Marine Incinerator
Marine Incinerator
TeamTec Incinerator
OG400C/OG400CS
TG5.2
OG200/400C
Copyright 2003 TeamTec AS. All rights reserved.
No part of this manual may be reproduced, transmitted, stored in a database or translated into
any language or in any form without explicit and written permission of TeamTecAS.
O 4 0 0 C /O G 4 0 0 C S 3
ADDENDUMS, CORRECTIONS AND NOTES
All TeamTec incinerators are made according to EC Type-Examination Certificate MED-B, and are
found to comply with the requirements in the following regulations/standards:
Annex A.1, item NO. A1/2.7 and Annex B, Module B in the Directive. Marpol 73/78 as amended, Annex
VI Regulation 16(2)(a), IMO Res. MEPC. 244(66) adopted April 4th 2014 (Replacing MEPC.76(40)).
Generally, for a design or type approval certificate, it is allowed to make minor modifications to the
equipment. Minor modifications are changes that will not affect the incinerators function or design. The
incinerator type is still the same, and all main functions are identical to the type approved unit and will be
covered by the certificates. The type stamped on the incinerator is the same as we have on the certificate,
but some of the drawings might have letter codes to describe the extra equipment (minor modification) on
your incinerator. All possible letter codes are:
O400C/OG400CS 4
TABLE OF CONTENTS
Table of contents
ADDENDUMS, CORRECTIONS AND NOTES......................................................................................4
ACRONYMS AND TERMS..................................................................................................................... 10
SAFETY MARKINGS.............................................................................................................................. 11
GENERAL USE AND SAFETY INSTRUCTIONS............................................................................... 11
GARBAGE MANAGEMENT.................................................................................................................. 12
INCINERATION OF SOLID AND LIQUID WASTE............................................................................................... 12
SOLID AND LIQUID WASTE THAT IS PROHIBITED TO BE BURNED..................................................................12
SOLID WASTE HANDLING............................................................................................................................. 13
BATCH LOADING...........................................................................................................................................13
SLUICE FEEDING........................................................................................................................................... 13
SLUDGE CAPACITY............................................................................................................................... 13
INTRODUCTION......................................................................................................................................14
INSTRUCTION MANUAL, PURPOSE AND SCOPE.............................................................................................. 14
SERVICE NETWORK FOR TEAMTEC INCINERATORS...................................................................................... 14
CHINA........................................................................................................................................................ 14
MAIN DATA.............................................................................................................................................. 15
PERFORMANCE DATA....................................................................................................................................15
Incinerator (combustion chamber)..........................................................................................................15
Burner (fixed on combustion chamber)................................................................................................... 15
Diesel oil booster pump (optional)..........................................................................................................16
Flue gas fan (bulkhead mounted)............................................................................................................ 16
Sludge tank.............................................................................................................................................. 17
Sludge circulating pump. (installed on sludge tank)............................................................................... 17
Sludge filling pump (if dual sludge tank system).....................................................................................17
Sludge dosage pump (fixed on combustion chamber)............................................................................. 17
Water dosage pump (Optional)............................................................................................................... 17
Diesel oil preheater (fixed on combustion chamber).............................................................................. 18
Electrical control panel incinerator (fixed on combustion chamber)..................................................... 18
Flue gas damper...................................................................................................................................... 18
SHIPS SYSTEM INTERFACE REQUIREMENT.................................................................................................... 19
Electrical................................................................................................................................................. 19
Diesel oil..................................................................................................................................................19
Flue gas duct........................................................................................................................................... 19
Sludge and Steam or Air..........................................................................................................................19
Water and Steam or Air (Optional)......................................................................................................... 19
Sludge tank. (1100 / 1700 / 2000 / 3000l option).................................................................................... 19
Water tank. (435 l) (Optional).................................................................................................................20
TECHNICAL DESCRIPTION.................................................................................................................21
OVERALL SYSTEM FUNCTION DESCRIPTION..................................................................................................21
Combustion chamber...............................................................................................................................21
Flue gas fan............................................................................................................................................. 21
Sludge service tank with heater............................................................................................................... 21
Sludge settling tank with heater (optional)..............................................................................................22
Water injection (Optional).......................................................................................................................22
Water tank (Optional)..............................................................................................................................22
SLUDGE CONTROL........................................................................................................................................ 23
Introduction............................................................................................................................................. 23
Temperature limits...................................................................................................................................23
Burner stage............................................................................................................................................ 23
Control.....................................................................................................................................................24
OPERATOR PANEL................................................................................................................................ 25
OG400C/OG400CS 5
TABLE OF CONTENTS
General.................................................................................................................................................... 25
SCREENS....................................................................................................................................................... 26
Structure.................................................................................................................................................. 26
Pop-up Start -Stop................................................................................................................................... 27
Information pop-up..................................................................................................................................27
Burner......................................................................................................................................................28
Setting tanks.............................................................................................................................................28
Hour counters.......................................................................................................................................... 29
Setup........................................................................................................................................................ 29
Login........................................................................................................................................................30
Wrong user pop-up.................................................................................................................................. 30
Change values..........................................................................................................................................30
Settings burner.........................................................................................................................................31
Settings alarms........................................................................................................................................ 32
Settings sludge (1/5)................................................................................................................................ 33
Settings sludge (2/5)................................................................................................................................ 34
Settings sludge (3/5)................................................................................................................................ 35
Settings sludge (4/5)................................................................................................................................ 36
Settings sludge (5/5)................................................................................................................................ 37
Settings solid waste (1/2).........................................................................................................................38
Settings solid waste (2/2).........................................................................................................................39
Settings sludge with water....................................................................................................................... 40
Settings solid waste and sludge............................................................................................................... 41
Settings loading/slagging and stop..........................................................................................................42
Burn-in.....................................................................................................................................................43
Backlight..................................................................................................................................................44
Time and date.......................................................................................................................................... 44
Program information...............................................................................................................................45
Consumption............................................................................................................................................45
Consumption setup.................................................................................................................................. 45
Alarm system............................................................................................................................................46
The alarm Screen.....................................................................................................................................46
Alarm List................................................................................................................................................ 46
Setting list................................................................................................................................................ 49
Settings frequency inverter ALTIVAR 12.................................................................................................52
PROGRAM DESCRIPTION....................................................................................................................53
OVERALL PROGRAM FUNCTION DESCRIPTION.............................................................................................. 53
General.................................................................................................................................................... 53
Flue Gas Fan/Damper.............................................................................................................................54
Function Sludge program........................................................................................................................54
Function solid waste program.................................................................................................................57
Function Solid waste and sludge program.............................................................................................. 58
MAINTENANCE INSTRUCTION..........................................................................................................59
PREVENTIVE MAINTENANCE......................................................................................................................... 59
Service hours:.......................................................................................................................................... 59
REGULAR MAINTENANCE PROCEDURES......................................................................................... 60
INSPECTION...................................................................................................................................................63
Combustion chamber:..............................................................................................................................63
Diesel oil pump:.......................................................................................................................................63
Flue gas fan:............................................................................................................................................63
Sludge dosage pump:...............................................................................................................................63
CLEANING AND LUBRICATION...................................................................................................................... 64
DISASSEMBLY, REPAIR, REPLACEMENT AND REASSEMBLY.......................................................................... 65
Repair of refractory................................................................................................................................. 65
Restriction Bricks replacement................................................................................................................66
Flue gas fan............................................................................................................................................. 67
Replace flue gas fan impeller:..................................................................................................................................67
Disassembly.........................................................................................................................................................67
Repair...................................................................................................................................................................67
6 OG / 4 0 0 C /O G 4 0 0 C S
TABLE OF CONTENTS
Replacement........................................................................................................................................................ 67
Reassembly.......................................................................................................................................................... 67
To adjust the clearance between impeller and fan house...................................................................................68
Performance verification..................................................................................................................................... 68
Mounting of bearings with tapered bore..................................................................................................................69
Flue Gas Damper Motor......................................................................................................................... 70
SPARE PARTS.......................................................................................................................................... 73
RECOMMENDED MINIMUM SPARE PARTS..................................................................................................... 73
1 YEAR WEAR AND TEAR PARTS OG200/400C, TG5.2................................................................................74
RECOMMENDED ON BOARD REPAIR PARTS,..................................................................................................75
OG200/400C, TG5.2....................................................................................................................................75
STORAGE AND INSTALLATION.........................................................................................................76
PREPARATION FOR SHIPMENT.......................................................................................................................76
STORING AT YARDS WAREHOUSE................................................................................................................76
PRESERVATION FROM INSTALLATION TO START-UP OF EQUIPMENT............................................................ 76
PRESERVATION IN CASE OF LONG TIME STORING AFTER INSTALLATION......................................................76
PRE-COMMISSIONING....................................................................................................................................77
Mechanical completion check list............................................................................................................77
Pre-check of live equipment.................................................................................................................... 77
TEST OF SAFETY AND ALARMS.................................................................................................................... 78
OPERATION INSTRUCTIONS.............................................................................................................. 84
PRIOR TO START........................................................................................................................................... 84
SLAGGING.....................................................................................................................................................84
SOLID WASTE............................................................................................................................................... 84
SLUDGE.........................................................................................................................................................84
SOLID WASTE SLUDGE.................................................................................................................................85
SLUDGE AND WATER................................................................................................................................... 85
EMERGENCY STOP........................................................................................................................................ 86
In the incinerator room............................................................................................................................86
Outside the incinerator room.................................................................................................................. 86
WHEN EMERGENCY STOP IS USED, OR AT BLACK OUT................................................................................. 86
TROUBLE SHOOTING........................................................................................................................... 87
APPENDIX A: PLC..................................................................................................................................90
GENERAL...................................................................................................................................................... 90
BASE UNIT....................................................................................................................................................91
INSERTING SD CARD.................................................................................................................................... 93
REPLACING THE BATTERY............................................................................................................................ 94
DIAGNOSTICS................................................................................................................................................96
APPENDIX B: OPERATOR PANEL.....................................................................................................98
GENERAL...................................................................................................................................................... 98
TECHNICAL DATA......................................................................................................................................... 99
APPENDIX C: OIL BURNER...............................................................................................................101
SERVICING AND ADJUSTMENT.................................................................................................................... 101
Dismantling........................................................................................................................................... 101
Cleaning and adjustment....................................................................................................................... 101
Re-assembly........................................................................................................................................... 101
DIESEL OIL PRESSURE ADJUSTMENT...........................................................................................................101
BURNER BLAST TUBE REPLACEMENT........................................................................................................ 102
Reassembly of blast tube:...................................................................................................................... 103
Oil Burner damper motor replacement................................................................................................. 104
Reassembly of the oil burner damper motor......................................................................................... 105
AIR ADJUSTMENT........................................................................................................................................106
DO NOZZLES...............................................................................................................................................106
Standard nozzle......................................................................................................................................106
OG400C/OG400CS 7
TABLE OF CONTENTS
Maintenance.......................................................................................................................................... 106
Capacities.............................................................................................................................................. 107
Burner nozzle assembly repair.............................................................................................................. 108
Reassembly of burner nozzle assembly..................................................................................................109
Ignition cables replacement...................................................................................................................111
Photo Resistor replacement...................................................................................................................113
Ignition transformer replacement..........................................................................................................114
APPENDIX D: DIESEL OIL PUMP.................................................................................................... 115
APPLICATIONS............................................................................................................................................ 115
PUMP OPERATING PRINCIPLE...................................................................................................................... 115
Bleed...................................................................................................................................................... 115
Cut-off:...................................................................................................................................................115
TECHNICAL DATA....................................................................................................................................... 116
General.................................................................................................................................................. 116
Hydraulic data.......................................................................................................................................116
PUMP DIMENSIONS......................................................................................................................................117
PIPE DIMENSIONS........................................................................................................................................117
INSTALLATION............................................................................................................................................ 118
START UP.................................................................................................................................................... 118
PRESSURE REGULATION..............................................................................................................................118
SYSTEMATIC MAINTENANCE.......................................................................................................................118
PARTS LIST................................................................................................................................................. 119
Oil Burner Fuel Pump replacement...................................................................................................... 120
Burner Pump Shaft Seal replacement....................................................................................................122
Burner pressure regulation kit replacement..........................................................................................124
Spline coupling replacement................................................................................................................. 127
APPENDIX E: FREQUENCY INVERTER ATV12........................................................................... 129
SPECIFICATION............................................................................................................................................129
TECHNICAL CHARACTERISTICS...................................................................................................................130
ACCESSING TERMINAL BLOCKS.................................................................................................................. 131
Power Terminals....................................................................................................................................131
FAULTS – CAUSES – REMEDIES..................................................................................................................132
Drive does no start, no fault displayed..................................................................................................132
APPENDIX F: SLUDGE BURNER......................................................................................................134
CLEANING OF SLUDGE BURNER.................................................................................................................. 134
PROCEDURE FOR ADJUSTING THE SLUDGE BURNER....................................................................................134
APPENDIX G: SLUDGE VALVE........................................................................................................ 135
Valve...................................................................................................................................................... 136
APPENDIX H: SLUDGE DOSAGE PUMP.........................................................................................137
DIMENSION................................................................................................................................................. 137
DISMANTLING AND ASSEMBLY DIAGRAM,..................................................................................................138
PARTS LIST ART. NO. 21270............................................................................................................... 139
INSTALLATION............................................................................................................................................ 140
Installation and Safety Recommendations.............................................................................................140
General.................................................................................................................................................. 140
STORAGE.................................................................................................................................................... 140
Short-term storage.................................................................................................................................140
Long-term storage................................................................................................................................. 140
IMMEDIATELY PRIOR TO INSTALLATION AND STARTING............................................................................ 140
ELECTRICAL................................................................................................................................................141
General safety........................................................................................................................................141
Start-up procedure.................................................................................................................................141
DRY RUNNING.............................................................................................................................................141
MECHANICAL SEALS, ALL PUMPS............................................................................................................... 142
Guards................................................................................................................................................... 142
8 OG / 4 0 0 C /O G 4 0 0 C S
TABLE OF CONTENTS
OG400C/OG400CS 9
ACRONYMS AND TERMS
Acronym/term Definition
The difference noted in a sensor's output as a response to an increasing or
Hysteresis
decreasing input signal of the same value
OG400C/OG400CS 10
SAFETY
Safety markings
The contents of this manual use marking based on ISO 3864-1, with the following
differentiation:
Never turn off the main power before the chamber temperature is down below 170°C.
Never load glass, lithium batteries or spray cans in the incinerator – nor
large quantities of oily rags or filter cartridges. This may damage the flue gas stack and
refractory.
Inspect the cooling jacket every 6 months (open the cover plates) and clean as required
with steam or hot water.
Do never throttle the air/steam needle valve more than ¾ turn closed. If the pressure
increases above green area, clean the sludge burner nozzle.
If experiencing any problem with high temperature in combustion chamber, flue gas or
control of sludge dosing, replace the dosing pump stator.
Do not transfer sludge to the service tank during sludge burning in a single tank system
(can damage the refractory).
As a minimum, heat the sludge over night, without starting the circulating pump. Next
morning drain off the free water and start the sludge programs
OG400C/OG400CS 11
GARBAGE MANAGEMENT
Garbage management
TeamTec recommend working out guidelines for an on-board garbage management plan.
Personnel responsible for operation of the incinerator shall be trained and capable of
implementing the guidance follows by the instruction manual.
Waste incineration on board sea going ships and offshore platforms is world wide regulated by IMO
MARPOL 73/78, RESOLUTION MEPC 76(40), STANDARD SPECIFICATION FOR SHIPBOARD
INCINERATORS, adopted on 25.september 1997, and IMO MARPOL ANNEX VI REGULATION 16
and APPENDIX IV adopted on 26. September 1997 and IMO Res. MEPC. 244(66) adopted April 4th
2014 (Replacing MEPC.76(40)).
MERCURY
LEAD
NICKEL
VANADIUM
ZINC
IMO Annex VI regulation 16 prohibits incineration on ship of certain products, such as
contaminated packaging materials and polychlorinated biphenyls (PCBs).
Do not incinerate metals as soda and food can plates, flatware, serving
spoons/tray, hardware (nuts & bolts), structural pieces, wire rope, chains etc, glass such as
bottles, jars, drinking glasses etc., flammable materials such as bottles or cans containing
flammable liquids or gasses and aerosol cans. Do not incinerate heavy load with plastics or
bulk food waste.
12 OG/400C/OG400CS
GARBAGE MANAGEMENT
Class 2 refuse, consists of approximately even mixture of rubbish and garbage by weight. This
type of waste is common to passenger ships occupancy, consisting of up to 50% moisture, 7%
incombustible solids and has a heating value of about 10.000 kJ/kg as fired.
Be aware that plastics has high calorific value, about 36.000 kJ/kg and must
only be incinerated in small amounts at the same time.
Batch loading
Each morning, providing that the combustion chamber temperature is lower than 170°C, slag
and ashes should be removed. Partly burnt garbage shall remain in the chamber. This garbage
will be fully incinerated at the next sequence of incineration. The air inlet openings in the
bottom of the combustion chamber must be regularly cleaned. This is important in order to let
the combustion air come into the chamber.
Load the combustion chamber to maximum 2/3 height with garbage of type IMO class 2. If high
calorific garbage is loaded, a smaller quantity must be loaded per charge.
Sluice feeding
If sluice is installed, solid waste can be fed into the 55 litre sluice at temperatures between
700°C and 1050°. Fill the trash in a garbage paper bag, open the sluice lid/sluice door and put
the bag into the sluice. Do not jam the trash bag into the sluice or overfill it. Close the lid /
sluice door and rotate the sluice by the handle on the sluice. The recommended waiting time
between each time the sluice can be operated is 210seconds. After the waiting time has elapsed,
the sluice is ready for a new load.
Sludge Capacity
The incinerator is certified according to MEPC 244(66) which determines the sludge to contain
20% water.
A high water content up to 50% water content will result in a higher capacity than what is
mentioned in the certificate. As an example, the sludge with 40% water content will have lower
calorific value than IMO sludge, hence higher hydraulic capacity.
A water content higher than 50% requires a pilot burner (support burner). This reduces the
available capacity for burning of sludge.
OG400C/OG400CS 13
INTRODUCTION
Introduction
Instruction manual, purpose and scope
This user manual is made according to guidelines in the Norwegian Standard NS 5820
The manual will guide the reader/user gradually to an understanding required for safe operation
and maintenance of the incinerator system.
It is important for the user to have a good understanding of the incinerator function, to avoid
malfunction caused by operational errors.
The guarantee will be invalid if problems and/or caused by operational errors or mistreatment.
Tel.: +(47) 37 19 98 00
E-mail: office@teamtec.no
China
Tel: +86-(0)25-86723713
Fax: +86-(0)25-86723747
E-Mail: services@nj-lzep.com
Please note that our main strategy is to offer our customers the best service and quality
spare parts wherever and whenever they need them. To reach this goal we have
established a stock of spare parts and trained service personnel in major ports throughout
the world.
14 OG/400C/OG400CS
MAIN DATA
Main data
Performance data
Incinerator (combustion chamber).
71kg/h (74 l/h) IMO sludge oil IMO sludge (20% water)
Corresponding to: Solid waste max. 400 litre per charge(52kg per IMO class 02 waste
charge) or 55 l/charge continuous feeding
1
USCG Capacity
2
USCG Capacity
OG400C/OG400CS 15
MAIN DATA
Weight (each): 30 kg
Connections: 1/4"
Weight: 12 kg.
Weight: 326 kg
16 OG/400C/OG400CS
MAIN DATA
Sludge tank
Volume: Net: 435, 700, 1100, 1700, 2000, 3000
litres.
Flange rating: PN 16
OG400C/OG400CS 17
MAIN DATA
Enclosure rating IP 55
Size: DN400/DN350
Weight: 68/71 kg
18 OG/400C/OG400CS
MAIN DATA
Diesel oil.
Diesel oil supply line Equipped with a closing
valve. DN 15 flange, max pressure
Connection: 1.5 bar
Recommended filter, mesh
40µm
Max.suction lift 3500mm
Diesel oil return line Connection. DN 15 flange, max pressure
1.5 bar
OG400C/OG400CS 19
MAIN DATA
Detailed information regarding the system is found on the Piping & Instrument Diagram given in the
Drawings section.
Detailed information regarding the system is found on the Piping & Instrument Diagram given in the
Drawings section
20 OG/400C/OG400CS
TECHNICAL DESCRIPTION
Technical description
Overall system function description
The TeamTec Incinerator type OG200/400C is designed for on board incineration of ship's waste oil and solid
refuse. The system consists of 5 main parts:
Combustion chamber with diesel oil burner, sludge burner, pilot fuel heater and electric control panel.
Flue gas damper.
Sludge service tank with circulating pump and heater.
Sludge settling tank with filling pump and heater.(Optional)
Water injection (Optional)
Combustion chamber
The combustion chamber consists of a cylindrical chamber. The trash is ignited by burner in the chamber. The
combustion chamber is equipped with an inspection, which can be opened only while the incinerator is not
burning. The control system will prevent the door from being opened before the set temperature for cooling is
reached.
The flue gas outlet is located at the top of the chamber. The flames from the burners follow a corkscrew
pattern towards the bottom and continue rotation upwards in the centre of the combustion chamber. Remnants
of particulate matters in the gas flow are neutralised by the burner, making the combustion ecologically safe.
As the fumes exits the chamber, cooling air drawn from the lower part of the casing is mixed with the flue gas
to bring the temperature down to approx. 330°C before it pulled out by the flue gas fan and blown out the stack
to atmosphere.
The burning process is monitored by the PLC and scanned by a photo resistor in the burner. The temperatures
are also monitored/regulated automatically by the PLC control system.
Two sight glasses are equipped, for the operator to be able to inspect the amount of trash in the chamber and
the function of the system.
The combustion chamber is of steel construction, lined with specially designed refractory blocks. Between the
steel and refraction there is a 50mm layer of insulation. The refractory material is made of a low cement/high
alumina quality being slag resistant and having very good thermal shock resistance. A double steel casing with
a cooling air jacket forms the outside of the combustion chamber.
The combustion chamber is equipped with a, three-stage diesel oil burner and a steam/air atomising nozzle for
sludge burning. Under the burner assembly, a bracket/drip tray for sludge burning equipment is mounted.
The Diesel Oil burner has 3 stages, automatically controlled by the PLC. In addition there are four stages for
sludge burning, using steam or compressed air for atomising. The sludge burner allows particles up to 4 mm to
pass through. The D.O. burner is monitored by the PLC and has a built in primary air fan and diesel oil pump.
The main electrical control panel is normally fitted on the incinerator and it contains circuit breakers, starters,
frequency inverters, PLC and operator panel. The electric panels are built according to international standards
for marine equipment. The operator panel, which is located at the side of the control panel, has a LCD display
touch screen for selecting burner program modes and for monitoring the burning process.
OG400C/OG400CS 21
TECHNICAL DESCRIPTION
Drain valves (sample points) are mounted on the tank to check the sludge level in the tank. A level transmitter
on the tank provides PLC to generate an animated tank level readout on operator panel (display on incinerator
control panel), and right amount of sludge burned.
A circulating pump is mounted on the tank. The pump transports the sludge to the incinerator and a return line
to the tank is provided, a god mixing of the sludge and water is guaranteed. A low level switch on the tank will
stop the incinerator, the circulating pump and heating when the level has reached a minimum. An indicating
light for heating is placed on the junction box on the tank.
Do not transfer sludge to the service tank during sludge burning
When burning sludge with injected water, the sludge burning capacity increases, NOx in flue gas duct reduces
and it is an easy way to get rid of problem water. Dumping oily water directly into the sea can harm marine life,
and is illegal. Various ports are facing new local regulations on ship emissions, including discharges of ballast
water, gray water, bilge water, and deck runoff, among others. Disposal of the contaminated water in the
incinerator is an easy and effective solution to a complex problem.
The water tank has filling, overflow and ventilation connection. The incinerator has frequency controlled water
dosing pump unit, with suction lift at 3500mm. The water is connected to the incinerator with DN 15 flange
connection.
The water tank has two level switches. A high level switch to stop the filling pump and a low level switch, with
dual contact set, to start the filling pump and to stop the water injection if switch is activated for more than two
minutes. This is to prevent the water dosage pump to run dry. A suitable tank is available from TeamTec.
22 OG/400C/OG400CS
TECHNICAL DESCRIPTION
Sludge control
Introduction
The automatic sludge control logic is designed for burning a maximum amount of sludge, consuming a
minimum amount of diesel, and maintaining a combustion chamber temperature above 870°C (CCT stop
burner diesel oil), see operator panel - settings sludge program page 2/4. Sludge quality is an important factor
for the sludge burning process. The system is capable to handling sludge with a high content of water, but this
might however result in a higher consumption of diesel oil.
Temperature limits
680°C Start sludge burner.
640°C Temperature decrease to this level stop sludge burner and increase sludge quality
counter with 2(see sludge quality control Page 30).
660°C Temperature decrease to this level, after temperature have been above 690°C,
decrease the sludge dosage pump rpm with 40 and increase sludge quality counter
with 2.
690°C Temperature increase to this level increase the sludge dosage pump rpm with 40.
700°C Alarm level for low combustion chamber temperature, if combustion chamber
temperature has been above 850°C. Sluice is available in Solid waste program.
840°C Starts a diesel support burner in addition to the condition at 870°C and increase the
sludge quality counter with 2. Decrease the sludge dosage pump rpm with 100.
870°C Temperature allowing burning sludge alone. Temperature increases to this level an
increase of the sludge dosage pump rpm with 100.
890°C Above this temperature the sludge quality counter will step down by one every
minute.
900°C Sluice is available in Sludge &Solid waste program.
1000°C Temperature increase to this level and above, decrease the sludge dosage pump rpm
with 4 rpm every 30 second if Sludge &Solid waste program is running.
1050°C Sluice is not available in Sludge & Solid waste or Solid waste program.
1050°C Water injection control temperature. Water amount injected to combustion chamber
will increase if CCT is above this level, and decrease if CCT below this level.
1110°C Water injection starts.
1150°C Temperature increase to this level and above, decreases the sludge dosage pump rpm
with 4rpm every 30 second.
Burner stage
STAGE NO 3 Diesel oil nozzles no. 1 + 2.
OG400C/OG400CS 23
TECHNICAL DESCRIPTION
Control
At first start up a sludge burner program, the sludge burner starts when combustion chamber temperature rises
above 680°C, the operator panel will indicate burner stage 5, the sludge dosage pump will be given start speed
200 rpm, and will run at this speed for 60 seconds. During the 60 seconds, burner step 5 will be fixed.
Assuming the sludge is of a good quality the temperature will start to rise. If the temperature raise is >=0°C
over 30 seconds, the sludge dosing pump increase 3 rpm. There will be a sampling of temperature each 30 sec.
and provided there is a temperature raise, a new step of 3 rpm will take place.
If the sludge quality is still good, the sludge dosing pump will be given a new step increase of 50 rpm when
temperature rises above 690°C. The burner stage will be 4. When temperature raise above 870°C the sludge
dosing pump will again be given a new step increase 220 rpm and the burner stage will be 7.
If the sludge contains too much water or chemicals, the temperature is likely to fall below 640°C and the sludge
dosing pump stop. Burner will change to stage 3, and the sludge quality counter will increase with 2 (after an
attempt to stage 5). When temperature rises above 680°C the sludge burner will start again. The burner stage
will then depend of sludge quality number. The sludge quality number is an indication of the quality of the
sludge. A high sludge quality number indicates a sludge with high water content, and burner will use more
diesel oil.
The low temperature alarm, 700°C, will first be activated if temperature has been above 870°C.
24 OG/400C/OG400CS
OPERATOR PANEL
Operator Panel
General
The operator panel is a touch sensitive screen enabling the operator to enter information to the incinerator
control system. The screen is also displaying information from the control system to the operator. The panel is
connected to a PLC, controlling the combustion process. A description of the screens follows. The main picture
is displayed at start up and is possible to access by pressing “main” from most other screens. The screen will
display equipment according to scope of delivery from TeamTecAS
The Main picture has animated feedback to the
operator. The pumps and fans turn green when 1
running. The level switches are animated up or down
according to the level. A level indication is animated 2
at the sludge tanks. There are written numbers
displaying actual measured values positioned 3
approximately according to physical position at the
incinerator. In addition to the buttons at the lower part 4
of the panel, it is possible to press on an item on the
screen to open a different screen or dialogue box. The 5
list below describes the possible options:
6
10
1: Press in the middle of burner to access screen “Burner”
2: Press either of the two figures to access screen “Setting tanks” 11
3: Press heating symbol to access pop-up screen for start/stop heating sludge service tank.
4: Press heating symbol to access pop-up screen for start/stop heating sludge settling tank. 12
5: Press pump symbol to access pop-up screen for start/stop sludge filling pump (SFP).
6: Press pump symbol to access pop-up screen for start/stop sludge circulation pump
(SCP).
7: Press “Stop” button to stop incinerator.
8: Press “Alarm” button to access alarm screen.
9: Press “Hour” button to access screens for hour counting.
10: Press “Slag” button to start loading / slagging program.
11: Press “Setup” button to access screen “Setup” for selection of specific setup screen.
12: Press “Start” button to access pop-up for start / change program.
(The appearance of the screen may differ based on the choice of optional equipment)
OG400C/OG400CS 25
OPERATOR PANEL
Screens
Structure
Logic control system consists of an “Overview” screen and several sub-screens in the order as described below:
Main
Select/start
programs
Setup Burner
Sludge I/O
Solid waste
Information
The control system Pop-up
will activate these SW Sludge
screens. Service
Pop-up
Sludge and Water
Login
Restore
Factory
Burn-in Settings
Display backlight
Date time
Prog. info
Water tank
Hour
General: From all screens it is possible to stop the incinerator by pressing “Stop” It is also possible to access
“Main”, Setup” and “Alarm from all screens.
26 OG/400C/OG400CS
OPERATOR PANEL
Information pop-up
An information pop-up gives information to the
user about irregularities between user actions and
incinerator status. Read the message and press
“Ack”.
The following messages may appear as
information messages:
Not possible to start sludge filling pump low level in sludge settling tank
Not possible to start sludge filling pump high level in sludge service tank
Not possible to start sludge filling pump when sludge program is running
OG400C/OG400CS 27
OPERATOR PANEL
Not possible to start sludge circulation pump low level in sludge service tank
Not possible to start sludge program - low level sludge service tank
Not possible to start solid waste - sludge program - low level sludge service tank
Not possible to start program - Door not closed - please close door
Heating of refractory is finished. Let the incinerator cool down for 10 Hours
Burner
Display actual values and status on motors,
actuators and sensors. No adjustments or
settings on this screen – view only.
Setting tanks
Displays tanks physical attributes and sludge
mass for correct sludge consumption.
28 OG/400C/OG400CS
OPERATOR PANEL
Hour counters
Display last run and total hours. Press “Next”
button to access screen “Hour counters 2”
Setup
Some functions require the operator to login in
order to access a screen or to alter a value in
the setup. This normally indicates that the
operator needs training in order to be aware of
the consequences of his actions.
Select the setup screen you want to access. If
not logged in as user “usr”, values on different
setup screens are “view only”.
OG400C/OG400CS 29
OPERATOR PANEL
Login
Pressing “Setup” will give access to “Login”.
Change values
Plot the value that should be changed. A numeric pop-up will appear:
The present value is displayed on the line. Type in a new value and press return to
accept, or press “ESC” to cancel.
30 OG/400C/OG400CS
OPERATOR PANEL
Settings burner
If not logged in as user “usr”, values on different
setup screens are “view only”. Buttons “Prev.”
and “Next” is used in a circular shift function
between a number of setting screens.
Text Description
Burner damper burner Burner damper opening. Adjusts the amount of air supplied to the
step x combustion process by the burner motor fan.
Factor CCP burner Correction of burner damper opening related to combustion chamber
damper reg. pressure (CCP). Used internally in the control system.
Factor SDP burner Correction of burner damper opening in related to sludge dosage pump
damper reg. (SDP) speed. Used internally by the control system.
OG400C/OG400CS 31
OPERATOR PANEL
Settings alarms
If not logged in as user “usr”, values on
different setup screens are “view only”.
Text Description
Alarm max time diesel The maximum time the diesel heater is activated the first time after start
heater start incinerator. The diesel heater requires extra time at start-up.
Alarm max time diesel The maximum time the diesel heater is activated during incinerating.
heater run
Alarm CCT below Maximum temperature drop combustion chamber temperature (CCT).
minimum operation Related to “Minimum operating CCT”.
temp
32 OG/400C/OG400CS
OPERATOR PANEL
Text Description
CCP start sludge Set point combustion chamber pressure (CCP) when starting a sludge
program
Max. CCP run sludge Maximum combustion chamber pressure (CCP). Used internally as a limit
in the control system
Min. CCP run sludge Minimum combustion chamber pressure (CCP). Used internally as a limit
in the control system
Min. sludge Minimum sludge temperature before starting sludge program. This value is
temperature running also calculating alarm sludge temperature. See alarm settings.
sludge
Alarm sludge The maximum temperature drop in sludge temperature. Related to “Min
temperature low sludge temperature running sludge”.
Alarm sludge temp. The maximum temperature increase in sludge temperature. Related to “Min
high, above normal sludge temperature running sludge”.
Min. CCT for run Minimum combustion chamber temperature (CCT) before starting sludge.
sludge
CCT low hysteresis – Maximum drop combustion chamber temperature (CCT) – stop sludge
stop sludge. dosage system.
OG400C/OG400CS 33
OPERATOR PANEL
Text Description
Time start sludge Time after start sludge dosage pump (SDP) before making adjustments – to
before adjust ensure a stable process before adjusting sludge.
Time check CCT after Time between reading combustion chamber temperature (CCT) and making
adjust adjustments to the process
CCT inc between The minimum increase in combustion chamber temperature (CCT) needed
adjust – inc sludge at time check before making adjustment to process.
CCT inc sludge – dec Minimum combustion chamber temperature (CCT) before decreasing diesel
diesel oil oil and increasing sludge.
Hysdec sludge – inc Maximum drop combustion chamber temperature (CCT) before decreasing
diesel oil sludge and increasing diesel oil.
CCT stop burner Minimum combustion chamber temperature (CCT) before stop diesel oil
diesel oil and further increase sludge.
Hys burner restart Maximum drop combustion chamber temperature (CCT) before restart
diesel oil burner diesel oil and decrease sludge.
Maximum CCT Maximum combustion chamber temperature (CCT) before reducing sludge.
Hys max. CCT – stop Maximum drop combustion chamber temperature (CCT) before stop
dec sludge reducing sludge.
Set CCP running Step Set point for Combustion Chamber Pressure (CCP) is -15mmWC during
4&5 burner stage 4 & 5 as long as the Combustion Chamber Temperature is
below 800°C
Set min CCP for Minimum set point for Combustion Chamber Pressure (CCP) as long as the
temp.regulating Combustion Chamber Temperature is above 800°C
34 OG/400C/OG400CS
OPERATOR PANEL
Text Description
Max. FGT – start Maximum flue gas temperature (FGT) before decreasing combustion
adjust CCP chamber pressure (CCP)
Hys max. FGT – stop Maximum drop flue gas temperature (FGT) before stop decreasing
adjust CCP combustion chamber pressure (CCP)
Time check FGT Time between check flue gas temperature (FGT) before making further
adjust CCP increase in combustion chamber pressure (CCP)
FGT max. inc. CCP Maximum flue gas temperature(FGT), increase combustion chamber
pressure(CCP).
Max. FGT – start Maximum flue gas temperature (FGT) decrease sludge dosage pump (SDP)
adjust SDP RPM RPM.
Hys FGT – stop adjust Minimum drop flue gas temperature (FGT) before stop decreasing sludge
SDP RPM dosage pump (SDP) RPM.
Min. CCT scale CCP Minimum combustion chamber temperature (CCT) in scaling range for
run sludge adjusting combustion chamber pressure (CCP)
Max. CCT scale CCP Maximum combustion chamber temperature (CCT) in scaling range for
run sludge adjusting combustion chamber pressure (CCP)
CCP running burner Set point combustion chamber pressure (CCP) running burner step 6
step 6
OG400C/OG400CS 35
OPERATOR PANEL
Text Description
SDP RPM decrease Decreasing SDP RPM every 30 second if combustion temperature
CCT >Max. CCT run sludge – dec sludge(1/4).
SDP RPM increase Increasing SDP RPM every 30 second if combustion temperature CCT
increases or equal.
Min. RPM SDP Minimum RPM for sludge dosage pump (SDP).
Max. RPM SDP Maximum RPM for sludge dosage pump (SDP).
Sludge quality counter Sludge quality counter number. See Page 29.
Purging start sludge Time for purging sludge nozzle before opening sludge.
Purging stop sludge – Minimum combustion chamber temperature (CCT) for stop purging sludge
CCT below nozzle.
Alarm low level Activate if alarm is needed when sludge service tank low level switch is
Sludge service tank activated.
36 OG/400C/OG400CS
OPERATOR PANEL
Text Description
OG400C/OG400CS 37
OPERATOR PANEL
Text Description
Set burning time On, makes it possible to program a fixed burning time
CCP start-up solid Minimum combustion chamber pressure (CCP) before start burner at start
waste program solid waste program
CCP max. solid waste Maximum combustion chamber pressure (CCP) when running solid waste
program
CCP min. solid waste Minimum combustion chamber pressure (CCP) when running solid waste
program
Maximum CCT Max combustion chamber temperature (CCT), decrease burner stage
38 OG/400C/OG400CS
OPERATOR PANEL
Text Description
Max. FGT start Maximum flue gas temperature (FGT) before start adjusting combustion
adjustment CCP chamber pressure (CCP).
Hysteresis FGT stop Minimum drop flus gas temperature (FGT) before stop adjusting
adjusting CCP combustion chamber pressure (CCP)
CCP inc when FGT Value for increasing combustion chamber pressure (CCP) when flue gas
above set point temperature (FGT) is above set point
CCP dec when FGT Value for decrease combustion chamber pressure (CCP) when flue gas
below set point temperature (FGT) is below set point
Time check FGT Time between reading flue gas temperature (FGT) before making
adjust CCP adjustments to combustion chamber pressure (CCP).
Max. FGT start adjust Maximum flue gas temperature (FGT) before start adjusting burner step.
burner step
Hysteresis FGT stop Minimum drop flue gas temperature (FGT) before stop adjusting burner
adjust burner step step.
Time check FGT Time between reading flue gas temperature (FGT) before making
adjust burner step adjustment to burner step.
OG400C/OG400CS 39
OPERATOR PANEL
Text Description
CCT enable Water Setpoint combustion chamber temperature for water injection to start.
injection
CCT min. for Water Minimum combustion chamber temperature when water injection is
injection enabled.
Setpoint water Setpoint combucstion chamber temperature for control of water injection.
injection Control
Maximum CCP Maximum combustion chamber pressure (CCP) for running sludge with
running sludge with water.
water
Increase RPM WDP Increase of Water dosage pump RPM every 60 second until “Max RPM
WDP” is reached
Setpoint steam/air Minimum pressure to trigger the alarm for pressure low water
pressure min
Setpoint steam/air Maximum pressure to trigger the alarm for pressure high water
pressure max
40 OG/400C/OG400CS
OPERATOR PANEL
Text Description
Max. CCT SW & Maximum combustion chamber temperature (CCT) – reduce sludge when
sludge running solid waste and sludge program.
Hysteresis max. CCT Minimum drop combustion chamber temperature (CCT) – stop reducing
SW & sludge sludge when running solid waste and sludge program.
OG400C/OG400CS 41
OPERATOR PANEL
Text Description
CCP running cooling Set point for combustion chamber pressure (CCP) when running “Stop”
program (cooling).
Auto start of FGF after The flue gas fan atomically starts after the emergency stop is released, if
emergency stop CCT above 220°C.
Stop when CCT below Maximum combustion chamber temperature (CCT) to stop “Stop program”
– cooling.
Hys. stop CCT open Maximum increase combustion chamber temperature (CCT) after stop to
door allow opening of door(s)
42 OG/400C/OG400CS
OPERATOR PANEL
Burn-in
If not logged in as user “usr”, values on
different setup screens are “view only”.
Burn-in program is used for burning in
refractory after long storage periods or
refractory replacement. It runs automatically
for 10 hours, increasing CCT from 200°C to
600°C. A message will appear when refractory
is ready.
Text Description
Temperature set point Set point for combustion chamber temperature CCT, running Burn-in
(view only) program
Hys. chang. burner Hysteresis for temperature set point, when changing burner step.
step
OG400C/OG400CS 43
OPERATOR PANEL
Incinerator configuration
The button “Restore factory settings” can be
used to restore settings to factory
specifications.
If assistance from TeamTec is required, you
might be asked for the incinerator
configuration listed on the screen
Backlight
No user name and password required.
44 OG/400C/OG400CS
OPERATOR PANEL
Program information
Values are view only. If assistance from
TeamTec is required, you might be asked for
the type and version listed on the screen.
Consumption
Display consumption for last run and total.
Press “Setup consumption” to access setup
screen.
Consumption setup
If not logged in as user “usr”, values on
different setup screens are “view only”.
OG400C/OG400CS 45
OPERATOR PANEL
Alarm system
If the control system encounters any irregularities the system will give an alarm and shut down the incinerator.
When an alarm occurs, the internal audible alarm activates and the alarm signal is given to ships alarm system.
The "ALARM" screen will pop-up at the operator panel display and the most recent alarm(s) will be displayed
at the top of the list. The “ALARM” screen will display active alarms as well as the alarm history. A total of
128 alarms (active and history) can be displayed. When additional alarms occur, the oldest alarms will be
deleted from the alarm history list.
Alarms Status:
Symbol Status
! Active Not accepted
*! Active Accepted
Buttons for handling alarm system.
* Not active Accepted
Alarm List
The Alarm-list contains information about which alarms that are available. The reference refers to electrical
drawings.
46 OG/400C/OG400CS
OPERATOR PANEL
Sludge pressure high 1.00 bar Sl. prog -U11 Sludge pressure high.
Sludge temperature low 50°C Sl. prog. -F16 Sludge temperature low.
Sludge temperature high 95°C Sl. prog. -F16 Sludge temperature high.
Sludge service tank temp. 110°C Sl. Prog. +3A-S4 Safety thermostat released.
high5 (require manual reset)
Circuit failure FGT ~ All time -A4 Open circuit in sensor (broken)
or short circuit in amplifier for flue
gas temperature.
Circuit failure CCT ~ All time -A2 Open circuit in sensor (broken)
or short circuit in amplifier for
combustion chamber
3
Optional equipment
4
See motor rating
5
sludge tank w/el. heater
OG400C/OG400CS 47
OPERATOR PANEL
48 OG/400C/OG400CS
OPERATOR PANEL
Setting list
OG400C/OG400CS 49
OPERATOR PANEL
6
Visible if heat tracing installed
7
Visible if heat tracing installed
50 OG/400C/OG400CS
OPERATOR PANEL
Settings
Tanks
TG5
Sludge
Max tank level Volume below low level Tank area density
435 L 500000 mm² 0.96 Kg/L
703 L 217,9 L. 750000 mm² 0.96 Kg/L
1107 L 219,5 L 1020703mm² 0.96 Kg/L
1692 L 277,0 L 1517468 mm² 0.96 Kg/L
2071 L 277,0 L 1517468 mm² 0.96Kg/L
2938 L 622,0 L 1517468 mm² 0.96 Kg/L
3812 L 622,0 L 1985565 mm² 0.96Kg/L
4945 L 550,0 L 1985565 mm² 0.96 Kg/L
OG400C/OG400CS 51
OPERATOR PANEL
52 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
Program description
Overall program function description
The TeamTec Incinerator type OG200/400C is controlled by a Programmable logic controller (PLC) which
handles both the operating functions and the alarm system. The Human Machine Interface (HMI) is a touch
screen operator terminal. The operator terminal allows the user to view and monitor the process and to give
input to the process by choosing appropriate program to the desired task.
The Incinerator has 5 programs to select from; “Sludge”, “Solid waste & Sludge”, “Sludge with Water8”,
“Solid Waste” and “Slag”. Some functions are general and controlled in the same way regardless of choice of
program.
General
The diesel oil burner heats up the incinerator. The burner runs in different steps, each program calculates the
required burner step and the burner responds accordingly by controlling the diesel oil valves, the burner air
damper the burner motor and the ignition electrodes.
The airflow through the burner is adjusted by the burner damper to different air flow at different steps on the
burner. The damper opening is corrected for the actual pressure in the combustion chamber (CCP) and the
actual speed of the sludge dosing pump (SDP)
8
Optional Water injection
OG400C/OG400CS 53
MAINTENANCE INSTRUCTION
Burner step 0 X X X X
Burner step 1 X X X X
Burner step 2 X X X X
Burner step 3 X X X X
The temperature and pressure in the combustion chamber is controlled by calculations in the control system.
54 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
By adjusting:
All checks of temperature are made in time intervals. After each change in state or function, further
adjustments are not made until time interval has elapsed.
At the end of each time interval (30-60 sec. - adjustable), the change in combustion chamber temperature (CCT)
is calculated. Depending of temperature raise (or drop), adjustments are made, according to calculations, to
components that will influence the combustion chamber temperature (CCT), and the present combustion
chamber temperature (CCT) is stored.
At the end of next time interval new calculations are made with reference to stored and actual combustion
chamber temperature (CCT) and components adjusted again.
OG400C/OG400CS 55
MAINTENANCE INSTRUCTION
56 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
Note: All references to settings and values are for explanation only. The values on your incinerator or
application may be different.
The program assumes a batch load of waste in the incinerator and will have initial speed and pressure set points
to facilitate enough combustion air to handle this (CCP=28 mmWC, burnerstep 1).
All checks of temperature are made in time interval. After each change in state or function, further adjustments
are not made until time interval has elapsed.
At the end of each time interval (40 sec), the change in combustion chamber temperature (CCT) is calculated.
Depending of temperature raise (or drop), adjustments are made, according to calculations, to components that
will influence the combustion chamber temperature (CCT), and the present combustion chamber temperature
(CCT) is stored.
At the end of next time interval new calculations are made with reference to stored and actual combustion
chamber temperature (CCT) and components adjusted again according to tabular below.
Delta CCT Delta step 1 Delta Delta Delta step Delta step
step 2 step 3 4 5
CCT < -1C°
STEP CCT -1 to + 3 to +10 to > +17C°
+3C° +10C° +17C°
> 1000C° P +1 0 -2 -4 -5
4 B 0 -1 -1 -1 -2
860 - 1000C° P +2 +1 0 -2 -4
3 B +1 0 0 -1 -1
700 – 860C° P +4 +3 +2 0 -2
2 B +1 +1 +1 0 0
< 700C° P +8 +6 +4 +2 0
1 B +1 +1 +1 +1 0
P = Combustion chamber pressure (-mmWC)
B = Burnerstep
Delta CCT = Temperature rise after 40 seconds.
The diesel oil burner heats up the incinerator. The burner starts and runs in 3 steps (burner step 1-3). Change in
burner steps are made in time intervals as described above.
When combustion chamber temperature (CCT) reaches set point 1000°C, the diesel oil burner reduces one step,
and further increase in combustion chamber temperature (CCT), reduces burner to step 1.
At the end of time interval (see description above), corrections are made to combustion chamber pressure
(CCP), according to calculations involving a combination of actual temperature in combustion chamber (CCT)
and the temperature raise (or drop) since last correction.
Combustion chamber pressure is also controlled by the flue gas temperature (FGT). At flue gas temperature
(FGT) above set point (330 °C), the control system overrides calculations made in time interval (as described
above).
OG400C/OG400CS 57
MAINTENANCE INSTRUCTION
58 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
Maintenance instruction
Preventive maintenance
Preventive maintenance periods are defined in the
control system apart from the daily checks. The
control system counts the running hours of the diesel
oil burner. Each group is connected to a list of service
points required to perform. The preventive
maintenance is divided into four groups: Weekly,
monthly, 6 monthly and yearly. Based on experience
the intervals correspond to respectively 100h, 400h,
2500h and 5000h programmed with a service interval
“Hours service”. 6 monthly and yearly service is also
triggered by standby time on the incinerator. When
the actual running hours since last performed
maintenance exceeds the service interval the control
system calls for service by a pop up screen.
It is then required to follow the appropriate procedure. When the maintenance has been carried out press
“Done” and “Hours since last service” is reset. If not logged in as user “usr”, values on different setup screens
are “view only”. Also the “Done” buttons are only visible if user “usr” has logged in.
Service hours:
When “Hours since last service” is above
setting “Hours service”, a red banner is
activated in line for the item. By pressing
“Done”, the hour counter “Hours since last
service” is reset to 0 and the red banner is
turned off.
If otherwise not specified, no testing of equipment is needed before turning incinerator system back on
again after maintenance task is completed
OG400C/OG400CS 59
MAINTENANCE INSTRUCTION
60 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
OG400C/OG400CS 61
MAINTENANCE INSTRUCTION
27 Replace nozzles Yearly (5000 hours Allen key, 3 mm See service video
for D.O. burner or 365 days) Allen key, 4 mm
with new ones. 14mm wrench
16mm wrench
19mm wrench
27mm wrench
Screwdriver,
flathead, 6 mm
62 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
Inspection
ITEM ACTION
Combustion chamber: Monthly check: Check visually the refractory inside the combustion chamber. If
pieces of refractory have fallen out so the insulation or steel is visible, then use of
the incinerator must be discontinued until a repair has been carried out. Pay
attention to residue on the walls. If this is over 20 mm thick, remove this by means
of a wire brush and a paint-scraper. Do not use a hammer!
Diesel oil pump: Daily check: Check visually for leakage. The pressure is to be checked daily. If
pressure drops below 16 bar and cannot be adjusted by means of the adjustment
screw, clean the filter. (Ref. Appendix D )
To clean the filters, proceed as follows:
Close the valves on supply and return line to D.O. pump. Remove all 8 bolts at the
end the pump opposite the drive-side. Remove the end cover and the cover gasket.
The filter is now visible and can be pulled out without the use of tools. Clean the
filter in diesel oil and blow dry with compressed air. Reassemble and adjust the
pressure to 16 bar.
Flue gas fan: Monthly check: Check the fan belts for sufficient tightness. Correct deflection is 10
mm using a force of approx. 3 kg. weight load.
Sludge dosage pump: Weekly check: Check visually for leakage. Turn the shaft by hand to check it is
moving freely.
OG400C/OG400CS 63
MAINTENANCE INSTRUCTION
Photo resistor: The photo resistor should be cleaned by means of a damp cloth every week.
Diesel oil burner: Caution: The main switch must be in OFF position whenever working with
the burner.
For dismantling and re-assembly, see Appendix C. The blast tube, flame
scrod and diesel nozzle should be cleaned every month. This can be
cleaned with Kerosene, White Spirit or Marine Diesel Oil and a brush. The
electrodes should be wiped off with a cloth dipped in one of the above
mentioned agents.
Diesel oil pump: The filter must be cleaned every 6 month. For dismantling and re-assembly,
see Appendix D.
Flue gas fan: The grease in the bearings must be changed every six months. Make sure
the bearings are clean before they are re-greased. Pay special attention to
reinstalling of the top half of the housing to its respective base after re-
greasing. The top halves must not be mixed; each top half is made unique to
the base.
Also check the tension of the V-belts.
Door hinges: Door hinges to be greased every six months. Use ordinary ball bearing
grease.
Sluice: The sluice bearings must be lubricated every month. Use a graphite grease
type Esso Beacon Q2 or equal.
Unscrew the blinding plug and lubricate the nipple. Replace the plug. Also
lubricate the bearing on the opposite side by lubricating the nipple through
the expanded metal.
Pusher: Lubricate the bearings for the pusher with a grease gun every 6-month. Use
heat resistant type (Esso Beacon EP2 or equal).
Sludge nozzle: The sludge nozzle should be cleaned every month, if necessary.
For dismantling and re-assembly, see Appendix.
64 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
For detailed instructions of all maintenance tasks, please see the “Teamtec
incinerator service video” supplied by Teamtec
Repair of refractory
Main power switch must be turned off before starting this maintenance task. Check that the
incinerator combustion chamber is cold.
CALDE PATCH PT 88U is delivered in 25 Kg plastic containers and is used for small incinerator brick
repairs, article 11878.
The following working should be applied when using CALDE PATCH PT88U:
1. The surface should be clean(ed) and all loose material should be removed to secure a firm
binding between the repair substance and the bricks.
2. The bricks should be padded one by one, meaning no Calde Patch to bind two bricks together.
3. Do not fill the gaps between the bricks with Calde Patch. The bricks need
the space for heat expansion. Preferably use cardboard between the
bricks when padding the brick edges.
4. If there is some OLD repair substance left on the area that is to be fixed, it is important to add
some water to this part of the area and make it wet BEFORE new repair substance is added to
the spot.
5. CALDE PATCH PT88U consists of proximately 20% water to obtain a plastic substance that
can easily be worked with. The material is VERY sensitive to additional water content.
(Additional water should not be added without consulting to TeamTec AS first).
6. CALDE PATCH PT88U shall be added to the bricks by means of a stopping knife until the right
thickness has been reached. The thickness should be at least 10mm, but not so much it causes
sagging. The material will have to dry for some hours before the next layer is added, if necessary.
7. We advise to dry the material over night by means of an electrical heater (max 50 degrees)
before the incinerator is started up again. I your incinerator have a burn in program; please use
this for 5 to 6 hours the day after padding, before reverting to normal incineration.
OG400C/OG400CS 65
MAINTENANCE INSTRUCTION
Main power switch must be turned off before starting this maintenance task. Check that the
incinerator combustion chamber is cold.
1. There are 4 bricks located at the outlet of the combustion chamber. The 4 bricks are
forming a circle and are self locking.
2. Push one brick up and then the three other are loose.
66 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
Disassembly
1. Switch off the power and make sure it cannot be switched on again while the unit is under
repair.
2. Disconnect the electrical cables to the motor.
3. Remove the 16 bolts pos. 30 on the cover (motor end of the fan housing).
4. Remove the 4 bolts for the bearing stand (fan base).
5. Slide the bearing stand assembly backwards from the fan housing till the impeller is clear of
the housing.
6. Carefully turn the bearing stand assembly to get access to the impeller.
7. The impeller is attached to the shaft with a taper lock hub. On the hub, unscrew the two
hexagon screws. By inserting one of the screws in the third hole (the one not in use), the
impeller will come off the hub when the screw is screwed in.
Repair
It is not advisable to repair an impeller unless one has access to balancing equipment.
Replacement
No special procedure is required except for cleaning the shaft and the hub before the hub is
placed on the shaft.
Reassembly
1. Remove the hexagon screws from the third hole. Insert the taper lock
hub in the impeller and put the two hexagon screws back to their original
position and tighten.
2. Carefully slide the bearing stand assembly back into the fan house.
3. Put the 4 bolts for the bearing stand back and tighten
4. But back the 16 bolts for fastening the bearing base to the fan housing
and tighten.
OG400C/OG400CS 67
MAINTENANCE INSTRUCTION
Performance verification
1. Run the fan in cold and hot condition and listen for noise.
2. Inspect that the fan is able to provide at least 100 mm WC negative pressure in the
combustion chamber. (Cold gas.)
68 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
OG400C/OG400CS 69
MAINTENANCE INSTRUCTION
(Demo pictures only. The motor can be replaced without dismantling the damper unit from the stack)
Tools needed:
- Wrench set, metric
1. Disconnect the cables from the junction box (remember the color combination) and
loosen the lock bolt shown at the picture.
70 OG/400C/OG400CS
MAINTENANCE INSTRUCTION
4. Unscrew one of the bolts for the bracket shown at the picture below in order to turn
the bracket and free the motor.
5. Picture below is showing all parts in the new damper motor kit. The marked parts
will not be needed, as they are excessive part! Use the previously dismantled
original parts!
6. Enter the marked unit into the motor and lock it with shaft lock shown at point 2.
7. Make sure that the motor can turn 90° by pressing the button marked at the picture
and turn the shaft.
OG400C/OG400CS 71
MAINTENANCE INSTRUCTION
8. Assemble the motor to the damper. The damper flap position is marked with a cut in
the shaft end. Remember to tighten the bolt shown in point 1 and the bracket shown
in point 4.
Connect the wires. Test that the motor is turning correctly. Ex. If the motor turns the flap open when it is
supposed to close, you should change the position for the orange and the violet wires
72 OG/400C/OG400CS
SPARE PARTS
Spare parts
Recommended Minimum spare parts
Article / Name 17910 / Minimum Spare Parts, OG200/400C, TG5
OG400C/OG400CS 73
SPARE PARTS
74 OG/400C/OG400CS
SPARE PARTS
OG400C/OG400CS 75
STORAGE AND INSTALLATION
76 OG/400C/OG400CS
STORAGE AND INSTALLATION
Pre-commissioning
Mechanical completion check list.
Prior to function testing at first start up, the following mechanical completion must be checked.
1. Check that the foundation support and the deck strength are adequate for the incinerator unit. (5. ton)
2. Check that flue gas fan foundation is of a sturdy design for fan to run without vibration.
3. Check that the air inlet to the incinerator room has sufficient capacity.
4. Check that the necessary drainpipe is installed and connected.
5. Check that the incinerator door can be fully opened and locked in the installed locking mechanism.
6. Check that the insulation, flue gas duct and flue gas fan is installed and fixed.
7. Check that the flue gas duct is not welded direct into painted wall penetration. (fire hazard)
8. Check that the refractory brickwork has been dried out with a portable heater for 48 hours at
approximately 100°C.
9. Check that the “Burn In” program has been run for 10 hours. The “Burn In” program starts with a
combustion chamber temperature at 200°C and runs for 10 hours. The Burn In Program is available
from the set up menu in the operator panel when logged in as user.
10. Check the diesel oil line for correct hook up, and make sure that no valve is closed on the return line.
(A blocked return line will result in a leak in the diesel oil pump shaft seal)
11. Check the electrical power supply for correct rated protection at the ship distribution board.
12. Check that all pipes, ducts and cables hooked up have been correctly completed according to
arrangement drawings.
Pre-check of live equipment.
After having checked out the above items, a function test according to this manual can take place
OG400C/OG400CS 77
STORAGE AND INSTALLATION
2. FLUE GAS TEMP. HIGH At flue gas temperature above alarm set
Adjust alarm set point point, the alarm will activate and the burner
[Alarm max. FGT] stops.
below operating temp. Flue gas temp. FGT high
5. MOTOR OVERLOAD The motor stops, the alarm will activate and
Activate test button at front the burner stops.
of the motor circuit breaker.
78 OG/400C/OG400CS
STORAGE AND INSTALLATION
9. DIESEL OIL TEMP LOW At start of heating the alarm activates and
Start a burner program. the burner stops.
Adjust alarm set point
[Alarm max. time dieselheater
start]
to "0". Diesel oil temp. low
OG400C/OG400CS 79
STORAGE AND INSTALLATION
13. STEAM/AIR PRESSURE After 10 sec. alarm activates and the burner
SLUDGE LOW stops.
Adjust [Alarm setpoint
minimum steam/air pressure]
setting to 4.5 bar.
Steam/air press. - sludge low
Start a sludge program.
When running sludge, close
off steam-air supply.
14. STEAM/AIR PRESSURE After 10 sec. alarm activates and the burner
SLUDGE HIGH stops.
Adjust [Alarm setpoint
maximum steam/air pressure]
setting to 1 bar. Steam/air press. - sludge high
Start a sludge program.
15. SLUDGE PRESSURE LOW After 10 sec. alarm activates and the burner
Adjust [Alarm setpoint stops.
minimum sludge pressure]
setting to 1 bar. Sludge pressure low
80 OG/400C/OG400CS
STORAGE AND INSTALLATION
18. SLUDGE TEMP HIGH Alarm activates and the burner stops.
Start a sludge program.
Adjust set point
[Min. sludge temp run sludge]
below actual temperature and
adjust alarm set point to 0. Sludge temperature high
[Alarm sludge temp high]
20. ERROR MODBUS COMM. Alarm activates and the burner stops.
SLAVE 2 SDP
Withdraw the modbus plug on
the inverter –U4, wait for Error Modbus comm. slave 2 SDP
alarm modbus comm.
OG400C/OG400CS 81
STORAGE AND INSTALLATION
22. LOW LEVEL SLUDGE After 10 sec. delay the Alarm/Warning activates
SERVICE TANK and burner stops
Activate test lever if
mounted or disconnect Low level sludge service tank
cable.
Start a sludge program.
23. CIRCUIT FAILURE CCT Alarm activates and the burner stops.
Disconnect wire from A2
Cartrige AI0 Circuit failure CCT
24. CIRCUIT FAILURE SDP Alarm activates and the burner stops.
TEMP
Disconnect wire from A2
Cartrige AI1 Circuit failure SDP Temp
9
Sludge tank with el. heater.
82 OG/400C/OG400CS
STORAGE AND INSTALLATION
OG400C/OG400CS 83
TROUBLE SHOOTING
Operation instructions
Prior to start
1. Main switch on the control panel is switched to position "ON". The operator panel is
energised and the Process picture will show in the display.
Slagging
1. Check that there are no flames in the incinerator.
2. Push the "SLAG" key, the flue gas fan will run at a fixed speed when the temperature is
below 170°C (+50 hysteresis).
3. Open the ash door and remove ashes and slag, partly burned cans, can remain. These will
burn out eventually.
NOTE! Combustion air inlet openings at "floor" level must be cleaned.
This is important for a free airflow to the combustion chamber.
Solid Waste
1. Fill the combustion chamber half full with waste (max 400 L)
NOTE: The Solid waste program start up sequence assumes a batch load. If the incinerator
is to be heated up without a batch load, choose the sludge program.
2. Close the door.
3. Push the key "START" and choose "SOLID WASTE" from the menu. The flue gas fan will
start and automatically control the pressure in the chamber. If there are conditions not met
required for starting the incinerator, the operator panel will display a message explaining the
condition. If an exact burning time is wanted, it can be activated from the “Settings Solid
Waste (1/3)” menu. After the time has elapsed the incinerator stops, and the cooling down
sequence starts.
4. When the key "STOP" is pushed, the burner will stop, and the cooling down sequence starts.
5. When the temperature in the combustion chamber has decreased to 170°C, the flue gas fan
will stop and door locks energized.
Sludge
1. Fill up the sludge tank10 and activate the heater. This is done by the pressing the heater
symbol on the operator panel. Choose start heater and the heater symbol will change colour
to indicate that the heater is on and the temperature is controlled locally by the thermostat
2. Drain off water from the settling tank. (The sludge should be settled overnight before water
is drained off). Remember, longer settling time, better settling!
3. Start the filling pump by pressing the pump symbol and choose start pump. The symbol will
change colour to green to indicate that the pump is running. The pump will stop
automatically if the service tank level is high or the settling tank level is low.
4. Activate the heater on the service tank. This is done by the pressing the heater symbol on
the operator panel. Choose start heater and the heater symbol will change colour to indicate
that the heater is on and the temperature is controlled locally by the thermostat
10
If no dual tank system, jump to point 4.
84 OG/400C/OG400CS
STORAGE AND INSTALLATION
5. Drain off water from the service tank. (The sludge should be settled overnight before water
is drained off). Remember, longer settling time, better settling!
6. Start the service tank circulation pump by pressing the pump symbol and choose start pump.
The symbol will change colour to green to indicate that the pump is running. Check the
sludge pressure on the pressure indicator to be in the range of 0.2 bar, adjust if required,
using the bypass valve. Run the circulation pump for at least 1 hour prior to burning sludge!
7. Check the atomising -air /-steam supply pressure to be 6 - 8 bar. If steam is used, the
condensate must be drained off by use of the valve located at sludge equipment drip tray.
8. Push the key "START" and choose "SLUDGE" from the menu. The flue gas fan will start
and automatically control the pressure in the chamber. If there are conditions not met
required for starting the incinerator, the operator panel will display a message explaining the
condition.
9. The manual regulating valve for air / steam atomising located at sludge equipment drip tray
should be from ¾ to 1 turn open. The pressure should be shown in the upper half of the
green area (3.3 bar or 48 PSI) when the sludge burner/nozzle is clean. If pressure rises, do
NOT adjust the valve, but clean the sludge burner.
10. When the low level in sludge tank, or the key "STOP" is pushed, the burner will stop, and
the cooling down sequence starts.
11. When the temperature in the combustion chamber has decreased to 170°C the flue gas fan
will stop and door locks will be energized.
OG400C/OG400CS 85
TROUBLE SHOOTING
Emergency stop
In the incinerator room.
Turn the main switch at the control panel "OFF".
Safety warning: If smoke exits the incinerator to the incinerator room, evacuate the room
immediately. Risk of of loss of health and life.
86 OG/400C/OG400CS
TROUBLE SHOOTING
Trouble shooting
Symptom Probable cause Checkout procedure
1. OPERATOR PANEL 1. Faulty main power supply. Check main switch -Q1Check
DEAD. power supply from main
switchboard.
2. Emergency stop switch Check switch -S1.
open.
3. Faulty fuse for pilot Check fuses –F12 and –F13
transformer.
4. Faulty fuse -F13. Check fuse.
Change stator.
3. Damaged sludge dosing
pump stator.
Adjust to correct setting.
4. Sludge pressure to high. (0.2 bar)
5. Temperature raising 1. Loaded too much waste Stop loading, and tray to block
"uncontrolled" with high calorific value. lower four corner ventilation
slots.
2. Damaged sludge dosing Change stator.
pump stator.
3. Sludge speed control not Check sludge speed.
working.
4. Leaking diesel oil solenoid Change the valve.
valve.
OG400C/OG400CS 87
TROUBLE SHOOTING
88 OG/400C/OG400CS
TROUBLE SHOOTING
10. DRAUGHT FAILURE 1. Leaking sensor tube. Check sensor tube for damage
(low under pressure) and fixing.
12. LOW CAPACITY 1. Blocked air cooling inlet. Clean inlet. (Bottom grating)
OG400C/OG400CS 89
APPENDIX A
Appendix A: PLC
General
The Standard PLC contain of 4 units. See Figure 11 and 12.
1 2 3 4
Figure 11
90 OG/400C/OG400CS
APPENDIX A
Base Unit
Figure 12
1. Status LEDs
2. Output removable screw terminal block
3. Clip-on lock for 35-mm (1.38in.)
4. Ethernet port
5. 220Vac 50/60Hz Power supply
6. USB mini-B programming port
7. Serial line port 1
8. SD Card slot
9. 2 analogue inputs
10. Run/Stop switch
11. Input removable screw terminal block
12. I/O Expansion connector
13. Cartrige slot 1
14. Cartrige slot 2
OG400C/OG400CS 91
APPENDIX A
92 OG/400C/OG400CS
APPENDIX A
Inserting SD card
When new program is received this will be installed from the SD Card slot.
Follow the steps listed to reprogram the plc.
3. Check the Status LED on the plc, when the SD label is activated the SD card program is
being downloaded to the plc.
4. When the LED switches off and the PLC Run indication is activated, remove the SD card
from the plc. (Step 2-1)
OG400C/OG400CS 93
APPENDIX A
Replacing the battery when the controller is powered down will lose all user
application memory. Always replace the battery when the controller is powered on!
Follow the procedure 1-3 below to connect the new battery to the plc.
94 OG/400C/OG400CS
APPENDIX A
A
C
Dimension:
A – 90mm (3.5 in.)
B – 29.4mm (1.157 in.)
C – 27.4mm (1.07 in.)
OG400C/OG400CS 95
APPENDIX A
Diagnostics
96 OG/400C/OG400CS
APPENDIX A
OG400C/OG400CS 97
APPENDIX B
Figure 14.
See also chapter Operator Panel, page 26, for user functions.
98 OG/400C/OG400CS
APPENDIX B
Technical data
USB
Figure 15
Battery/SD Card Ethernet
The operator panel is an Ethernet only display with 2 USB port, and consist of a colour
(640X480) graphics display. Colour terminals support a fixed palette of 256 standard VGA
colours. All colours in an application is defined when the application is created, and not
selectable at the terminal.
The SD flash slot is used to program the display. Normally this will be done by TeamTec
personnel.
The operator panel is connected to the PLC with Ethernet communication.
The terminal requires 24VDC.
Display temperature should be less than 55°C. The CPU temperature should be less than 95°C.
The terminal has one LED indicator that shows listed operations:
Color Indication Description
Green On Offline
In Operation
Orange Flashing Software starting up
Red On Power is turned ON
- Off Power is turned OFF
OG400C/OG400CS 99
APPENDIX B
Product certification compliance with European Union Directives. EMC tests satisfies EN
50081-1-2:1993 and EN 61000-6-2:1999
100 OG/400C/OG400CS
APPENDIX C
Appendix C: Oil
burner
Servicing and
adjustment
Air damper motor
1
DO pump
Dismantling
DO press. adjustment screw
DO pressure transmitter
2 5
1. Pull out the photo cell.
3
1. Remove the cover on top of the burner.
2. Disconnect the ignition cables.
3. Disconnect and pull out the sludge burner.
4. Disconnect and pull out the nozzle line.
4
Cleaning and
adjustment Ignition electrode
(Figure 1)
Flame scrod
Clean the blast tube,
flame scrod,
Blast tube
ignition electrodes
and sludge burner.
Replace the diesel
oil nozzle if
necessary.
Nozzle 2
Note: The Sludge burner
smallest nozzle is Nozzle 1
Figure 1
stage one. Check
the spark gap and
the position of the flame scrod.
Re-assembly
Re-assembly the burner in reverse order.
OG400C/OG400CS 101
APPENDIX C
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Allen key set, metric
- Hammer and chisel
102 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX C
4. The blast tube is now loose and can be pushed into the combustion chamber.
Note: Due to soot deposits, the blast tube might be stuck. Use a hammer and chisel carefully to get
loosen the blast tube.
Note: The blast tube should be adjusted in order for the two screws mentioned in point 3 to be in the
middle of the sliding track.
OG400C/OG400CS 103
APPENDIX C
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Screwdriver set
- Allen key set, metric
104 OG/400C/OG400CS
APPENDIX C
PS! Make sure that the shaft is in approx. mid position when assembling, and that the damper flap is in closed
position.
OG400C/OG400CS 105
APPENDIX C
Air adjustment
The Burner damper motor is analogue, and will open the damper proportionally to the control voltage applied
by the control system. The only two checks necessary is Closed position and that it operates freely.
To check that the damper is closed make sure that the damper blade is vertical to the opening when the control
system shows 0% opening (after power up, flue gas fan not running).
To check that the damper operates freely, wind up the actuator by using a 4mm hex key on the top of the
damper motor, then release and observe that the damper closed by the spring action.
DO nozzles
Standard nozzle
Incinerator Nozzle 1 Nozzle 2 Std. pressure DO temp.
OG 200C 2.5 GPH 60 4.5 GPH 45 16 bar 50°C
OG 400C 2.5 GPH 60 4.5 GPH 45 16 bar 50°C
GS 500C 3.5 GPH 60 5.5 GPH 45 16 bar 50°C
OG200/400C 4.5 GPH 45° 6.5 GPH 45° 16 bar 50 °C
For special cases other nozzles can be used.
Maintenance
Burner nozzle cannot be repaired.
106 OG/400C/OG400CS
APPENDIX C
Capacities
Oil burner nozzle capacities in l/h at various pressures.11
Rated flow 12 Pressure in bar
G.P.H. l/h 10 11 12 13 14 15 16
1,50 5,68 6,82 7,12 7,41 7,71 8,00 8,24 8,47
1,65 6,25 7,41 7,82 8,24 8,53 8,82 9,29 9,76
1,75 6,62 7,88 8,29 8,71 9,06 9,41 9,71 10,00
2,00 7,57 9,06 9,47 9,88 10,29 10,71 11,06 11,41
2,25 8,52 10,24 10,71 11,18 11,59 12,00 12,41 12,82
2,50 9,46 11,29 11,82 12,35 12,88 13,41 13,88 14,35
3,00 11,36 13,53 14,18 14,82 15,47 16,12 16,65 17,18
3,50 13,25 15,88 16,65 17,41 18,06 18,71 19,35 20,00
4,00 15,14 18,12 19,00 19,88 20,65 21,41 22,18 22,94
4,50 17,03 20,35 21,35 22,35 23,24 24,12 24,94 25,76
5,00 18,93 22,59 23,71 24,82 25,82 26,82 27,71 28,59
5,50 20,82 24,82 26,06 27,29 28,35 29,41 30,47 31,53
6,00 22,71 27,18 28,47 29,76 30,94 32,12 33,24 34,35
6,50 24,61 29,41 30,59 31,76 33,53 35,29 36,47 37,65
7,00 26,50 31,76 33,53 35,29 36,47 37,65 38,82 40,00
7,50 28,39 34,12 35,88 37,65 38,82 40,00 41,76 43,53
8,00 30,28 36,47 38,24 40,00 41,18 42,35 44,12 45,88
11
Sp gr 0,85 @ 25C and viscosity 1,3E @ 20°C
12
Pressure = 100 P.S.I.
OG400C/OG400CS 107
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Allen key set, metric
108 OG/400C/OG400CS
APPENDIX D
3. Loosen the two screws marked at the picture in order to dismantle the electrodes and the flame scrod
and then unscrew the D.O. nozzles!
16788
17304
Note! Adjustment of ignition electrodes and flame scrod needed. The 1 mm indicated is from the top
of the fastening sleeve of the flame scrod to the top of the main body of the burner head. See also
next page.
OG400C/OG400CS 109
APPENDIX D
110 OG/400C/OG400CS
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Allen key set, metric
OG400C/OG400CS 111
APPENDIX D
112 OG/400C/OG400CS
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Screwdriver set
- Allen key set, metric
1. Connect the cables for the photo resistor back into the terminal block
2. Put the two covers back, an tighten the scews to hold them in place
3. Put the photo resistor back into its socket
OG400C/OG400CS 113
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Allen key set, metric
1. Mount the ignition transformer on the burner by fastening the two screws.
2. Reattach the two cables into the ignition transformer.
3. Put the inspection cover back on and tighten the screws to keep it in place.
4. Turn main power back on.
114 OG/400C/OG400CS
APPENDIX D
Applications
Light and medium oil
Nozzle flow up to 110 l/h (2850 rpm, 5 cSt, 10 bar)
Normally associated with in-line solenoid valve.
One or two-pipe system
Bleed Figure 2
Figure 3
OG400C/OG400CS 115
APPENDIX D
Technical data
General
Mounting Flange according to DIN 24220
Connection:
Inlet 1/4" NPTF
Return 1/4 " NPTF
Nozzle outlet 1/8" NPTF
Pressure gauge port 1/8" NPSF
Vacuum gauge port ¼" NPTF
Valve function Pressure regulating cut-off.
Strainer 45 cm² open area 120 opening size.
Shaft 11 mm according to DIN 24220
By-pass plug Inserted for 2 pipe system. To be removed with
3/16" allen key for 1 pipe system.
Weight 4 kg
Rotation Anti-clockwise rotation. Left hand nozzle.
(seen from shaft end).
Hydraulic data
Nozzle pressure range. 10 to 21 bar.
Delivery pressure setting. 16 bar
Viscosity range. 2.8 to 200 cSt
Inlet and return pressure. 1.5 bar max.
Suction height. 0.45 bar max. vacuum to prevent air separation
from oil.
Rated speed. 3600 rpm max.
Oil temperature. Max. 90°C in the pump.
Starting torque. 0.4 N.m
Figure 4
Figure 5
116 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX D
Pump dimensions
Pipe dimensions
The tables below give the maximum length (in meters) of suction line as function of 3 variables:
Q (l/h) 150
d (mm)
H (m) 10 12 14 16
0 11 24 46 80
0.5 12 27 51 90
1 14 30 57 99
2 17 36 68 118
3 20 42 79 136
4 22 48 90 155
Q (l/h) 150
d (mm)
H (m) 10 12 14 16
0 11 24 46 80
0.5 9 21 41 71
1 8 18 35 61
2 5 12 24 42
3 2 6 13 24
4 0 0 2 5
Figure 6
OG400C/OG400CS 117
APPENDIX D
Installation
The pump is ready for use with 2 pipe systems (i.e. with by-pass plug fitted, in the return port.)
The inlet and return pressures must not exceed 1.5 bar.
The vacuum must not be more than 0.45 bar to prevent air separation from oil.
It is recommended to use a separate filter upstream of the pump.
The pump is to be used with cylindrical fitting or conical fittings as appropriate and sealing washers. Other
sealants are not recommended.
Start up
Check that the sense of rotation for pump and motor are the same (an arrow is stamped on the pump body).
In order to purge pumps used on 1 pipe systems, loosen one of the high pressure connections. On 2 pipe
systems, purging is automatic.
Pressure regulation
Remove end cap nut from pump for access to pressure stetting screw. Turning the regulator screw clockwise
increases the pressure.
Systematic maintenance
1. Check the stop valve and in line filters.
1. Check the pump filter.
This filter should be cleaned with a soft brush and fuel oil.
Each time, the cover gasket should be changed.
2. Check the tightness of all couplings and unused plugs.
3. Check the shaft coupling.
4. Check the pump pressure.
Fit a pressure gauge in the fitting provided and run the pump in normal manner.
If the pressure required cannot be obtained, check that the pump is completely purged. If air
bubbles are found in the fuel, check all connections for tightness.
5. Check the pump vacuum.
Fit a vacuum gauge in fitting provided and run the pump in the normal manner, making sure
to fully purge the pump.
The vacuum should not exceed 0.45 bar. If this is the case, check condition of all
components (non return valve, stop valves, filters....).
If the pump does not suck correctly, check for any leaks in the line by retightening all
fittings.
118 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX D
Figure 7
Parts list
Pos. no. Description Article no.
OG400C/OG400CS 119
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Allen key set, metric
3. Measure the distance shown at the below picture before removing the spline coupling from the old
pump. Should be 10mm.
120 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX D
4. Untighten the set screw and move the spline coupling to the new pump. Distance between spline
coupling and pump as measured in point 3.
OG400C/OG400CS 121
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Allen key set, metric
- Lug spanner
3. Measure the distance shown at the below picture in order to positioning the spline coupling correctly
when reassembling. Should be 10mm
122 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX D
6. Pick out all the parts and replace it with the new ones. Picture below shows in which order!
Reassembly
1. Put all the parts back in the pump in the order shown on the picture above
2. Put the lock nut back and tighten by turning it clockwise, tighten with 20Nm force
3. Mount the spline coupling on the pump, distance should be 10mm
4. Put the pump back on the burner, and tighten the 2 bolts to keep it in place
5. Reconnect the 3 D.O, pipes to the pump
6. Turn main power back on
OG400C/OG400CS 123
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Screwdriver set
1. Disconnect the D.O. pipe from the pump. Unscrew the two large hexagon nuts.
2. Use a pipe or similar to knock out the cylindered part that remain inside the pump.
124 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX D
4. Add item 6 and 7 to item 5, as shown at the picture below, and slide the complete unit back in
position in the pump.
5. Enter the nut item 10 to the pump. Notice the direction of the spring washer item 8.
6. Enter the item 1, 2, 3 and 4 to the pump. Notice the direction of item 3.
OG400C/OG400CS 125
APPENDIX D
7. When starting the incinerator again, the pressure has to be regulated to 16 bar by adjusting at the
screw as shown at picture below.
126 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX D
(Demo pictures only. The burner should never be dismantled from the incinerator for any maintenance or
replacement.)
Tools needed:
- Wrench set, metric
- Allen key set, metric
OG400C/OG400CS 127
APPENDIX D
4. Measure the distance shown at the below picture before removing the spline coupling. Should be 10mm
1. Put the inner spline coupling back into the fan wheel and tighten the set screws.
2. Put the outer spline coupling on the pump and adjust the distance between them, should be 10mm.
tighten the set screw to keep it in place
3. Put the motor with the fan wheel back on the burner and tighten the 4 bolts.
4. Put the pump back on the burner, and tighten the 2 bolts to keep it in place
5. Reconnect the 3 D.O, pipes to the pump
6. Turn main power back on
128 OG/400C/OG400CS
APPENDIX E
13
Line current: Typical value without additional inductance.
14
Transient current: for 60seconds
OG400C/OG400CS 129
APPENDIX E
Technical characteristics
Degree of protection IP 20 without protective vent cover. IP31 other areas.
Vibration and shock 1 gn from 13 to 150 Hz, 15 g for 11 ms
resistance
(EN60068)
Degree of pollution Degree 2 according to UL840. Protect the drive against dust,
corrosive gases, and falling liquid.
Relative maximum 96% without condensation or dripping water (if there is a risk
humidity of condensation provide a heating system).
Ambient air temp. in Operating: -10°C to +60°C (with vent cover removed)
acc. with EN50178 Storage: -25°C to +70°C
Maximum operating 1000 m. without derating. Above this, derate the current by
altitude 1% for each additional 100 m.
Output voltage Maximum voltage equal to mains voltage.
Frequency range 0 Hz to 500 Hz.
Maximum transient 150% of nominal drive controller current for 60 seconds
current
Breaking torque 100% of the nominal motor torque without break resistor
(typical value). Up to 150 % with braking resistor as an
option.
Frequency - Display: 0.1 Hz
resolution
- Analog inputs: 0.1 Hz for 100 Hz maximum
Switching frequency Can be adjusted from 2.0 to 16 kHz
Speed controller - Galvanic isolation between power and control circuits
protection and (inputs,
safety outputs, supplies)
- Protection against short-circuits:
within internal power supplies
between output phases
between the output phases and earth
- Protection against input phase loss
- Thermal protection from excessive overheating and
overcurrents
- Under and overvoltage supply
- Overvoltage safe on braking
Motor protection Thermal protection integrated into the drive controller by
calculating I²t. Protection against motor phase loss.
130 OG/400C/OG400CS
APPENDIX E
Control
terminals
Power
terminals
Figure 31
Power Terminals
The power terminals must be connected before connecting the control terminals!
Figure 32
OG400C/OG400CS 131
APPENDIX E
The Assignment of the “Fast stop” or “Freewheel stop” functions will prevent the drive from starting
if the corresponding logic inputs are nor powered up. The ATV320 then displays “nSt” in freewheeel
stop mode and “FSt” in stop mode. This is normal since these functions are active at zero so that the
drive will be stopped safely if there is a wire break.
Check that the run command input(s) have been actuated in accordance with the chosen control mode
(tCC parameter in the I-O menu).
If an input is assigned to the limit switch function and this input is zero, the drive can only be started
up by sending a command for the opposite direction, see ATV 320 programming manual.
If the reference channel or the control channel is assigned to Modbus or CANopen, the drive displays
nSt on power-up and remains at stop until the communication bus sends a command.
If the LED on the DC bus is lit and nothing appears on the display, check that there is no short-circuit
on the 10 V power supply.
If the drive displays “rdY” and refuses to start, check that there is not short circuit on the 10 V power
supply and check the wiring of inputs AI1 and AI2 and the connection to the RJ45 connector.
132 OG/400C/OG400CS
APPENDIX E
OG400C/OG400CS 133
APPENDIX F
Loosen setscrews (A), and nut (B) and pull out the external pipe (C).
Clean the external (C) and internal (D) pipes.
After cleaning, re-assemble the sludge burner in reverse order.
Check that internal pipe (D) is centred (concentric) in the external pipe (C), adjust with set-
screw (A) according to the adjustment procedure below.
134 OG/400C/OG400CS
APPENDIX G
Figure 错误!未找到引用源。
OG400C/OG400CS 135
APPENDIX G
Valve
Valve housing Brass
Cove Red brass
Inner parts AISI 430F
Sealing device Teflon, Viton and Silicone
Control medium Steam 180°C, max 7 bar. Inlet 1/8 BSP
Medium Oil 90°C, max 1 bar. Inlet/Discharge 3/4 BSP
Repair kit for sludge valve article no. 12806 consist of:
Figure 33
136 OG/400C/OG400CS
APPENDIX H
Dimension
Weight:19,5 kg
Figure 34
OG400C/OG400CS 137
APPENDIX H
Figure 35
138 OG/400C/OG400CS
APPENDIX H
Figure 36
OG400C/OG400CS 139
APPENDIX H
Installation
Installation and Safety Recommendations
In common with other items of process plant a pump must be installed correctly to ensure satisfactory and safe
operation. The pump must also be maintained to a suitable standard. Following these recommendations will
ensure that the safety of personnel and satisfactory operation of the pump is achieved.
General
When handling harmful or objectionable materials, adequate ventilation must be provided in order to disperse
dangerous concentrations of vapours. It is recommended that wherever possible pumps should be installed with
provision for adequate lighting, thus ensuring that effective maintenance can be carried out in satisfactory
conditions. With certain product materials, a hosing down facility with adequate draining will simplify
maintenance and prolong the life of pump components.
Storage
Short-term storage
Where a pump has to be stored for 6 months or less then the following steps are advised:
1. Store pump inside wherever possible or if this is not feasible then provide protective covering. Do
not allow moisture to collect around the pump.
2. Remove the drain plug, if fitted. Any inspection plates fitted should also be removed to ensure that the
suction housing could drain and dry completely.
3. Loosen the packing gland and inject sufficient grease into the stuffing box. Tighten the gland nut
hand tight. If a water flush system is to be used do not grease, a small amount of light oil is
recommended for these.
4. See Manufacturers instructions for motor/gearbox/drive instructions for storage procedures.
Long-term storage
If the pump is to be kept in storage for more than six months then in addition to the above the following
procedures should be carried out regularly (every 2 - 3 weeks if possible):
1. If practicable rotate the pump at least three quarters of one revolution to avoid the rotor setting in the
stator.
2. Note, however, that the pump is not to be rotated for more than two revolutions each time because
damage could be caused to the rotor/stator elements.
140 OG/400C/OG400CS
APPENDIX H
Electrical
Electrical connection should only be made using equipment suitable for both rating and environment. Where
any doubts exist regarding the suitability of equipment, supplier should be consulted before proceeding.
Normally the pump should be installed with starting equipment arranged to give direct on line starting.
Earthing points will be provided on electric drives (if supplied) and it is essential that these are correctly
connected. When the motor is being wired and checked for rotation, the start/stop sequence must be
instantaneous to prevent dry running or pressurising upstream equipment. (Check direction arrow on pump
nameplate). The electrical installation should include appropriate isolating equipment to ensure that the pump
unit is safe to work on.
The pump must never run against a closed inlet or outlet valve, as this could result in mechanical failure.
General safety
Great care must be taken to protect all electrical equipment from splashing when hosing down.
All nuts and bolts, securing flanges and base mounting fixtures must be checked for tightness before operation.
To eliminate vibration, the pump must be correctly aligned with the drive unit, and all guards must be securely
flexed in position. When commissioning the plant, all joints in the system must be checked thoroughly for
leakage.
If, when starting, the pump does not appear to operate correctly, the plant must be shut down immediately and
the cause of the malfunction established before operations are recommenced. It is recommended that
depending upon plant system operation, either a combined vacuum and pressure gauge, or a vacuum gauge
only be fitted to the pump inlet port, and a pressure gauge fitted to the outlet port, these will then continuously
monitor the pump operating conditions.
Start-up procedure
Pumps must be filled with liquid before starting. The initial filling is not for priming purposes, but to provide
the necessary lubrication of the stator until the pump primes itself. When the pump is stopped, sufficient liquid
will normally be trapped in the rotor/stator assembly to provide lubrication upon re-starting.
If, however, the pump has been left standing for an appreciable time, moved to a new location, or has been
dismantled and re-assembled, it must be refilled with liquid and given a few turns before starting. The pump is
normally somewhat stiff to turn by hand owing to the dose rotor/stator fit. However, this stiffness disappears
when the pump is running normally against pressure.
Dry running
Never run the pump in a dry condition even for a few revolutions, the stator will be damaged
immediately. Continual dry running could produce some harmful or damaging effects.
OG400C/OG400CS 141
APPENDIX H
Guards
In the interests of safety, all guards must be replaced after necessary adjustments have been made to the pump.
Warning/control device
Prior to operating the pump, if any warning or control devices are fitted these must be set in accordance with
their specific instructions.
142 OG/400C/OG400CS
APPENDIX H
Diagnostic chart
SYMPTOMS POSSIBLE CAUSES
1 NO DISCHARGE 1.2.3.7.26.28.29.
2 LOSS OF CAPACTY 3.4.5.6.7. &: 9.10. 11.13. 16.17.21.22.23.29.
3 IRREGULAR DISCHARGE 3.4.5.6.7.8.13.15.29.
4 PRIMING LOST AFTER START 3.4.5.6.7.8.13.15.
5 PUMP STALLS AT START UP 8.11.24.
6 PUMP OVERHEATS 8.9.11.12.18.20.
7 MOTOR OVERHEATS 8.11.12.15.18.20.
8 EXCESSIVE POWER ABSORBED BY PUMP 8.11.12.15.18.20.
9 NOISE AND VIBRATION 3.4.5.6.7.8.9.11.13.15. 18.s~19. 20.22.23.27.
10 PUMP ELEMENT WEAR 9.11..
11 EXCESSIVE GLAND OR SEAL WEAR 12.14.25.30.
12 GLAND LEAKAGE 13.14.
13 SEIZURE 9. 11.12.20.
OG400C/OG400CS 143
APPENDIX I
Model 40WYXH-6-20
Marine Sludge Oil Circulation Pump
Operation Instruction
144 OG/400C/OG400CS
APPENDIX I
1.General information
Model 40WYXH-6-20 marine sludge oil circulation pump is a
motor-driven horizontal sludge oil pump (Reference to as residual oil
pump hereinafter).
Pumps of this series are suitable for delivering heavy oil and sludge
oil with temperature up to 90℃. This is a piece of equipment optimal
for completion of incinerator in water treatment plant.
1.1Type designation
40 WY XH ─ 6 ─ 20
Pressure at rated flow0.20Mpa
Rated flow 6m3/h
Circulation pump
Sludge oil(residual oil)
Inlet and outlet dia40mm
2.Structure and Features
2.1Structure (See fig.)
A. Pump of this series is composed of casing, impeller, locking bolts,
sealing device, motor and etc.
B. Pump of this series is a horizontal pump with the motor at rear
and pump in front coupled together. The pump uses semi-open
impeller which is directly connected to motor output shaft.
C. Inlet and outlet of the pump shall be connected to external with
standard four-step four-hole flanges.
2.2 Features
Pumps of this series feature high discharge power, good sealing
performance, thermal resistance, high efficiency and energy saving.
3.Selection of Main Part and Component Materials
a. Pump casing, rear pump casing and impeller are made of ductile
cast iron.
b. Metal bellow mechanical sealing ring is used as shaft seal。
OG400C/OG400CS 145
APPENDIX I
146 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX I
OG400C/OG400CS 147
APPENDIX I
Packing list
Inspection:____________ Packing:____________Date:____________
148 OG / 4 0 0 C /O G 4 0 0 C S
APPENDIX I
OG400C/OG400CS 149
APPENDIX J
Dimension
Weight:19,5 kg
Figure 37
OG400C(S) 150
APPENDIX J
Figure 38
OG400C/OG400CS 151
APPENDIX J
Figure 39
OG400C(S) 152
APPENDIX K
APPENDIX K: Refractory
Introduction
The inner lining of the incinerator consists of a heat resistant material called refractory. This material can
withstand temperatures up to 1500°C, and its function is to protect and insulate the insulation behind. The
refractory lifetime will vary depending on the use of the incinerator and if maintenance of the incinerator has
been performed regularly according to instructions given in the maintenance chapter. If the incinerator has been
well serviced over the years, there will be less wear on the refractory, and the refractory lifetime will be 7-10
years.
The first is a glass-like, hard slag, looking like the surface of the moon. This type of slag is normally building
up in a thin layer, and should not be removed.
The second type of slag is the soft ash type of slag that builds up in a heavy layer, and should be gently
removed during the daily ash removal routine.
Parts of refractory can chip off, for example if air at room temperature is leaking in to the chamber from the
door gasket or if sludge containing water is transferred to the sludge service tank during sludge burning. In the
latter case, water in the sludge will then become steam at 100°C. Both room air and steam are very chilly for
1100°C refractory, cooling the refractory surface very rapidly, but not the core. The huge temperature
difference between surface and core of refractory will then create a lot of tension forces, for which concrete has
little strength to withstand, and the result in these scenarios is chipping.
Refractory is very slowly wearing down from day one of operation (faster if handbook procedures and
instructions are not followed to the point), but the look of the surface can be disregarded. The important
parameter is if 30% of the thickness or more of the brick dimension is lost, repair material should be added in
order to rebuild the brick to original dimension.
In doubt:
Feel free to ask Teamtec main office to give an opinion. Good quality digital photos, taken from different
distances and angels are required (spares@teamtec.no or service@teamtec.no ).
OG400C/OG400CS 153
APPENDIX K
The following working should be applied when using CALDE PATCH PT88U:
The surface should be clean(ed) and all loose material should be removed to secure a firm binding between the
repair substance and the bricks.
The bricks should be padded one by one, meaning no Calde Patch to bind two bricks together.
Do not fill the gaps between the bricks with Calde Patch. The bricks need the space for heat expansion.
Preferably use cardboard between the bricks when padding the brick edges.
If there is some OLD repair substance left on the area that is to be fixed, it is important to add some water to
this part of the area and make it wet BEFORE new repair substance is added to the spot.
CALDE PATCH PT88U consists of proximately 20% water to obtain a plastic substance that can easily be
worked with. The material is VERY sensitive to additional water content. Water should not be added without
consulting to TeamTec AS first.
CALDE PATCH PT88U shall be added to the bricks by means of a stopping knife until the right thickness has
been reached. The thickness should be at least 10mm. The material will have to dry for some hours before the
next layer is added.
We advise to dry the material over night by means of an electrical heater (max 50 degrees) before the
incinerator is started up again. If your incinerator has a burn in program, please use this for 5 to 6 hours the day
after padding to cure in the repair substance.
OG400C(S) 154
DRAWINGS
DRAWINGS
OG400C/OG400CS 155
DRAWINGS
List of drawings
Incinerator
Dwg. no Name of drawing
1011248 Piping & Instrument Diagram OG200C/CS, Steam Heating
116711 Combustion Chamber Assy. OG200/400C
116740 Combustion Chamber Assy. OG200/400CS
1008973 Combustion Chamber Mounting Drawing OG200/400C
116711M Combustion Chamber Main Dimension. OG200/400C
116740M Combustion Chamber Main Dimension. OG200/400CS
119827 Oil Burner F-50-45-T, 220V With Analog Motor
119512 Oil Burner F-50-45-T, 220V with Sludge Burner, Sub Assy.
1008970 Refractory and Insulation OG200C/CS
119640 Sludge Oil Dosage Valve Assembly,
116726 Garbage Door Assembly
116742 Door Assy.CO1310×510 with Sluice
3010075 Running Instructions OG200/400C
3010073 Running Instructions OG200/400CS
Flue gas
Dwg. no Name of drawing
1011017 Flue Gas Damper Assembly DN400/300
1007000 Flue Gas Damper, Sub. Assy DN400/300
1008645 Flue Gas Fan, Sub. Assy. DN 300 H2
3010975 Main dimensions Flue Gas Fan DN 300 H2
AS350-5 Expansion Compensator DN 350
Sludge Tank
Dwg. no Name of drawing.
116831 Sludge Tank Assembly1100 L Net Steam Heating
116831M Main Dimension Sludge Tank 1100L Net Stem heating
Electrical diagrams
Dwg. no Name of drawing
2009906 Cable Arrangement for OG200C/CS
1011269 Control Panel 380/440V - 220V for OG400C/CS
1010728 Mounting Plate with El.Components 380/440V-220V, OG200C/CS
3010840 Electric Diagram 380/440V-220V Teamtec Incinerator OG200C/CS
4007918 Terminal Diagram Diesel Oil Burner F-50-45-T with Analog Motor
1010920 Control Panel Sludge Tank w/Steam Heating
2009668 Mounting Plate w/El.Components Sludge Tank w/Steam Heating
3010933 Electric Diagram Sludge Tank w/Steam Heating
156