2019 Power Situation
2019 Power Situation
REPORT
        Peak
      Demand
      15,581 MW
                                                               Capacity
                                                               Installed – 25,531 MW
                                                               Dependable – 22,736 MW
                                                               Available – 16,606 MW
      Electricity
      Sales and
   Consumption
   106,041 GWh                                                 Newly
                                                               Operational
                                                               Installed Capacity
                                                               1,674 MW
        Gross
    Generation
  106,041 GWh
                                                              Power Project
                                                              Capacity
                                                              Committed – 5,767 MW
   Transmission                                               Indicative – 42,815 MW
 Substation Capacity
         36,436 MVA
         Line Length
       20,079 ckt-km                                           Distribution
                                                               EC - 121
                                                               PIOU - 24
                                                               LGUOU - 5
                                                               MPC - 1
                                                                            1|D O E - E P I M B
                       2 0 1 9   P o w e r   D e m a n d   a n d   S u p p l y   H i g h l i g h t s
                                                            DEMAND
      Peak Demand
     12,000      10,000    8,000     6,000        4,000      2,000    -   MW
     11,344
                                                                          Luzon
       10,876
                                                       2,224
                                                                          Visayas
                                                          2,053
                          2019       2018
                                                          2,013
                                                                          Mindanao
                                                           1,853
Figure 1. 2018 vs. 2019 Peak Demand per Grid (in MW)
The country’s total peak demand1 in 2019 was recorded at 15,581 MW, which is 799
MW or 5.4% higher than the 14,782 MW in 2018. As recorded by the System Operator,
the Luzon grid contributed 11,344 MW or 72.8% of the total demand while Visayas
and Mindanao contributed a share of 14.3% (2,224 MW) and 12.9% (2,013 MW),
respectively. With reference to year 2018, the peak demand of Luzon increased by
468 MW or 4.3% while Visayas and Mindanao grew by 8.3% and 8.6%, respectively.
                                                                                                         30,551,604
                Residential
                                                                                                   28,260,764
                                                                                         25,475,850
                Commercial
                                                                                      24,016,270
                                                                                                   28,193,978
                  Industrial
                                                                                               27,587,348
                                      2,896,602
                    Others
                                      2,752,719
                  Own-Use
                                                      8,929,107                       2019         2018
                                                    8,141,036
                                                          9,994,347
              Systems Loss
                                                      9,006,580
NOTE: *Includes Off-Grid Sales and Consumption (1.4% of the total sales and consumption)
      Numbers may not sum up to total due to rounding off.
Figure 2. 2019 vs. 2018 Electricity Sales and Consumption by Sector, Philippines (in MWh)
The Philippines’ Gross Domestic Product (GDP) posted a 5.9% full-year growth for
2019, 0.3% below the previous year’s GDP, the slowest growth rate in eight years. In
the 4th quarter of 2019, the GDP grew by 6.4%, but it was still not enough to meet the
1   Total non-coincidental peak demand of Luzon, Visayas and Mindanao grids
                                                                                                                2|D O E - E P I M B
                                                                            2 0 1 9   P o w e r      S i t u a t i o n   R e p o r t
target economic growth which ranges from 6.0% to 6.5%. Nonetheless, historical data
has shown that when the Philippines experienced an expanding economy or a positive
GDP growth rate, that expansion was directly proportional to electricity consumption.
Therefore, correlating the relationship between the two, a continuous GDP growth
entailed a consistently rising demand in electricity.
The total electricity sales and consumption grew by 6.3%, with an absolute level of
106,041 GWh by the end of 2019 from 99,765 GWh of the previous year. As the rate
of inflation slowed down to an average of 2.5% in 2019 from a noticeably higher rate
of 5.2% in 2018, the country as expected experienced a boost in electricity
consumption. The sector with the largest consumption remains to be residential
(28.8%) followed by industrial (26.6%) and commercial (24.0%).
The industrial sector is the only sector whose annual growth rate took a downswing
from its rapid increase of 7.9% in 2018 down to only 2.2% in 2019. One factor of the
decline can be attributed to the slowdown in public construction at the start of 2019 as
a result of the delayed approval of the Administration’s 2019 budget and the 45-day
public works ban due to the 2019 National and Local Elections on 13 May 2019.
Likewise, the reduction in public infrastructure spending, hence lagging in
construction-related manufactures, and the weaker global economy resulted in a
decrease in both volume and value of the manufacturing sector, only improving in the
latter part of the year bolstered by the surge in public spending of 54% or ₱100.3 billion
in September as state agencies expedited the implementation of major infrastructure
projects as part of their catch-up measures. As a result, electricity sales and
consumption of the industrial sector went up by 3.8% for the second half of the year.
On the other hand, the growth rate of the residential and commercial sectors remained
persistent as the consumption increased by 8.1% and 6.1%, respectively, against last
year’s growth rate of 5.5% for both sectors due to election-related activities and
warmer temperature in the summer months. The continuous rise in global surface
temperatures primarily contributed to the uptrend as heat indices hit dangerous levels
especially in the months of April, May, and June. Moreover, the El Niño event
throughout the year is a likely driver of the variation in consumption especially in
households and commercial spaces e.g. an increase in consumption can be attributed
to substantial utilization of cooling equipment.
“Others”, referring to public buildings, street lights, irrigation, agriculture, and “others
not elsewhere classified”, continued to post a modest growth rate of 5.2% from 2,753
GWh in 2018 to 2,897 GWh in 2019.
Parallel to the Others sector, the utilities’ own-use for office and station use of the
power plants, classified in Fig. 2 simply as “Own-Use”, grew significantly by 9.7% or
8,929 GWh from a previous diminution of 2.1% between 2018 and 2017. While this
year, “Losses” from the generation, transmission, and distribution accounted for 9,994
GWh, the largest growth by sector with a 988 GWh or 11.0% increase from 2018 due
to the testing and commissioning of various power plants in the country with total
capacities of 2,002 MW (Luzon - 1,035 MW, Visayas - 371 MW and Mindanao - 596
MW).
                                                                                    3|D O E - E P I M B
                                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
          Table 1. Electricity Sales & Consumption of Distribution Utilities
                                   by Grid (in GWh)
     TYPE OF DISTRIBUTION
                                       LUZON     VISAYAS             MINDANAO              PHILIPPINES
           UTILITIES
  Non-Utilities/Directly
                                        3,334      540                   162                     4,036
  Connected
  Other Services                        1,706      503                    65                     2,274
  Plant Station Used                    4,379     1,649                 1,065                    7,094
  Transmission Losses                   2,389      378                   629                     3,396
Among the three island groups, Luzon accounted for the highest electricity sales and
consumption with a share of 77,687 GWh or 73.3%. Visayas came in next with a share
of 14,549 GWh or 13.7% and followed closely by Mindanao with a share of 13,805
GWh or 13.0%. In line with the increase in electricity demand, the energy consumption
in Mindanao boomed at a growth rate of 8.1%, followed by Visayas (7.8%) and Luzon
(5.7%). Sales and consumption in the Off-Grid areas also grew at a rate of 9.2%,
contributing a share of 1,470 GWh or 1.4% of the country’s total energy production.
The country’s total sales in electricity continued to manifest resiliency, garnering
                                                                                        4|D O E - E P I M B
                                                           2 0 1 9   P o w e r   S i t u a t i o n    R e p o r t
87,118 GWh or a 5.4% growth rate from 2018, dropping just a few notches below last
year’s growth rate of 6.2%.
In Fig. 3, the Total Sales was divided into four categories according to their utility type:
Private Investor Owned Utilities (PIOUs), Electric Cooperatives (ECs), Non-
Utilities/Directly Connected Customers (DCC), and Other Services. Accounting for
55.9% of the country’s electricity production, PIOUs contributed a total sales of 59,301
GWh, whereas 23,213 GWh or 21.9% was sourced from the ECs’ contributions. Non-
Utilities and Other Services, which refers to the energy delivered to other generators,
were 4,036 GWh (3.8%) and 568 GWh (0.5%), respectively. In Table 1, part of the
Other Services included the energy consumed to pump the Kalayaan Power Plant.
However, it should be noted that in the Total Sales and Consumption shown in Fig. 2,
the actual total sales (comprising of Residential, Commercial, and Others sectors)
does not include the energy consumed when pumping but instead was accounted as
part of the consumption under Own-Use which is reflected in the latter part of this
report.
                                                                                ECs
                                                                               21.9%
                     System Loss
                        9.4%                     Total Sales
                                                   82.2%                       PIOUs
                     Own-Use                                                   55.9%
                      8.4%
                                                                           Non-Utilities
                                                                              3.8%
                                                                          Other Services
                                                                              0.5%
Figure 3. Total Electricity Sales and Consumption by Type Percentage Shares, Philippines
                                                                                              5|D O E - E P I M B
                                                                2 0 1 9   P o w e r    S i t u a t i o n   R e p o r t
   Table 2. 2019 and 2018 Comparative Electricity Sales and Consumption of
                   Distribution Utilities, Philippines (in GWh)
In 2019, the peak of the total sales and consumption of DUs occurred in June,
recording a 9.3% share which is 852 GWh more than the monthly average of 7,437
GWh. The residential sector remains to have the highest percentage share with a
growth rate of 8.1%. The region to obtain the highest DU sales and consumption is the
                                                                                                   6|D O E - E P I M B
                                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
National Capital Region with a 33.4% share, followed by Region IV-A (19.9%) and
Region III (12.0%).
SUPPLY
                                   Installed                                  Dependable
    Fuel Type
                          2018                   2019                2018                       2019
 Coal                     8,844                 10,417               8,368                      9,743
 Oil Based                4,292                 4,262                2,995                      3,015
 Natural Gas              3,453                 3,453                3,286                      3,286
 Renewable
                          7,227                 7,399                6,592                      6,691
 Energy
 Geothermal               1,944                 1,928                1,770                     1,792
 Hydro                    3,701                 3,760                3,473                     3,508
 Biomass                   258                   363                  182                       227
 Solar                     896                   921                  740                       737
 Wind                      427                   427                  427                       427
 TOTAL                    23,815                25,531               21,241                    22,736
 Table 4. 2019 Total Installed and Dependable Capacity per Grid and Off-Grid,
                               Philippines (in MW)
                              Installed                                    Dependable
   GRID
                  Grid         Off-grid          Total       Grid            Off-grid                  Total
 Luzon           16,870         416             17,286      15,261            336                     15,598
 Visayas         3,770           40             3,809       3,276              30                     3,306
 Mindanao        4,366           70             4,436       3,780              52                     3,832
 TOTAL           25,006         526             25,531      22,317            419                     22,736
                                            Installed, MW                         Dependable
            Fuel Type
                                       2018             2019                 2018           2019
 Coal                                   720             1,559                 690          1,409
 Oil-Based                               87                8                   83             6
 Natural Gas                              0                0                    0             0
 Renewable Energy                       126              108                  122            74
   Geothermal                            12                0                   12             0
   Hydro                                 80              31                    80            18
   Biomass                               34               52                   30            36
   Solar                                  0               25                    0            20
   Wind                                   0                0                    0             0
 TOTAL                                  934             1,674                 894          1,489
The total power supply, in terms of installed capacity, grew by 7.2% from 23,815 MW
in 2018 to 25,531 MW in 2019. The 25,006 MW or 97.9% of the total installed capacity
                                                                                         7|D O E - E P I M B
                                                           2 0 1 9    P o w e r   S i t u a t i o n    R e p o r t
was contributed by the Luzon, Visayas, and Mindanao main grids while 526 MW or
2.1% was contributed by off-grid areas. As shown in Table 5, a total of 1,674 MW new
capacities were added to the country’s supply in 2019 which include coal-fired (1,559
MW), oil-based (8 MW), hydropower (31 MW), biomass (52 MW), and solar (25 MW)
power plants. Share by grid is discussed in a separate section of this report. In terms
of share by grid, Luzon contributed additional capacity of 700 MW or 41.8% of the
newly installed capacities while added Visayas 371 MW or 22.3% and Mindanao with
602 MW or 35.9%.
GENERATION
POWER PROJECTS
                                                         Committed                          Indicative
                            Fuel Type             No. of    Capacity     %           No. of    Capacity                   %
                                               Proponents     (MW)     Share      Proponents (MW)                       Share
 Coal                                               7        4,126.0    71.5          13        10,463.0                 24.4
 Oil-Based                                          3        414.6      7.2               9             2,146.3           5.0
 Natural Gas                                        1        650.0     11.3               9             8,758.0           20.5
 Renewable Energy
                                                    20       576.7     10.0             178            21,447.2           50.1
 (RE)
                                                                                                           8|D O E - E P I M B
                                                                              2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                           Committed                                Indicative
         Fuel Type                  No. of    Capacity          %            No. of    Capacity                  %
                                 Proponents    (MW)            Share      Proponents (MW)                       Share
     Geothermal                       1         50.0            0.9            5         496.0                   1.2
     Hydro                              2              23.1     0.4              68             4,816.6           11.2
     Biomass                           14             263.6     4.6              20              280.4            0.7
     Solar                              3             240.0     4.2              67            12,097.8           28.3
     Wind                               0                0       0               18             3,756.4           8.8
   TOTAL                               31            5,767.3   100.0            209            42,814.5          100.0
 BESS                                   1               49                       15             1,863.5
NOTE: Numbers may not sum up to total due to rounding off.
To address the increasing demand brought about by economic development, the DOE
encourages the private sector to invest in power generation and augment the needed
capacity in the power system. As shown in Table 6, capacities from committed power
projects reached 5,767 MW by the end of 2019. About 71.5% of these capacities are
from coal-fired power projects that will provide baseload capacity in the system in the
coming years.
The indicative power projects capacity amounted to 42,815 MW by the end of 2019.
Coal-fired power projects contributed 24.4%, while 50.1% is expected to come from
renewable energy technologies.
SIGNIFICANT INCIDENTS
LUZON
For 2019, the Luzon grid experienced 46 Yellow Alerts and 16 Red Alerts occurrences.
These red and yellow alerts were mainly attributed to the high demand coupled with
the mild El Niño condition which further increased the demand and brought down the
available capacity of hydroelectric power plants in the grid during the summer months.
Other factors that contributed to the issuance of these alerts were the series of
unplanned outages, extended outages, and capacity deration of power plants.
Furthermore, expected capacity from committed power projects were not able to ease
the power situation due to their delayed commissioning and commercial operation,
such as the 300 MW Masinloc Expansion and the 150 MW SMC Limay Power
Projects. The red alert occurrences resulted in a series of automatic and manual load
dropping incidents which led to the implementation of Interruptible Load Program
(ILP).
Another notable incident in the Luzon grid was the 6.1 magnitude earthquake that
occurred at 5:11 PM of 22 April 2019 with the epicenter located 18 kilometers east of
Castillejos, Zambales. After the earthquake, several power plants and some
transmission lines in central Luzon tripped leaving Luzon with 10,059 MW available
capacity which was insufficient to supply the system demand. Power in the affected
areas were immediately restored, however, few power plants were isolated due to
sustained transmission line outages and equipment problems in the power plant
facilities.
                                                                                                   9|D O E - E P I M B
                                                                      2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
VISAYAS
Visayas grid has been a recipient of a lot of yellow alerts and a few red alerts this
2019, having 186 Yellow alert notices and 10 Red alert notices. These alerts usually
occurred in the evening and were amplified on occasions where a significant amount
of capacity is unavailable due to plant outages and reduction of output from solar
plants. These issuances have been more frequent this year due to increasing demand
and the existing transmission line congestions being experienced in the region.
Grid disturbances were also experienced because of power plant and line trippings
that resulted in load droppings and momentary power interruptions. One of the issues
that is currently being addressed in the Visayas is the availability of operational
reserves.
There were a couple of new power plants that went on commercial operation this year
and the completion of ongoing transmission projects is expected to alleviate the
situation in the grid and help provide the necessary highways where electricity can
pass through and be delivered in various parts of the island region.
MINDANAO
Mindanao grid has been known for its over-supply capacity since the addition of coal-
fired power plants in the region in 2016. In 2019, there were no recorded yellow and
red alerts that disrupted the operation of the Mindanao grid, despite the occurrence of
several natural calamities such as earthquakes and typhoons. However, there are still
issues on the occurrences of Manual Load Dropping (MLD) in some regions in
Mindanao due to the current bilateral dispatch protocol and the absence of the
Wholesale Electricity Market (WESM) in the said grid. The mild El Niño resulted in
depletion of capacities from Agus-Pulangi Hydroelectric Power Plants while several
Distribution Utilities failed to adjust their respective nominations, thus resulting in over-
nomination and MLDs. WESM Mindanao is expected to address the issue once it
comes online in 2020.
                                                                                    10 | D O E - E P I M B
                                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                                                     LUZON
                                                        Capacity
                Peak Demand                        Installed – 17,289 MW
                     11,344 MW                    Dependable – 15,598 MW
                                                   Available – 11,643 MW
        Electricity                            Newly
        Sales and                       Operational Capacity
       Consumption                                 700 MW
           77,687 GWh
13,000
  12,000
                                                 11,245 11,344
                                        10,957                   10,997                       10,845
                                                                          10,687
  11,000                                                                            10,392             10,413
                               10,180                                                                             10,111
                                                 10,750 10,876
  10,000               9,309
                                        10,539
               9,123                                                                          10,346
                               9,936                             9,996              10,035             10,088 9,987
                                                                           9,843
   9,000               9,579
               9,213
   8,000
               Jan     Feb     Mar      Apr      May    Jun       Jul      Aug       Sep      Oct       Nov       Dec
2019 2018
The peak demand of the Luzon grid increased to 11,344 MW for 2019, equivalent to
4.3% growth from the 2018 peak demand of 10,876 MW. The peak demand registered
by the system operator occurred on 21 June 2019. During the peak interval, a red alert
notice was issued and a portion of the demand of the Manila Electric Company
(MERALCO) was de-loaded through the Interruptible Load Program (ILP). To capture
the actual peak demand of Luzon, the recorded compensable de-loaded ILP
participants amounting to 132 MW was added to the system peak demand that
resulted in a total of 11,476 MW. With consideration of ILP, the Luzon grid registered
an increase of 600 MW or 5.5% from 2018.
                                                                                                    11 | D O E - E P I M B
                                                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                                                    LUZON
                          Electricity Sales and Consumption (in GWh)
 •
 •                         •                         •
                                                                             Electricity     sales      and
 •           29%           •       28%               •         25%           consumption of Luzon for
                                                                             2019 reached a total of
 •          22,207         •     21,912              •        19,444
                                                                             77,687 GWh maintaining its
                                                                             growth      of   5.7%.    The
     Residential           Commercial                Industrial
                                                                             residential sector contributed
                                                                             the most to Luzon’s overall
                                                                             growth rate nearly followed
 •                         •                         •
                                                                             by the commercial sector.
 •            2%           •        8%               •         9%            Luzon’s      share    of   the
 •            1,229        •      6,173              •        6,722          country’s total electricity
                                                                             sales     and    consumption
                                                     Systems
     Others                Own-Use*                                          remained the largest at
                                                     Loss
                                                                             73.3%.
*Own-Use includes energy consumed in pumping (Kalayaan Power Plant)
      Figure 6. 2019 Electricity Sales and Consumption, Luzon
                                           Installed                                      Dependable
        Fuel Type                                  Percent Share                                    Percent Share
                                  MW                                              MW
                                                        (%)                                              (%)
     Coal                        6,929                       40.1                6,520                      41.8
BESS 10 10
                                                                                                   12 | D O E - E P I M B
                                                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                                                 LUZON
                                          Gross Generation (MWh)
                                                                                                13 | D O E - E P I M B
                                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                                              LUZON
           Table 9. Summary of Committed and Indicative Power Projects,
                        as of 31 December 2019 (in MW)
                                        Committed                            Indicative
 Type of Power Plant            No. of   Capacity                    No. of   Capacity
                                                          % Share                                          % Share
                             Proponents    (MW)                   Proponents    (MW)
 Coal                             4       3,436.0          73.8         9      8,935.0                      24.7
 Oil-Based                        1        300.0            6.4         5      2,016.0                       5.6
 Natural Gas                      1        650.0           14.0         8      8,620.0                      23.8
 Renewable Energy                 7        268.0            5.8       103     16,647.0                      46.0
   Geothermal                     0          0               0          3       390.0                        1.1
   Hydro                          0          0               0         39      3,505.1                       9.7
   Biomass                         5            53.0        1.1        10       129.0                        0.4
   Solar                           2            215.0       4.6        42     10,584.5                      29.2
   Wind                            0              0          0          9      2,038.4                       5.6
 2019 TOTAL                        13          4,654.0     100.0      127     36,218.0                      100.0
 BESS                                                                   8       1,090
 2018 TOTAL                        19          4,775.0                 92     26,805.0
NOTE: Numbers may not sum to total due to rounding off.
                                                                                             14 | D O E - E P I M B
                                                                 2 0 1 9   P o w e r   S i t u a t i o n    R e p o r t
                                                                                          VISAYAS
                                                     Capacity
               Peak Demand                    Installed – 3,809 MW
                  2,224 MW                   Dependable – 3,306 MW
                                              Available – 2,668 MW
       Electricity                        Newly
       Sales and                   Operational Capacity
      Consumption                            373 MW
         14,549 GWh
 2,400
                                           2,224    2,220                                 2,224
                                                                      2,148     2,164               2,168     2,151
 2,200                             2,116                    2,129
                           2,010
 2,000             1,919
          1,873                    2,044   2,053
                                                    2,010             2,015               2,026               2,020
                           1,956                            1,972               1,954               1,980
 1,800    1,892    1,913
 1,600
           Jan     Feb     Mar     Apr     May      Jun     Jul       Aug       Sep       Oct       Nov       Dec
2019 2018
                                                                                                15 | D O E - E P I M B
                                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                                           VISAYAS
                          Electricity Sales and Consumption (in GWh)
 •
 •                         •                         •
                                                             In 2019, the electricity sales
 •     29%             •       13%           •     30%       and consumption of the
                                                             Visayas Grid grew to 14,549
 •     4,198           •      1,887          •     4,382     GWh at a rate of 7.8%. In the
                                                             previous years, a 4.3%
 Residential           Commercial            Industrial
                                                             growth rate was posted in
                                                             2018 and 5.0% in 2017. The
                                                             boost      in    demand     for
 •                     •                     •
                                                             electricity production can be
 •      7%             •       11%           •     9%        attributed to the robust
 •     1,072           •      1,670          •    1,340      economic activities in major
                                                             provinces,      especially    in
                                             Systems
 Others                Own-Use                               Central       Visayas     which
                                             Loss
                                                             accounted for more than half
   Figure 9. 2019 Electricity Sales and Consumption, Visayas of the energy consumption in
the grid. Visayan Electric Company, Inc. (VECO), which serves the cities of Cebu,
Mandaue, Talisay, Naga, and four municipalities of the greater part of Metro Cebu,
contributed 3,714 GWh of electricity, a 10% increase in last year’s consumption and
making them the second largest distribution utility in the Philippines in terms of
electricity sales.
                                            Installed                                  Dependable
         Fuel Type                                  Percent Share                                 Percent Share
                                    MW                                         MW
                                                         (%)                                           (%)
     Coal                          1,399                     36.7              1,349                     40.8
    Biomass
                  Solar
                 4.1%
                             Wind              Power plants within the Visayas grid
                            1.4%
     2.2%                                      registered 16,059 GWh of gross
   Hydro
   0.4%
                                               generation in 2019. The region continued
                                               to remain as the renewable energy
                                               dominated grid in the country with 47.2%
                                               share of generation coming from
                                     Coal
                                    49.6%      renewable energy technologies with
                                               corresponding shares of geothermal at
Geothermal                                     39.1%, solar at 4.1%, biomass at 2.2%,
 39.1%
                                               wind at 1.4%, and hydro at 0.4%. For the
                                               fossil-based    power     plants,    coal
                                               generation increased and still is the
                            Oil Based          largest producer at 49.6% with the entry
                              3.3%
                                               of new coal-fired power plants while oil-
   Figure 10. 2019 Gross Generation, Visayas   based plants had a share of 3.3%.
                                                                                 17 | D O E - E P I M B
                                                     2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                                          VISAYAS
           Table 12. Summary of Committed and Indicative Power Projects,
                         as of 31 December 2019 (in MW)
                                        Committed                               Indicative
 Type of Power Plant            No. of   Capacity                       No. of   Capacity
                                                             % Share                                          % Share
                             Proponents   (MW)                       Proponents    (MW)
  Coal                            1       135.0                25.7       1        600.0                       14.6
  Oil-Based                       2       114.6                21.9       4        124.4                        3.0
  Natural Gas                     0         0                    0        1        138.0                        3.3
  Renewable Energy               10       274.7                52.4      36       3,357.5                      79.1
   Geothermal                     1        50.0                 9.5       1         76.0                        1.8
   Hydro                          2        23.1                 4.4      13        728.2                       17.7
   Biomass                        7       201.6                38.5       3         32.0                        0.8
   Solar                          0         0                    0       11        703.3                       17.1
   Wind                           0         0                    0        8       1,718.0                      41.7
 2019 TOTAL                      13       524.3               100.0      42       4,119.9                      100.0
  BESS                                                                    4        363.5
 2018 TOTAL                        14           766.0                         40          3,903.0
NOTE: Numbers may not sum up to total due to rounding off.
                                                                                                18 | D O E - E P I M B
                                                                    2 0 1 9   P o w e r   S i t u a t i o n    R e p o r t
                                                                              MINDANAO
                                                     Capacity
               Peak Demand                    Installed – 4,436 MW
                  2,013 MW                   Dependable – 3,832 MW
                                              Available – 2,295 MW
       Electricity                        Newly
       Sales and                   Operational Capacity
      Consumption                            602 MW
         13,805 GWh
2,400
 2,200
                                           2,013    2,001             1,977               1,987     1,995     1,992
                                                            1,943               1,960
 2,000                             1,892
                           1,817
          1,775
                   1,726
 1,800
                                           1,847                      1,821               1,835     1,833     1,853
                                   1,781                    1,762               1,794
 1,600             1,704   1,729                    1,741
          1,665
 1,400
           Jan     Feb     Mar     Apr     May      Jun     Jul       Aug       Sep       Oct       Nov       Dec
2019 2018
Source: NGCP Figure 11. 2018 vs. 2019 Peak Demand, Mindanao
The Mindanao grid reached its peak demand of 2,013 MW on 8 May 2019 with an
8.6% growth rate from 2018. The security of supply in Mindanao opens up great
demand opportunities in all of its regions. The supply side clearly shows readiness to
massive infrastructure projects brought about by the Build, Build, Build Program of the
government and various investments in the private sector. Significantly, having the
highest reserve margin among the three grids, Mindanao imposes a lot of promise in
grid modernization in the upcoming commercial operation of WESM Mindanao and
Mindanao-Visayas Interconnection Project.
                                                                                                19 | D O E - E P I M B
                                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                               MINDANAO
                          Electricity Sales and Consumption (in GWh)
•
•                         •                         •
                                                              The Mindanao grid recorded
                                                              13,805 GWh of electricity
•     30%             •        12%           •     32%
                                                              sales and consumption. On a
•     4,146           •       1,677          •     4,368      per grid basis, the sustained
                                                              accelerated      growth      in
Residential            Commercial            Industrial       Mindanao resulted in an 8.1%
                                                              increase in 2019, relatively in
                                                              pace with year-ago rate of
•                     •                      •
                                                              8.2%. The Davao Region
•      4%             •        8%            •     14%        contributed the most share
•      595            •       1,085          •     1,932      with 33.3% in total electricity
                                                              sales and consumption while
                                             Systems          Zamboanga           Peninsula,
Others                 Own-Use
                                             Loss
                                                              Northern            Mindanao,
  Figure 12. 2019 Electricity Sales and Consumption, Mindanao SOCCSKSARGEN,         Caraga,
and Bangsamoro Autonomous Region in Muslim Mindanao (BARMM) contributed
12.0%, 24.6%, 18.0%, 9.0%, and 3.1%, respectively.
                                           Installed                                  Dependable
       Fuel Type                                   Percent Share                                 Percent Share
                                  MW                                          MW
                                                        (%)                                           (%)
    Coal                         2,089                       47.1             1,874                      48.9
                                                                                                20 | D O E - E P I M B
                                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                 MINDANAO
                                    Gross Generation (GWh)
                Biomass Solar
                       0.7%
                                 Wind            The Mindanao gross generation
                 0.0%           0.6%
                                                 amounted to 13,805 GWh for 2019. Coal
                                                 further increased its share in the mix at
  Hydro
 20.9%                                           68.2% due to the addition of 3x150 MW
                                                 GNPK Coal and 119 MW SEC Coal
                                                 Expansion Unit. This increase is
  Geothermal                                     expected to continue when the 150 MW
    5.5%                           Coal
                                  68.2%          GNPK Unit 4 comes online by 2020.
                                                 Meanwhile, renewable energy sources
                                                 contributed 27.7% share, comprising
  Oil Based
    4.0%                                         geothermal (5.5%), hydro (20.9%),
                                                 biomass (0.7%), and solar (0.6%).
                                                 Similar to the Luzon and Visayas grids,
                                                 oil-based plants provided the least
   Figure 13. 2019 Gross Generation, Mindanao    contribution at 4.0%.
                                                                                   21 | D O E - E P I M B
                                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                              MINDANAO
           Table 15. Summary of Committed and Indicative Power Projects,
                             as of 31 December 2019
                                        Committed                            Indicative
 Type of Power Plant            No. of   Capacity                    No. of   Capacity
                                                          % Share                                            % Share
                             Proponents   (MW)                    Proponents   (MW)
 Coal                             2       555.0            94.2        3       928.0                          37.5
 Oil-Based                        0         0                0         1        5.9                            0.2
 Natural Gas                      0         0                0         0         0                              0
 Renewable Energy                  3             34.0       5.8              38          1,542.7              62.3
   Geothermal                      0              0          0                1            30.0                1.2
   Hydro                           0              0          0               13           583.3               23.6
   Biomass                         2              9.0       1.5               7           119.4                4.8
   Solar                           1             25.0       4.2              17           810.0               32.7
   Wind                            0               0         0                0             0                   0
 2019 TOTAL                         5           589.0      100.0             47          2,476.6              100.0
 BESS                               1            49.0                         3           410.0
 2018 TOTAL                        11           788.0                        41          2,491.0
NOTE: Numbers may not sum to total due to rounding off.
                                                                                               22 | D O E - E P I M B
                                                                   2 0 1 9   P o w e r   S i t u a t i o n    R e p o r t
                                   TRANSMISSION
GRID PROFILE
As of December 2019, a total of 36,436 MVA substation capacities and 20,079 circuit-
km are accounted for in the transmission assets being managed by NGCP. Table 16
below shows the summary of existing facilities.
                                    2018                                      2019
 Philippines                       34,852                                    36,436
     •     Luzon                   26,598                                    28,021
     •     Visayas                  4,874                                    4,884
     •     Mindanao                 3,380                                    3,531
                                    2018                                      2019
 Philippines                       20,505                                    20,079
     •     Luzon                    9,447                                    9,227
     •     Visayas                  5,379                                    5,299
     •     Mindanao                 5,679                                    5,553
Source: 2020-2040 TDP
To ensure that voltages across the network are within the levels prescribed in the
Philippine Grid Code, capacitor banks and shunt reactors have been installed in
appropriate locations in different parts of the grid with summary shown in Table 17:
Table 17. Summary of Installed Capacitor Banks and Shunt Reactors, 2019
                                                                                    23 | D O E - E P I M B
                                                      2 0 1 9    P o w e r   S i t u a t i o n   R e p o r t
TRANSMISSION PROJECTS COMPLETED
For 2019, 13 main grid projects were completed and energized by NGCP, of which
accumulated by a total of 55ckt-km Transmission Line, 3,200MVA and 1352.5MVAr of
substation capacity. These projects were intended to facilitate entry of generation
capacities, load growth, and system reliability.
                                                                                        Date of
        Project Name/Components             MVA   MVAR          CKT-KM                Completion/
                                                                                      Energization
 Luzon Leg
 Hermosa–Floridablanca 69 kV
 Transmission Line                           -       -              17                   Feb 2019
50 Sep 2019
Mindanao Leg
Matanao–Toril–Bunawan 230kV
Transmission Line                            -       -              38                   Dec 2019
• Bunawan Substation                                 -                  -
                                            600                                          Oct 2019
• Toril Substation
                                            600                                          Nov 2019
• Culaman Substation                         50                                          Dec 2019
Balo-i–Kauswagan–Aurora 230 kV
                                            300      -                  -                Jun 2019
Substation Phase 1
                                                                               26 | D O E - E P I M B
                                               2 0 1 9   P o w e r       S i t u a t i o n   R e p o r t
MAJOR COMMITTED PLANTS AND ASSOCIATED TRANSMISSION PROJECTS
The following tables and maps show the list of major committed plants on the grid and
the associated transmission projects that will accommodate their entry:
Luzon Grid
                                                                           Associated
  Proposed Major      Capacity      Comm.
                                               Connection Point           Transmission                ETC*
   Power Plants        (MW)          Year
                                                                             Project
 COAL
                                                                        San Manuel–
 Masinloc                                      Masinloc 230 kV          Nagsaag 230 kV                 Mar
                         300       Q1 2020
 Expansion Project*                            Switchyard               Transmission                   2021
                                                                        Line
                                               Hermosa 230 kV
                                     Unit I
                                               Substation (Initial      Western 500 kV
 RPEI Coal-Fired                     2020                                                              Jun
                         600                   Connection)              Backbone (Stage
 Power Project*                                                                                       2021
                                               Castillejos 230 kV       1)
                                               Substation
                                                                                        27 | D O E - E P I M B
                                                            2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
     Based on DOE List of Private Sector
                                                                Based on Transmission Development Plan
   Initiated Power Projects as of December
                                                                              2020-2040
                     2019
                                                                                           Associated
   Proposed Major            Capacity         Comm.
                                                             Connection Point             Transmission                 ETC*
    Power Plants              (MW)             Year
                                                                                             Project
                                               Unit II      (Permanent
                                               2021         Connection)
                                                                                        Mariveles–                     Dec
                                                                                        Hermosa 500 kV                 2020
 GNPower Dinginin                                                                       Transmission
 2 x 660 MW                                                                             Line Project
                                                            Mariveles 500 kV
 Supercritical Coal‐            1336            2020
                                                            Substation
 Fired Power                                                                            Hermosa–San                    Mar
 Project*                                                                               Jose 500 kV                    2021
                                                                                        Transmission
                                                                                        Line Project
                                                                                        Pagbilao 500 kV                Mar
                                               Unit 1
                                                                                        Substation                     2021
                                              early Q4
 A1E Coal‐Fired                                2023         Pagbilao 500 kV
                                1200                                                    Pagbilao–
 Power Project*                                             Substation
                                                                                        Tayabas 500 kV                Jul 2023
                                               Unit 2
                                                                                        Transmission
                                               TBD
                                                                                        Line Project
 OIL-BASED
 Ingrid Pililla Diesel                                      Malaya 230 kV
                                 300         Dec 2019                                   None                           2020
 Power Plant*                                               Substation
 NATURAL GAS
 EWC CCGT Power                                             Pagbilao 230 kV             Pagbilao 500 kV                Mar
                                 650         Dec 2021
 Plant *                                                    Substation                  Substation                     2021
 SOLAR
 ELPI Pasuquin
                                                            Laoag 115 kV
 Solar Power Plant               100         Dec 2019                                   None                            N/A
                                                            Substation
 Project*
 Concepcion 1 Solar                                         Concepcion 69 kV
                                 115         Dec 2020                                   None                            N/A
 Power Project*                                             Substation
 BIOMASS
 GGREC Napier
 Grass‐ Fired                                               Cabanatuan 69 kV
                                  12         Aug 2019                                   None                            N/A
 Biomass Power                                              Substation
 Plant*
                                                            ISELCO II San
 Isabela La Suerte
                                   5         Nov 2019       Manuel 13.2 kV              None                            N/A
 Rice Husk-Fired
                                                            feeder
 VSGPC Multi‐
 Feedstock Biomass                                          Cabanatuan 69 kV
                                   6         Nov 2019                                   None                            N/A
 Power Plant                                                Substation
 Project*
 Cleangreen Energy
                                                            Hermosa 69 kV
 Biomass Power                    12         Nov 2019                                   None                            N/A
                                                            Substation
 Plant Project*
 Green Innovations
                                                            Gamu 69 kV
 Biomass Power                    18         Nov 2019                                   None                            N/A
                                                            Substation
 Plant*
NOTE: Commissioning year for each power plant is still subject to update.
* - with SIS
                                                                                                        28 | D O E - E P I M B
                                                                            2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Visayas Grid
                                                                        Associated
 Proposed Major      Capacity      Comm.
                                              Connection Point         Transmission                  ETC
  Power Plants        (MW)          Year
                                                                          Project
COAL
Palm Concepcion                               Direct connection      Eastern Panay
Coal-Fired Power        135       Dec 2021    to Concepcion          Transmission               Completed
Project*                                      Substation             Line Project
OIL-BASED
                                                                     No grid                         N/A
                                              Interim: Cutin         reinforcement
                                              along Isabel–          required
Isabel Modular                                Pasar 138 kV Line
Diesel Ancillary                              2
                         70       Dec 2019
Service Power
Project*                                      Final: Direct          Cebu–Leyte 230              Mar 2025
                                              connection to          kV
                                              Isabel Substation      Interconnection
                                                                     Line 3 and 4
                                              Existing
                                                                     No grid
TPVI DieselFired                              connection at
                       44.58      Nov 2019                           reinforcement                   N/A
Power Plant*                                  NGCP’s Naga 138
                                                                     required
                                              kV Substation
BIOMASS
BISCOM                                        Tap connection         CNP 230 kV
Cogeneration             48       Oct 2019    along                  Backbone Stage              Dec 2021
Power Plant*                                  Kabankalan– La         3
                                                                                       29 | D O E - E P I M B
                                                           2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
    Based on DOE List of Private Sector
                                                           Based on Transmission Development Plan 2020-
  Initiated Power Projects as of December
                                                                               2040
                    2019
                                                                                         Associated
   Proposed Major            Capacity        Comm.
                                                           Connection Point             Transmission                  ETC
    Power Plants              (MW)            Year
                                                                                           Project
                                                           Castellana 69 kV
                                                           line
                                                           Tap connection
 SNBI Cane trash‐                                                                     CNP 230 kV
                                                           along Bacolod–
 Fired Biomass                   25         Oct 2019                                  Backbone Stage              Dec 2021
                                                           San Enrique 69 kV
 Power Project *                                                                      3
                                                           line
                                                           Direct connection
                                                           to NGCP’s 69 kV
 NNBI Biomass                                                                         CNP 230 kV
                                                           Cadiz Substation
 Power Plant                     25         Nov 2019                                  Backbone Stage              Dec 2021
                                                           or tap connection
 Project*                                                                             3
                                                           along Cadiz-
                                                           Victorias 69 kV line
                                                           Tap connection             CNP 230 kV
 VMC Cogeneration
                                 60         Jan 2021       along Cadiz-               Backbone Stage              Dec 2021
 Power Project *
                                                           Victorias 69kV line        3
 SCBI Multi‐
                                                           Tap connection             CNP 230 kV
 Feedstock
                                 20         Nov 2019       along Cadiz–San            Backbone Stage              Dec 2021
 Biomass Power
                                                           Carlos 69 kV line          3
 Project *
 HPC Cogeneration                                          Tap connection             No grid
 Power Plant                   20.58        Dec 2019       along Cadiz–Silay          reinforcement                   N/A
 Project*                                                  69 kV line                 required
NOTE: Commissioning year for each power plant is still subject to update.
                                                                                                        30 | D O E - E P I M B
                                                                            2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Mindanao Grid
   Proposed                                                   Associated
                   Cap.      Comm.        Connection
  Major Power                                                Transmission                      ETC
                   (MW)       Year          Point
     Plants                                                     Project
COAL
GNPower
                                                          Balo-I –
Kauswagan
                                        Kauswagan         Kauswagan 230 kV
Clean Coal‐         150      Q1 2020                                                      Completed
                                        Substation        Transmission Line
Fired Power
                                                          Project
Plant*
                                                          Villanueva–
FDC‐ MPC CFB
                                        Villanueva        Kinamlutan 230 kV
Coal‐ Fired         405        TBD                                                         Jan 2025
                                        Substation        T/L and Opol S/S
Power Plant
                                                          Bus-in Project
SOLAR
                                                          Embedded
ADGI GenSan                                               Generation -No
                               Dec      General Santos
Solar Power        24.96                                  Transmission                         N/A
                               2019     Substation
Project*                                                  Reinforcement
                                                          Required
                                                                                     31 | D O E - E P I M B
                                                         2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
  Based on DOE List of Private Sector
                                                         Based on Transmission Development Plan 2019-
 Initiated Power Projects as of August
                                                                             2040
                  2018
    Proposed                                                                    Associated
                           Cap.         Comm.           Connection
  Major Power                                                                  Transmission                       ETC
                           (MW)          Year             Point
     Plants                                                                       Project
 BIOMASS
                                                                            Embedded
 PTCI Rice Husk‐
                                                                            Generation -No
 Fired Biomass                                        Sultan Kudarat
                              3        Jun 2019                             Transmission                          N/A
 Cogeneration                                         Substation
                                                                            Reinforcement
 Facility
                                                                            Required
                                                                            Embedded
                                                      SOCOTECO I’s
                                                                            Generation -No
 BFI Biogas                               Nov         69 kV
                            5.96                                            Transmission                          N/A
 Power Project                            2019        SubTransmissi
                                                                            Reinforcement
                                                      on Line
                                                                            Required
NOTE: Commissioning year for each power plant is still subject to update.
* - with SIS
                                                                                                        32 | D O E - E P I M B
                                                                            2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                          PROPOSED TRANSMISSION NETWORK OUTLOOK FOR 2040
6 Luzon-Visayas Bipolar Operation (Dec 2030) 10 Cebu-Bohol-Leyte 230kV Backbone (Dec 2035)
    ➢ To accommodate additional generation, import and                   ➢ To significantly boost the supply reliability to support load
      export to the Visayas Grid                                           growth.
                                                                                34 | D O E - E P I M B
                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
•     24 December 2019 due to the entry of Typhoon Ursula that caused 15 trippings on
      the following transmission lines:
                                                                                35 | D O E - E P I M B
                                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                  DISTRIBUTION
There are one-hundred fifty-one (151) distribution utilities (DUs) in the country, of
which one-hundred twenty-one (121) are Electric Cooperatives, twenty-four (24)
Privately-Owned Distribution Utilities including entities duly authorized to operate
within the economic zones, five (5) local government unit owned and operated utilities,
and one (1) Multi-Purpose Cooperative.
To ensure the reliability and security of power supply, DUs have implemented various
capital expenditure projects including electrification, network and non-network
projects. As of 2019, a total of 7,160 ckt-km of sub-transmission lines, 186,017 ckt-km
of distribution lines and 28,563 MVA substation capacities were completed. Table 25
shows the actual completed projects of DUs per grid:
The following figures are the one-page infographic profiles of the DUs per region which
features the regional supply and demand outlook and annual average growth rate of
peak demand over the ten-year planning period. It also shows the actual and
forecasted energy requirements of the DUs and the 2018 actual number of customers
per sector: residential, commercial, industrial, and others. Also, the completed (as of
2019) and planned capital expenditures projects are also presented.
NOTE:
     1. All data and information contained in the one-page infographic profile were
        sourced from the 2019-2028 Distribution Development Plan of the DUs.
                                                                                               36 | D O E - E P I M B
                                                                   2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 18. One-Page Infograpic Profile of DUs - NCR
                                                                37 | D O E - E P I M B
                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 19. One-Page Infograpic Profile of DUs - CAR
                                                                38 | D O E - E P I M B
                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 20. One-Page Infograpic Profile of DUs – Region I
                                                                   39 | D O E - E P I M B
                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 21. One-Page Infograpic Profile of DUs – Region II
                                                                   40 | D O E - E P I M B
                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 22. One-Page Infograpic Profile of DUs – Region III
                                                                    41 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 23. One-Page Infograpic Profile of DUs – Region IV-A
                                                                    42 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 24. One-Page Infograpic Profile of DUs – Region IV-B
                                                                    43 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 25. One-Page Infograpic Profile of DUs – Region V
                                                                  44 | D O E - E P I M B
                                      2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 26. One-Page Infograpic Profile of DUs – Region VI
                                                                   45 | D O E - E P I M B
                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 27. One-Page Infograpic Profile of DUs – Region VII
                                                                    46 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 28. One-Page Infograpic Profile of DUs – Region VIII
                                                                    47 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 29. One-Page Infograpic Profile of DUs – Region IX
                                                                   48 | D O E - E P I M B
                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 30. One-Page Infograpic Profile of DUs – Region X
                                                                  49 | D O E - E P I M B
                                      2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 31. One-Page Infograpic Profile of DUs – Region XI
                                                                   50 | D O E - E P I M B
                                       2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 32. One-Page Infograpic Profile of DUs – Region XII
                                                                    51 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 33. One-Page Infograpic Profile of DUs – Region XIII
                                                                    52 | D O E - E P I M B
                                        2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
Figure 34. One-Page Infograpic Profile of DUs – BARMM
                                                                53 | D O E - E P I M B
                                    2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                         OFF-GRID AND MISSIONARY
                                                                                 ELECTRIFICATION
            Electricity                            Newly
            Sales and                       Operational Capacity
           Consumption                                 37 MW
              1,470 GWh
                                                           Distribution**
                       Gross                                  EC - 43
                     Generation                               PIOU - 1
                                                            LGUOU - 1
                      1,623 GWh                               MPC – 1
                                                              QTP – 1
*Subject to change based on the availability of data NPC-SPUG
** Inclusive of DUs with grid and off-grid customers
 •                           •                         •
                                                                               Off-grid      areas    in  the
 •         49%               •       22%               •       5%              Philippines recorded a total
                                                                               electricity      sales    and
 •         715               •        326              •       68
                                                                               consumption of 1470 GWh, a
                                                                               9.2% increase from the
     Residential             Commercial                Industrial
                                                                               previous year’s consumption
                                                                               of     1,346      GWh.    The
                                                                               residential sector remains to
 •                           •                         •
                                                                               have the highest percentage
 •         11%               •        0%               •       13%             share of 49% or 715 GWh,
 •         169               •        3                •       190             and      followed     by   the
                                                                               commercial sector with a
                                                       Systems
     Others                  Own-Use                                           share of 22% or 326 GWh.
                                                       Loss
The total installed capacity in 279 small island and isolated grids (SIIGs) decreased
by 2.5% from 568 MW in 2018 to 526 MW in 2019. The 7.4% decrease can be
attributed to the decommissioning of aging generating units as well as the reduction
of rental capacities of the Small Power Utilities Group of the National Power
Corporation (NPC-SPUG). On the other hand, off-grid generation increased from
1,492 GWh in 2018 to 1,623 GWh in 2019 (8.8%).
                                                                                                     54 | D O E - E P I M B
                                                                         2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                                                                           OFF-GRID AND MISSIONARY
                                                                                   ELECTRIFICATION
                              Oil                                                        Oil
                             94.2%                                                      94.8%
The year 2019 saw a more diversified capacity and generation mix due to the
commercial operation of wind and solar power plants in Oriental Mindoro and Tablas
Island, respectively. Further, a new power provider, Renesons Energy Polillo, Inc.,
started its commercial operation of its diesel power plant in Polillo Island in 2019.
2
    Note: 16 MW PHESI wind power plant and 7.5MWp STEC solar power plant were not included in the 2019 capacity mix.
                                                                                                       55 | D O E - E P I M B
                                                                          2 0 1 9    P o w e r   S i t u a t i o n   R e p o r t
                                                                   OFF-GRID AND MISSIONARY
                                                                           ELECTRIFICATION
Table 26. Off-Grid Demand per Service Hours, 2018 vs. 2019
                                             2018                                        2019
   Service Hours
                            No. of SIIGs            Demand, MW         No. of SIIGs              Demand, MW
          5                       135                         1              134                         1
          8                        49                         2               48                         3
        12-16                      29                         7               20                         5
         24                        64                        266              77                        293
       TOTAL                      277                        277             279                        302
NOTE: Numbers may not sum up to total due to rounding off.
                                                                                               56 | D O E - E P I M B
                                                                   2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
     MAJOR POLICIES ISSUED IN 2019 RELATED TO GENERATION,
               TRANSMISSION AND DISTRIBUTION
DEPARTMENT
                                              DATE OF
 CIRCULAR                 TITLE                                           OBJECTIVE
                                             ISSUANCE
  NUMBER
                                                              To prescribe an omnibus set of
                                                              guidelines that incorporate and
                 Prescribing the Omnibus                      interrelate all existing and new
                 Guidelines on Enhancing                      policies and strategies for
                 Off-Grid Power              01/25/2019       achieving      quality,   reliable,
DC2019-01-0001
                 Development and                              affordability, security, stability,
                 Operation                                    efficiency and accountability of
                                                              electric power services in off-
                                                              grid areas
                                                              To     issue,     adopt,   and
                                                              promulgate      a    framework
                                                              governing the operations of
                 Providing for the                            embedded generators pursuant
                 Framework Governing                          to its authority and mandate
DC2019-02-0003                               02/08/2019
                 the Operations of                            under     EPIRA      and     its
                 Embedded Generators                          Implementing      Rules    and
                                                              Regulations (IRR), and after
                                                              due consideration of the inputs
                                                              from various stakeholders.
                                                                               57 | D O E - E P I M B
                                                   2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
DEPARTMENT
                                              DATE OF
 CIRCULAR                  TITLE                                          OBJECTIVE
                                             ISSUANCE
  NUMBER
                                                                               58 | D O E - E P I M B
                                                   2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
ANNEX 1
                                      59 | D O E - E P I M B
          2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
ANNEX 2
                                      60 | D O E - E P I M B
          2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
ANNEX 3
                                      61 | D O E - E P I M B
          2 0 1 9   P o w e r   S i t u a t i o n   R e p o r t
                              Prepared by the
            Power Planning and Development Division (PPDD)
           Electric Power Industry Management Bureau (EPIMB)
                       DEPARTMENT OF ENERGY
                              Redentor E. Delola
                              Assistant Secretary
                               Irma C. Exconde
       Assistant Director, Electric Power Industry Management Bureau
                              Thelma B. Ejercito
                              OIC-Division Chief
                           Department of Energy
    Energy Center, Rizal Drive cor 34th Street, Bonifacio Global City (BGC),