BELL

ISO ROOM PWD ROOM PWD DORM HALLWAY PWD CR PWD ROOM PWD ROOM ISO ROOM PANTRY REFLECTION GADGET OFFICE VIP AREA
ROOM 3 MANAGER ROOM ROOM

GFPB ZONE 1
FACP

FIRE ALARM AND DETECTION


1 SYSTEM RISER DIAGRAM
EC 5 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 5 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

1.70
PORCH
DN DN

W W W W W W W W W W W W W W W W W W
4 5 5 4 4 5 5 5 4 4 5 5 5 4 4 5 5 4

1 D
2 T&B T&B D
2
D
2 T&B
SD
2
T&B D
2
D
2 T&B T&B D
2

1.83
URINAL
SHO. SHO. SHO. SHO. SHO. SHO.
DORM MANAGER

2 SD
3
BED
SD
3
SD
3
BED
LOUNGE
D
2

BED
SD
3
SD
3
BED BED
SD
3

ISO. RM. ISO. RM.


BED UP UP EE
3.90

PWD PWD PWD C.R. PWD PWD


BED CLO BED RM.
MECH. RM.
2 3 4 5
1 6
RECEPT.
D BED D D BED D D BED D D BED D
1 1 1 1 1 1 1 1

3
D NVR
13.85

3 D
2.40

3
W HALLWAY HALLWAY W
1
1
NVR

SD

4 4

D D
1.33

1 1
SHO. UP NVR UP
D
T&B. CLO. 1

4' VIP AREA


3.90

W
UP D 4 UP
1 R
NV D LOBBY R
D
NV 1
2.57

F.E. F.E.

FULL HEIGHT GLASS


REFLECTION ROOM PANTRY
BED ROOM-2 OFFICE.
5 BED ROOM-1
SD
GADGET ROOM
1.83

1
T&B.
PANTRY

0.13
1.05
NVR

0.57 1.20
W W W W W W W W W W
1 2 4 5 3 3 1 1 5 5
MAIN ENTRANCE
5.40

5.90
3.00
DRIVEWAY

6'

GROUND FLOOR
1 CCTV LAYOUT
EC 6 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 6 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

1.70
W
BALC. BALC.
W W W W W
5 3 3 3 3 5

1 WC SHO.
SD
4 SD
4
SHO.

1.83
READING READING
WC AREA AREA
SHO. SHO.
BED BED
2 WC
DORMER RM. DORMER RM.
BED
DORMER RM.
BED

SHO. D D 10 11 SHO.
1 1
7

CLO. CLO.
COMMON TOILET
3.90
URINAL URINAL
CLO. CLO.
D D D D
1 1 1 1
COMMON TOILET

D HALLWAY DN DN HALLWAY D
2 2

3
13.85

2.40

NVR
6 W
DN UP 6 UP DN

4
1.33

4' UP UP
3.90

R
NV
2.57

LOFT AREA OPEN ABOVE LOFT AREA

5
1.83

6
5.40

6'

MEZZANINE FLOOR
1 CCTV LAYOUT
EC 7 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 7 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

CANOPY IN ALUMINUM COMPOSITE PANEL


(ACP)
1.80 W
GUTTER 5
GRILLS GRILLS GRILLS GRILLS GRILLS GRILLS

0.85
BALC. WC. WC. BALC. BALC. BALC. BALC. BALC. BALC. BALC. BALC. BALC.

1.83
D D D
W 4 W W 4 W W 4 W W 4 W W 4 W 4 W W
7 7 7 7 7 7 7 7 7 7 7 7

2 SHO SHO

STORAGE EE
3.90

DORMER RM.
BED BED
DORMER RM. DORMER RM.
BED BED
DORMER RM. DORMER RM.
BED BED
DORMER RM. DORMER RM.
BED BED
DORMER RM. DORMER RM.
BED BED
DORMER RM. RM.
10 9 8 7 6 5 4 3 2 1

D D
1 1

BED BED BED BED D BED BED D D BED BED D D BED BED D
D D D 1 1

3 1 1 1 1 1 1 1

D D
13.85

3
2.40

NVR
3

FIRE FIRE
CORRIDOR CORRIDOR

NVR
EXIT VR EXIT
N NVR

DN GRILLS GRILLS DN

4 D D D DN DN D D D
1.33

BED 1 1 BED BED 1 1 BED BED 1 1 BED


GRILLS GRILLS

4'
3.90

BED BED BED BED BED BED


DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM.
2.57

11 12 13 14 15 16

OPEN BELOW

SHO SHO SHO ATRIUM SHO SHO SHO

5 W W W W W W W W W W W W W W
8
1.83

8 D 8 8 D 8 8 D 8 8 D 8 8 D 8 8 D 8 8
4 4 4 4 4 4

W
WC. BALC. BALC. WC. WC. BALC. 6 W BALC. WC. WC. BALC. BALC. WC.
6

6 GUTTER
5.40

5.80

6'

10.03

SECOND FLOOR
1 CCTV LAYOUT
EC 8 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 8 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
A' A B C D E F G H I J J'
33.00

1.50 3.30 3.30 3.30 3.30 6.60 3.30 3.30 3.30 3.30

CANOPY IN ALUMINUM COMPOSITE PANEL


(ACP)
1.80 W
GUTTER 5

0.85
BALC. WC. WC. BALC. BALC. BALC. BALC. BALC. BALC. BALC. BALC. BALC.

1.83
D D D
W 4 W W 4 W W 4 W W 4 W W 4 W 4 W W
7 7 7 7 7 7 7 7 7 7 7 7

2 SHO SHO

STORAGE EE
3.90 DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM.
RM.
BED BED BED BED BED BED BED BED BED BED
10 9 8 7 6 5 4 3 2 1

D D
1 1

BED BED BED BED D BED BED D D BED BED D D BED BED D
D D D 1 1

3 1 1 1 1 1 1 1

D D
13.85

3
2.40

NVR 3

FIRE FIRE

NVR
CORRIDOR R CORRIDOR
EXIT NV NVR EXIT

DN GRILLS GRILLS DN

4 D D D DN DN D D D
1.33

BED 1 1 BED BED 1 1 BED BED 1 1 BED


GRILLS GRILLS

4'
3.90

BED BED BED BED BED BED


DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM. DORMER RM.
2.57

11 12 13 14 15 16

OPEN BELOW

SHO SHO SHO ATRIUM SHO SHO SHO

5 W W W W W W W W W W W W W W
8
1.83

8 D 8 8 D 8 8 D 8 8 D 8 8 D 8 8 D 8 8
4 4 4 4 4 4

BALC. BALC. BALC. W W BALC. BALC. BALC.


WC. WC. WC. 6 6 WC. WC. WC.

6 GUTTER
5.40

5.80
CANOPY IN ALUMINUM COMPOSITE PANEL
(ACP)

6'

10.03

THIRD FLOOR
1 CCTV LAYOUT
EC 9 SCALE 1:150MTS

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 9 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date:
ACCESS
SWITCH

HALLWAY HALLWAY HALLWAY HALLWAY


25MM 15MM
PVC PVC THIRD FLOOR
ACCESS
SWITCH

HALLWAY HALLWAY HALLWAY HALLWAY


25MM 15MM
PVC PVC
SECOND FLOOR
ACCESS
SWITCH

HALLWAY HALLWAY
15MM
PVC
25MM
PVC
MEZZANINE FLOOR
FIBER ACCESS
SWITCH SWITCH
25MM
PVC
NVR

HALLWAY HALLWAY HALLWAY HALLWAY


MVP

MONITOR 15MM
PVC

GROUND FLOOR
1 CCTV LAYOUT
SCALE 1:150MTS
EC 10

OWNER: Project Title: Prepared by: Recommending approval by: Approved by: Sheet Content: Sheet No.
Republic of the Philippines CONSTRUCTION
DEPARTMENT OF SCIENCE AND TECHNOLOGY EC
OF PLANNING TEAM Meriam F. Fallar Edward C. Albaracin As Shown
..\Pisay logo.jpg Philippine Science High School
DORMITORY BUILDING I FAD Chief Campus Director
MIMAROPA Region Campus
Brgy. Rizal, Odiongan, Romblon 5505 10 10
Location: Brgy. Rizal, Odiongan Romblon 5505 Date Prepared: Date: Date: