When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.
Symbols
This symbol indicates that casualty or serious accident may occur if you ignore
the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the
safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the
safety instruction.
Safety of Personnel
• The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
• Non-standard and improper high voltage operations may result in fire and electric shock.
• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
• Power off the device before performing operations on the power supply equipment.
• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
• When working at a height, be cautious about falling objects.
Device Safety
• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
• The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
Adjustable wrench
Power cable crimping pliers Wire cutter (with the diameter of at least 32mm)
Combination wrench
(21mm~21mm)for pole installation
Level bar Torque screwdriver (17mm~17mm) for wall installation
2
Space Requirements (Unit: mm)
a RRU Dimensions
285 170
485
00 400
≥6
00 100
≥3
≥ 60
0
80
0
≥500 300
562 562
≥300 200
00 300
≥5
≥ 80
00 80 0
≥5 0 300
≥500 300
3
Installation Modes
The following figure shows the specifications of the metal pole, angle steel, and U-steel where the RRU is installed.
60mm~114mm
m
0
8
m
0
5
m
3
6
m
0
3
50mm~100mm
63mm~80mm
Metal pole Angle steel U-steel
The RRU can be installed on the tower. For details, see page 24 Lifting the RRU and
Installation Components to the Tower
The following figures show the installations of multiple RRUs on the metal poles.
4
Installation Procedure
Start
Prepare the
installation
(slide5)
Install the RRU on a Install the RRU on a Install the RRU on Install the RRU on a
metal pole wall an angle steel U-steel
(slide6~10) (slide11) (slide12) (slide12)
Check the
installation
(slide22)
End
M10x110
Bolt
Main
fixture
Auxiliary
fixture
5
Installing the RRU on a Metal Pole
a Installing a Single RRU in Ordinary Mode
1. Before installing the main fixture, ensure that the contact piece
on the fixture is fixed.
2. When installing the main fixture, keep the arrow on the main
fixture upward.
Arrow
Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main fixture.
You may fit one end of the auxiliary fixture on one dual-nut bolt assembly before installation. And then fit the other end
on the other dual-nut bolt assembly during the installation.
6
Installing the RRU on a Metal Pole
Use an adjustable wrench (21 mm) to tighten the nut. In this way, the main and auxiliary
fixtures are securely mounted on the pole.
When tightening the nuts, ensure that the two dual-nut bolt assemblies are tightened simultaneously. The fastening
torque is 35 N• m to 40 N• m.
The RF port at the bottom of the RRU does not have load bearing capacity.
Do not place the RRU on the ground on its bottom during the installation.
7
Installing the RRU on a Metal Pole
b Installing Two RRUs in Back-To-Back Mode
Install an RRU first. For details, see Install the main fixture of another RRU.
page 6 Installing a Single RRU in Ensure that the main and auxiliary fixtures
Ordinary Mode. are perfectly fitted.
M6x16 M6x16
RRU installed in
reverse mode
Cabling
RRU installed in cavity
ordinary mode
8
Installing the RRU on a Metal Pole
c Installing Multiple RRUs in Centralized Mode
M6x16 M6x16
9
Installing the RRU on a Metal Pole
c Installing Multiple RRUs in Centralized Mode
The following figures show the installation positions for a fourth RRU.
10
Installing the RRU on a Wall
Place the auxiliary fixture Drill holes at the anchor points and then install the
on the wall at the expansion bolt assemblies.
installation position and
M10x65 bolt
then mark the anchor Spring washer 10
points by using a marking
Plastic tube
pen. Flat washer 10
Expansion tube
When RRUs are installed on a wall, the specifications of the wall are as follows:
1. When a single RRU is installed on the wall at the back, the wall must have the load capacity of 1.25 kN bolt stress;
2. When a single RRU is installed on the wall at the side, the wall must have the load capacity of 2.0 kN bolt stress.
3. When three RRUs are installed on the wall at the side, the wall must have the load capacity of 6.0 kN bolt stress.
Fit the auxiliary fixture on the Install the main Install the RRU.
expansion bolts downward, and fixture.
then tighten the bolts by using a
combination wrench (17 mm).
11
Installing the RRU on a U-Steel
U-steel
The procedure for installing the RRU on a U-steel is the same as that for installing the RRU on a metal pole.
Angle steel
The procedure for installing the RRU on an angle steel is the same as that for installing the RRU on a metal pole.
12
Installing the RRU Cables
a Cable Connections of a Single RRU
PGND cable
Antenna
Feeder jumper
Power cable
CPRI optical cable
Alarm cable
AISG multi-wire cable
Feeder
AISG extension cable
BBU
The RET/MON port on the RRU is multi-functional, and can be installed with either AISG multi-wire cable or
alarm cable. When the length of the AISG multi-wire cable is not enough, you can choose the optional AISG
extension cable.
13
Installing the RRU Cables
b Cable Connections of Multiple RRUs
PGND cable
Feeder jumper
Power cable
CPRI optical cable
Antenna
Antenna
Antenna
BBU
For detail information of the cable, see Cable List on Page 15 and 16.
14
Installing the RRU Cables
c Cable List
CPRI optical cable DLC connector The connectors labeled 1A and 1B are
connected to port labeled CPRI_W on
the RRU
15
Installing the RRU Cables
c Cable List
AISG Standard AISG male Standard AISG female connector of the AISG
extension connector multi-wire cable
cable
Standard AISG Standard AISG male connector of the RCU
female connector
Alarm cable DB9 male connector Port labeled RET/MON at the bottom of the RRU
16
Installing the RRU Cables
d Opening and Closing the Cover Plate of the RRU Cabling Cavity
• Open the cover plate of the RRU • Close the cover plated of the RRU cabling
cabling cavity cavity
1. The screw on the cover plate is tightened until the fastening torque is 14 N.m.
2. The screws on the cover plate are tightened in the order shown in the preceding figure.
Cover plate of
The cabling
cavity
Waterproof filler
17
安装RRU线缆
Grounding
bolt
OT terminal
PGND cable
Shielding layer of Strap First wrap the joint
the power cable with the waterproof
tape, and then wrap
the joint with the
PVC insulating tape.
PGND cable
Feeder jumper
Power cable
CPRI optical cable
AISG extension cable
1. Press the strap on the exposed shielding layer of the The tape is wrapped spirally upwards, downwards,
power cable tightly. Ensure that the lower edge of the and then upwards again in three layers. For every two
exposed shielding layer does not exceed the position adjacent tape layers, the tape on the upper layer
shown in the figure. overlaps about half the width of the tape on the lower
2. The shielding layer of the power cable at the end layer.
connecting to the power
For details on how to add the OT terminals to the power cable, see pages 26 to 27
Adding OT Terminals to the Power Cable of the RRU.
18
Installing the RRU Cables
g RRU+APM30/APM30H
Shielding layer
1. The RRU power cable is connected to one group of the LOAD4 to LOAD9 terminals of the PDU.
2. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and
then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30/APM30H.
19
Installing the RRU Cables
h RRU+APM30(+24V)
Shielding layer
1. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and
then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30.
2. The RRU power cable is connected to one group of the LOAD0 to LOAD5 terminals of the DCDU-03C.
20
Installing the RRU Cables
i RRU+TMC
LOAD0
1. When connecting the RRU power cable to the DCDU-03C, you must add an OT terminal to the shielding layer.
Then, fix the OT terminal to the corresponding PGND terminal of the DCDU-03C. For details on how to add an OT
terminal, see pages 26 to 27 Adding OT Terminals to the Power Cable of the RRU.
2. The RRU power cable is connected to one group of the LOAD0 to LOAD5 terminals of the DCDU-03C.
21
RRU Hardware Installation Checklist
No. Items
1 The position for each equipment conforms to the engineering design and meets
the space requirement. Sufficient space is reserved for equipment maintenance.
4 Waterproof check: The empty cable troughs in the cabling cavity of the RRU are
waterproofed. The cover plate is tightly buckled on the cabling cavity of the RRU.
The RF ports that are not connected with RF cables are capped and
waterproofed.
5 No joint lies in the middle of the power cable or the PGND cable.
6 The lugs at both ends of the power cable or the PGND cable are securely
soldered or crimped.
7 The power cable and PGND cable are not short-circuited or reversely connected
and are not damaged or broken.
8 The working grounding and protection grounding of the base station and the
lightning protection grounding of the building share one group of grounding
conductors.
10 All labels, tags, and nameplates are correct, legible, and complete. All the labels
at both ends of the cables, jumpers and feeders are legible.
11 Set the power switch to OFF and check the input voltage (-48 V DC power supply:
-36 V DC to -57 V DC. AC power supply: 150 V AC to 300 V AC). Set the power
switch to ON and check the RUN LED (the RUN LED is ON for 1s and OFF for
1s).
22
Powering On the RRU
The RRU should be powered on in 24 hours after being unpacked. The power off duration of the RRU cannot
exceed 24 hours during maintenance.
23
Reference
a Lift the RRU and installation components to the tower.
Tie one end of a rope to the installation components and the other end to the rope for
binding the RRU.
Lifting rope
Steering rope
24
Reference
a Lift the RRU and installation components to the tower.
Lift the RRU and installation components to the tower.
Pulley
Steering
Lifting rope
rope
B C
1. Installer A climbs onto the tower. Then, fixes the pulley to the support of the tower platform and leads the lifting
rope through the pulley.
2. Installer C uses a lifting rope to bind the RRU and installation components as shown in the preceding figure
and then ties a knot in the steering rope at the handle of the RRU.
3. Installer B pulls the lifting rope downwards, and at the same time, installer C pulls the steering rope away from
the tower to prevent the RRU and installation components from colliding with the tower.
4. Installers A holds the RRU and installation components and unties the ropes
25
Reference
b Adding OT Terminals to the Power Cable of the RRU
OT terminals on the power cable:
OT terminals
26
Reference
b Adding OT Terminals to the Power Cable of the RRU
Assemble an OT terminal on the power cable at the end connecting to the power supply
device.
OT terminal on the
Heat-shrinkable tube PVC insulating tape shielding layer
27
Reference
c Pin Assignment of the RRU AISG Extension cable
Pin of the AISG Pin of the AISG female Wire Color Wire Type Instruction
male connector connector
Blue
Orange
Brown
DB9 waterproof Pin Name Wire Color Wire Type Cord End Label
Connector Terminal
28
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People’s Republic of China
www.huawei.com
Issue: 01
Part Number: 31504691
Date: 2009-03-15