31-Track Renewals NCR 060231191002 Mughalsarai - 2019-2020 21.84 6.56 7.05 0.1
Allahabad -TRR
(P) - 19.531 km
(PB#471/2019-
20/NCR)
31-Track Renewals NCR 060231191011 Kanpur - Rura - 2019-2020 9.36 3.4 5.1 0
CTR (S) - 6.426
km (PB#472/2019-
20/NCR)
31-Track Renewals NCR 060231191016 Tundla - 2019-2020 23.64 10.38 3.5 0
Ghaziabad - TBR -
77.53 km
(PB#473/2019-
20/NCR)
31-Track Renewals NCR 060231191017 Mughalsarai - 2019-2020 10.07 3.7 2.25 0
Allahabad - TTR
(FS TWS
WCMSC) - 32
sets
(PB#474/2019-
20/NCR)
31-Track Renewals NCR 060231201005 Allahabad - 2020-2021 58.88 28.07 10.02 0
Kanpur - TRR(P) -
51.777 km
(PB#472/2020-
21/NCR)
31-Track Renewals NCR 060231211009 Kanpur - Rura 2021-2022 24.31 8.94 5.05 0.56
(UP) - TSR(P) -
19.715 km &
Manikpur - Naini
(UP) - TSR(P) -
2.200 km
(PB#486/2021-
22/NCR)
31-Track Renewals NCR 060231211016 Tundla - 2021-2022 20.48 2.04 5.5 4.32
Ghaziabad -
TTR(FS TWS
WCMSC) - 66
sets
(PB#488/2021-
22/NCR)
31-Track Renewals NCR 060231211018 Pd Deen Dayal 2021-2022 7.54 3.36 5.5 0
Upadhayay -
Allahabad -
TTR(FS TWS
WCMSC) - 22
sets
(PB#488/2021-
22/NCR)
31-Track Renewals NCR 060331111001 Bina - Agra - TBR - 2011-2012 14.38 5.86 0.53 0
51.145 km & TFR -
52.879 km
31-Track Renewals NCR 060331151005 Bina- Agra -TFR - 2015-2016 8.94 3.65 0.01 0
17.17, TWR -
17.84, SEJ - 22
nos. & GJ - 44
nos.
31-Track Renewals NCR 060331151009 Jhansi - Kanpur: 2015-2016 11.2 4.28 0.01 0
TFR - 53.5 kms &
TBR - 6.300 Kms
31-Track Renewals NCR 060331161001 Bina - Dhaulpur - 2016-2017 24.69 10.01 0.91 -0.29
TBR - 56.153 km
31-Track Renewals NCR 060331161002 Bina - Dhaulpur - 2016-2017 220.92 107.62 0.01 0
TRR(P) - 100.907
km
31-Track Renewals NCR 060331161005 Jhansi - Kanpur - 2016-2017 7.42 3.19 0.01 0
TTR(CS) - 64 sets
31-Track Renewals NCR 060331161007 Jhansi- Kanpur - 2016-2017 129.01 52.23 0.02 0
CTR(P) 36.58 Km
31-Track Renewals NCR 060331171006 Jhansi - Manikpur 2017-2018 33.53 15.48 0.5 0
- TBR - 115 km
31-Track Renewals NCR 060331181003 Bina-Sithouli - 2018-2019 15.6 5.05 0.51 0.17
CTR(S) - 12.75
km
31-Track Renewals NCR 060331181007 Jhansi-Manikpur 2018-2019 22.37 7.73 1.2 0
(SL) - TWR - 170
km
31-Track Renewals NCR 060331191001 Jhansi - Kanpur - 2019-2020 5.13 2.07 0.07 0
CTR(P) - 2.16 km
(PB#470/2019-
20/NCR)
31-Track Renewals NCR 060331221004 Bina - Jhansi (UP) 2022-2023 27.74 11.59 6.77 0
- TSR(P) - 24.000
Tkm
(PB#492/2022-
23/CR)
32-Bridge Works, Tunnel NCR 060132181002 Dholpur-Agra 2018-2019 10.23 3.07 1 0
Works and Approaches Cantt. -
Procurement,
fabrication,
assembling,erecti
on and repl
(Bridge No.1314/1
& 1331/1)
32-Bridge Works, Tunnel NCR 060132161002 Agra Divn. - Repl 2016-2017 13.09 6.34 0.99 0
Works and Approaches of steel girders up
to 9.14 m span by
RCC/PSC slab
(15 Nos)
32-Bridge Works, Tunnel NCR 060232101001 Allahabad-Khaga - 2010-2011 6.11 2.02 0.18 0.3
Works and Approaches Rehabilitation by
box girder in track
circuited area
(bridge No.29 &
31)
32-Bridge Works, Tunnel NCR 060232181001 Allahabad 2018-2019 16.1 6.97 1.53 0.34
Works and Approaches Division - Repl. of
plate girders on
bridges (7 Nos)
33-Signalling and NCR 060133181001 Agra Cantt- 2018-2019 6.58 2.13 0 0
Telecommunication Dhaulpur -
Reliability
improvement of
signalling gears of
old intermediate
block signalling (4
IBS)
30 NCR 060230101009 Kulwa-Somna - DYCSTE-C-AGC- SIG-WS-Contract- Indoor work in connection with modification in Electronic Interlocking for 32728580 21/07/2021
Road over bridge S AND T AGC-89 closing of Level X-ing gates in connection with ROB/RUB in TDL-GZB
in lieu of level section of Prayagraj division of North Central Railway
crossing No.120-
B
30 NCR 060030131005 Shikohabad- PRAYAGRAJ 3320212022-86 Provision of shed on approaches of LHSs in SKB-FBD Branch Line 46274167 17/09/2021
Farrukhabad - DIVISION-ENGG under ADEN/NCR/FZD.
Elimination of
level crossings by
road under
bridges (14 Nos)
30 NCR 060230121036 Tundla - DYCSTE-C-AGC- SIG-WS-Contract- Indoor work in connection with modification in Electronic Interlocking for 32728580 21/07/2021
Ghaziabad - 2- S AND T AGC-89 closing of Level X-ing gates in connection with ROB/RUB in TDL-GZB
lane road over section of Prayagraj division of North Central Railway
bridge in lieu of
level crossing
Nos.75, 79, 83,
107, 71, 110, 118
138
30 NCR 060030131006 Shikohabad- PRAYAGRAJ 3320212022-86 Provision of shed on approaches of LHSs in SKB-FBD Branch Line 46274167 17/09/2021
Farrukhabad - DIVISION-ENGG under ADEN/NCR/FZD.
Elimination of
level crossings by
road under
bridges (14 Nos)
31 NCR 060131191004 Agra Cantt - AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Palwal - TBR - ELECTRICAL 2022-23
21.11 km
(PB#473/2019-
20/NCR)
31 NCR 060131201002 Idgah- Bayana - AGRA DIVISION- 2021-Oct-03-02 Supply, Installation & Commissioning, operation of 9704676 11/11/2021
TBR - 16.997 Km ENGINEERING ETP/WWTP/STP for waste/Sewerage water recycling at Agra Fort
. station & maintenance for two year
31 NCR 060231191016 Tundla - PRAYAGRAJ 4220212022-103 Cess repair and protection of cess in Aligarh-Ghaziabad section under 24802382 27/10/2021
Ghaziabad - TBR - DIVISION-ENGG ADEN/Aligarh.
77.53 km
(PB#473/2019-
20/NCR)
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-ENGG-C- PART-I : Boxing of ballast at various locations of Jhansi - Kanpur 29855249 15/12/2021
CTR(P) - 2.16 km DIVISION-ENGG 2021-102 section under ADEN(HQ-I)JHS & ADEN CNB sub-division, PART-
(PB#470/2019- II : Pre & Post BCM work at various locations of Jhansi - Kanpur
20/NCR) section under ADEN(HQ-I)JHS & ADEN CNB sub-division.
31 NCR 060331161007 Jhansi- Kanpur - JHANSI JHS-ENGG-C- PART-I : Boxing of ballast at various locations of Jhansi - Kanpur 29855249 15/12/2021
CTR(P) 36.58 Km DIVISION-ENGG 2021-102 section under ADEN(HQ-I)JHS & ADEN CNB sub-division, PART-
II : Pre & Post BCM work at various locations of Jhansi - Kanpur
section under ADEN(HQ-I)JHS & ADEN CNB sub-division.
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-N-W-10-22 Provision of shifting of S&T cable and other related work in 7512518 12/05/2022
CTR(P) - 2.16 km DIVISION-S AND connection with the work of CTR -TTR & LHS-NHS &
(PB#470/2019- T BRIDGE in section of branch line Jhansi.
20/NCR)
31 NCR 060131191003 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Etmadpur -TBR - ELECTRICAL 2022-23
8.300 km
(PB#473/2019-
20/NCR)
31 NCR 060131181004 Dholpur-Agra AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Cantt. - CTR(S) - ELECTRICAL 2022-23
7.795 km
31 NCR 060131201006 Idgah - Bayana - AGRA DIVISION- 2021-Oct-03-02 Supply, Installation & Commissioning, operation of 9704676 11/11/2021
TBR - 58.699 Km ENGINEERING ETP/WWTP/STP for waste/Sewerage water recycling at Agra Fort
station & maintenance for two year
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-ENGG-C- Supplying and stacking of SKV welding Portion with improved 5881638 06/12/2021
CTR(P) - 2.16 km DIVISION-ENGG 2021-93 preheating welding technology namely compressed air petrol /LPG
(PB#470/2019- along with Single shot crucible fitted and with use of three piece
20/NCR) prefabricated moulds with Automatic Tapping Thimble (ATT) technology
under jurisdiction of ADEN/CNB & ADEN/HQ-I/JHS.
31 NCR 060231191011 Kanpur - Rura - PRAYAGRAJ 3320212022-84 Provision of LWR on various Loop Lines in CNB-RRH section under 30751825 17/09/2021
CTR (S) - 6.426 DIVISION-ENGG Sr.DEN/III/PRYJ and RRH-TDL section under Sr.DEN/IV/PRYJ.by
km (PB#472/2019- Mobile Flash Butt Welding of Rails.
20/NCR)
31 NCR 060231181007 Kanpur-Tundla - PRAYAGRAJ 3320212022-84 Provision of LWR on various Loop Lines in CNB-RRH section under 30751825 17/09/2021
CTR(S) - 9.043 DIVISION-ENGG Sr.DEN/III/PRYJ and RRH-TDL section under Sr.DEN/IV/PRYJ.by
km (Loop Lines) Mobile Flash Butt Welding of Rails.
31 NCR 060131181004 Dholpur-Agra AGRA DIVISION- AGC-ELG-T-03- Part A.)Augmentation of passenger facilities at Railway stations for 6426382 24/06/2021
Cantt. - CTR(S) - ELECTRICAL 2021-22 better air circulation by providing energy efficient BLDC fans at platform
7.795 km and service building in Agra Division.
Part-B) Electrification of Halt Station through SPV model-05 No's
AF-BKI Section (NOHBACHMANDI, TALCHERA, DATIA HALT,
BHUDA, BHAJERA).
Part-C) Provision of 20 KWp on grid connected Solar Power plant (Roof
Top) in Agra Division.
31 NCR 060131181003 Agra Cantt.- AGRA DIVISION- AGC-ELG-T-03- Part A.)Augmentation of passenger facilities at Railway stations for 6426382 24/06/2021
Palwal(DN) - ELECTRICAL 2021-22 better air circulation by providing energy efficient BLDC fans at platform
TRR(P) - 18.269 and service building in Agra Division.
km Part-B) Electrification of Halt Station through SPV model-05 No's
AF-BKI Section (NOHBACHMANDI, TALCHERA, DATIA HALT,
BHUDA, BHAJERA).
Part-C) Provision of 20 KWp on grid connected Solar Power plant (Roof
Top) in Agra Division.
31 NCR 060131191004 Agra Cantt - AGRA DIVISION- AGC-ELG-T-03- Part A.)Augmentation of passenger facilities at Railway stations for 6426382 24/06/2021
Palwal - TBR - ELECTRICAL 2021-22 better air circulation by providing energy efficient BLDC fans at platform
21.11 km and service building in Agra Division.
(PB#473/2019- Part-B) Electrification of Halt Station through SPV model-05 No's
20/NCR) AF-BKI Section (NOHBACHMANDI, TALCHERA, DATIA HALT,
BHUDA, BHAJERA).
Part-C) Provision of 20 KWp on grid connected Solar Power plant (Roof
Top) in Agra Division.
31 NCR 060331181003 Bina-Sithouli - JHANSI JHS-ENGG-C- Supplying and stacking of SKV welding Portion with improved 9716844 12/05/2021
CTR(S) - 12.75 DIVISION-ENGG 2021-36 preheating welding technology namely compressed air petrol /LPG
km along with Single shot crucible fitted and with use of three piece
prefabricated moulds with Automatic Tapping Thimble (ATT) technology
under jurisdiction of ADEN/CNB & ADEN/HQ-I/JHS.
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-ENGG-C- Supplying and stacking of SKV welding Portion with improved 9716844 12/05/2021
CTR(P) - 2.16 km DIVISION-ENGG 2021-36 preheating welding technology namely compressed air petrol /LPG
(PB#470/2019- along with Single shot crucible fitted and with use of three piece
20/NCR) prefabricated moulds with Automatic Tapping Thimble (ATT) technology
under jurisdiction of ADEN/CNB & ADEN/HQ-I/JHS.
31 NCR 060331221004 Bina - Jhansi (UP) JHANSI JHS-ENGG-HQ- Loading, Leading and Unloading of Misc. P. Way material by 13436072 04/04/2023
- TSR(P) - 24.000 DIVISION-ENGG 2023-31 Truck/Trailor from any station to any station between various Sleeper
Tkm Plants, SSE/Pway/Depot and SSE/Pway/Track Depot Jhansi of NCR.
31 NCR 060231201005 Allahabad - PRAYAGRAJ 10420222023-322 Prayagraj-Kanpur : Improvement of Cess and Repairs to Trolley Refuse 38131337 01/03/2023
Kanpur - TRR (P) - DIVISION-ENGG in the jurisdiction of Sr. Divisional Engineer/II/North Central
51.777 Kms. Railway/Prayagraj.
31 NCR 060131171006 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Tundla -TBR - ELECTRICAL 12R1-2022-23
11.96 km
31 NCR 060131181004 Dholpur-Agra AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Cantt. - CTR(S) - ELECTRICAL 12R1-2022-23
7.795 km
31 NCR 060131191004 Agra Cantt - AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Palwal - TBR - ELECTRICAL 12R1-2022-23
21.11 km
(PB#473/2019-
20/NCR)
31 NCR 060131191003 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Etmadpur -TBR - ELECTRICAL 12R1-2022-23
8.300 km
(PB#473/2019-
20/NCR)
31 NCR 060131171006 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Tundla -TBR - ELECTRICAL 2022-23
11.96 km
42 NCR 060342201003 Jhansi~Up- JHANSI JHS-RS-WC-T4- Electrical work for "Up-gradation and augmentation of Electric 460927 27/02/2023
gradation and DIVISION- 2022-23 & Diesel Locomotive maintenance and production facilities"
augmentation of ELECTRICAL
Electric Diesel
Locomotive
maintenance and
production
facilities.
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Bills pending for registration for more than 4 days
Report Time 29/05/23 15:24:49
PH RLY UWID NAME OF WORK SANCTION BILL NUMBER BILL DATE BILL DESCRIPTION BILL AMOUNT PENDING DAYS NAME OF
YEAR (Rs.) PARTY
30 NCR 060230181002 Mughalsarai- 2018-2019 32022216871 24/05/2023 Hitech 1200 milimeter x 760 milimeter (mm L x D) Executive Computer 6099.78 5 HEAVEN
Ghaziabad - Road table. ENTERPRISES-
over bridge in lieu ALLAHABAD
of 12 level
crossings
(PB#279/2018-
19/NCR)
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Bills under process for more than 3 days
Report Time 29/05/23 15:25:46
PH RLY UWID NAME OF WORK SANCTION YEAR CO6 NUMBER CO6 DATE BILL DESCRIPTION BILL AMOUNT PENDING DAYS STATUS PARTYNAME
30 NCR 060230181002 Mughalsarai- 2018-2019 32050123000228 23/05/2023 shifting of 132 kV TR Line of ROB at LC b/w CNB-GZB 8441858 6 REGISTERED PSH TECHNO
Ghaziabad - ENGINEERING
Road over bridge PRIVATE
in lieu of 12 level LIMITED-
crossings MEERUT
(PB#279/2018-
19/NCR)
30 NCR 060230181002 Mughalsarai- 2018-2019 32020123005511 25/05/2023 Payorder in favour of Executive engineer,DVVNL,Lal diggi,Aligarh 58422 4 REGISTERED ELECTRICAL
Ghaziabad - DISTRIBUTION
Road over bridge DIVISION-
in lieu of 12 level IST,ALIGARH
crossings
(PB#279/2018-
19/NCR)
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
List of Works
Report Time 29/05/23 15:26:29
PLAN HEAD RAILWAY UWID NAME OF WORK SANCTION SANCTION ENVIRONMENT DESIGN & LAND GAD STATUS ESTIMATE COMPLETION
YEAR COST CLEARANCE DRAWING ACQUISITION SANCTION REPORT
STATUS
14 NCR 060314101002 Gwalior- 2010-2011 3747 Not required 80% progress 90% progress 80% progress RE Not due
Sheorpurkalan (ExcessInCostSa
with extension to nc).
Kota (284 km)
15 NCR 060115161002 Yamuna Bridge- 2016-2017 107.74 Not required 50% progress Not Required 50% progress Det. Est. Sanc. Not due
Agra Fort - Double
line with major
bridge at Yamuna
river(2.11 km)
16 NCR 060316051001 Bijauli, Bhandai & 2005-2006 0 Not required Complete Not Required Complete RE under prep. Completion
Mata Tila - Addl. estimate under
loop line preparation
17 NCR 060017071002 North Central 2007-2008 11.25 Not required Not Required Not Required Not Required RE under prep. Not Required
Railway -
Extension of
automatic ticket
vending machines
30 NCR 060330161001 Bina-Jhansi- Road 2016-2017 28.73 Not required Complete Not Required Complete RE under prep. Not due
over bridge in lieu
of level crossing
No. 329
30 NCR 060330121004 Dholpur-Agra - 2012-2013 70.13 Not required 90% progress Not Required 90% progress RE Not due
Normal height (ExcessInCostSa
subways / road nc).
under bridges in
lieu of level
crossings (15
Nos)
30 NCR 060230121036 Tundla - 2012-2013 225.15 Not required Nil Progress Not Required 40% progress Det. Est. Sanc. Not due
Ghaziabad - 2-
lane road over
bridge in lieu of
level crossing
Nos.75, 79, 83,
107, 71, 110, 118
& 138
30 NCR 060230181002 Mughalsarai- 2018-2019 440.08 Not required 80% progress 60% progress Complete Det. Est. Sanc. Not due
Ghaziabad - Road
over bridge in lieu
of 12 level
crossings
(PB#279/2018-
19/NCR)
30 NCR 060330161008 Gwalior-Agra- 2016-2017 32.06 Not required Complete Not Required Complete RE under prep. Under preparation
Road over bridge
in lieu of level
crossing No. 426
30 NCR 060130121001 Mathura-Palwal - 2012-2013 85.66 Not required 30% progress Not Required 40% progress Det. Est. Sanc. Completion
Subways in lieu of estimate under
level crossings preparation
(tvu more than
25000 & upto
100000) (17 Nos)
31 NCR 060231211016 Tundla - 2021-2022 20.48 Not required Not Required Not Required Not Required RE under prep. Not due
Ghaziabad -
TTR(FS TWS
WCMSC) - 66
sets
(PB#488/2021-
22/NCR)
31 NCR 060231201005 Allahabad - 2020-2021 58.88 Not required Not Required Not Required Not Required DE under prep. Not Required
Kanpur - TRR(P) -
51.777 km
(PB#472/2020-
21/NCR)
31 NCR 060231191001 Barhan - Etah - 2019-2020 45.23 Not required Not Required Not Required Not Required RE under prep. Not due
CTR (P) - 23.76
km (PB#470/2019-
20/NCR)
31 NCR 060231181019 Tundla-Ghaziabad 2018-2019 7.58 Not required Not Required Not Required Not Required RE under prep. Not due
(UP) - TRR(P) -
6.84 km
31 NCR 060231191016 Tundla - 2019-2020 23.64 Not required Not Required Not Required Not Required RE under prep. Not due
Ghaziabad - TBR -
77.53 km
(PB#473/2019-
20/NCR)
31 NCR 060331131005 Bina-Agra - TBR - 2013-2014 26.05 Not required Not Required Not Required Not Required RE under prep. Not due
117.095 km
31 NCR 060331151002 Bina - Agra Cantt. 2015-2016 39.21 Not required Not Required Not Required Not Required RE under prep. Not Required
: TTR = 120 Nos.
32 NCR 060132181002 Dholpur-Agra 2018-2019 10.23 Not required 70% progress 70% progress 70% progress RE under prep. Not due
Cantt. -
Procurement,
fabrication,
assembling,erecti
on and repl
(Bridge No.1314/1
& 1331/1)
32 NCR 060132161002 Agra Divn. - Repl 2016-2017 13.09 Not required Nil Progress Not Required Nil Progress Det. Est. Sanc. Not due
of steel girders up
to 9.14 m span by
RCC/PSC slab
(15 Nos)
32 NCR 060232181001 Allahabad Division 2018-2019 16.1 Not required Not Required Not Required Complete RE under prep. Not Required
- Repl. of plate
girders on bridges
(7 Nos)
33 NCR 060333181005 Jhansi-Bina - 2018-2019 19.22 Not required 10% progress Not Required Not Required Det. Est. Sanc. Not due
Reliability
improvement of
signalling gears of
old intermediate
block signalling
(14 IBS)
36 NCR 060237171002 Mugalsarai- 2017-2018 125.94 Not required 20% progress Nil Progress 10% progress Det. Est. Sanc. Not due
Ghaziabad - New
220/132 kv grid
sub-station at
Bhogaon, 220/132
kv transmission
lines & associated
works
36 NCR 060337151001 Agasod-Karoda - 2015-2016 31.13 Not required Complete Complete Complete RE Not Required
Addl traction sub- (ExcessInCostSa
station & nc).
associated
transmission line
works
42 NCR 060242191001 Kanpur 2019-2020 12 Not required Nil Progress Not Required Nil Progress Det. Est. Sanc. Not due
central~~Up-
gradation&
Augmentation of
Electric
Locomotive of
ELS/CNB for
maintenance
facilities
42 NCR 060442203001 CMLR Jhansi: - 2020-2021 1 Not required Nil Progress Not Required Not Required Det. Est. Sanc. Not due
supply & inst. of 1
NX CAD software
17PC sets
networking at
shop floor offices
Poll. data sensors
with LED display
panel&40CCTV
42 NCR 060242211005 Provision of 750 2021-2022 6 Not required Nil Progress Not Required Nil Progress Det. Est. Sanc. Not due
Volt power supply
for maintenance
of HOG coaches
in washing/sick
lines at PRYJ and
CNB.
53 NCR 060053185001 Design, supply, 2018-2019 23.16 Not required Complete Complete Complete RE Not due
installation and (ExcessInCostSa
commissioning of nc).
quick watering
system at
Allahabad and
Kanpur Central
stations
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Work based on no exp in last 30 days
Report Time 29/05/23 15:27:06
PLAN HEAD RAILWAY UWID NAME OF WORK SANCTION YEAR SANCTION EXP TILL 2022- OUTLAY 2023- EXP.(DURING
COST(In Cr.) 23(In Cr.) 24(In Cr.) 2023-24)(In Cr.)
16 NCR 060216151001 Allahabad 2015-2016 5.3 2.29 1.5 0
Division - Extn. of
CSR of 10,13,15
& 16 in GMC
16 NCR 060316051001 Bijauli, Bhandai & 2005-2006 0 0.44 0 0
Mata Tila - Addl.
loop line
17 NCR 060017071002 North Central 2007-2008 11.25 4.12 0.13 0
Railway -
Extension of
automatic ticket
vending machines