0% found this document useful (0 votes)
81 views10 pages

EDac Projects

The document summarizes several oil and gas projects completed by SPIC JEL Engineering including: 1) Mechanical erection works for GAIL Pata Gas Cracker project and GAIL Gandhar Gas Processing project. 2) Electro mechanical erection works for Ravva Satellite Gas Development project and ONGC G1 & GS15 Oil Field Development project. 3) Mechanical erection works for SPIC LPG project and ONGC Oil Collecting Station project. The document provides brief details about the scope and timeline of each project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views10 pages

EDac Projects

The document summarizes several oil and gas projects completed by SPIC JEL Engineering including: 1) Mechanical erection works for GAIL Pata Gas Cracker project and GAIL Gandhar Gas Processing project. 2) Electro mechanical erection works for Ravva Satellite Gas Development project and ONGC G1 & GS15 Oil Field Development project. 3) Mechanical erection works for SPIC LPG project and ONGC Oil Collecting Station project. The document provides brief details about the scope and timeline of each project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

http://pkarthikeyan73.blogspot.com/2011/11/service-details-spic-jel-engineering.

html

> Human Resources
> Human Resources
> Design Resources
> Design Resources
> Fabrication Resources
> Fabrication Resources
> Construction Resources
> Construction Resources

> Overview
> Overview
> Mission & Vision
> Mission & Vision
> Quality
> Quality
> Board of Directors
> Board of Directors

> Overview
> Overview
> Room Base Multimedia
> Room Base Multimedia
> Customers In India
> Customers In India
> Latest News
> Latest News

> Video On Demand
> Video On Demand
> SMATV Maintenance
> SMATV Maintenance

 HOM ABOU PROJECT FACILITIE


| | SERVICES | | | SUBSIDIARY | CLIENTS | CAREERS
E T US S S
REFINERY AND OIL & GAS PROJECTS

GAIL PATA GAS CRACKER & PROCESSING PROJECT

Name of work : Mechanical Erection works for Gail Pata Gas Cracker &
Processing Unit.
Site : Pata. U.P.
Client : M/s Gas Authority of India Limited, New Delhi.
Customer : M/s Gas Authority of India Limited, New Delhi
Consultant : M/s. EIL, New Delhi.
Project Duration : 20 Months.
Our Scope of :  Fabrication & Erection of Piping & related Civil
Work works.
 Erection of Equipments, Stack, Structural and
Centrifugal Compressors.

Date of : December 1997


Completion
GAIL GANDHAR GAS PROCESSING PROJECT

Name of work : Electro Mechanical Erection works for Gail Gandhar


Gas Processing Unit.
Site : Gandhar. U.P.
Client : M/s Gas
Authority of
India Limited,
New Delhi.
Customer : M/s Gas
Authority of
India Limited,
New Delhi
Consultant : M/s. EIL, New
Delhi.
Project Duration : 18 Months
Our Scope of Work :  Fabrication & Erection of Piping & related Civil
works.
 Erection of Equipments, Structural, RCC, Cold
Insulation and Painting.
 Supply & Installation of Transformers, Panels &
Switch board.
 Installation of Cable, Cable Tray, Termination &
Lighting.

Date of Completion : May 2001


RAVVA SATELLITE GAS DEVELOPMENT PROJECT

Name of work : Electro Mechanical Erection works for Ravva Satellite Gas
development Project at Amalapuram, A.P.
Site : Amalapuram, A.P.
Client : M/s. Clough Engineering Limited, Australia.
Customer : M/s. ONGC , M/s. Cairn Energy, M/s. Videocon
Petroleum Ltd. & M/s. Ravva Oil (Singapore)
Project Duration : 12 months.
Our Scope of :  Supply, Fabrication & Erection of Piping,
Work Equipment, and Structural works.
 Supply & Installation of Cable, Cable Trays and
Earthing.

Date of : November 2001


Completion
ONGC G1 & GS15 OIL FIELD DEVELOPMENT PROJECT

Name of : Electrical and Instrumentation installation works for ONGC G1


work & GS15 Fields Development Project at Amalapuram, AP.
Site : Amalapuram,
AP.
Client : M/s. Clough
Engineering
Limited,
Australia.
Customer : M/s. ONGC.
Project : 12 months.
Duration
Our Scope of : Installation of Swithchgear, Cables, Cable Trays, Termination,
Work Electrical Equipments, Panels, Instruments Installation, and
Instrument cable, Field Instruments & Instrument loop
checking.
Date of : March 2008
Completion
SPIC LPG PROJECT

Name of work : Mechanical Erection works for SPIC LPG Project


at, Tuticorin, Madurai, Madras.
Site : Tuticorin, Madurai and Madras,
Client : M/s. SPIC Petroleum Division Tuticorin.
Customer : M/s. SPIC Petroleum Division Tuticorin.
Project Duration : 14 months.
Our Scope of :  Fabrication & Erection of 9 Kms. 14” LPG Pipe
Work Line.
 Erection of Equipments and Structural.

Date of : April 1995


Completion
ONGC OIL COLLECTING STATION PROJECT

Name of work : Electro Mechanical Erection works for Oil Collecting Station
of ONGC at Ramnad, Tamilnadu.
Site : Ramnad,
Tamilnadu.
Client : M/s.
ONGC.
Customer : M/s.
ONGC.
Project : 9 months.
Duration
Our Scope of :  Design, Supply, Fabrication & Erection of Storage
Work Tanks and Water Seal Drum.
 Erection of Equipments, Piping, Piping Supports, and
Structural.
 Installation of Transformer, Cabling, Cable Trays and
Termination.

Date of : August
Completion 2002
RAVVA SATELLITE GAS DEVELOPMENT PROJECT

Name of work : Electro Mechanical Erection works for Ravva


Satellite Gas Development Project at Amalapuram,
A.P.
Site : Amalapuram, A.P.
Client : M/s. Cairn Energy India Pty. Ltd.
Customer : M/s. ONGC, M/s. Cairn Energy, M/s. Videocon
Petroleum Ltd. & M/s. Ravva Oil (Singapore)
Project Duration : 7 Months.
Our Scope of :  Erection of Equipments, Piping, Piping Supports,
Work Structural and Civil Earthworks.
 Installation of Instrumentation Cabling, Cable Trays
and Termination.

Date of : January 2004


Completion
NIKO DEW POINT CONTROL UNIT PROJECT

Name of work : Civil works for Niko Dew Point Control unit project
Site : Hazira
Client : M/s.Technip,Chennai.
Customer : M/s. NIKO Resources.
Consultant : M/s.Technip,Chennai.
Project Duration : 4 months.
Our Scope of : Civil Woks for Substation, DG Room and Civil foundation
Work for Equipments.
Date of : June 2004
Completion
ONGC OFFSHORE PLATFORMS PROJECT

Name of work : Mechanical Erection works for ONGC Offshore


Platforms in Mumbai.
Site : Mumbai.
Client : M/s. ONGC.
Customer : M/s. ONGC.
Project Duration : 3 months.
Our Scope of :  Removal of Old Gratings, Handrails and Chequered
Work Plates.
 Erection of Gratings, Handrails and Chequered
Plates.

Date of : February 2003


Completion
IOCL FCC SHUTDOWN PROJECT

Name of work : Civil & Structural works for IOCL FCC Shutdown at
Gujarat Refinery.
Site : IOCL, Gujarat.
Client : M/s. IOCL, Gujarat.
Customer : M/s. IOCL, Gujarat.
Consultant : M/s. EIL, New Delhi.
Project Duration : 3 Months.
Our Scope of : Replacement of Column, Civil & Structural works.
Work
Date of : October 2007
Completion
RELIANCE JAMNAGAR REFINERY EXPANSION PROJECT

Name of work : Mechanical works for Sulphur Recovery Unit (SRU) 3


Trains at Reliance Jamnagar Refinery Expansion project.
Site : Jamnagar.
Client : M/s. Reliance
Refinery Limited,
Jamnagar.
Customer : M/s. Reliance
Refinery Limited,
Jamnagar.
Project Duration : 15 Months.
Our Scope of : Erection of Piping
Work and Structural
works.
Date of : March 2008
Completion

HPCL VIZAG REFINERY EXPANSION PROJECT

Name of work : Mechanical Erection Works for Fluid Catalytic Cracker


Unit of HPCL Vizag Refinery Expansion Project.
Site : Vizag. Refinery, A.P.
Client : M/s HPCL, Vizag
Customer : M/s HPCL, Vizag
Consultant : M/s. Engineers India Ltd (EIL), New Delhi.
Project Duration : 20 Months.
Our Scope of : Erection of Piping, cement Lined Piping, Equipments and
Work Civil works.
Date of : June 2000
Completion
CPCL REFINERY EXPANSION-III PROJECT

Name of : Mechanical Erection works for Hydro cracker(HCU) and


work Merox Units of Chennai Petroleum Corporation Limited
(CPCL)'s Expansion - III Project at Manali.
Site : Manali,
Chennai.
Client : M/s.
CPCL,
Chennai.
Customer : M/s.
CPCL,
Chennai.
Consultant : M/s.
Engineers
India Ltd
(EIL),
New
Delhi
Project : 11
Duration months
Our Scope of :  Fabrication & Erection of Piping.
Work  Erection of Static Equipment, Rotary Equipment,
Pressure vessels, Heat Exchanger and Structural.

Date of : August
Completion 2004
IOCL XYLENE HEATER PROJECT

Name of work : Mechanical Erection works for IOCL Expansion Project.


Site : IOCL, Panipat.
Client : M/s. L&T Ltd,
Mumbai.
Customer : M/s. IOCL, Panipat
Refinery.
Consultant : M/s. EIL.
Project Duration : 9 months.
Our Scope of : Fabrication &
Work Erection of Hot Oil,
Fired Combustion &
Xylene Heaters.
Date of : June 2005
Completion
RELIANCE REFINERY LIGHT NAPTHA UNIT EXPANSION PROJECT

Name of work : Mechanical works for Light Naptha Unifying Unit /


Selective Hydrogenation Process / Tertiary Amile Methyl
Ether Units.
Site : Jamnagar, Gujarat.
Client : M/s Reliance
Industries, Jamnagar,
Gujarat.
Customer : M/s Reliance
Industries, Jamnagar,
Gujarat.
Project : 14 months.
Duration
Our Scope of :  Fabrication &
Work Erection
Piping works.
 Erection of
Structural &
Equipments.

Date of : December 1999


Completion
IOCL PANIPAT REFINERY EXPANSION PROJECT
Name of work : Electrical Works for HCU unit at IOCL Panipat Refinery
Expansion project.
Site : IOCL, Panipat.
Client : M/s. Daelim Industrial Co. Ltd., Korea.
Customer : M/s. IOCL, Panipat Refinery.
Consultant : M/s. Daelim Industrial Co. Ltd., Korea.
Project Duration : 14 Months.
Our Scope of : Installation of Transformer, Switchgear, MCC Panels,
Work Cable Tray, 6.6KV Power Cable, 6.6 KV Bus Duct, 600 V
Power Cable, Lighting Fixture, Switch & Receptacle and
Fire Fighting..
Date of : December 2005
Completion
IOCL MATHURA REFINERY EXPANSION PROJECT

Name of work : Mechanical Erection works for Naptha Splitter Unit at IOCL
Mathura Refinery Expansion Project.
Site : IOCL
Mathura.
Client : M/s. Toyo
Engineering
India Ltd.,
Customer : M/s. IOCL
Mathura
Refinery.
Consultant : M/s. Toyo
Engineering
India Ltd.
Project : 6 months.
Duration
Our Scope of : Supply, Fabrication & Erection of Piping, Structural,
Work Equipments and Painting works.
Date of : May 2005
Completion
HPCL FCCU-II REFINERY SHUTDOWN PROJECT

Name of work : Mechanical Erection works for HPCL FCCU-II


Refinery Shutdown Project.
Site : HPCL, Vizag.
Client : M/s. HPCL, Vizag
Customer : M/s. HPCL, Vizag.
Consultant : M/s. Engineers India Ltd (EIL), New Delhi.
Project Duration : 3 months.
Our Scope of : Erection of FCCU Reactor, Heat Exchangers, Columns,
Work Vessels and Regenerator.
Date of : June 2004.
Completion
IOCL MATHURA REFINERY EXPANSION NHTU REVAMP PROJECT

Name of work : Mechanical Erection works for NHTU Revamp IOCL


Expansion Project.
Site : IOCL Mathura.
Client : M/s. Technip KT India Ltd., New Delhi.
Customer : M/s. IOCL Mathura Refinery.
Consultant : M/s. Technip KT India Ltd., New Delhi.
Project Duration : 4 months.
Our Scope of :  Fabrication & Erection Hydrogen Reformer.
Work  Erection of Structurals, Piping, Naptha Super
Heater, Reactor Feed Heaters, Equipments, Gratings
and Painting.

Date of : May 2004.


Completion
IOCL PANIPAT REFINERY EXPANSION SULPHUR RECOVERY
PROJECT

Name of work : Composite Works for Stand-by Sulphur Recovery Unit


Project at Panipat Refinery.
Site : IOCL, Panipat.
Client : M/s. IOCL, Panipat Refinery.
Customer : M/s. IOCL, Panipat Refinery.
Consultant : M/s. EIL, New Delhi.
Project Duration : 9 months.
Our Scope of :  Erection of Piping, Structural, Equipments and
Work Insulation works.
 Electrical, and Control & Instrumentation works.
 Civil Works.

Date of : January 2001


Completion
IOCL BARAUNI REFINERY EXPANSION PROJECT

Name of work : Electrical works for DHDT Unit of IOCL Barauni


Refinery, Bihar
Site : Barauni, Bihar.
Client : M/s.Samsung Engineering Co. Ltd., Korea.
Customer : M/s. IOCL, Barauni, Bihar.
Consultant : M/s. EIL, New Delhi.
Project Duration : 7 months.
Our Scope of :  Installation of 2000 KVA/ 300 KVA Transformer.
Work  Installation of HT & LT Panels.
 Installation of Motor Control Center, Cable Tray,
Cabling, Termination, Lighting, Telephone and Fire
Alarm Systems.

Date of : April 2001


Completion
IOCL MATHURA REFINERY EXPANSION PROJECT

Name of work : Mechanical Erection of Flare System for IOCL Mathura


Refinery.
Site : IOCL, Mathura.
Client : M/s. Airoil - Flaregas (I) Pvt. Ltd.
Customer : M/s. IOCL Mathura Refinery
Consultant : M/s. EIL, New Delhi.
Project Duration : 4 months
Our Scope of : Erection of Water Seal Drum (6.4 mtr. Width x 16 mtr.
Work Height), Knockout Drum (2.9 mtr width x22 mtr. Height)
and Derrick Structure.
Date of : May 2004
Completion
IOCL VADODARA REFINERY EXPANSION PROJECT

Name of work : Electro Mechanical & Civil works for IOCL


Vadodara Refinery Expansion project at Gujarat.
Site : Vadodara, Gujarat.
Client : M/s. IOCL Vadodara Refinery.
Customer : M/s. IOCL Vadodara Refinery.
Consultant : M/s. EIL, New Delhi.
Project Duration : 2 months.
Our Scope of :  Erection of Fixed Roof Tanks, Structural and
Work Equipments.
 Electrical & Instrumentation Cabling works.
 Civil Earthworks, RCC & RFCC works.

Date of : December 2003


Completion