Construction Progress Report
Construction Progress Report
(Khanikote) to P2 of T-13 & P-1 of T-14 (Basindadhar) and Bridge No 60 (between KM 61.004 to KM 73.784 approx.)
on Katra - Banihal Section of Udhampur-Srinagar-Baramulla New BG Railway Line Project (Package T-13).”
Supply, drilling, installation and grouting of SN type rock bolts of the specified
length, Fy>= 200 KN (slopes, tunnel support & face bolts ) as per approved
B102 drawings & specifications or as directed by Engineer. The rate shall include costs
of all materials, labour, equipments, etc. required for the complete job as per
specifications or as directed by Engineer-in-Charge.
a)Providing & laying cement concrete of grade M15 below /above the ground
F102 Cum 6,675.6
levelRate 1% less as per clause no 17 of Special condition of contract Section IIA)
-
Providing and laying RCC in M-30 Grade with 20mm crushed graded stone
aggregate in raft, footings/pedestals of abutments and piers or any other locations
as per the instructions of Engineer-in-charge for all depths and heights including
cost of all materials, leads & lifts, mechanical mixing, admixtures, formwork,
4 F104 centering, scaffoldings, concrete placing, compaction with mechanical/electrical Cum 8,694.00
vibrators, dewatering, curing, leveling of surface and finishing in all respects as per
drawings & specifications and as directed by Engineer-in-charge as
a complete job. Note: The payment for reinforcement steel
shall be made separately under item No.F201.
-
Concrete M-40 in RCC in pedestal, protection walls, seismic stoppers for all
heights with 20 mm crushed graded stone aggregate and sand of approved quality
with all leads & lift, mechanical mixing & vibration, curing including formwork,
5 F105 shuttering, centering, scaffolding etc. with all labour & material as a complete job Cum 22,883.00
as per drawings & specification and as directed by Engineer-in- charge as a
complete job.
Note :- Payment for reinforcement steel shall be made as per item No.F201. -
Providing and laying RCC in M-25 grade with 20mm crushed graded stone
aggregates in well steining for all heights including cost of all materials, leads &
lifts, mechanical mixing, admixtures, formwork, centering, scaffolding, concrete
placing, compaction with mechanical / electrical vibrators, dewatering, curing,
leveling of surface and finishing in all respects as per drawings & specifications or
7 F107 Cum 10,892.00
as directed by Engineer-in-charge as a complete job.
Note :-1) The rate for this item is inclusive of marking of level gauge from top to
bottom of steining on all four sides as complete job.
2) The payment for reinforcement steel shall be made separately under item
No.F201.
-
Sinking wells in all types of strata by open grabbing, control blasting under water or
with protective cage, open dredging, or any other established method including
continuous correction of tilt and shift in each stage so that finally the sunk well in
respect of shift and tilt is within acceptable limits with all contractor's labour, tools
and plants. lead and lift, materials, etc., as a complete job as per specifications or
as directed by the Engineer-in-Charge.
8 F108 Note: 1. The rate shall include all charges for all operations, tools and plants, Cum 2,876.00
hoists, dredgers, pulsometer gantry, pulleys, kentledges, rails, sleepers, bellies,
ropes, strings, baskets, empty cement bags and all consumables required for
sinking, all ascends, descends, leads, lifts, loading, unloading pumping out water,
removal of any obstructions whatsoever not mentioned here but required for
completing the item, disposal of spoils, loading, leading and spreading the same in
formation, in approaches, all labour and material as a complete job.
-
Providing and laying reinforced cement concrete of M-25 grade with 40mm and
down gauge crushed aggregate in top plug including cost of all materials, leads
& lifts, mechanical / electrical vibrators, dewatering, curing, leveling of surface and
11 F111 finishing in all respects as per drawings & specification as a complete job and as Cum 9,938.00
directed by Engineer-in-charge.
Note: The payment for reinforcement steel should be made separately
under item No. F201.
-
Providing and laying RCC in M-35 grade with 20mm crushed graded stone
aggregates in well cap for all heights including cost of all materials, leads & lifts,
mechanical mixing, admixtures, formwork, centering, scaffolding, concrete placing,
compaction with mechanical / electrical vibrators, dewatering, curing, leveling of
12 F112 surface and finishing in all respects as per drawings & specifications as a complete Cum 11,915.00
job and as directed by Engineer-in-charge.
Note:-1) The rate shall include cost of bailing / pumping out water, handling,
rehandling any obstructions if required. 2)The payment for reinforcement
steel should be made separately under item No. F201.
-
Providing and laying RCC in M-35 Grade with 20mm crushed graded stone
aggregate in abutments, piers, abutment/pier caps, return wall, dirt wall, box,
approach slab, deck slab, crash Barrier etc.. for all depths/heights including cost of
all materials, leads & lifts, mechanical mixing, admixtures, formwork, centering,
13 F113 scaffoldings, concrete placing, compaction with mechanical/electrical vibrators, Cum 14,794.00
dewatering, curing, leveling of surface and finishing in all respects as per drawings
& specifications as a complete job and as directed by Engineer-in- charge.
Note: The payment for reinforcement steel shall be made separately under
item No. F201
-
(Steel Work)
Supply , drilling and installation of Swellex type rock bolts of 4m length, Fly>=160
Kn (tunnel support) as per approved drawings & specifications or as directed by
1 NS-01 No. 10221
the Engineer. The rate shall include costs of all materials, labour, equipment, etc.
as a complete job as per specifications or as directed by Engineer-in- Charge
-
Supply , drilling and installation of Swellex type rock bolts of 6m length, Fly>=160
Kn (tunnel support) as per approved drawings & specifications or as directed by
2 NS-02 No. 14667
the Engineer. The rate shall include costs of all materials, labour, equipment, etc.
as a complete job as per specifications or as directed by Engineer-in- Charge
-
3 NS-03 Pertaining to Tunnel 13-Tunnel14 execution Job 1052094 -
Carrying out plate load test at founding level of abutments,piers, including all
4 NS-04 consumable if any as per specifications & as directed by Engineer In-Charge and Nos. 755020
submission of report. -
Supplying and fixing mechnical coupler/reducers of various diameter of approved
quality including transportation, cost of threading for lapping of reinforcement steel
5 NS-05
as directed by engineer im charge andf with all contractors material, labours, tools
plant machineries consumebeles etc all complete. -
25mm Dia. Coupler Nos 221 -
32mm Dia. Coupler Nos 273 -
Providing and laying RCC in M-40 grade with 20 mm crushed graded stone
aggregates and sand of approved quality in abutment, abutment cap, pier cap,
brackets, corbels, seismic stoppers, walkways with pier cap & pedestals etc.
of all shapes/sizes for all height including cost of all labor, materials, leads & lift,
mechanical mixing, admixture, formwork, shuttering, cantering, scaffoldings,
6 NS-06 concrete placing, compaction with mechanical/electrical vibrators, dewatering, Cum 24392
curing, levelling of surface, and finishing etcin all respects as per drawing &
specifications.
Note:Payment for supply of cement will be made under the contractual BOQ item
no. D 122 as per actual consumption or approved mix proportions (design),
whichever is lower.
-
Extra for Providing and applying (Patent No. 109784/67) inhibited cement slurry
7 NS-07 MT 10011
coating as per specifications and as directed by Engineer - in - charge.
Providing and laying RCC in M-40 grade with 20 mm crushed graded stone
aggregates and sand of approved quality in hollow/solid pier shafts of all
shapes/sizes for all height to be cast by SLIP FORM method including cost of
all labour, materials, admixture (if any)leads & lifts mechanical/electrical vibrators,
11 NS-11 dewatering, curing, levelling of surface, and finishing in all respects as per drawing Cum 24392
& specifications and as directed by Engineer-in charge. The rate shall also include
provision of level gauge from top to bottom of pier shaft as a complete job.
Note:Payment for supply of cement will be made separately as per actual
consumption or approved mix proportions (design). whichever is lower.
-
-
-
28.000 MT. B
A P4
23.000 MT
Excv face P-3
D C P2
28.000 MT. B
A P4
23.000 MT
Excv face P-3
D C P2
Providing and laying RCC in M-40 grade with 20 mm crushed graded stone aggregates and sand of approved quality
in abutment, abutment cap, pier cap, brackets, corbels, seismic stoppers, walkways with pier cap & pedestals etc. of
all shapes/sizes for all height including cost of all labor, materials, leads & lift, mechanical mixing, admixture,
NS-06 formwork, shuttering, cantering, scaffoldings, concrete placing, compaction with mechanical/electrical vibrators,
dewatering, curing, levelling of surface, and finishing etcin all respects as per drawing & specifications.
Note:Payment for supply of cement will be made under the contractual BOQ item no. D 122 as per actual
consumption or approved mix proportions (design), whichever is lower.
Extra for Providing and applying (Patent No. 109784/67) inhibited cement slurry coating as per specifications and as
NS-07
directed by Engineer - in - charge.
Supplying and fixing mechnical coupler/reducers of various diameter of approved quality including transportation, cost
of threading for lapping of reinforcement steel as directed by engineer im charge andf with all contractors material,
NS-05
labours, tools plant machineries consumebeles etc all complete.(Note- Payment for supply of renforcement steel shall
be paid seprately under item F 201
25mm Dia. Coupler
32mm Dia. Coupler
Construction of Tunnel T-13, Part Tunnel T-14 including Station Yard at Basindadhar, Approach Road from ADIT of T-13 (Khanikote) to P2 of T-13 & P-1 of T-14 (Basindadhar) and Bridge No 60 (between KM
61.004 to KM 73.784 approx.) on Katra - Banihal Section of Udhampur-Srinagar-Baramulla New BG Railway Line Project (Package T-13).”
Physical
Financial Target Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KONKAN RAILWAY CORPORATION LIMITED
PROJECT:- USBRL T-13 & T-14 LOCATION:- BRIDGE NO. -60
TITLE:- PCC BACKFILLING FOR A-2 RA-BILL NO & DATE:-R17, 31.03.2022
LEFT SIDE RIGHT SIDE T-14,TUNNEL SIDE REMARKS
S. No. TOP WIDTH BOTTOM WIDTH TOP WIDTH BOTTOM WIDTH TOP WIDTH BOTTOM WIDTH
1 2.400 2.300 1.600 1.300 2.600 2.100
2 3.100 2.400 2.500 2.100 2.600 2.000
3 2.900 2.500 2.500 2.200 2.500 2.100
4 3.300 2.800 2.100 2.300 2.300 2.100
5 2.44 2.3
AVERAGE 2.925 2.500 2.175 1.975 2.488 2.120
AVERAGE T,B 2.713 2.075 2.304