Sucess in Civil Services

The document provides a status report on priority railway works targeted for early completion in India. It lists 30 projects across multiple railway zones. For each project, it provides details such as the railway line, unique work ID, project name and location, sanction year and cost, expenditure to date and planned expenditure for 2023-2024. The majority of the projects are related to road over/under bridges to eliminate railway level crossings for improved safety. Total sanctioned cost of all projects is over 5000 crores INR with around half of the amount spent so far.

Uploaded by

ashish shukla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views32 pages

Sucess in Civil Services

The document provides a status report on priority railway works targeted for early completion in India. It lists 30 projects across multiple railway zones. For each project, it provides details such as the railway line, unique work ID, project name and location, sanction year and cost, expenditure to date and planned expenditure for 2023-2024. The majority of the projects are related to road over/under bridges to eliminate railway level crossings for improved safety. Total sanctioned cost of all projects is over 5000 crores INR with around half of the amount spent so far.

Uploaded by

ashish shukla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION

Work based on Utilization Category


Report Time 29/05/23 15:22:17
PLAN HEAD RAILWAY UWID NAME OF WORK SANCTION YEAR SANCTION EXP TILL 2022- OUTLAY 2023-24 EXP.(DURING
COST 23 2023-24)
14-Gauge Conversion NCR 060314101002 Gwalior- 2010-2011 3747 1252.82 661.31 103.23
Sheorpurkalan
with extension to
Kota (284 km)
15-Doubling NCR 060115161002 Yamuna Bridge- 2016-2017 107.74 53.29 36 0.55
Agra Fort -
Double line with
major bridge at
Yamuna
river(2.11 km)
16-Traffic Facilities-Yard NCR 060316051001 Bijauli, Bhandai & 2005-2006 0 0.44 0 0
Remodelling & Others Mata Tila - Addl.
loop line
16-Traffic Facilities-Yard NCR 060216151001 Allahabad 2015-2016 5.3 2.29 1.5 0
Remodelling & Others Division - Extn. of
CSR of 10,13,15
& 16 in GMC
17-Computerisation NCR 060017071002 North Central 2007-2008 11.25 4.12 0.13 0
Railway -
Extension of
automatic ticket
vending machines

30-Road Safety Works- NCR 060230101009 Kulwa-Somna - 2010-2011 21.91 10.65 1 0


Road Over/Under Bridges. Road over bridge
in lieu of level
crossing No.120-
B
30-Road Safety Works- NCR 060330161008 Gwalior-Agra- 2016-2017 32.06 10.29 0 0
Road Over/Under Bridges. Road over bridge
in lieu of level
crossing No. 426
30-Road Safety Works- NCR 060230121005 Kanpur-Ambiapur - 2012-2013 27.9 12.71 1 0
Road Over/Under Bridges. Elimination of
level crossings by
road under
bridges (6 Nos)
30-Road Safety Works- NCR 060230121007 Kanpur Central - 2012-2013 65.1 28.68 1 0
Road Over/Under Bridges. Kaurara - Road
under bridges in
lieu of level
crossings in main
line (14 Nos)

30-Road Safety Works- NCR 060230121017 Phaphund-Tundla 2012-2013 85.11 29.43 1 0


Road Over/Under Bridges. - Elimination of
level crossings by
road under bridge

30-Road Safety Works- NCR 060230121020 Tundla- 2012-2013 46.48 18 0 0


Road Over/Under Bridges. Ghaziabad - 4-
lane road over
bridge in lieu of
level crossing
No.134
30-Road Safety Works- NCR 060230121036 Tundla - 2012-2013 225.15 78.63 0.02 0
Road Over/Under Bridges. Ghaziabad - 2-
lane road over
bridge in lieu of
level crossing
Nos.75, 79, 83,
107, 71, 110, 118
& 138
30-Road Safety Works- NCR 060230121038 Kanpur-Tundla - 2012-2013 56.33 20.06 0.5 0
Road Over/Under Bridges. Road over bridge
in lieu of level
crossing Nos.67 &
69
30-Road Safety Works- NCR 060230161006 Etah-Barhan & 2016-2017 24.05 8.07 0 1.15
Road Over/Under Bridges. Aligarh-Bareilly &
Hathras-Hathras
Fort-Subways in
lieu of level
crossing No.
22C,24C,48C,68-
A & 87 & 3HK (6
Nos)
30-Road Safety Works- NCR 060230181002 Mughalsarai- 2018-2019 440.08 135.71 90.1 9.31
Road Over/Under Bridges. Ghaziabad - Road
over bridge in lieu
of 12 level
crossings
(PB#279/2018-
19/NCR)
30-Road Safety Works- NCR 060230981001 Kanpur - Road 1998-1999 30.5 14.21 0 0
Road Over/Under Bridges. over bridge in lieu
of level crossing
No 79-D on GT
Road
30-Road Safety Works- NCR 060330121004 Dholpur-Agra - 2012-2013 70.13 23.25 1.5 0
Road Over/Under Bridges. Normal height
subways / road
under bridges in
lieu of level
crossings (15
Nos)
30-Road Safety Works- NCR 060330161001 Bina-Jhansi- 2016-2017 28.73 6.86 0.3 2.03
Road Over/Under Bridges. Road over bridge
in lieu of level
crossing No. 329
30-Road Safety Works- NCR 060130161002 Agra- Palwal- 2016-2017 75.22 29.29 3.05 0.05
Road Over/Under Bridges. Road over bridge
in lieu of level
crossing No.544
(4-lane)
30-Road Safety Works- NCR 060130121001 Mathura-Palwal - 2012-2013 85.66 34.44 1.05 0.52
Road Over/Under Bridges. Subways in lieu of
level crossings
(tvu more than
25000 & upto
100000) (17 Nos)
30-Road Safety Works- NCR 060030131006 Shikohabad- 2013-2014 59.69 26.39 0 0
Road Over/Under Bridges. Farrukhabad -
Elimination of
level crossings by
road under
bridges (14 Nos)
30-Road Safety Works- NCR 060030131005 Shikohabad- 2013-2014 59.25 21.62 0 0
Road Over/Under Bridges. Farrukhabad -
Elimination of
level crossings by
road under
bridges (14 Nos)
30-Road Safety Works- NCR 060030131001 Kanpur - Road 2013-2014 25.86 8.7 0 0
Road Over/Under Bridges. over bridge
parrallel to
exisiting road over
bridge near
Jhakarkati
30-Road Safety Works- NCR 060230111001 Govindpuri - 2- 2011-2012 55.59 25.62 0 0
Road Over/Under Bridges. lane road over
bridge at km
1021/15-17
31-Track Renewals NCR 060131171005 Mathura - Alwar - 2017-2018 6.61 1.75 0.28 0.24
TBR -18.8 km
31-Track Renewals NCR 060131171006 Yammuna Bridge - 2017-2018 4.57 1.76 0.11 0
Tundla -TBR -
11.96 km
31-Track Renewals NCR 060131181001 Agra Cantt.- 2018-2019 49.55 21.84 4.51 0.41
Mathura - CTR(S)
- 33.439 km
31-Track Renewals NCR 060131181003 Agra Cantt.- 2018-2019 21.39 9.69 0.56 0
Palwal(DN) -
TRR(P) - 18.269
km
31-Track Renewals NCR 060131181004 Dholpur-Agra 2018-2019 11.56 3.61 1.2 0
Cantt. - CTR(S) -
7.795 km
31-Track Renewals NCR 060131191003 Yammuna Bridge - 2019-2020 3.96 1.82 0.27 0
Etmadpur -TBR -
8.300 km
(PB#473/2019-
20/NCR)
31-Track Renewals NCR 060131191004 Agra Cantt - 2019-2020 8.54 3.02 0.25 0.05
Palwal - TBR -
21.11 km
(PB#473/2019-
20/NCR)
31-Track Renewals NCR 060131201002 Idgah - Bayana - 2020-2021 6.33 1.82 0.54 0.18
TBR - 16.997 km
(PB#475/2020-
21/NCR)
31-Track Renewals NCR 060131201004 Agra fort - 2020-2021 5.26 2.08 0.01 0
Yamuna Bridge -
Replacement of
steel Channel
sleepers at Bridge
No. 162 - 1114
Nos.
(PB#475/2020-
21/NCR)
31-Track Renewals NCR 060131201006 Idgah - Bayana - 2020-2021 21.85 6.22 2.3 0.45
TBR - 58.699 km
(PB#475/2020-
21/NCR)
31-Track Renewals NCR 060231121005 Mughalsarai - 2012-2013 19.37 7.71 2 0
Ghaziabad - TTR -
493 Nos & SEJ -
200 Nos
31-Track Renewals NCR 060231121007 Mughalsarai - 2012-2013 147.57 59.05 0.55 0
Ghaziabad - TFR -
294 km, TBR -
71.60 km, glued
joints -1500 No &
TTR - 250 sets
31-Track Renewals NCR 060231131007 Mughalsarai- 2013-2014 10.77 4.58 0.12 0
Ghaziabad - SEJs
(120 Nos) & glued
joints (810 Nos)

31-Track Renewals NCR 060231151009 Kanpur-Tundla - 2015-2016 48.46 24.14 3.47 0


CTR (S) - 24.346
Kms.
31-Track Renewals NCR 060231151010 Kanpur-Tundla : 2015-2016 11.87 5.52 2.55 0
TTR - 28 Nos.,
D/S - 28 Nos.
31-Track Renewals NCR 060231151013 Mughalsarai- 2015-2016 32.06 12.89 0.01 0
Allahabad- TBR -
104.00 Kms
31-Track Renewals NCR 060231161003 Chunar-Chopan & 2016-2017 155.24 65.03 5.03 0.03
NainiI-Manikpur :
CTR(P) - 29.46
Kms & TRR (P) -
22.31 Kms.

31-Track Renewals NCR 060231161005 Mughalsarai - 2016-2017 94 39.42 3.25 0


Ghazibad -
TTR(TWS) - 250
sets, TTR(CMSC)
- 250 sets,
Renewal of SEJ -
200 sets &
renewal of Glued
Joint -1000 sets

31-Track Renewals NCR 060231161006 Mughalsarai- 2016-2017 38.16 13.96 1.01 0


Allahabad - CTR
(S)- 13.127 km
31-Track Renewals NCR 060231161007 Mughalsarai- 2016-2017 26.71 10.47 1.55 0.53
Allahabad - TBR -
58.45 Km
31-Track Renewals NCR 060231161009 Mughalsarai- 2016-2017 34.72 14.15 2 0
Allahabad -
TTR(TWS)- 151
sets
31-Track Renewals NCR 060231171005 Mughalsarai - 2017-2018 5.95 2.9 1.85 0
Allahabad -
TSR(P) - 7.916
km
31-Track Renewals NCR 060231171006 Mughalsarai - 2017-2018 17.72 5.86 2.03 0
Allahabad -
CTR(S) - 5.385
km & TTR - 13 No
of COD Siding at
Chheoki

31-Track Renewals NCR 060231181007 Kanpur-Tundla - 2018-2019 12.87 4.42 1.55 0


CTR(S) - 9.043
km (Loop Lines)
31-Track Renewals NCR 060231181012 Manikpur-Naini - 2018-2019 21.81 6.83 5.5 0.2
TBR - 74.55 km
31-Track Renewals NCR 060231181014 Manikpur- 2018-2019 20.13 7.16 2.52 0.14
Naini(UP) -
CTR(P) - 10.695
km
31-Track Renewals NCR 060231181016 Mughalsarai- 2018-2019 10.05 3.68 3.1 0
Allahabad - TTR -
30 sets
31-Track Renewals NCR 060231181019 Tundla- 2018-2019 7.58 2.44 1.01 0.14
Ghaziabad (UP) -
TRR(P) - 6.84 km
31-Track Renewals NCR 060231191001 Barhan - Etah - 2019-2020 45.23 16.44 9.01 0.01
CTR (P) - 23.76
km (PB#470/2019-
20/NCR)

31-Track Renewals NCR 060231191002 Mughalsarai - 2019-2020 21.84 6.56 7.05 0.1
Allahabad -TRR
(P) - 19.531 km
(PB#471/2019-
20/NCR)
31-Track Renewals NCR 060231191011 Kanpur - Rura - 2019-2020 9.36 3.4 5.1 0
CTR (S) - 6.426
km (PB#472/2019-
20/NCR)
31-Track Renewals NCR 060231191016 Tundla - 2019-2020 23.64 10.38 3.5 0
Ghaziabad - TBR -
77.53 km
(PB#473/2019-
20/NCR)
31-Track Renewals NCR 060231191017 Mughalsarai - 2019-2020 10.07 3.7 2.25 0
Allahabad - TTR
(FS TWS
WCMSC) - 32
sets
(PB#474/2019-
20/NCR)
31-Track Renewals NCR 060231201005 Allahabad - 2020-2021 58.88 28.07 10.02 0
Kanpur - TRR(P) -
51.777 km
(PB#472/2020-
21/NCR)
31-Track Renewals NCR 060231211009 Kanpur - Rura 2021-2022 24.31 8.94 5.05 0.56
(UP) - TSR(P) -
19.715 km &
Manikpur - Naini
(UP) - TSR(P) -
2.200 km
(PB#486/2021-
22/NCR)
31-Track Renewals NCR 060231211016 Tundla - 2021-2022 20.48 2.04 5.5 4.32
Ghaziabad -
TTR(FS TWS
WCMSC) - 66
sets
(PB#488/2021-
22/NCR)
31-Track Renewals NCR 060231211018 Pd Deen Dayal 2021-2022 7.54 3.36 5.5 0
Upadhayay -
Allahabad -
TTR(FS TWS
WCMSC) - 22
sets
(PB#488/2021-
22/NCR)
31-Track Renewals NCR 060331111001 Bina - Agra - TBR - 2011-2012 14.38 5.86 0.53 0
51.145 km & TFR -
52.879 km

31-Track Renewals NCR 060331111005 Jhansi-Kanpur - 2011-2012 7.77 3.51 0.01 0


TBR - 36.20 km
31-Track Renewals NCR 060331131005 Bina-Agra - TBR - 2013-2014 26.05 11.37 0.01 0
117.095 km
31-Track Renewals NCR 060331151002 Bina - Agra Cantt. 2015-2016 39.21 14.88 1 0
: TTR = 120 Nos.

31-Track Renewals NCR 060331151005 Bina- Agra -TFR - 2015-2016 8.94 3.65 0.01 0
17.17, TWR -
17.84, SEJ - 22
nos. & GJ - 44
nos.
31-Track Renewals NCR 060331151009 Jhansi - Kanpur: 2015-2016 11.2 4.28 0.01 0
TFR - 53.5 kms &
TBR - 6.300 Kms

31-Track Renewals NCR 060331161001 Bina - Dhaulpur - 2016-2017 24.69 10.01 0.91 -0.29
TBR - 56.153 km
31-Track Renewals NCR 060331161002 Bina - Dhaulpur - 2016-2017 220.92 107.62 0.01 0
TRR(P) - 100.907
km
31-Track Renewals NCR 060331161005 Jhansi - Kanpur - 2016-2017 7.42 3.19 0.01 0
TTR(CS) - 64 sets

31-Track Renewals NCR 060331161007 Jhansi- Kanpur - 2016-2017 129.01 52.23 0.02 0
CTR(P) 36.58 Km

31-Track Renewals NCR 060331171006 Jhansi - Manikpur 2017-2018 33.53 15.48 0.5 0
- TBR - 115 km

31-Track Renewals NCR 060331181003 Bina-Sithouli - 2018-2019 15.6 5.05 0.51 0.17
CTR(S) - 12.75
km
31-Track Renewals NCR 060331181007 Jhansi-Manikpur 2018-2019 22.37 7.73 1.2 0
(SL) - TWR - 170
km
31-Track Renewals NCR 060331191001 Jhansi - Kanpur - 2019-2020 5.13 2.07 0.07 0
CTR(P) - 2.16 km
(PB#470/2019-
20/NCR)
31-Track Renewals NCR 060331221004 Bina - Jhansi (UP) 2022-2023 27.74 11.59 6.77 0
- TSR(P) - 24.000
Tkm
(PB#492/2022-
23/CR)
32-Bridge Works, Tunnel NCR 060132181002 Dholpur-Agra 2018-2019 10.23 3.07 1 0
Works and Approaches Cantt. -
Procurement,
fabrication,
assembling,erecti
on and repl
(Bridge No.1314/1
& 1331/1)

32-Bridge Works, Tunnel NCR 060132161002 Agra Divn. - Repl 2016-2017 13.09 6.34 0.99 0
Works and Approaches of steel girders up
to 9.14 m span by
RCC/PSC slab
(15 Nos)

32-Bridge Works, Tunnel NCR 060232101001 Allahabad-Khaga - 2010-2011 6.11 2.02 0.18 0.3
Works and Approaches Rehabilitation by
box girder in track
circuited area
(bridge No.29 &
31)
32-Bridge Works, Tunnel NCR 060232181001 Allahabad 2018-2019 16.1 6.97 1.53 0.34
Works and Approaches Division - Repl. of
plate girders on
bridges (7 Nos)
33-Signalling and NCR 060133181001 Agra Cantt- 2018-2019 6.58 2.13 0 0
Telecommunication Dhaulpur -
Reliability
improvement of
signalling gears of
old intermediate
block signalling (4
IBS)

33-Signalling and NCR 060333181005 Jhansi-Bina - 2018-2019 19.22 8.21 0 0


Telecommunication Reliability
improvement of
signalling gears of
old intermediate
block signalling
(14 IBS)
33-Signalling and NCR 060233161003 Kanpur central- 2016-2017 71.24 33.25 3 0.38
Telecommunication Tundla-Juhi A&B
Cabin:
replacement of
mechanical
signaling assets
of Juhi A and B
Cabin by
Centralised
operation of
points and
signals.
36-Other Electrical Works, NCR 060237171002 Mugalsarai- 2017-2018 125.94 31.59 41 9.98
incl TRD Ghaziabad - New
220/132 kv grid
sub-station at
Bhogaon,
220/132 kv
transmission lines
& associated
works
36-Other Electrical Works, NCR 060337151001 Agasod-Karoda - 2015-2016 31.13 12.04 8.2 0.02
incl TRD Addl traction sub-
station &
associated
transmission line
works
42-Workshops including NCR 060242191001 Kanpur 2019-2020 12 4 3 0.22
Production Units central~~Up-
gradation&
Augmentation of
Electric
Locomotive of
ELS/CNB for
maintenance
facilities
42-Workshops including NCR 060242183002 Kanpur 2018-2019 6 2 2 0
Production Units central~~Kanpur-
Up-gradation of
new coaching
complex for high
speed rolling
stock
maintenance
42-Workshops including NCR 060242211005 Provision of 750 2021-2022 6 2 2 0.92
Production Units Volt power supply
for maintenance
of HOG coaches
in washing/sick
lines at PRYJ and
CNB.

42-Workshops including NCR 060442203001 CMLR Jhansi: - 2020-2021 1 0 0 0.42


Production Units supply & inst. of 1
NX CAD software
17PC sets
networking at
shop floor offices
Poll. data sensors
with LED display
panel&40CCTV

42-Workshops including NCR 060442193004 RSK/STLI-Up- 2019-2020 3 1 1 0


Production Units gradation of
existing
infrastructure &
safety facility at
RSK/STLI
42-Workshops including NCR 060342201003 Jhansi~Up- 2020-2021 9 4 4 0
Production Units gradation and
augmentation of
Electric & Diesel
Locomotive
maintenance and
production
facilities.
51-Staff Quarters NCR 060152161001 Mathura - Repl of 2016-2017 2.95 0.93 0.12 0
old roofs of RB-II
& H-type quarters
by RCC roofs (59
Nos)
51-Staff Quarters NCR 060251161002 Tundla - Aligarh - 2016-2017 14.35 5.66 1.3 1.09
Repl. of quarters,
type-II - 126 units
51-Staff Quarters NCR 060251213013 Tundla- 2021-2022 1 0 0 0.46
Ghaziabad :-
Improvement of
basic
infrastructure of
staff quarters,
approach road of
colonies &
Electrical works
under Sr.DEN/5
section.
53-Customer Amenities NCR 060053185001 Design, supply, 2018-2019 23.16 7.47 0 2.15
installation and
commissioning of
quick watering
system at
Allahabad and
Kanpur Central
stations
53-Customer Amenities NCR 060353161001 Banda - Chitrakut 2016-2017 12.16 5.12 0 0
Dham - Karwi -
Provision of
washable apron
with cleaning
arrangements
64-Other Specified Works NCR 060364193001 Astroturf pitch 2019-2020 3 1 0 0
replacement,
improvement of
visitors gallery &
players hostel in
Railway Hockey
stadium at
Gwalior.
64-Other Specified Works NCR 060264183007 Allahabad~~Allah 2018-2019 3 1 1 0
abad Division -
Construction of
new Crew running
room at ALD.

TOTAL 7452.32 2680.6 983.46 140.36


STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Tender Published but not opened
Report Time 29/05/23 15:23:28
PH RAILWAY UWID NAME OF WORK DEPARTMENT TENDER NO. TENDER PUB. TENDER DESCRIPTION TENDER VALUE
DATE (Rs.)
30 NCR 060230181002 Mughalsarai- PRAYAGRAJ GSU-II-PRYJ-12- 16/05/2023 Appointment of Project Supervision Services Agency (PSSA) For 70669508
Ghaziabad - Road DIVISION-GATI 2023-PSSA Providing Project Supervision Services for the projects of Gati Shakti
over bridge in lieu SHAKTI Unit, Prayagraj Division
of 12 level
crossings
(PB#279/2018-
19/NCR)
30 NCR 060230181002 Mughalsarai- PRAYAGRAJ GSU-II-PRYJ-13- 17/05/2023 Soil Investigation for construction of Road Over Bridges in lieu of 9 No 3453110
Ghaziabad - Road DIVISION-GATI 2023 LCs (05 End-to-end: 18, 2, 75-A, 88 & 78B, and 04 Railway
over bridge in lieu SHAKTI Portion:86-B,49, 83 & 415-A) under Dy.CE-II/GSU/PRYJ unit in
of 12 level PRYJ division of NCR.
crossings
(PB#279/2018-
19/NCR)
31 NCR 060331221004 Bina - Jhansi (UP) JHANSI JHS-ENGG-HQ- 18/05/2023 Loading, Leading and Unloading of Misc. P. Way material by 13436072
- TSR(P) - 24.000 DIVISION-ENGG 2023-84 Truck/Trailor from any station to any station between various Sleeper
Tkm Plants, SSE/Pway/Depot and SSE/Pway/Track Depot Jhansi of NCR.
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Tender opened but LOA not issued for more than 45 days
Report Time 29/05/23 15:24:11
PH RAILWAY UWID NAME OF WORK DEPARTMENT TENDER NO. TENDER DESCRIPTION TENDER VALUE TENDER
(Rs.) OPENING DATE
14 NCR 060314101002 Gwalior- DYCE-C-GWL- CEN05GWL0922 Construction of station buildings ,platforms, COPs, Quarters, service 193751441 17/10/2022
Sheorpurkalan ENGINEERING buildings, offices and other ancillary work in Sabalgarh-Birpur section in
with extension to connection with the Gauge conversion work of GWL-SEO(GC) work.
Kota (284 km)
14 NCR 060314101002 Gwalior- DYCE-C-GWL- CEN05GWL0722 Supplying & stacking of 65mm gauge stone machine crushed 88173780 16/11/2022
Sheorpurkalan ENGINEERING ballast from Sabalgarh (excluding) to Birpur (Including) in connection
with extension to with Gwalior- Sheopur GC project.
Kota (284 km)
14 NCR 060314101002 Gwalior- DYCSTE-C-AGC- SIG-WS-Contract- Indoor and outdoor telecommunication work with laying of OFC & 6- 93881424 08/08/2022
Sheorpurkalan S AND T AGC-93 Quad and Supply & installation of IPMPLS & VOIP in
with extension to connection with Gauge Conversion with provision of single line in
Kota (284 km) Gwalior-Sabalgarh section of Jhansi Division on N.C. Railway
14 NCR 060314101002 Gwalior- DYCE-C-GWL- CEN05GWL0622 Assembling, erection launching and other miscellaneous work for 15449523 08/09/2022
Sheorpurkalan ENGINEERING Construction of Road Over Bridge No.21/A, 1/42.00m span BOW String
with extension to steel girder in connection with Gwalior-Sheopurkalan (GC) Project.
Kota (284 km)
14 NCR 060314101002 Gwalior- CAO-C-HQ- AGC-EL-C-T-04- Electrification of various services buildings, Approach Road, Quarters, 35550825 14/09/2022
Sheorpurkalan ELECTRICAL 2022-23 LC gates etc. in Gwalior-Sabalgarh section in connection with GC work
with extension to of GWL-SOE line.
Kota (284 km)
14 NCR 060314101002 Gwalior- DYCSTE-C-AGC- SIG-WS-Contract- Indoor and outdoor telecommunication work with laying of OFC & 6- 93881424 11/07/2022
Sheorpurkalan S AND T AGC-91 Quad and Supply & installation of IPMPLS & VOIP in
with extension to connection with Gauge Conversion with provision of single line in
Kota (284 km) Gwalior-Sabalgarh section of Jhansi Division on N.C. Railway
14 NCR 060314101002 Gwalior- DYCE-C-GWL- CEN05GWL0322 Assembling, erection launching and other miscellaneous work for 17086623 10/06/2022
Sheorpurkalan ENGINEERING Construction of Road Over Bridge No.21/A, 1/42.00m span BOW String
with extension to steel girder in connection with Gwalior-Sheopurkalan (GC) Project.
Kota (284 km)
14 NCR 060314101002 Gwalior- DYCE-C-GWL- CEN05GWL0321 Supplying & stacking of 65mm gauge stone machine crushed 279030000 09/09/2021
Sheorpurkalan ENGINEERING ballast from Birlanagar yard(Excluding) to Sabalgarh
with extension to (including)(chainage 310m to 91000m) in connection with Gwalior-
Kota (284 km) Sheopurkalan GC project.
15 NCR 060115161002 Yamuna Bridge- DYCE-C-I-AGC- CEN00AGC0422 Earthwork in embankment and other ancillary work of approach of new 49440227 20/07/2022
Agra Fort - ENGINEERING Yamuna bridge and civil work in connection with doubling of JAB -AF
Double line with section.
major bridge at
Yamuna
river(2.11 km)
15 NCR 060115161002 Yamuna Bridge- DYCE-C-I-AGC- CEN00AGC1022 Earthwork in embankment and other ancillary work of approach of new 49440227 07/10/2022
Agra Fort - ENGINEERING Yamuna bridge and civil work in connection with doubling of JAB -AF
Double line with section.
major bridge at
Yamuna
river(2.11 km)
15 NCR 060115161002 Yamuna Bridge- DYCE-C-I-AGC- CEN00AGC0321 Construction of office Building, Store, shed of SSE/C/S&T/AGC 10355855 22/07/2021
Agra Fort - ENGINEERING and Improvement of office Rest House & office of DY.CE/C/AGC
Double line with
major bridge at
Yamuna
river(2.11 km)
15 NCR 060115161002 Yamuna Bridge- DYCSTE-C-AGC- SIG-WS-Contract- Design, Manufacturing, Supply, Installation, Testing and Commissioning 127265509 02/03/2023
Agra Fort - S AND T AGC-94 of Solid State (Electronic) Interlocking System Conforming to RDSO
Double line with Specification No. - RDSO/SPN/192/2019 Ver. 2 with latest amendment
major bridge at including all Indoor & Outdoor signaling work at Agra fort and
Yamuna Jamuna bridge stations in connection with AF-JAB doubling work of
river(2.11 km) Agra division of North Central Railway.

30 NCR 060230101009 Kulwa-Somna - DYCSTE-C-AGC- SIG-WS-Contract- Indoor work in connection with modification in Electronic Interlocking for 32728580 21/07/2021
Road over bridge S AND T AGC-89 closing of Level X-ing gates in connection with ROB/RUB in TDL-GZB
in lieu of level section of Prayagraj division of North Central Railway
crossing No.120-
B
30 NCR 060030131005 Shikohabad- PRAYAGRAJ 3320212022-86 Provision of shed on approaches of LHSs in SKB-FBD Branch Line 46274167 17/09/2021
Farrukhabad - DIVISION-ENGG under ADEN/NCR/FZD.
Elimination of
level crossings by
road under
bridges (14 Nos)
30 NCR 060230121036 Tundla - DYCSTE-C-AGC- SIG-WS-Contract- Indoor work in connection with modification in Electronic Interlocking for 32728580 21/07/2021
Ghaziabad - 2- S AND T AGC-89 closing of Level X-ing gates in connection with ROB/RUB in TDL-GZB
lane road over section of Prayagraj division of North Central Railway
bridge in lieu of
level crossing
Nos.75, 79, 83,
107, 71, 110, 118
138
30 NCR 060030131006 Shikohabad- PRAYAGRAJ 3320212022-86 Provision of shed on approaches of LHSs in SKB-FBD Branch Line 46274167 17/09/2021
Farrukhabad - DIVISION-ENGG under ADEN/NCR/FZD.
Elimination of
level crossings by
road under
bridges (14 Nos)
31 NCR 060131191004 Agra Cantt - AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Palwal - TBR - ELECTRICAL 2022-23
21.11 km
(PB#473/2019-
20/NCR)
31 NCR 060131201002 Idgah- Bayana - AGRA DIVISION- 2021-Oct-03-02 Supply, Installation & Commissioning, operation of 9704676 11/11/2021
TBR - 16.997 Km ENGINEERING ETP/WWTP/STP for waste/Sewerage water recycling at Agra Fort
. station & maintenance for two year
31 NCR 060231191016 Tundla - PRAYAGRAJ 4220212022-103 Cess repair and protection of cess in Aligarh-Ghaziabad section under 24802382 27/10/2021
Ghaziabad - TBR - DIVISION-ENGG ADEN/Aligarh.
77.53 km
(PB#473/2019-
20/NCR)
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-ENGG-C- PART-I : Boxing of ballast at various locations of Jhansi - Kanpur 29855249 15/12/2021
CTR(P) - 2.16 km DIVISION-ENGG 2021-102 section under ADEN(HQ-I)JHS & ADEN CNB sub-division, PART-
(PB#470/2019- II : Pre & Post BCM work at various locations of Jhansi - Kanpur
20/NCR) section under ADEN(HQ-I)JHS & ADEN CNB sub-division.

31 NCR 060331161007 Jhansi- Kanpur - JHANSI JHS-ENGG-C- PART-I : Boxing of ballast at various locations of Jhansi - Kanpur 29855249 15/12/2021
CTR(P) 36.58 Km DIVISION-ENGG 2021-102 section under ADEN(HQ-I)JHS & ADEN CNB sub-division, PART-
II : Pre & Post BCM work at various locations of Jhansi - Kanpur
section under ADEN(HQ-I)JHS & ADEN CNB sub-division.

31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-N-W-10-22 Provision of shifting of S&T cable and other related work in 7512518 12/05/2022
CTR(P) - 2.16 km DIVISION-S AND connection with the work of CTR -TTR & LHS-NHS &
(PB#470/2019- T BRIDGE in section of branch line Jhansi.
20/NCR)
31 NCR 060131191003 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Etmadpur -TBR - ELECTRICAL 2022-23
8.300 km
(PB#473/2019-
20/NCR)
31 NCR 060131181004 Dholpur-Agra AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Cantt. - CTR(S) - ELECTRICAL 2022-23
7.795 km
31 NCR 060131201006 Idgah - Bayana - AGRA DIVISION- 2021-Oct-03-02 Supply, Installation & Commissioning, operation of 9704676 11/11/2021
TBR - 58.699 Km ENGINEERING ETP/WWTP/STP for waste/Sewerage water recycling at Agra Fort
station & maintenance for two year
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-ENGG-C- Supplying and stacking of SKV welding Portion with improved 5881638 06/12/2021
CTR(P) - 2.16 km DIVISION-ENGG 2021-93 preheating welding technology namely compressed air petrol /LPG
(PB#470/2019- along with Single shot crucible fitted and with use of three piece
20/NCR) prefabricated moulds with Automatic Tapping Thimble (ATT) technology
under jurisdiction of ADEN/CNB & ADEN/HQ-I/JHS.

31 NCR 060231191011 Kanpur - Rura - PRAYAGRAJ 3320212022-84 Provision of LWR on various Loop Lines in CNB-RRH section under 30751825 17/09/2021
CTR (S) - 6.426 DIVISION-ENGG Sr.DEN/III/PRYJ and RRH-TDL section under Sr.DEN/IV/PRYJ.by
km (PB#472/2019- Mobile Flash Butt Welding of Rails.
20/NCR)

31 NCR 060231181007 Kanpur-Tundla - PRAYAGRAJ 3320212022-84 Provision of LWR on various Loop Lines in CNB-RRH section under 30751825 17/09/2021
CTR(S) - 9.043 DIVISION-ENGG Sr.DEN/III/PRYJ and RRH-TDL section under Sr.DEN/IV/PRYJ.by
km (Loop Lines) Mobile Flash Butt Welding of Rails.
31 NCR 060131181004 Dholpur-Agra AGRA DIVISION- AGC-ELG-T-03- Part A.)Augmentation of passenger facilities at Railway stations for 6426382 24/06/2021
Cantt. - CTR(S) - ELECTRICAL 2021-22 better air circulation by providing energy efficient BLDC fans at platform
7.795 km and service building in Agra Division.
Part-B) Electrification of Halt Station through SPV model-05 No's
AF-BKI Section (NOHBACHMANDI, TALCHERA, DATIA HALT,
BHUDA, BHAJERA).
Part-C) Provision of 20 KWp on grid connected Solar Power plant (Roof
Top) in Agra Division.
31 NCR 060131181003 Agra Cantt.- AGRA DIVISION- AGC-ELG-T-03- Part A.)Augmentation of passenger facilities at Railway stations for 6426382 24/06/2021
Palwal(DN) - ELECTRICAL 2021-22 better air circulation by providing energy efficient BLDC fans at platform
TRR(P) - 18.269 and service building in Agra Division.
km Part-B) Electrification of Halt Station through SPV model-05 No's
AF-BKI Section (NOHBACHMANDI, TALCHERA, DATIA HALT,
BHUDA, BHAJERA).
Part-C) Provision of 20 KWp on grid connected Solar Power plant (Roof
Top) in Agra Division.
31 NCR 060131191004 Agra Cantt - AGRA DIVISION- AGC-ELG-T-03- Part A.)Augmentation of passenger facilities at Railway stations for 6426382 24/06/2021
Palwal - TBR - ELECTRICAL 2021-22 better air circulation by providing energy efficient BLDC fans at platform
21.11 km and service building in Agra Division.
(PB#473/2019- Part-B) Electrification of Halt Station through SPV model-05 No's
20/NCR) AF-BKI Section (NOHBACHMANDI, TALCHERA, DATIA HALT,
BHUDA, BHAJERA).
Part-C) Provision of 20 KWp on grid connected Solar Power plant (Roof
Top) in Agra Division.
31 NCR 060331181003 Bina-Sithouli - JHANSI JHS-ENGG-C- Supplying and stacking of SKV welding Portion with improved 9716844 12/05/2021
CTR(S) - 12.75 DIVISION-ENGG 2021-36 preheating welding technology namely compressed air petrol /LPG
km along with Single shot crucible fitted and with use of three piece
prefabricated moulds with Automatic Tapping Thimble (ATT) technology
under jurisdiction of ADEN/CNB & ADEN/HQ-I/JHS.
31 NCR 060331191001 Jhansi - Kanpur - JHANSI JHS-ENGG-C- Supplying and stacking of SKV welding Portion with improved 9716844 12/05/2021
CTR(P) - 2.16 km DIVISION-ENGG 2021-36 preheating welding technology namely compressed air petrol /LPG
(PB#470/2019- along with Single shot crucible fitted and with use of three piece
20/NCR) prefabricated moulds with Automatic Tapping Thimble (ATT) technology
under jurisdiction of ADEN/CNB & ADEN/HQ-I/JHS.

31 NCR 060331221004 Bina - Jhansi (UP) JHANSI JHS-ENGG-HQ- Loading, Leading and Unloading of Misc. P. Way material by 13436072 04/04/2023
- TSR(P) - 24.000 DIVISION-ENGG 2023-31 Truck/Trailor from any station to any station between various Sleeper
Tkm Plants, SSE/Pway/Depot and SSE/Pway/Track Depot Jhansi of NCR.

31 NCR 060231201005 Allahabad - PRAYAGRAJ 10420222023-322 Prayagraj-Kanpur : Improvement of Cess and Repairs to Trolley Refuse 38131337 01/03/2023
Kanpur - TRR (P) - DIVISION-ENGG in the jurisdiction of Sr. Divisional Engineer/II/North Central
51.777 Kms. Railway/Prayagraj.
31 NCR 060131171006 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Tundla -TBR - ELECTRICAL 12R1-2022-23
11.96 km
31 NCR 060131181004 Dholpur-Agra AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Cantt. - CTR(S) - ELECTRICAL 12R1-2022-23
7.795 km
31 NCR 060131191004 Agra Cantt - AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Palwal - TBR - ELECTRICAL 12R1-2022-23
21.11 km
(PB#473/2019-
20/NCR)
31 NCR 060131191003 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 26/12/2022
Etmadpur -TBR - ELECTRICAL 12R1-2022-23
8.300 km
(PB#473/2019-
20/NCR)
31 NCR 060131171006 Yammuna Bridge - AGRA DIVISION- AGC-ELG-T-12R- Provision of 220 KWp Solar Plant with AMC for 3 years in Agra Division. 9803354 29/09/2022
Tundla -TBR - ELECTRICAL 2022-23
11.96 km
42 NCR 060342201003 Jhansi~Up- JHANSI JHS-RS-WC-T4- Electrical work for "Up-gradation and augmentation of Electric 460927 27/02/2023
gradation and DIVISION- 2022-23 & Diesel Locomotive maintenance and production facilities"
augmentation of ELECTRICAL
Electric Diesel
Locomotive
maintenance and
production
facilities.
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Bills pending for registration for more than 4 days
Report Time 29/05/23 15:24:49
PH RLY UWID NAME OF WORK SANCTION BILL NUMBER BILL DATE BILL DESCRIPTION BILL AMOUNT PENDING DAYS NAME OF
YEAR (Rs.) PARTY
30 NCR 060230181002 Mughalsarai- 2018-2019 32022216871 24/05/2023 Hitech 1200 milimeter x 760 milimeter (mm L x D) Executive Computer 6099.78 5 HEAVEN
Ghaziabad - Road table. ENTERPRISES-
over bridge in lieu ALLAHABAD
of 12 level
crossings
(PB#279/2018-
19/NCR)
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Bills under process for more than 3 days
Report Time 29/05/23 15:25:46
PH RLY UWID NAME OF WORK SANCTION YEAR CO6 NUMBER CO6 DATE BILL DESCRIPTION BILL AMOUNT PENDING DAYS STATUS PARTYNAME

30 NCR 060230181002 Mughalsarai- 2018-2019 32050123000228 23/05/2023 shifting of 132 kV TR Line of ROB at LC b/w CNB-GZB 8441858 6 REGISTERED PSH TECHNO
Ghaziabad - ENGINEERING
Road over bridge PRIVATE
in lieu of 12 level LIMITED-
crossings MEERUT
(PB#279/2018-
19/NCR)
30 NCR 060230181002 Mughalsarai- 2018-2019 32020123005511 25/05/2023 Payorder in favour of Executive engineer,DVVNL,Lal diggi,Aligarh 58422 4 REGISTERED ELECTRICAL
Ghaziabad - DISTRIBUTION
Road over bridge DIVISION-
in lieu of 12 level IST,ALIGARH
crossings
(PB#279/2018-
19/NCR)
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
List of Works
Report Time 29/05/23 15:26:29
PLAN HEAD RAILWAY UWID NAME OF WORK SANCTION SANCTION ENVIRONMENT DESIGN & LAND GAD STATUS ESTIMATE COMPLETION
YEAR COST CLEARANCE DRAWING ACQUISITION SANCTION REPORT
STATUS
14 NCR 060314101002 Gwalior- 2010-2011 3747 Not required 80% progress 90% progress 80% progress RE Not due
Sheorpurkalan (ExcessInCostSa
with extension to nc).
Kota (284 km)
15 NCR 060115161002 Yamuna Bridge- 2016-2017 107.74 Not required 50% progress Not Required 50% progress Det. Est. Sanc. Not due
Agra Fort - Double
line with major
bridge at Yamuna
river(2.11 km)

16 NCR 060316051001 Bijauli, Bhandai & 2005-2006 0 Not required Complete Not Required Complete RE under prep. Completion
Mata Tila - Addl. estimate under
loop line preparation
17 NCR 060017071002 North Central 2007-2008 11.25 Not required Not Required Not Required Not Required RE under prep. Not Required
Railway -
Extension of
automatic ticket
vending machines

30 NCR 060330161001 Bina-Jhansi- Road 2016-2017 28.73 Not required Complete Not Required Complete RE under prep. Not due
over bridge in lieu
of level crossing
No. 329
30 NCR 060330121004 Dholpur-Agra - 2012-2013 70.13 Not required 90% progress Not Required 90% progress RE Not due
Normal height (ExcessInCostSa
subways / road nc).
under bridges in
lieu of level
crossings (15
Nos)
30 NCR 060230121036 Tundla - 2012-2013 225.15 Not required Nil Progress Not Required 40% progress Det. Est. Sanc. Not due
Ghaziabad - 2-
lane road over
bridge in lieu of
level crossing
Nos.75, 79, 83,
107, 71, 110, 118
& 138
30 NCR 060230181002 Mughalsarai- 2018-2019 440.08 Not required 80% progress 60% progress Complete Det. Est. Sanc. Not due
Ghaziabad - Road
over bridge in lieu
of 12 level
crossings
(PB#279/2018-
19/NCR)
30 NCR 060330161008 Gwalior-Agra- 2016-2017 32.06 Not required Complete Not Required Complete RE under prep. Under preparation
Road over bridge
in lieu of level
crossing No. 426
30 NCR 060130121001 Mathura-Palwal - 2012-2013 85.66 Not required 30% progress Not Required 40% progress Det. Est. Sanc. Completion
Subways in lieu of estimate under
level crossings preparation
(tvu more than
25000 & upto
100000) (17 Nos)
31 NCR 060231211016 Tundla - 2021-2022 20.48 Not required Not Required Not Required Not Required RE under prep. Not due
Ghaziabad -
TTR(FS TWS
WCMSC) - 66
sets
(PB#488/2021-
22/NCR)
31 NCR 060231201005 Allahabad - 2020-2021 58.88 Not required Not Required Not Required Not Required DE under prep. Not Required
Kanpur - TRR(P) -
51.777 km
(PB#472/2020-
21/NCR)
31 NCR 060231191001 Barhan - Etah - 2019-2020 45.23 Not required Not Required Not Required Not Required RE under prep. Not due
CTR (P) - 23.76
km (PB#470/2019-
20/NCR)

31 NCR 060231181019 Tundla-Ghaziabad 2018-2019 7.58 Not required Not Required Not Required Not Required RE under prep. Not due
(UP) - TRR(P) -
6.84 km
31 NCR 060231191016 Tundla - 2019-2020 23.64 Not required Not Required Not Required Not Required RE under prep. Not due
Ghaziabad - TBR -
77.53 km
(PB#473/2019-
20/NCR)
31 NCR 060331131005 Bina-Agra - TBR - 2013-2014 26.05 Not required Not Required Not Required Not Required RE under prep. Not due
117.095 km
31 NCR 060331151002 Bina - Agra Cantt. 2015-2016 39.21 Not required Not Required Not Required Not Required RE under prep. Not Required
: TTR = 120 Nos.

32 NCR 060132181002 Dholpur-Agra 2018-2019 10.23 Not required 70% progress 70% progress 70% progress RE under prep. Not due
Cantt. -
Procurement,
fabrication,
assembling,erecti
on and repl
(Bridge No.1314/1
& 1331/1)

32 NCR 060132161002 Agra Divn. - Repl 2016-2017 13.09 Not required Nil Progress Not Required Nil Progress Det. Est. Sanc. Not due
of steel girders up
to 9.14 m span by
RCC/PSC slab
(15 Nos)

32 NCR 060232181001 Allahabad Division 2018-2019 16.1 Not required Not Required Not Required Complete RE under prep. Not Required
- Repl. of plate
girders on bridges
(7 Nos)
33 NCR 060333181005 Jhansi-Bina - 2018-2019 19.22 Not required 10% progress Not Required Not Required Det. Est. Sanc. Not due
Reliability
improvement of
signalling gears of
old intermediate
block signalling
(14 IBS)
36 NCR 060237171002 Mugalsarai- 2017-2018 125.94 Not required 20% progress Nil Progress 10% progress Det. Est. Sanc. Not due
Ghaziabad - New
220/132 kv grid
sub-station at
Bhogaon, 220/132
kv transmission
lines & associated
works

36 NCR 060337151001 Agasod-Karoda - 2015-2016 31.13 Not required Complete Complete Complete RE Not Required
Addl traction sub- (ExcessInCostSa
station & nc).
associated
transmission line
works
42 NCR 060242191001 Kanpur 2019-2020 12 Not required Nil Progress Not Required Nil Progress Det. Est. Sanc. Not due
central~~Up-
gradation&
Augmentation of
Electric
Locomotive of
ELS/CNB for
maintenance
facilities
42 NCR 060442203001 CMLR Jhansi: - 2020-2021 1 Not required Nil Progress Not Required Not Required Det. Est. Sanc. Not due
supply & inst. of 1
NX CAD software
17PC sets
networking at
shop floor offices
Poll. data sensors
with LED display
panel&40CCTV

42 NCR 060242211005 Provision of 750 2021-2022 6 Not required Nil Progress Not Required Nil Progress Det. Est. Sanc. Not due
Volt power supply
for maintenance
of HOG coaches
in washing/sick
lines at PRYJ and
CNB.

53 NCR 060053185001 Design, supply, 2018-2019 23.16 Not required Complete Complete Complete RE Not due
installation and (ExcessInCostSa
commissioning of nc).
quick watering
system at
Allahabad and
Kanpur Central
stations
STATUS OF PRIORITY WORKS TARGETED FOR EARLY COMPLETION
Work based on no exp in last 30 days
Report Time 29/05/23 15:27:06
PLAN HEAD RAILWAY UWID NAME OF WORK SANCTION YEAR SANCTION EXP TILL 2022- OUTLAY 2023- EXP.(DURING
COST(In Cr.) 23(In Cr.) 24(In Cr.) 2023-24)(In Cr.)
16 NCR 060216151001 Allahabad 2015-2016 5.3 2.29 1.5 0
Division - Extn. of
CSR of 10,13,15
& 16 in GMC
16 NCR 060316051001 Bijauli, Bhandai & 2005-2006 0 0.44 0 0
Mata Tila - Addl.
loop line
17 NCR 060017071002 North Central 2007-2008 11.25 4.12 0.13 0
Railway -
Extension of
automatic ticket
vending machines

30 NCR 060230121036 Tundla - 2012-2013 225.15 78.63 0.02 0


Ghaziabad - 2-
lane road over
bridge in lieu of
level crossing
Nos.75, 79, 83,
107, 71, 110, 118
& 138
30 NCR 060230121005 Kanpur-Ambiapur - 2012-2013 27.9 12.71 1 0
Elimination of
level crossings by
road under
bridges (6 Nos)
30 NCR 060030131006 Shikohabad- 2013-2014 59.69 26.39 0 0
Farrukhabad -
Elimination of
level crossings by
road under
bridges (14 Nos)
30 NCR 060230121020 Tundla- 2012-2013 46.48 18 0 0
Ghaziabad - 4-
lane road over
bridge in lieu of
level crossing
No.134
30 NCR 060330161001 Bina-Jhansi- 2016-2017 28.73 6.86 0.3 2.03
Road over bridge
in lieu of level
crossing No. 329
30 NCR 060230101009 Kulwa-Somna - 2010-2011 21.91 10.65 1 0
Road over bridge
in lieu of level
crossing No.120-
B
30 NCR 060130161002 Agra- Palwal- 2016-2017 75.22 29.29 3.05 0.05
Road over bridge
in lieu of level
crossing No.544
(4-lane)
30 NCR 060230111001 Govindpuri - 2- 2011-2012 55.59 25.62 0 0
lane road over
bridge at km
1021/15-17
30 NCR 060330121004 Dholpur-Agra - 2012-2013 70.13 23.25 1.5 0
Normal height
subways / road
under bridges in
lieu of level
crossings (15
Nos)
30 NCR 060230121017 Phaphund-Tundla 2012-2013 85.11 29.43 1 0
- Elimination of
level crossings by
road under bridge

30 NCR 060130121001 Mathura-Palwal - 2012-2013 85.66 34.44 1.05 0.52


Subways in lieu of
level crossings
(tvu more than
25000 & upto
100000) (17 Nos)
30 NCR 060030131005 Shikohabad- 2013-2014 59.25 21.62 0 0
Farrukhabad -
Elimination of
level crossings by
road under
bridges (14 Nos)
30 NCR 060230981001 Kanpur - Road 1998-1999 30.5 14.21 0 0
over bridge in lieu
of level crossing
No 79-D on GT
Road
30 NCR 060230161006 Etah-Barhan & 2016-2017 24.05 8.07 0 1.15
Aligarh-Bareilly &
Hathras-Hathras
Fort-Subways in
lieu of level
crossing No.
22C,24C,48C,68-
A & 87 & 3HK (6
Nos)
30 NCR 060230121038 Kanpur-Tundla - 2012-2013 56.33 20.06 0.5 0
Road over bridge
in lieu of level
crossing Nos.67 &
69
30 NCR 060330161008 Gwalior-Agra- 2016-2017 32.06 10.29 0 0
Road over bridge
in lieu of level
crossing No. 426
30 NCR 060030131001 Kanpur - Road 2013-2014 25.86 8.7 0 0
over bridge
parrallel to
exisiting road over
bridge near
Jhakarkati
31 NCR 060331161007 Jhansi- Kanpur - 2016-2017 129.01 52.23 0.02 0
CTR(P) 36.58 Km

31 NCR 060331111001 Bina - Agra - TBR - 2011-2012 14.38 5.86 0.53 0


51.145 km & TFR -
52.879 km

31 NCR 060331151002 Bina - Agra Cantt. 2015-2016 39.21 14.88 1 0


: TTR = 120 Nos.

31 NCR 060131191003 Yammuna Bridge - 2019-2020 3.96 1.82 0.27 0


Etmadpur -TBR -
8.300 km
(PB#473/2019-
20/NCR)
31 NCR 060331181003 Bina-Sithouli - 2018-2019 15.6 5.05 0.51 0.17
CTR(S) - 12.75
km
31 NCR 060231151013 Mughalsarai- 2015-2016 32.06 12.89 0.01 0
Allahabad- TBR -
104.00 Kms
31 NCR 060231201005 Allahabad - 2020-2021 58.88 28.07 10.02 0
Kanpur - TRR(P) -
51.777 km
(PB#472/2020-
21/NCR)
31 NCR 060231171006 Mughalsarai - 2017-2018 17.72 5.86 2.03 0
Allahabad -
CTR(S) - 5.385
km & TTR - 13 No
of COD Siding at
Chheoki

31 NCR 060331161002 Bina - Dhaulpur - 2016-2017 220.92 107.62 0.01 0


TRR(P) - 100.907
km
31 NCR 060231151010 Kanpur-Tundla : 2015-2016 11.87 5.52 2.55 0
TTR - 28 Nos.,
D/S - 28 Nos.
31 NCR 060231171005 Mughalsarai - 2017-2018 5.95 2.9 1.85 0
Allahabad -
TSR(P) - 7.916
km
31 NCR 060331111005 Jhansi-Kanpur - 2011-2012 7.77 3.51 0.01 0
TBR - 36.20 km
31 NCR 060231131007 Mughalsarai- 2013-2014 10.77 4.58 0.12 0
Ghaziabad - SEJs
(120 Nos) & glued
joints (810 Nos)

31 NCR 060231181019 Tundla- 2018-2019 7.58 2.44 1.01 0.14


Ghaziabad (UP) -
TRR(P) - 6.84 km
31 NCR 060331171006 Jhansi - Manikpur 2017-2018 33.53 15.48 0.5 0
- TBR - 115 km

31 NCR 060331181007 Jhansi-Manikpur 2018-2019 22.37 7.73 1.2 0


(SL) - TWR - 170
km
31 NCR 060231181016 Mughalsarai- 2018-2019 10.05 3.68 3.1 0
Allahabad - TTR -
30 sets
31 NCR 060131191004 Agra Cantt - 2019-2020 8.54 3.02 0.25 0.05
Palwal - TBR -
21.11 km
(PB#473/2019-
20/NCR)
31 NCR 060231191011 Kanpur - Rura - 2019-2020 9.36 3.4 5.1 0
CTR (S) - 6.426
km (PB#472/2019-
20/NCR)

31 NCR 060231181007 Kanpur-Tundla - 2018-2019 12.87 4.42 1.55 0


CTR(S) - 9.043
km (Loop Lines)
31 NCR 060231151009 Kanpur-Tundla - 2015-2016 48.46 24.14 3.47 0
CTR (S) - 24.346
Kms.
31 NCR 060231161009 Mughalsarai- 2016-2017 34.72 14.15 2 0
Allahabad -
TTR(TWS)- 151
sets
31 NCR 060331221004 Bina - Jhansi (UP) 2022-2023 27.74 11.59 6.77 0
- TSR(P) - 24.000
Tkm
(PB#492/2022-
23/CR)
31 NCR 060331131005 Bina-Agra - TBR - 2013-2014 26.05 11.37 0.01 0
117.095 km
31 NCR 060231161003 Chunar-Chopan & 2016-2017 155.24 65.03 5.03 0.03
NainiI-Manikpur :
CTR(P) - 29.46
Kms & TRR (P) -
22.31 Kms.

31 NCR 060131201004 Agra fort - 2020-2021 5.26 2.08 0.01 0


Yamuna Bridge -
Replacement of
steel Channel
sleepers at Bridge
No. 162 - 1114
Nos.
(PB#475/2020-
21/NCR)
31 NCR 060231121005 Mughalsarai - 2012-2013 19.37 7.71 2 0
Ghaziabad - TTR -
493 Nos & SEJ -
200 Nos
31 NCR 060331151005 Bina- Agra -TFR - 2015-2016 8.94 3.65 0.01 0
17.17, TWR -
17.84, SEJ - 22
nos. & GJ - 44
nos.
31 NCR 060131171005 Mathura - Alwar - 2017-2018 6.61 1.75 0.28 0.24
TBR -18.8 km
31 NCR 060131181004 Dholpur-Agra 2018-2019 11.56 3.61 1.2 0
Cantt. - CTR(S) -
7.795 km
31 NCR 060131181001 Agra Cantt.- 2018-2019 49.55 21.84 4.51 0.41
Mathura - CTR(S)
- 33.439 km
31 NCR 060231211018 Pd Deen Dayal 2021-2022 7.54 3.36 5.5 0
Upadhayay -
Allahabad -
TTR(FS TWS
WCMSC) - 22
sets
(PB#488/2021-
22/NCR)
31 NCR 060331151009 Jhansi - Kanpur: 2015-2016 11.2 4.28 0.01 0
TFR - 53.5 kms &
TBR - 6.300 Kms

31 NCR 060231161005 Mughalsarai - 2016-2017 94 39.42 3.25 0


Ghazibad -
TTR(TWS) - 250
sets, TTR(CMSC)
- 250 sets,
Renewal of SEJ -
200 sets &
renewal of Glued
Joint -1000 sets

31 NCR 060231191017 Mughalsarai - 2019-2020 10.07 3.7 2.25 0


Allahabad - TTR
(FS TWS
WCMSC) - 32
sets
(PB#474/2019-
20/NCR)
31 NCR 060331161005 Jhansi - Kanpur - 2016-2017 7.42 3.19 0.01 0
TTR(CS) - 64 sets

31 NCR 060331191001 Jhansi - Kanpur - 2019-2020 5.13 2.07 0.07 0


CTR(P) - 2.16 km
(PB#470/2019-
20/NCR)
31 NCR 060231121007 Mughalsarai - 2012-2013 147.57 59.05 0.55 0
Ghaziabad - TFR -
294 km, TBR -
71.60 km, glued
joints -1500 No &
TTR - 250 sets
31 NCR 060231161006 Mughalsarai- 2016-2017 38.16 13.96 1.01 0
Allahabad - CTR
(S)- 13.127 km
31 NCR 060231191016 Tundla - 2019-2020 23.64 10.38 3.5 0
Ghaziabad - TBR -
77.53 km
(PB#473/2019-
20/NCR)
32 NCR 060132161002 Agra Divn. - Repl 2016-2017 13.09 6.34 0.99 0
of steel girders up
to 9.14 m span by
RCC/PSC slab
(15 Nos)

32 NCR 060132181002 Dholpur-Agra 2018-2019 10.23 3.07 1 0


Cantt. -
Procurement,
fabrication,
assembling,erecti
on and repl
(Bridge No.1314/1
& 1331/1)

32 NCR 060232101001 Allahabad-Khaga - 2010-2011 6.11 2.02 0.18 0.3


Rehabilitation by
box girder in track
circuited area
(bridge No.29 &
31)
32 NCR 060232181001 Allahabad 2018-2019 16.1 6.97 1.53 0.34
Division - Repl. of
plate girders on
bridges (7 Nos)
33 NCR 060133181001 Agra Cantt- 2018-2019 6.58 2.13 0 0
Dhaulpur -
Reliability
improvement of
signalling gears of
old intermediate
block signalling (4
IBS)

33 NCR 060333181005 Jhansi-Bina - 2018-2019 19.22 8.21 0 0


Reliability
improvement of
signalling gears of
old intermediate
block signalling
(14 IBS)

42 NCR 060442193004 RSK/STLI-Up- 2019-2020 3 1 1 0


gradation of
existing
infrastructure &
safety facility at
RSK/STLI
42 NCR 060242183002 Kanpur 2018-2019 6 2 2 0
central~~Kanpur-
Up-gradation of
new coaching
complex for high
speed rolling
stock
maintenance
42 NCR 060342201003 Jhansi~Up- 2020-2021 9 4 4 0
gradation and
augmentation of
Electric & Diesel
Locomotive
maintenance and
production
facilities.
51 NCR 060251161002 Tundla - Aligarh - 2016-2017 14.35 5.66 1.3 1.09
Repl. of quarters,
type-II - 126 units
51 NCR 060152161001 Mathura - Repl of 2016-2017 2.95 0.93 0.12 0
old roofs of RB-II
& H-type quarters
by RCC roofs (59
Nos)
53 NCR 060053185001 Design, supply, 2018-2019 23.16 7.47 0 2.15
installation and
commissioning of
quick watering
system at
Allahabad and
Kanpur Central
stations
53 NCR 060353161001 Banda - Chitrakut 2016-2017 12.16 5.12 0 0
Dham - Karwi -
Provision of
washable apron
with cleaning
arrangements
64 NCR 060264183007 Allahabad~~Allah 2018-2019 3 1 1 0
abad Division -
Construction of
new Crew running
room at ALD.

64 NCR 060364193001 Astroturf pitch 2019-2020 3 1 0 0


replacement,
improvement of
visitors gallery &
players hostel in
Railway Hockey
stadium at
Gwalior.
STATUS OF PRIORITY WORKS TARGETED FOR EARLY
SUMMARY OF ALL REPORTS
Report generated: 29.05.2023 at 03:27:39 PM
HEAD NC Total
R
1. No of Work 98 98
2. Tender Published but not opened 3 3
3. Tender opened but LOA not issued for more than 45 41 41
days
4. Bills pending for registration for more than 4 days 1 1
5. Bills under process for more than 3 days 2 2
7.Pending:(Environmental Clearance, GAD, Design & 98 98
Drawing, Estimate Sanction, Land
Acquisition, Completion Report)
8. Work where no expenditure is booked in last 30 days 75 75