Page 1
VRW & VBR (OTHER MATERIALS)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02
THE FOLLOWING
COMPLETION OF
A STAGE UNDER
OF WORK DONE
ROAD WORK (2)
SCHEDULE H(1)
RW/BR =VALUE
OTHER WORKS
COMPONENT
PL % OF OM
RESPECTIVE
ITEMS OF
FOR THE
MONTH
SR (M1-
BILL NO DATE DISCRIPTION MO M1 VRW & VBR (OM) REMARKS
NO MO)/M0)
(a) (b) (c) (d) (e) (f) (g) (h) (j) (l) (m) (n)
- 50 135.0 145.30 0.076 - EW/GSB/ Other works
VRW & VBR (OM ) = AMOUNT TO BE - 40 135.0 145.30 0.076 - Bituminous Work
ADDED OR DEDUCTED FROM IPC DUE - 35 135.0 145.30 0.076 - Cement Concrete Pavement
1 IPC-1 30-06-2022 Feb-22
TO CHANGE IN COST OF OTHER
Culvert, Minor Bridges And Other
MATERIALS - 30 135.0 145.30 0.076 -
Structure
56,59,85,339.00 25 135.0 145.30 0.076 91,40,663.22 Major Bridge And Structures
- 50 135.0 151.90 0.125 - EW/GSB/ Other works
VRW & VBR (OM ) = AMOUNT TO BE - 40 135.0 151.90 0.125 - Bituminous Work
ADDED OR DEDUCTED FROM IPC DUE - 35 135.0 151.90 0.125 - Cement Concrete Pavement
2 IPC-2 31-08-2022 Apr-22
TO CHANGE IN COST OF OTHER
Culvert, Minor Bridges And Other
MATERIALS 92,36,972.00 30 135.0 151.90 0.125 2,94,428.48
Structure
19,56,04,115.00 25 135.0 151.90 0.125 51,95,734.30 Major Bridge And Structures
Page 1 of 1