FAKULTI KEJURUTERAAN
FAKULTI KEJURUTERAAN
UNIVERSITI MALAYSIA SARAWAK
94300 KOTA SAMARAHAN
ABSTRACT
The Industrial Training was conducted at Dewan Bandaraya Kuching Utara (DBKU) from 26th
July 2021 to 1st October 2021. I was attached to Infrastructure Maintenance Division (IMT). The
department mainly perform maintenance activities to the road signs, road pavement markings,
roadside footpath and road kerb. Other than that, they also provide services such as road
patching works and road drain construction.
The following report provides a brief overview of the structures of the organizations, the
activities of the organization and also projects conducted. The tasks performed will be
described according to the training schedule and achievement tasks. Further details of each
activity carried out including problems encountered, work observations, problem solving will
be described in the next section. The full report of the specific study conducted is as in
appendices. Other task-related information is also attached.
i
TABLE OF CONTENTS
Contents Pages
Abstract i
1.0 Organization Background 1
1.1 History 1
1.2 Background 1
1.3 Function 1
1.4 Vision, Mission, Slogan 2
1.5 Structure 2
1.6 Organization Chart 3
1.7 Infrastructure Maintenance Division (IMT) 4
2.0 Task Summary 6
3.0 Summary 9
3.1 “Garis Panduan Papan Tanda Jalan DBKU” 9
3.2 Project Monitoring - Bina Baru Jalan Penghujung (Link Road) Jalan 12
Astana 11 ke Jalan Merdeka
3.3 Work programme 17
3.4 Knowledge Gained - Tender Procurement Process 18
4.0 Conclusion 22
References 23
Appendices 24
ii
CHAPTER 1: ORGANIZATION BACKGROUND
1.1 History
1.2 Background
DBKU, one of the Local Authorities administrating the Kuching City, was established
under The City of Kuching North (Ordinance No. 3 1988). It administrates the northern part
of the city comprising an area of approximately 369.48 km2 with more than 43,575 properties
and a population of about 235,966 people. The City of Kuching is divided into 2 areas; north
and south. Each of these is administered by a Datuk Bandar - a Commissioner for Kuching
North (Kuching Utara) with area of 369.48km2 and a mayor for Kuching South (Kuching
Selatan) with area of 61.53km2.
The management of DBKU is committed to ensure not only excellent quality services to
its stakeholders, but also is committed to protect the environment, provide a safe and healthy
environment for its employees and efficient energy management in compliance with statutory
and regulatory requirements.
1
1.4 Vision, mission and slogan
Each department is divided into more divisions (24 Divisions). All divisions would
perform their respective roles and responsibilities to meet the needs of their stakeholders and
ultimately stakeholder’s satisfaction. The achievement of this objective is to be in line with
DBKU’s Mission and Vision, values, policies and strategies tailored within its financial
means and human capital capability. All Divisions would make periodic review of their
business processes to ensure continual improvement in tandem with the environmental
(including energy efficiency), technological, economic, law, social and political changes.
2
1.6 DBKU Organization Chart
3
1.7 Infrastructure Maintenance Division (IMT)
4
(b) IMT Organization Chart
5
CHAPTER 2: TASK SUMMARY
Throughout 10 weeks of Industrial Training at IMT Division, DBKU, below is the brief
description of what I have learn and experienced.
6
Penghujung (Link Road) Lorong Astana 11 ke Jalan
Merdeka.
Understand the scope of work for “Bina Baru Jalan
Penghujung (Link Road) Lorong Astana 11 ke Jalan
Merdeka.
5 23/08/2021 - 27/08/2021 Adding more information into “Garis Panduan Papan
Tanda Jalan DBKU”, information about the
advertisements installation at public places for local
authorities in Sarawak.
Reading about the basic principles of advertisement
control.
Site visit to RPR Kampung Tunku Fasa 2.
Reading on the Contract Document for “Cadangan
Membaikpulih Parit Konkrit di Sebahagian RPR
Kampung Tunku Fasa 2”.
6 30/08/2021 - 03/09/2021 Reading on the Terms and Condition for Installation of
advertisements at public places for local authorities in
Sarawak.
Getting information about DBKU history and background
for report writing.
Learning about Tendering Process and Procurement
Method.
7 06/09/2021 - 10/09/2021 Reading on the road work for “Bina Baru Jalan
Penghujung (Link Road) Lorong Astana 11 ke Jalan
Merdeka” project in detail.
Review the drawing and drain work.
Continue on editing the “Garis Panduan Papan Tanda
Jalan DBKU”.
Reading on the concrete work for “Bina Baru Jalan
Penghujung (Link Road) Lorong Astana 11 ke Jalan
Merdeka” project.
8 13/09/2021 - 17/09/2021 Reading on Standard Specification for Road Works,
JKR/SPJ/1988.
7
Review documents, letters, complaint letters, meeting
minutes, work programme for “Bina Baru Jalan
Penghujung (Link Road) Lorong Astana 11 ke Jalan
Merdeka” project.
Review and learn about the Topographical Detail Survey
and Offset/Plotted Plan.
Review drawing and contract document for Proposed
Road Improvement at Semariang Jaya (Jalan Bentara)
project.
Report writing.
9 20/09/2021 - 24/09/2021 Report writing.
Reading on JKR Form of Contract.
Editing the “Garis Panduan Papan Tanda Jalan DBKU”,
the page numbering, header, footer, citation for each
diagram, photo and table.
Site visit to Jalan Astana and Jalan Satok Timur.
Learning about Work Programme.
10 27/09/2021 - 01/10/2021 Report writing.
Adding more information into “Garis Panduan Papan
Tanda Jalan DBKU” which is the colour code used for
road furniture in Kuching area.
Editing the meeting paper, “Kertas Mesyuarat
Jawatankuasa Perancangan, Pembangunan, Persekitaran
dan Teknikal” (JPPT). (Appendix B)
Making a work programme/project timeline for “Bina
Baru Jalan Penghujung (Link Road) Lorong Astana 11 ke
Jalan Merdeka” project using Excel. (Appendix C)
Stamped tender drawing.
8
CHAPTER 3: SUMMARY
This part covers the practical experience and fundamental engineering knowledge learned
throughout industrial training. Furthermore, it outlines the issue as well as solutions for
resolving it.
I was given one task throughout my whole internship period since my first day until last
which is to make a guideline regarding road signage design and application of its installation
on roads in Kuching area. Title of the guideline that I work on is “Garis Panduan Papan Tanda
Jalan DBKU”. The full guidelines are as in Appendix D.
Description:
This guideline is intended to provide clarification as well as to act as a guideline
practiced at Dewan Bandaraya Kuching Utara (DBKU). The contents of this guideline are
suitable for reference by those who are directly involved in the maintenance of signage,
procedures to install the signage and road safety audits. The information contained in this
guideline is guided by ATJ 2A/85 (Pindaan 2016), ATJ 2B/85, ATJ 2C/85 (Pindaan 2017),
ATJ 2C/85 (Pindaan 2017), ATJ 2E/87, ATJ 9/86, and Akta Pengangkutan Jalan 1987 (Akta
333). The detailed explanation can be referred to the documents.
Objectives:
Function of this guideline is to create awareness for the road users, giving warning
signs and enable the drivers to stop or slow down. The traffic signs are installed according to
site requirements and based on law enforcement, facts and road site studies. The basic
principles of road sign installation are as follows:
1. Easily visible to the driver
2. Easy to see and can attract the driver’s attention from a suitable distance.
3. Contains information that should be required and can be understood by the driver at a
glance.
4. The installation location required does not cause visual disturbance while driving.
9
5. The driver has sufficient time to take action safely.
6. Effective during day and night.
7. Uniform according to standards.
Background:
Road signs are intended to provide directions, warnings, prohibitions, and information to
road users. It is usually displayed in a conspicuous location as well as symbols that are
easy to understand, concise, clear, and uniform. This serves to help road users arrive at
their respective destinations safely.
The use of signage in a location depends on the appropriateness of the instructions to be
conveyed to road users. Road signs have specific functions and purposes and are usually
classified according to specific categories.
These guidelines are prepared for the purpose of improvement and additional criteria to
“Garis Panduan Papan Tanda Jalan DBKU Pindaan 1/2018” to clarify the procedures and
criteria of road signs installed on roads maintained by the North Kuching City Hall.
These improvements involve:
10
Challenges:
Arahan Teknik Jalan (ATJ) is divided into many sections according to specific titles.
ATJ that I referred for guideline completion are ATJ 2A/85 (Pindaan 2016), ATJ 2B/85, ATJ
2C/85 (Pindaan 2017), ATJ 2C/85 (Pindaan 2017), ATJ 2E/87, ATJ 9/86, and Akta
Pengangkutan Jalan 1987 (Akta 333). It is quite difficult to gather all information from
different standards and organize it in an orderly manner in one book. I went through the
manual standard one by one in order to avoid confusion. Besides, it is quite difficult for me to
take pictures of traffic signs on the road in Kuching area because there is no place for me to
stop as a lot of cars passing by. Thus, some of the pictures that are used in the guideline, I
took it from Google Earth and Google Map.
11
3.2 Project monitoring - “Bina Baru Jalan Penghujung (Link Road) Lorong Astana 11
ke Jalan Merdeka”
The ongoing project that I monitored was the Bina Baru Jalan Penghujung (Link Road)
Lorong Astana 11 ke Jalan Merdeka. I was given the opportunity to follow up the work
progress during construction of the road and drain. Read and review all documents regarding
the project.
Background:
Title : Bina Baru Jalan Penghujung (Link Road) Lorong Astana 11 ke Jalan
Merdeka
Contract No. : DBKU/CQS/P/17/20
Contract Sum : RM1,491,145.00
Problem : The existing concrete open drains on both roadways have narrowed the
grass verge space, making it difficult to build a pathway along the road.
Solution : This project necessitates the creation of a drain cover for the current open
drain. Following the completion of the project, the residents will benefit
from the provision of a sidewalk and drain cover, which will improve the
aesthetics of the neighbourhood.
This project is located in Zone Astana. There are 2 main work proposed in this project
which are drain construction and road construction. As for the drain construction, open drain
is proposed along Lorong Astana while at Jalan Merdeka, covered drain is proposed. For road
construction, premix road pavement is proposed (approximately 830m2) at the intersection of
Jalan Merdeka and Lorong Astana and resurfacing work is proposed (approximately 562.5m2)
at along Lorong Astana.
Objectives:
Improve the aesthetic of the neighbourhood.
The residents will benefit from the provision of the sidewalk and drain cover.
12
Project Chronology:
13
(d) Contract awarded
The contract has been awarded to RizQiy Engineering on 6th January 2021 at 9.00AM at
DKBU @ Depo, Tingkat 2, Bilik Mesyuarat Bahagian Penyelenggaraan Infrastruktur
(IMT), Jalan Depo, 93050, Kuching, Sarawak, 20 days after Letter of Acceptance has
been released which is on 18th December 2020. Parties involved are as follows:
Implementing Agency : DBKU
Contractor : RizQiy Engineering
Project Period:
The project was commenced in January 2021 with six (6) months period and supposedly
completed by 30th June 2021 as per contract and agreement made on 6th January 2021
(9.00AM) at DKBU @ Depo, Tingkat 2, Bilik Mesyuarat Bahagian Penyelenggaraan
Infrastruktur (IMT), Jalan Depo, 93050, Kuching, Sarawak. However, the activities were
constrained and delayed due to unavoidable issues/conditions.This project is still ongoing.
14
Figure 3.4 Drain construction still ongoing
Problems:
1. Incremental weather since January - March 2021
Weather condition is one of the reasons that causes the project delayed. Some parts of
Kuching were hit by heavy rains at that time. Rain hinders vision for construction
workers and heavy machinery operators. It might also lead to unfavourable working
conditions.
3. Damage of property
Some residents complained that their houses were damaged due to the construction. The
houses in that area suffered cracks during excavation process, floor cracks, wall cracks
and floor are broken, lifted and perforated.
15
4. MCO
The construction work were also halted because of Movement Control Order (MCO). The
contractor have encounter disruption such as that arising from having to incorporate
stringent standard operating procedures on health and safety measures (“SOPs”) for
construction sites. These disruption has prevented them completing their tasks as planned.
16
3.3 Work Programme
I have been assigned to work on a project timeline or can also be called as work programme
for “Bina Baru Jalan Penghujung (Link Road) Lorong Astana 11 ke Jalan Merdeka” project.
The work programme is as in Appendix C.
Definition:
A work programme, also often known as a project timeline, is a visual representation of
the chronological order of events in a project that contractors use to ensure efficient project
performance (Swan, 2021). It is a group of tasks that must be performed within a certain
amount of time. Contractors frequently employ traditional planning and scheduling
procedures to prepare the work programme.
Function:
It delivers a simple yet comprehensive visual perspective of a project from beginning to
end, resulting in greater team productivity. Many benefits can be gained by using a project
timeline/work programme, including cost and time estimation. Its creation prior to the start of
a project enables the project manager in determining the overall resources, cost, and time
required to accomplish the project.
17
3.4 Knowledge gained
I gained knowledge about Tender Procurement Process. “Tender” is not a new word to me as
I have come across this term before but I do not know the exact meaning of it. During my
internship, I understand more about tender process as I always read the contract document and
also review drawing of some projects.
Tender Preparation
Tender Advertisement
Tender Submission
Tender Evaluation
Letter of Acceptance
Formal contract
18
Tender Preparation
For a charge of at least RM50, tender document must be prepared and circulated. It is a
lengthy process that requires thorough tender drawings, bills of quantities, general and
specific terms and conditions, specifications, a copy of the contract, and the expected scope of
work. It can also be defined as the paperwork that contractors use to submit a bid in response
to an employer's request. Following the completion of a feasibility study, the client often hires
a consultant team (led by architects/engineers) to finish the detailed design. Detailed drawings,
specifications, and, in many situations, a bill of quantities are produced by the design team.
The tender documents are created in advance of both the invitation to tender and the contract
review and award. The following is the detail for the tender document based on DBKU's
requirements:
i. Condition of Tendering
ii. Form of Tender
iii. Appendix to the Form of Contract
iv. “Surat Akaun Pembida”
v. JKR Form of Contract
vi. Addendum to Form of Contract
vii. Standard Specification for Road Works (JKR/SPJ/1988)
viii. Supplementary to Standard Specification for Road Works (JKR/SPJ/1988)
ix. Traffic Safety Code for Temporary Road Works
x. Environment Specification
xi. Integrated Management System Policy
xii. Anti-Bribery Policy
xiii. Summary of Tender
xiv. Schedules of Rates
xv. List of Drawings
xvi. Financial and Technical Information of Tender
19
Tender Advertisement (Invitation to Tender)
Procurement opportunities can be accessed through the procuring agencies’ websites.
As for tender advertisement by DBKU, tenderers may refer advertisements through the
website www.dbku.sarawak.gov.my. The sale of tender documents can begin as soon as the
advertisement is announced. Tender documents for local tenders can only be purchased by
contractors who have completed the local registration requirements. All contractors working
in Malaysia's construction business must register with CIDB, according to a law passed by
Parliament.
Tender Submission
The tender advertisement specifies the exact date and hour of the tender deadline, as
well as the address to which all tenders must be sent. Tenders can be mailed or dropped off in
designated boxes made accessible for this purpose. To enable scheduling and independent
evaluation, bidders' tender submissions should comprise distinct technical and financial
proposals prepared in two copies and sealed in separate envelopes.
Tender Evaluation
The evaluation of tenders is the step in the procurement process when a contracting
authority determines which of the tenders that match the established specifications is the best
based on the pre-announced award criteria, such as the lowest-priced or most economically
advantageous tender. For “Bina Baru Jalan Penghujung (Link Road) Jalan Astana 11 ke Jalan
Merdeka” project, DBKU has mentioned in the tender advertisement that they are not bound
to lowest tender. All tenders will be evaluated by evaluation committees using the criteria
outlined in the tender document. The qualified tenderer whose tender was found to be the
lowest-priced or most economically advantageous, is referred to as the awarded contract.
20
Acceptance of Tender
If the successful bidder's bid is approved in its whole, they will receive a letter of
acceptance. After that, the winning bidder must attest and return the Letter of Acceptance to
the government. If negotiations are required as a result of the Letter of Intent, the successful
bidder is issued a Letter of Acceptance, which must be returned to the Government for
contract formalisation. The Letter of Acceptance is a legally binding document that is
attached to the contract documents. The objective of the Letter of Acceptance is to allow the
contractor to begin work prior to the issuance of a formal contract. It enables the contractor to
order materials ahead of time, assign resources, and secure bonding or proof of insurance.
Formal Contract
Following receipt of the successful bidder's Letter of Acceptance, a formal contract is
written up. In addition to the parties' verbal permission, formal contracts require the existence
of a written and signed legal document. When these requirements are met, the agreement
becomes legally binding, and the parties' duties are legally enforceable.
Detail for contract document:
i. Form of Agreement
ii. Letter of Acceptance
iii. Correspondence and/or Minutes if Meetings referred to in that Letter of Acceptance
iv. Form of Tender
v. Addenda
vi. Conditions of Tendering
vii. Form of Contract
viii. Drawings
ix. Specifications of Particular Application or Special Specification
x. Standard Specifications
xi. Bill of Quantities / Schedule of Rates
xii. Summary of Tender
21
CHAPTER 4: CONCLUSION
Training is a method and way of learning in order to improve knowledge and skills by
doing jobs or tasks assigned. It is beneficial since they help with the development of
professional skills, the building of personal character, and the expansion of opportunities. I
have a better understanding of basic engineering challenges and how to solve them when
there are multiple parties involved. In my 10 weeks at Dewan Bandaraya Kuching Utara, I
have acquire much knowledge both theoretical and practical. I was involved in more office
work, reviewing drawing and reading the contract documents of some ongoing projects,
preparing slide presentation and meeting paper. At the same time, I learned about tender
procurement process and how DBKU handles problems that occur during construction
process. In addition, as I worked on making a guideline “Garis Panduan Papan Tanda Jalan
DBKU”, I gained more knowledge about types of signage and its installation application on
roads and also some signage that does not comply with the standards in Kuching area. Lastly,
my communication skills and self-confidence have also improved as I deal with different type
of individuals. One of the challenges I had throughout my internship was that there was not
enough work assigned to me. I'm reluctant to ask them for some works because they are so
preoccupied with their own. Also, I'm not sure if any of my coworkers will assist me or if they
will be disturbed.
22
REFERENCES
Dewan Bandaraya Kuching Utara (DBKU). Official website of Dewan Bandaraya Kuching
Utara. Retrieved from https://dbku.sarawak.gov.my/
Swan, G. (2021). How to Create Project Timeline in Excel (2021 Guide). Retrieved from
https://clickup.com/blog/create-a-timeline-in-excel/
23
Appendix A
(Layout drawing)
24
Appendix A1 Layout drawing of pedestrian walkway (cobble stone)
`
Appendix B
(Kertas Mesyuarat Jawatankuasa Perancangan, Pembangunan,
Persekitaran dan Teknikal untuk Penambahbaikan ke Atas Garis Panduan
Papan Tanda Jalan Raya DBKU)
THE COMMISSION OF THE CITY OF KUCHING NORTH
KERTAS MESYUARAT
JAWATANKUASA PERANCANGAN, PEMBANGUNAN, PERSEKITARAN DAN TEKNIKAL
PLANNING, DEVELOPMENT AND ENVIRONMENTAL COMMITTEE PAPER
Rujukan/Ref :
NO: 1
Tarikh/Date :
KEPUTUSAN
DECISION
KERTAS MESYUARAT
JAWATANKUASA PERANCANGAN, PEMBANGUNAN, PERSEKITARAN DAN TEKNIKAL
TAJUK:
1. OBJEKTIF
2. LATAR BELAKANG
2.1 Papan tanda jalan raya adalah bertujuan untuk memberi petunjuk, peringatan,
larangan, dan maklumat kepada pengguna jalan raya. Ia biasanya dipaparkan di
lokasi yang mudah dilihat serta simbol yang mudah difahami, ringkas, jelas, dan
seragam. Ini berfungsi untuk membantu pengguna jalan raya tiba di destinasi
masing-masing dengan selamat.
2.2 Nama papan tanda bagi jalan dan lorong hendaklah menggunakan Bahasa
Malaysia. Ini selaras dengan memorandum yang digunapakai oleh Jawatankuasa
Penamaan Geografi (JPGN) yang dikeluarkan oleh Kementerian Perancangan
Pembangunan Dan Pengurusan Sumber yang bertarikh 19.12.2001 (No rujukan:
29/KPS/T/2-1/21/7(5)).
2.4 Garis panduan ini disediakan bertujuan untuk penambahbaikan dan kriteria
tambahan kepada Garis Panduan Papan Tanda Jalan Raya pindaan 1/2018 bagi
memperjelaskan prosedur serta kriteria papan tanda jalan yang dipasang di atas
jalan yang diselenggara oleh Dewan Bandaraya Kuching Utara. Penambahbaikan
ini melibatkan:
2.4.1 Aplikasi reka bentuk ditambah baik untuk lima jenis papan tanda iaitu:
i. Tanda Peraturan (Regulatory Sign)
ii. Tanda Amaran (Warning Sign)
iii. Tanda Sementara (Temporary Sign)
iv. Tanda Panduan (Guide Sign)
v. Tanda Pengiklanan
Muka Surat 1
KERTAS MESYUARAT
JAWATANKUASA PERANCANGAN, PEMBANGUNAN, PERSEKITARAN DAN TEKNIKAL
Setiap permohonan pemasangan papan tanda jalan di jalan raya akan mengikut Garis
Panduan ini setelah mendapat kelulusan oleh Mesyuarat Jawatankuasa Perancangan,
Pembangunan, Persekitaran dan Teknikal ini.
Papan tanda jalan atau tanda jalan memang memainkan peranan penting dalam
memastikan pengguna jalan raya tiba di destinasi masing-masing dengan selamat. Ini
adalah salah satu alat komunikasi yang menerangkan sesuatu maklumat tentang arah,
jarak serta memberi peringatan dan larangan kepada pengguna jalan raya. Namun ia perlu
dibuat mengikut spesifikasi yang standard agar pengguna jalan raya tidak keliru
disebabkan oleh terlalu banyak papan tanda jalan berbeza-beza padahal menunjukkan
perkara yang sama. Oleh itu, bagi menangani permasalahan ini, Pengurusan DBKU telah
mengeluarkan standard papan tanda jalan untuk dipatuhi oleh mereka yang terlibat secara
langsung dengan penyelenggaraan papan tanda serta tatacara pemasangan dan
pemantauan di tapak bagi memastikan keselamatan pengguna jalan.
5. PERAKUAN
Muka Surat 2
Appendix C
(Work Programme)
BINA BARU JALAN PENGHUJUNG (LINK ROAD)
LORONG ASTANA 11 KE JALAN MERDEKA
Duration
No. Task Name Start Finish Jan Feb Mar Apr May Jun
(days)
1 BINA BARU JALAN PENGHUJUNG (LINK ROAD) 181 Fri 1/1/21 Wed 6/30/21
LORONG ASTANA 11 KE JALAN MERDEKA
2 Project Milestones 155 Fri 1/1/21 Wed 6/30/21
3 Milestone Start 0 Fri 1/1/21 Fri 1/1/21
4 Milestone Finish 0 Wed 6/30/21 Wed 6/30/21
5 Preliminaries & General 170 Fri 1/1/21 Sat 6/19/21
6 Survey Works 30 Fri 1/1/21 Thu 2/4/21
7 Builder's Works 153 Fri 1/1/21 Mon 6/28/21
8 Site Clearing 60 Fri 1/1/21 Thu 3/19/21
9 Earthworks 60 Sat 1/9/21 Fri 3/19/21
10 Drain Work 128 Sat 1/30/21 Mon 6/28/21
11 1.2m wide rc open drain (295m) 70 Sat 2/27/21 Tue 5/18/21
12 1.5m wide rc box culvert (12m) 29 Sat 2/27/21 Thu 4/1/21
13 1.2m wide rc house entrance covered drain 30 Thu 2/18/21 Wed 4/28/21
14 1.5m wide rc covered drain (150m) 80 Tue 2/23/21 Wed 5/26/21
15 0.3m x 0.25m precast sump 80 Thu 3/4/21 Fri 6/4/21
16 1.5m x 1.5m sump (3 nos) 21 Fri 3/5/21 Mon 3/29/21
17 Manhole 0.6m x 0.6m med. Duty (35 nos) 28 Sat 5/8/21 Wed 6/9/21
18 Rectification of ex. Concrete slab with 0.1m 28 Thu 5/27/21 Mon 6/28/21
19 75mm iron GI railing 28 Thu 5/27/21 Mon 6/28/21
20 Rip-rap 3.5m x 1.5m 3 Thu 5/27/21 Sat 5/29/21
21 Road Works 87 Fri 3/5/21 Mon 6/14/21
22 Proposed new road 87 Fri 3/5/21 Mon 6/14/21
23 Rock fill embankment & geotextile 35 Fri 3/5/21 Wed 4/14/21
24 Subgrade (3 nos CBR) 28 Thu 3/25/21 Mon 4/25/21
25 Sub-base (300mm thk) 28 Sat 4/10/21 Wed 5/12/21
26 Road-base (300mm thk) 28 Tue 4/27/21 Fri 5/28/21
27 60mm thk Premix Binder course & 9 Sat 5/29/21 Tue 6/8/21
bitumen prime coat
28 40mm thk premix wearing course & 5 Wed 6/9/21 Mon 6/14/21
bitumen tack coat
29 Proposed resurfacing road 14 Sat 5/29/21 Mon 6/14/21
30 Traffic sign & galv, Iron post 5 Tue 6/15/21 Sat 6/19/21
31 Thermoplastic pavement marking 5 Tue 6/15/21 Sat 6/19/21
Appendix D
(Garis Panduan Papan Tanda Jalan Raya Dewan Bandaraya Kuching
Utara Pindaan 2/2021)
2021
GARIS PANDUAN
PAPAN TANDA
JALAN
DEWAN BANDARAYA KUCHING UTARA
Garis Panduan Papan Tanda Jalan ini adalah bertujuan memberi penjelasan serta
sebagai Garis Panduan Sistem Papan Tanda Jalan yang diamalkan di Dewan
Bandaraya Kuching Utara. Kandungan Garis Panduan ini amat sesuai dijadikan
raya.
kepada Arahan Teknik (Jalan) 2A/85 (Pindaan 2019), Arahan Teknik (Jalan) 2B/85,
Arahan Teknik (Jalan) 2C/85 (Pindaan 2017), Arahan Teknik (Jalan) 2E/87,
Arahan Teknik (Jalan) 9/86, dan Akta Pengangkutan Jalan 1987 (Akta 333).
Adalah diharapkan dengan adanya Garis Panduan ini dapat memberi gambaran
dan panduan yang lebih mudah dan jelas mengenai perkara-perkara asas dan
penting berkaitan papan tanda jalan di jalan raya dibawah pentadbiran Dewan
PENDAHULUAN i
1.0 OBJEKTIF 1
2.0 FUNGSI DAN PRINSIP ASAS PAPAN TANDA 1
3.0 KLASIFIKASI PAPAN TANDA 2
4.0 CIRI-CIRI PAPAN TANDA 5
4.1 TANDA PERATURAN (REGULATORY SIGN) 7
4.1.1 Tanda Larangan (Prohibitive Sign) 8
4.1.2 Tanda Mandatori (Mandatory Sign) 20
4.2 TANDA AMARAN (WARNING SIGN) 29
4.3 TANDA SEMENTARA (TEMPORARY SIGN) 59
4.4 TANDA PANDUAN (GUIDE SIGN) 79
4.4.1 Tanda Destinasi 80
4.4.2 Tanda Tunjuk Arah 81
4.4.3 Tanda Jarak 84
4.4.4 Tanda Maklumat 86
4.4.5 Tanda Laluan 92
4.4.6 Tiang Kilometer 96
5.0 APLIKASI PAPAN TANDA 97
5.1 Aplikasi Pemasangan Papan Tanda Jalan 99
5.2 Aplikasi Papan Tanda Di Simpang Empat 107
5.3 Aplikasi Papan Tanda Di Simpang Tiga 108
5.4 Aplikasi Papan Tanda Amaran Di Selekoh 109
5.5 Aplikasi Papan Tanda Amaran Di Zon Had Laju 110
5.6 Aplikasi Papan Tanda Amaran Menghampiri Struktur Sempit 111
5.7 Aplikasi Papan Tanda Sementara Di Simpang Tiga 112
5.8 Aplikasi Papan Tanda Had Amaran Menghampiri Bonggol 113
5.9 Aplikasi Pemasangan Papan Tanda Baharu 114
5.10 Aplikasi Pemasangan Papan Tanda Iklan 116
6.0 KETIDAKPATUHAN PAPAN TANDA 133
6.1 Terlindung 134
6.2 Rosak 135
6.3 Tidak Mengikut Piawai 136
6.4 Kedudukan Salah 138
6.5 Lain-lain Kesalahan 139
RUJUKAN 140
Garis Panduan Papan Tanda ini dibukukan untuk menambah baik pelaksanaan
penyelenggaraan kerja tapak di samping mengemaskini tatacara serta mengadaptasikan
reka bentuk papan tanda jalan di bawah pentadbiran Dewan Bandaraya Kuching Utara.
Nama pada papan tanda bagi jalan atau lorong hendaklah menggunakan
Bahasa Malaysia. Penggunaan Bahasa lain tidak dibenarkan Rujuk Garis
Panduan Yang Digunapakai Oleh Jawatankuasa Penamaan Geografi
(JPGN) yang dikeluarkan oleh Kementerian Perancangan Pembangunan
Sumber bertarikh 19.02.2001 (No. Rujukan: 29/KPS/T/2-1/21/7(5)).
Fungsi Garis Panduan Papan Tanda ini adalah untuk mengawal lalu lintas,
memberitahu kewaspadaan di jalan serta sebagai tanda pemberitahuan
tentang amaran dan panduan kepada pengguna jalan raya.
(ii) Mudah dilihat dan boleh menarik perhatian pemandu dari jarak yang
sesuai;
Terdapat klasifikasi dan spesifikasi untuk Papan Tanda di jalan raya. Ia berdasarkan
kepada keperluan tapak untuk kawalan lalu lintas, amaran dan pemberitahuan.
Merah Merah
1. REGULATORY Putih Putih
Hitam Biru
Hitam
Kuning
2. WARNING Putih
Merah
Merah
Jingga
Kuning
3. TEMPORARY Hitam
Putih
Putih
Biru
Merah
Hijau
Putih Biru
Putih Hijau
4. GUIDE
Hitam Putih
Putih Coklat
Kuning Hijau
Putih Merah
Warna yang dikodkan dari Jadual 3.1 digunakan untuk jalan raya, selain daripada permukaan
papan tanda lalu lintas, seperti tanda jalan, isyarat lalu lintas dan tiang tanda lalu lintas, guard rails,
kerb dan sebagainya, dan mestilah dari cat kemasan gloss atau bahan berkualiti tinggi.
Warna yang digunakan untuk semua permukaan papan tanda haruslah sebanding dengan warna
yang dibentuk daripada koordinat kromatik seperti yang ditunjukkan dalam Jadual 3.1 dan haruslah
daripada bahan reflektif retro.
Kuning Hijau
0.387 0.610 0.369 0.546 0.428 0.496 0.460 0.540
Fluorescent
Kuning
0.497 0.520 0.446 0.483 0.512 0.421 0.557 0.442
Fluorescent
Jingga
0.583 0.416 0.535 0.400 0.595 0.351 0.645 0.355
Fluorescent
Sumber: ASTM D4956-09 Standard Specification for Retro-reflective Sheeting for Traffic Control
RP 1. Stop At Intersection
Colour:
Background - Red
Border - White
Lettering - White
Dimension (mm)
Sign
a b c d e f g h j k
Minimum 600 20 200 200 100 510 20 15 250 180
Other
900 30 300 300 150 765 30 25 370 260
size
Colour:
Circle & Diagonal - Red
Symbol - Black
Background - White
Dimension (mm)
Operating a b c d e f g h r1 r2 r3
Minimum 265 250 60 30 70 35 15 35 300 240 70
Normal 335 320 75 40 90 45 20 45 375 300 90
When
used with
140 130 30 15 40 20 10 20 150 125 35
traffic
signal
Colour:
Circle & Diagonal - Red
Symbol - Black
Background - White
Dimension (mm)
Operating a b c d e f g h r1 r2 r3
Minimum 265 250 60 30 70 35 15 35 300 240 70
Normal 335 320 75 40 90 45 20 45 375 300 90
When
used with
140 130 30 15 40 20 10 20 150 125 35
traffic
signal
RP 3. U-Turn Prohibited
Colour:
Circle & Diagonal - Red
Symbol - Black
Background - White
Dimensions (mm)
Sign
a b c d e f g h r1 r2 r3 r4
Minimum 165 190 60 30 70 35 15 35 300 240 70 25
Normal 335 320 65 32.5 90 45 20 45 375 250 90 30
Colour:
Symbol - White
Background - Red
Dimensions (mm)
Sign
a b c d
Minimum 600 400 100 50
Normal 750 500 125 62.5
Colour:
Background - White
Symbol - Black
Circle - Red
Dimensions (mm)
Sign
a b h1 h2
Minimum 600 60 220 110
Normal 750 75 275 140
RP 6a. No Entry for Vehicles Having Overall Height Exceeding the Specified
Height
Colour:
Background - White
Symbol - Black
Circle - Red
Dimensions (mm)
Sign
a b c d h1 h2 h3
Minimum 600 60 100 90 220 110 55
Normal 750 75 125 110 275 140 70
RP 6b. No Entry for Vehicles Having Overall Width Exceeding the Specified
Width
RP 7. Speed Limit
A sign indicating the starting point of a Speed Limit Zone along a section of road where the posted
maximum speed limit applies. “50” is the speed limit in km/h given here as an example. An
additional panel (optional) may be provided bearing an inscription “MULA” or “TAMAT” to denote
the start or end of a Speed Limit Zone (eg. RP9a).
Notes:
Colour: Letter Plate: For safety reason, borders and
Background - White corners of sign should be
Background - White
rounded on radius “R”
Symbol - Black Symbol - Black approximately 1/8 of lesser side
Circle - Red Border - Black dimensions but not exceeding
300mm.
Dimensions (mm)
Sign
a b c d e f g h R
Minimum 600 60 110 500 170 15 80 20 20
Normal 750 75 140 625 210 20 100 25 25
Colour:
Background - White
Symbol - Black
(g) Bullock cart Circle & Diagonal - Red
(h) Other slow moving vehicles
Dimensions (mm)
Sign
a b c d e f g h j k R
Minimum 600 60 110 150 75 680 220 80 10 20 40
Normal 750 75 140 190 95 850 275 100 15 25 50
(i)
Colour:
Circle & Diagonal - Red
Background - Blue
Dimensions (mm)
Sign
a b c r1 r2
Minimum 600 60 30 300 240
Normal 760 75 40 380 300
Colour:
Circle & Diagonal - Red
Background - Blue
Dimensions (mm)
Sign
a b c r1 r2
Minimum 600 60 30 300 240
Normal 760 75 40 380 300
Colour:
Circle & Diagonal - Red
Symbol - Black
Background - White
Dimensions (mm)
Sign
a b c d e f g h j
Minimum 600 60 60 30 140 130 65 110 85
Normal 750 75 75 37.5 175 165 80 135 105
Colour:
Main panel - White Background with Red Border
Additional Panel - White Background with Black Lettering
Dimensions (mm)
Sign
a b c d e f g h R1 R2
Minimum 600 80 15 600 480 30 15 110 75 45
Normal 750 100 20 750 600 35 20 140 95 70
RP 15. No Overtaking
A sign indicating the point along a road beyond which overtaking is
not allowed. An additional panel (optional) bearing the inscription
“DILARANG MEMOTONG” may be attached together.
Dimensions (mm)
Sign
a b c d e f g h i r
Minimum 600 60 60 30 340 20 10 80 630 60
Normal 750 75 75 37.5 425 25 15 100 790 75
Dimensions as in RP 15.
Dimensions as in RP 15.
RM 1. Direction to be Followed
A sign indicating the direction to be followed. The direction of the arrow may vary to suit the direction of
travel that vehicles must strictly comply.
i. Go Straight
ii. Turn Left (Right if symbol reversed)
iii. Turn Left Ahead (Right if symbol reversed)
iv. Turn Left or Go Straight (Right or Straight if symbol reversed)
(i) (ii)
(iii)
(iv)
Colour: Dimensions (mm)
Symbol - White Signs
a b c d e f g h i k m r1 r2
Background - Minimum 600 220 150 90 50 500 330 250 90 15 350 70 25
Blue Normal 750 275 190 100 65 625 420 310 110 20 440 90 30
RM 2. Dedicated Lane
A sign indicating the type of vehicle that can travel on the roadway. It is applicable to:
i. Motorcycles (with or without engine capacity restriction)
ii. Bicycles
iii. Tricycles
iv. Mopeds
v. Trishaws
vi. Animal drawn vehicles / carts of all forms
A sign indicating the point where traffic may pass on either side to reach the destination.
(i) (ii)
A sign indicating the point where traffic need to:
(i) Keep Left
(ii) Keep right Dimensions (mm)
Signs
a b c d e f g h
Colour: Minimum 600 220 150 80 500 330 50 15
Symbol - White Normal 750 290 130 120 625 495 65 20
Background - Blue
A sign indicating that heavy vehicles are required to use the left most lane.
Colour: Note:
L’ = Internal length in between borders calculated from letters & spacing
Lettering - White
B = Thickness of border = 1.5% x L’ or 20mm whichever is greater
Background - Blue
C = Distance between edge of sign panel & outer edge border = 0.5 x B
R = 40mm
Multiple Carriageway /
Single Carriageway
Speed Limit (km/h) Gantry Letter Height, H
Letter Height, H (mm)
(mm)
Speed limit > 90km/h 400 450
A sign indicating that vehicles are required to take the left most lane unless they wish to
overtake other vehicles.
Dimensions (mm)
Signs
a b
Minimum 620 850
A sign placed at a signalised junction where vehicles are allowed to turn left when there is no
vehicles from the right or crossing pedestrian in their path.
Dimensions (mm)
Signs
a b
Minimum 835 1060
RM 8. Tow-Away Zone
Colour:
Symbol - White
Background - Blue
Dimensions (mm)
Signs
a b
Minimum 600 400
Normal 750 480
Colour same as RM 9.
Dimensions (mm)
Signs
a b
Minimum 600 620
Normal 750 775
Colour:
Symbol/Lettering - White
Border - White
Background - Blue
Additional Plate - Black Lettering/Border on White
Background
Dimensions (mm)
Signs
a b c d e f g
Minimum 600 450 20 30 150 10 200
Dimensions (mm)
Signs
h j k l m n
Minimum 250 40 360 460 60 30
Colour:
Border/Vertical Rectangle - White
Horizontal Rectangle - White
Background - Blue
Dimensions (mm)
Signs
a b c d e f g h
Minimum 750 600 20 250 100 80 125 355
WD 1. Uneven Road
Used at approach to dips, hump bridges or ridges or for section
where the carriageway is in bad condition.
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
sizes 900 15 25 115
Note: For safety reason, borders and corners of sign should be rounded
on radius ‘R’ approximately 1/8 of lesser side dimensions but not
exceeding 300mm.
WD 2. Dangerous Bends
(a) (b)
Used at the approach to double bends or a succession of more than two bends:-
(a) First to the left (WD 2a)
(b) First to the right (WD 2b)
Note: For safety reason, borders and corners of sign
should be rounded on radius ‘R’ approximately 1/8
Colour:
of lesser side dimensions but not exceeding
Background - Yellow
300mm.
Border/Symbol - Black
Dimensions (mm)
Sign
a b c d e f g r R
Minimum 400 10 10 230 100 30 50 25 50
Normal 600 10 15 340 150 45 80 40 75
Other 750 15 20 430 190 55 90 45 95
Sizes 900 15 25 510 225 65 110 55 115
WD 3. Road Intersection
Dimensions (mm)
Sign
a b c d e R
Minimum 400 10 10 50 300 50
Normal 600 10 15 80 450 75
Other 750 15 20 90 560 95
sizes 900 15 25 120 675 110
WD 8. Dangerous Descent
Used at approach where the descent exceeds 1:10 or the
local conditions are such that it constitutes a danger.
Colour:
Background - Yellow
Symbol - Black
Border - Black
Dimensions (mm)
Signs
a b c h l R
Minimum 400 10 10 50 350 50
Normal 600 10 15 75 450 75
Other 750 15 20 100 550 85
Sizes 900 15 25 125 600 115
WD 9. Dangerous Ascent
Used at approach where the ascent exceeds 1:10 or the local
conditions are such that it constitutes a danger.
Colour:
Background - Yellow
Symbol - Black
Border - Black
Dimensions (mm)
Signs
a b c h l R
Minimum 400 10 10 50 350 50
Normal 600 10 15 75 450 75
Other 750 15 20 100 550 95
Sizes 900 15 25 125 600 115
(b)
(a)
Dimensions (mm)
Signs
a b c d e f g r R
Minimum 400 10 10 40 150 20 150 60 50
Normal 600 10 15 50 225 30 225 100 75
Other 750 15 20 60 275 35 275 125 95
Sizes 900 15 25 70 300 45 300 130 115
Dimensions (mm)
Signs
a b c d e f R1 R2
Minimum 400 10 10 500 170 20 50 20
Normal 600 15 15 500 170 20 75 20
Other 750 20 20 500 170 20 95 20
Sizes 900 25 25 500 170 20 115 20
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
WD 17. Awas
Dimensions (mm)
Signs
a b c d e R
Minimum 1000 500 15 300 10 65
Used in advance of a ‘STOP’ sign controlling an intersection where the ‘STOP’ sign may not be
sufficiently visible far ahead to enable a driver to stop safely at the stop line.
Dimensions (mm)
Colour: Signs
Background - Yellow a b c d e f g h j k R
Symbol - Black Minimum 400 10 10 60 70 70 85 20 15 100 50
Border - Black Normal 600 10 15 90 110 100 125 30 15 125 75
750 15 20 120 145 130 165 40 20 150 95
Other Sizes
900 15 25 150 170 150 200 50 25 175 115
Note: For safety reason, borders and corners of sign should be rounded on radius ‘R’ approximately 1/8 of
lesser side dimensions but not exceeding 300mm.
Used in advance of a ‘GIVE WAY’ sign controlling an intersection where the ‘GIVE WAY’ sign
may not sufficiently visible far ahead to enable a driver to give way before reaching
intersection.
Dimensions (mm)
Signs
a b c d e f g h j k R1 R2
Minimum 400 10 10 150 40 730 340 15 10 80 50 40
Normal 600 10 15 225 60 730 340 15 10 80 75 40
750 15 20 275 75 730 340 15 10 80 95 40
Other Sizes
900 15 25 330 90 730 340 15 10 80 115 40
Dimensions (mm)
Signs
a b c d e f g R
Minimum 400 10 10 50 15 100 35 50
Normal 600 10 15 75 20 150 45 75
Other 750 15 20 85 25 185 50 95
Sizes 900 15 25 100 30 225 55 115
Dimensions (mm)
Signs
a b c d e f g R
Minimum 400 10 10 50 15 100 35 50
Normal 600 10 15 75 20 150 45 75
Other 750 15 20 85 25 185 50 95
Sizes 900 15 25 100 30 225 55 115
Dimensions (mm)
Signs
a b c d e f g h j k r R1 R2
Minimum 400 10 10 150 40 15 340 730 80 10 35 50 40
Normal 600 10 15 225 60 20 340 730 80 15 50 75 40
750 15 20 270 75 25 340 730 80 20 65 95 40
Other Sizes
900 15 25 330 90 30 340 730 80 25 75 115 40
WD 23. Obstruction
Dimensions (mm)
Signs
a b c d e R
Minimum 400 10 10 75 120 50
Normal 600 10 15 110 180 75
Other 750 15 20 140 225 95
Sizes 900 15 25 160 270 115
WD 24a WD 24b
Used to delineate bridge ends, underpass and other obstructions within the shoulder. Also
used when the roadway clearance between bridge parapets is less than the width of the
pavement on the approach to the bridge. Used at the approach to location where rock or
earth from hillsides or cut slopes may fall on to roadway.
Dimensions (mm)
Signs
a b c d e f R
Minimum 400 10 10 220 70 70 50
Normal 600 10 15 330 100 100 75
Other 750 15 20 410 125 130 95
Sizes 900 15 25 500 150 160 115
Used if one of the junction is one way and traffic cannot enter from that direction.
Colour: Note: For safety reason, borders and corners of sign should be
Background - Yellow rounded on radius ‘R’ approximately 1/8 of lesser side dimensions but
Symbol - Black not exceeding 300mm
Border - Black
In addition, the no entry sign is to follow the colour as gazetted
Dimensions (mm)
Signs
a b c d e f g r h R
Minimum 400 10 10 220 70 100 100 50 20 50
Normal 600 10 15 330 100 150 150 75 30 75
750 15 20 410 125 180 200 90 40 95
Other Sizes
900 15 25 500 150 225 220 110 45 115
Dimensions (mm)
Signs
a b c d e f g h R
Minimum 400 10 10 70 30 200 130 30 50
Normal 600 10 15 100 40 310 200 50 75
Other 750 15 20 125 50 390 250 60 95
Sizes 900 15 25 150 60 470 300 75 115
Dimensions (mm)
Signs
a b c d g h R
Minimum 400 10 10 70 130 35 50
Normal 600 10 15 100 200 50 75
Other 750 15 20 125 250 60 95
Sizes 900 15 25 150 300 75 115
Dimensions (mm)
Signs
a b c d g h R
Minimum 400 10 10 70 130 35 50
Normal 600 10 15 100 200 50 75
750 15 20 125 250 60 95
Other Sizes
900 15 25 150 300 75 115
Dimensions (mm)
Signs
a b c d e f h R
Minimum 400 10 10 70 25 185 35 50
Normal 600 10 15 100 35 275 50 75
750 15 20 125 45 340 60 95
Other Sizes
900 15 25 150 55 410 75 115
Dimensions (mm)
Signs
a b c d e f h R
Minimum 400 10 10 70 25 185 35 50
Normal 600 10 15 100 35 275 50 75
Other 750 15 20 125 45 340 60 95
Sizes 900 15 25 150 55 410 75 115
Dimensions (mm)
Signs
a b c d e f g R
Minimum 400 10 10 300 30 150 50 50
Normal 600 10 15 450 45 220 75 75
Other 750 15 20 550 55 280 90 95
Sizes 900 15 25 675 65 335 110 115
Dimensions (mm)
Signs
a b c d e f g R
Minimum 400 10 10 300 30 150 50 50
Normal 600 10 15 450 45 220 75 75
Other 750 15 20 550 55 280 90 95
Sizes 900 15 25 675 65 335 110 115
Dimensions (mm)
Signs
a b c d
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c d e r R
Minimum 400 10 10 30 20 100 50
Normal 600 10 15 45 30 150 75
Other 750 15 20 55 40 185 95
Sizes 900 15 25 65 50 225 115
(a) (b)
Used at approach of a section of road having an additional climbing lane or three-lane
carriageway with two-way traffic in one direction and one-way in other direction.
Dimensions (mm)
Sign
a b c d e f g h j R
Minimum 400 10 10 20 80 10 100 50 60 50
Normal 600 10 15 30 120 15 150 75 90 75
Other 750 15 20 35 150 20 185 95 110 95
Sizes 900 15 25 40 180 25 225 110 135 115
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
Signs
a b c d e f g h j m R
Minimum 400 10 10 250 50 100 10 50 120 25 50
Normal 600 10 15 375 75 150 15 75 180 35 75
Other 750 15 20 450 90 180 20 165 220 45 95
Sizes 900 15 25 550 110 225 25 200 270 55 115
Dimensions (mm)
Signs
a b c d e f g h j k R
Minimum 400 10 10 250 50 100 100 50 60 10 50
Normal 600 10 15 375 75 150 150 75 90 10 75
Other 750 15 20 450 90 180 195 165 110 15 95
Sizes 900 15 25 550 110 225 235 200 130 20 115
Dimensions (mm)
Signs
a b c d e f g h j R
Minimum 400 10 10 40 300 10 10 50 85 50
Normal 600 10 15 60 450 15 15 75 125 125
Other 750 15 20 80 560 20 20 100 165 165
Sizes 900 15 25 100 675 25 25 125 200 200
(a) (b)
Used at the end if a divided road as a warning of Used at approach indicating a section of a road (not
two-way traffic ahead an intersection or junction) where the apposing
flows of traffic are separated by a physical barrier
Colour:
Notes: For safety reason, corners of sign should be rounded on
Background - Yellow
radius ‘R’ approximately 1/8 of lesser side dimensions but not
Symbol - Black
exceeding 300mm.
Border - Black
WD 38a WD 38b
Dimensions:
Dimensions (mm)
Signs
a b c d e f g h j k l m
Minimum 400 10 10 40 100 50 330 20 50 25 130 150
Normal 600 10 15 60 150 75 500 30 75 35 195 225
Other 750 15 20 80 200 100 625 40 100 45 250 290
Sizes 900 15 25 100 250 125 750 50 125 55 300 350
Dimensions (mm)
Signs
n p q r s t u v w x R
Minimum 100 180 100 100 50 85 10 10 30 50 50
Normal 150 270 150 150 75 125 15 15 40 60 75
Other 200 340 200 200 95 165 20 20 50 70 95
Sizes 235 400 235 250 115 200 25 25 55 80 115
WD 39a WD 39b
Used to provide guidance for motorist in areas where there is a hazardous change in horizontal
alignment.
Colour: Dimensions (mm)
Background - Yellow 900mm x 750mm x 600mm x
Symbol - Black 750mm 600mm 450mm
Border - Black a 375 300 210
Note: For safety reason, borders and b 25 15 10
corners of sign should be rounded on c 20 15 10
radius ‘R’ approximately 1/8 of lesser d 20 15 10
side dimensions but not exceeding R 95 75 60
300mm
Dimensions (mm)
Sign
a b c e f g h R
Minimum 480 600 15 10 80 60 110 60
Normal 600 750 20 15 100 80 130 75
WD 43. Chevron
Used to delineate the ‘T’ junctions and placed on the road facing the traffic that either turns left or
right.
a 600 mm
Colour: b 2620 mm
Background - Yellow (Reflective) c 15 mm
Border - Black (Non-reflective) d 20 mm
Chevron - Black (Non-reflective) e 200 mm
R 75 mm
Notes:
1. Signs shall not be placed less than 1.8m from the edge of road. Mounting height to be 1.5m from road
level to the bottom edge of signs.
2. For safety reason, borders & corners of sign should be rounded on radius ‘R’ approximately 1/8 of lesser
side dimensions but not exceeding 300mm.
WD 44. Playground
Dimensions (mm)
Sign
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
750 15 20 95
Other sizes
900 15 25 115
Dimensions (mm)
a b c d R
100 75 20 10 60
Dimensions (mm)
a b c d R
100 75 20 10 60
Dimensions (mm)
a a2 b c d 3/4H e H R1
930 15 1300 20 10 150 120 200 170
Dimensions (mm)
a b c d 3/4H e H R1
930 1085 20 10 150 120 200 170
Dimensions (mm)
a a2 b c d 3/4H e H R1
930 150 1260 20 10 150 120 200 170
Dimensions (mm)
Sign
a b c d f g h R1
Minimum 400 10 10 60 70 85 20 50
Normal 600 10 15 90 100 125 30 75
Other 750 15 20 120 130 165 40 95
sizes 900 15 25 150 150 200 50 115
WD 48. Hump
Used to indicate the hump on the road.
Notes: For safety reason, borders &
Colour: corners of sign should be on radius ‘R’
Background - Yellow approximately 1/8 of lesser side
Border/Symbol - Black dimensions but not exceeding 300mm.
Dimensions (mm)
Sign
a b c R
Minimum 400 10 10 50
Normal 600 10 15 75
Other 750 15 20 95
Sizes 900 15 25 115
Dimensions (mm)
a b c d e f g R
1670 1780 200 150 750 20 15 200
Dimensions (mm)
a b c d e f g R
2270 2160 200 150 750 20 15 270
Colour: LEGEND:
Background - Yellow H = Height of capital letter used
Border - Black c = Distance showing that words or symbols must be centralised
Lettering/Symbol - Black
Dimensions
L = Overall length of sign panel Varies
L’ = Internal length in between borders Calculated from letters and spacing
W = Overall height of sign panel Varies
R = Internal radius of border 2 % x L’
B = Thickness of border 1.5 % L’ or 20mm whichever is greater
C = Distance between edge of sign panel
0.5 x B
and outer edge of border
The sign should be placed in advance to warn the motorists of the construction areas.
Dimensions (mm)
a b c d e f g R
1524 1829 1174 350 100 200 150 75
Colour:
Background - Fluorescent orange
Background (Symbol) - High Intensity Prismatic yellow
Border - Black
Note: 400m is given as an example.
Symbol - Black
Distance varies from 200m until
Distance indicator
1600m
background - White i. 1600m iv. 300m
ii. 800m v. 250m
Lettering: Ccrige Narrow iii. 400m vi. 200m
Dimensions (mm)
a b c d e f g R
1219 914 849 125 100 600 25 75
Colour:
Background - Fluorescent orange
Background (Symbol) - White
Border - Red
Symbol - Black
Dimensions (mm)
a b c d e f g R
1219 914 750 125 100 250 125 75
T 4a T 4b
T 4c
T 4e T 4f
T 4d
T 4a T 4b T 4c
Dimensions (mm)
a b c d e f g h
600 25 30 120 15 150 75 90
T 4d T 4e T 4f
Dimensions (mm)
a b c d e f g
600 25 30 90 15 225 75
Approach sign for road narrowing from left / right hand side.
Dimensions (mm)
a b c d e R
1219 914 849 125 100 75
Details:-
Dimensions (mm)
a b c d e f
600 25 20 75 45 150
T 6. Detour Sign
This sign is used to show any detour or change in horizontal alignments at construction sites.
Dimensions (mm)
a b c d e R
1219 914 849 125 100 75
Details:-
Dimensions (mm)
a b c d e f R1 R2
440 230 178 154 26 52 158 188
Dimensions (mm)
a b c d e f g h j R
800 1500 280 100 200 100 500 250 120 75
The sign indicate that the traffic is permitted to keep left / right.
Details:-
Dimensions (mm)
d e f r
258 219 99 20
Colour:
Background - Fluorescent orange
Background (Symbol) - High Intensity Prismatic yellow
Border - Black
Symbol - Black
Dimensions (mm)
a b R
914 914 75
Details:-
Dimensions (mm)
c d e f g h r
200 100 235 150 60 90 10
Colour:
Background - Fluorescent orange
Border - Black
Symbol - Black
Dimensions (mm)
a b c d e R
400 1500 200 150 15 75
Approach sign for the use on single bend which is dangerous owing to physical
characteristics or reduced visibility to the left / right.
Colour:
Background - Fluorescent orange Dimensions (mm)
Background (Symbol) - High Intensity Prismatic a b R
yellow 914 914 75
Border - Black
Symbol - Black
Details:-
Dimensions (mm)
c d e f g h r
50 225 30 225 50 30 100
Sign to indicate a hazardous change in horizontal and vertical alignment both combined.
Colour:
Dimensions (mm)
Background - White
a b c d R
Stripe - Engineering
900 300 125 150 40
grade orange
Colour:
Background - Fluorescent orange
Background (Symbol) - High Intensity Prismatic yellow
Border - Black
Symbol - Black
Dimensions (mm)
a b c d R
914 914 600 25 75
Approach sign indicating some sort of danger ahead other than the danger warning signs
available. An additional rectangular panel bearing an inscription or symbol indicating the
nature of the danger ahead may be placed underneath this sign.
Colour:
Dimensions (mm)
Background - Fluorescent orange Signs
a b c d R
Border - Black
Minimum 500 1000 15 300 65
Lettering - Black
Colour:
Background - Fluorescent orange
Background (Symbol) - High Intensity prismatic yellow
Border - Black
Symbol - Black
Dimensions (mm)
a b c d R
914 914 600 25 75
Colour:
Background - Fluorescent orange
Background (Symbol) - High intensity prismatic yellow
Border - Black
Symbol - Black
Distance indicator background - White
Dimensions (mm)
a b c d e f g R
1219 914 849 125 100 600 25 75
The text 200m is the distance to the flagger position and this
distance varies from 200m until 1600m. This is an example;
i. 200m
ii. 100m
b.This signs with appropriate messages shall be placed at appropriate locations in a construction site.
Colour:
Background - Fluorescent orange Dimensions (mm)
Border - Black a b c d e f R
Lettering - Black 800 1200 20 55 125 50 75
Distance indicator background - White
Dimensions (mm)
a b c d e f R
800 1200 20 117.5 125 75 75
Colour: LEGEND:
Background - Fluorescent orange H = 150mm
Lettering - Black a & b = Distance showing that words or
Border - Black symbols must be centralised
Colour:
Background - Fluorescent orange Dimensions (mm)
Lettering - Black a b c d e
Border - Black 700 1200 20 90 100
This is an example. The following are the messages that can be used according to the requirements
of the construction area:
- Warna:
- Nama destinasi:
ii. Tidak melebihi 2 bilangan destinasi untuk satu arah atau laluan yang sama
- Nombor laluan:
ii. Menunjukkan laluan yang akan dilalui apabila keluar simpang atau susur yang
dinyatakan
- Contoh pemasangan:
- Warna:
- Nama destinasi:
ii. Tidak melebihi 2 bilangan destinasi untuk satu arah atau laluan yang sama.
- Nombor laluan:
ii. Laluan yang akan dilalui apabila keluar simpang atau susur yang dinyatakan.
- Anak panah:
ii. Satu anak panah dalam satu panel papan tanda bagi beberapa nama
destinasi sekiranya nombor laluan dan jenis papan tanda yang sama.
Rajah 4.1 Nama destinasi disusun mengikut aturan lawan jam (Sumber: ATJ 2E/87)
- Warna:
- Nama destinasi:
ii. Tidak melebihi 3 bilangan destinasi untuk satu arah atau laluan.
- Nombor laluan:
(on-the-route).
iii. Laluan yang akan dilalui apabila keluar simpang atau keluar susur yang
dinyatakan.
- Pemasangan:
i. UMUM
Maklumat kemudahan dan perkhidmatan yang disediakan seperti stesen minyak,
telefon dan sebagainya.
v. BANGUNAN KERAJAAN
Maklumat nama dan arah ke bangunan kerajaan.
vii. PESANAN
Memberi nasihat dan peringatan seperti “IKUT KIRI JIKA TIDAK MEMOTONG”,
“KENDERAAN BERAT IKUT KIRI” dan sebagainya.
viii. AMARAN
Memberi maklumat kawasan yang diketahui mendatangkan bahaya.
i. UMUM
Tulisan/Simbol & Border - Putih
Latar belakang - Biru
Rajah 4.2 Contoh - Contoh Papan Tanda Maklumat Umum (ATJ 2E/87)
Foto 4.7 Contoh Papan Tanda Kawasan Rekreasi, Tempat Bersejarah dan Kebudayaan
KAMPUNG BUNTAL
Rajah 4.3 Contoh Papan Tanda Nama Bandar / Kampung (ATJ 2E/87)
v. BANGUNAN KERAJAAN
vii. PESANAN
viii. Amaran
Tulisan/Simbol & Border: Putih
Latar Belakang: Merah
Tanda laluan:-
Terdapat juga tanda laluan iaitu jalan dibawah seliaan JKR Sarawak yang
dibawah pentadbiran DBKU seperti berikut :-
Tiang Kilometer:-
Terdapat dua jenis tiang kilometer:-
i. Jenis A (Type A)
ii. Jenis B (Type B)
Ciri-ciri:
i. Kedudukan di setiap 5 kilometer sepanjang laluan
ii. Berbentuk segi empat (Berbentuk huruf V dari pandangan pelan)
iii. Nombor laluan
iv. Nama destinasi utama dan sekunder
v. Jarak ke destinasi utama dan sekunder
vi. Nombor seksyen
Ciri-ciri:
i. Kedudukan di setiap 1 kilometer sepanjang laluan
ii. Berbentuk segi empat
iii. Nombor laluan
iv. Nama destinasi utama
v. Jarak ke destinasi utama
vi. Nombor seksyen
Foto 4.12 Contoh Tiang Kilometer Jenis A Foto 4.13 Contoh Tiang Kilometer Jenis B
Reka bentuk dan pemasangan papan tanda adalah mengikut spesifikasi dan rekabentuk
yang ditetapkan oleh DBKU dalam kontrak tahunan :
100 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 101
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
102 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
5.1.4 Vertical & Horizontal Placement of Signs (Arahan Teknik Jalan 2B/85)
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 103
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
104 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 105
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
106 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 107
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
108 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 109
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Rajah 5.7 Lokasi Tipikal Papan Tanda Amaran Di Zon Had Laju
110 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Rajah 5.8 Lokasi Tipikal Papan Tanda Amaran Menghampiri Struktur Sempit
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 111
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
112 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Foto 5.2 Papan tanda amaran menunjukkan had laju saranan 50m sebelum bonggol
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 113
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Foto 5.3 Papan Tanda Ikut Arah Baharu Foto 5.4 Papan Tanda Halangan di Hadapan
Baharu
Jadual 5.0: Perbandingan antara Papan Tanda ATJ 2A/85 dan Papan Tanda Baharu
850 mm 300 mm
Panjang median yang banyak dijumpai di kawasan Kuching adalah kira-kira 1m (1000mm). Oleh
itu, reka bentuk papan tanda ATJ 2A/85 agak tidak sesuai untuk diguna pakai dan diletakkan di
median. Selain itu, clearance papan tanda ATJ 2A/85 adalah kurang daripada 0.6 meter (Rajah
5.6). Merujuk kepada Arahan Teknik Jalan 2B/85 jarak unjuran struktur papan tanda (min.
clearance) dibenarkan adalah tidak kurang 0.6 meter dari laluan kenderaan (road edge). Selain itu,
penjuru papan tanda halangan (ATJ 2A/85) juga boleh mendatangkan bahaya kepada pengguna
jalan.
114 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Foto 5.5 Papan Tanda Halangan ATJ 2A/85 yang terletak di Q100-1B Jalan Sultan Tengah
Foto 5.6 Papan Tanda Halangan Baharu yang terletak di Q1002B Jalan Wan Alwi
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 115
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Foto 5.7 Guidelines Advertisements at Public Places for Local Authorities in Sarawak
116 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Prosedur:
1. Semua permohonan mesti dihantar oleh "orang yang berkelayakan" (qualified person) ke
Jabatan Tanah dan Ukur / BDA melalui pihak berkuasa tempatan.
2. Jabatan Tanah dan Survei / BDA akan meneruskan permohonan tersebut ke Kementerian
Perancangan Sumber dan Alam Sekitar / Ministry of Resource Planning and Environment
(MRPE) untuk pertimbangan SPA.
3. Setelah diluluskan oleh SPA, pemohon hendaklah memohon lesen iklan luar daripada pihak
berkuasa tempatan.
Keperluan:
1. Lokasi, kedudukan dan ukuran iklan harus mematuhi panduan yang telah ditetapkan.
2. Reka Bentuk & Pengiraan Struktur, Lukisan, dan lain-lain perlu dihantar.
3. Pemegang lesen bertanggungjawab untuk membuat bayaran dan / atau membuat
pembaharuan lesen iklan untuk iklan yang dipaparkan: Kegagalan untuk membuat
pembayaran dan / atau pembaharuan lesen iklan akan mengakibatkan penghapusan iklan
tersebut.
4. Bayaran Lesen Iklan:
i. RM100 per meter persegi setahun untuk 20 meter persegi pertama atau sebahagian
daripadanya dan RM70 untuk setiap meter persegi berikutnya setiap tahun atau
sebahagian daripadanya [Bagi Pihak Berkuasa Tempatan Bandar];
ii. RM75 per meter persegi setahun untuk 20 meter pertama bahagiannya dan RM50 untuk
setiap meter persegi berikutnya setiap tahun atau sebahagian daripadanya [Bagi Pihak
Berkuasa Tempatan Daerah].
5. Untuk mengenakan wang jaminan yang akan dikembalikan seperti berikut:
Iklan - RM5,000
6. Untuk mengenakan insurans liabiliti awam dengan perlindungan minimum:
Iklan dipaparkan di lokasi yang dapat diakses oleh orang awam - RM1,000,000 setahun.
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 117
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Bahasa Iklan:
1. Iklan boleh dibuat atau dipamerkan dalam bahasa apa pun.
2. Perkataan dan huruf dalam Bahasa Malaysia apabila digunakan bersama dengan bahasa lain
mesti diberi penekanan dari segi ukuran dan warna, dan di tempat yang lebih menonjol
daripada perkataan dalam bahasa lain yang digunakan.
3. Untuk memastikan penggunaan Bahasa Malaysia betul dalam iklan apa pun, Pihak Berkuasa
Tempatan boleh merujuk kata-kata yang digunakan (dalam Bahasa Malaysia) ke Dewan
Bahasa dan Pustaka untuk mendapatkan nasihat dan pengesahannya sebelum iklan tersebut
dapat dipamerkan atau dipaparkan kepada umum.
Syarat-syarat Lesen:
1. Pihak Berkuasa Tempatan tidak akan bertanggungjawab atas sebarang kemalangan atau
kecelakaan yang mungkin berlaku akibat pemasangan iklan tersebut.
2. Nombor lesen yang dikeluarkan oleh PBT mesti ditulis di sudut kanan bawah iklan dan mesti
jelas dan kelihatan.
3. Pemegang lesen / pemilik iklan diminta untuk menjaga iklan dalam keadaan yang jelas dan
stabil selama tempoh paparan.
4. Pemegang lesen / pemilik hendaklah membuat pembayaran dan / atau memperbaharui lesen
iklannya tiga bulan sebelum tarikh luput.
5. Pemegang lesen / pemilik iklan akan memberitahu & memohon lesen baru jika ada perubahan
pada iklan iklan berlesen tersebut.
6. Pihak Berkuasa Tempatan boleh meminta pemegang lesen / pemilik untuk mengambil
tindakan pembaikan berkenaan dengan iklan seperti yang diarahkan oleh Pihak Berkuasa
Tempatan.
7. Sekiranya melanggar mana-mana syarat di atas, Pihak Berkuasa Tempatan boleh
membatalkan lesen tersebut setelah memberi notis 14 hari secara bertulis kepada pemegang
lesen / pemilik dan diminta untuk memindahkan iklan tersebut dalam masa 14 hari dari tarikh
pembatalan.
8. Sekiranya, pemegang lesen kehilangan hak untuk iklan di tapak - papan iklan, lesen yang
dikeluarkan akan terbatal.
118 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 119
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
120 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
18 m 9m
6m
12 m
12 m
6m
Note: However, SPA may approve any application for advertisement billboards (that does not
comply with this guidelines) based on the Planning principle.
7m
3.6 m
12 m
Shoulder
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 121
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
MEDIUM
12m 4m
9m
3m
6m
3m
Min 2m
Min 2m Min 2m
Max 9m
Max 6m Max 5m
Note: However, SPA may approve any application for advertisement billboards (that does not
comply with this guidelines) based on the Planning principle.
3m
2.5 m
Shoulder
122 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
SMALL
5 m2
Min 2m
Max 6m
Note: However, SPA may approve any application for advertisement billboards (that does not
comply with this guidelines) based on the Planning principle.
5 m2
1.8 m 3m
Min 2.0m
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 123
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
124 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
i. Iklan Gantri
Iklan atau pemberitahuan produk, aktiviti atau perkhidmatan yang disokong oleh sistem
struktur dan dipasang di permukaan gantri.
Saiz: Tidak melebihi lebar dan panjang gantri dan hendaklah berada dalam rizab jalan.
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 125
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
126 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
v. Projecting Sign
Iklan atau pemberitahuan atau produk, aktiviti atau perkhidmatan yang diletakkan pada
struktur unjuran (projecting structure) lebih dari 1 m dari dinding bangunan.
Saiz: 2.5m x 5m
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 127
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
128 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 129
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
130 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 131
(Pindaan 2/2021)
5.0 APLIKASI PAPAN TANDA
xv. Temporary Advertisement (Fishtail / Horizontal Banner / Huge Banner / Captive Balloon
/ Blinds, etc)
Iklan atau pemberitahuan mengenai produk, aktiviti atau perkhidmatan yang diletakkan di
fishtail / horizontal banner / huge banner / captive balloon / blinds, dan lain-lain untuk jangka
masa tidak lebih dari 3 bulan berturut-turut.
Saiz: Fishtail - 3m (Tinggi) x 0.76m (Lebar)
Horizontal Banner - 1.2m (Tinggi) x 6m (Lebar)
Ukuran blind tidak boleh melebihi lebar maksimum 3 m per unit dan minimum 1 m
dari atas permukaan lantai.
132 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
6.0
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 133
(Pindaan 2/2021)
6.0 KETIDAKPATUHAN PAPAN TANDA
6.1 Terlindung
Foto 6.1 Papan tanda dilindungi oleh papan Foto 6.2 Papan tanda dilindungi oleh pokok
tanda lain
Foto 6.3 Papan tanda dilindungi oleh papan Foto 6.4 Papan tanda dilindungi oleh pokok
tanda lain
Foto 6.5 Papan tanda dilindungi oleh pokok Foto 6.6 Papan tanda dilindungi oleh pokok
134 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
6.0 KETIDAKPATUHAN PAPAN TANDA
6.2 Rosak
Foto 6.7 Sebahagian muka papan tanda Foto 6.8 Sebahagian muka papan tanda
tertanggal terturun
Foto 6.9 Papan tanda tumbang Foto 6.10 Papan tanda tumbang
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 135
(Pindaan 2/2021)
6.0 KETIDAKPATUHAN PAPAN TANDA
Foto 6.12 Papan tanda arah - Tiada nombor Foto 6.13 Papan tanda jarak - Tiada nombor
laluan laluan
Foto 6.14 Papan tanda tunjuk arah - Saiz Foto 6.15 Papan tanda tunjuk arah - Anak
tulisan tidak mengikut piawai panah terus di sebelah kanan, saiz dan bentuk
anak panah tidak mengikut piawai
136 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
6.0 KETIDAKPATUHAN PAPAN TANDA
Foto 6.16 Tiada nombor seksyen tidak Foto 6.17 Penggunaan warna, anak panah
mengikut piawai destinasi tidak mengikut piawai, tidak
mengikut aturan arah lawan jam
Foto 6.18 Papan tanda arah tidak mengikut Foto 6.19 Papan tanda arah tidak mengikut
piawai piawai
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 137
(Pindaan 2/2021)
6.0 KETIDAKPATUHAN PAPAN TANDA
Foto 6.20 Papan tanda terlalu rapat dengan Foto 6.21 Papan tanda bertindih
paveman
Foto 6.22 Kedudukan papan tanda terlalu Foto 6.23 Papan tanda didirikan di belakang
hampir antara satu sama lain pokok
Foto 6.24 Papan tanda lama yang tidak Foto 6.25 Papan tanda di atas laluan pejalan
dibuang kaki
138 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
6.0 KETIDAKPATUHAN PAPAN TANDA
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 139
(Pindaan 2/2021)
RUJUKAN
Dokumen-dokumen rujukan sistem papan tanda jalan di Malaysia adalah seperti berikut:
■ KRITERIA REKABENTUK
■ LOKASI PELETAKAN
■ KRITERIA REKABENTUK
■ LOKASI PELETAKAN
140 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)
PENGHARGAAN
Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara 141
(Pindaan 2/2021)
TERIMA KASIH
142 Garis Panduan Papan Tanda Jalan Dewan Bandaraya Kuching Utara
(Pindaan 2/2021)