0% found this document useful (0 votes)
22 views1 page

Esc - 6

The document appears to be a schedule detailing adjustments to be made to interim payment certificates due to changes in the cost of other materials. It includes two entries, for February and April 2022, listing various construction components and the amounts to be added or deducted.

Uploaded by

Ajay sai kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Esc - 6

The document appears to be a schedule detailing adjustments to be made to interim payment certificates due to changes in the cost of other materials. It includes two entries, for February and April 2022, listing various construction components and the amounts to be added or deducted.

Uploaded by

Ajay sai kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Page 1

VRW & VBR (OTHER MATERIALS)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02

THE FOLLOWING
COMPLETION OF
A STAGE UNDER
OF WORK DONE

ROAD WORK (2)


SCHEDULE H(1)
RW/BR =VALUE

OTHER WORKS

COMPONENT
PL % OF OM
RESPECTIVE

ITEMS OF
FOR THE
MONTH
SR (M1-
BILL NO DATE DISCRIPTION MO M1 VRW & VBR (OM) REMARKS
NO MO)/M0)

(a) (b) (c) (d) (e) (f) (g) (h) (j) (l) (m) (n)
- 50 135.0 145.30 0.076 - EW/GSB/ Other works

VRW & VBR (OM ) = AMOUNT TO BE - 40 135.0 145.30 0.076 - Bituminous Work
ADDED OR DEDUCTED FROM IPC DUE - 35 135.0 145.30 0.076 - Cement Concrete Pavement
1 IPC-1 30-06-2022 Feb-22
TO CHANGE IN COST OF OTHER
Culvert, Minor Bridges And Other
MATERIALS - 30 135.0 145.30 0.076 -
Structure
56,59,85,339.00 25 135.0 145.30 0.076 91,40,663.22 Major Bridge And Structures

- 50 135.0 151.90 0.125 - EW/GSB/ Other works

VRW & VBR (OM ) = AMOUNT TO BE - 40 135.0 151.90 0.125 - Bituminous Work
ADDED OR DEDUCTED FROM IPC DUE - 35 135.0 151.90 0.125 - Cement Concrete Pavement
2 IPC-2 31-08-2022 Apr-22
TO CHANGE IN COST OF OTHER
Culvert, Minor Bridges And Other
MATERIALS 92,36,972.00 30 135.0 151.90 0.125 2,94,428.48
Structure
19,56,04,115.00 25 135.0 151.90 0.125 51,95,734.30 Major Bridge And Structures