0% found this document useful (0 votes)
487 views3 pages

Incident Action Plan

Sample bagaimana kita membuat Incident Action Plan sebagai tahapan mitigasi kita dari sebuah area kerja.

Uploaded by

anto kartono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
487 views3 pages

Incident Action Plan

Sample bagaimana kita membuat Incident Action Plan sebagai tahapan mitigasi kita dari sebuah area kerja.

Uploaded by

anto kartono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

INCIDENT ACTION PLAN

IAP-FIRE-001 FURNACE TRANSFORMER ON FIRE

WORST EMERGENCY EVENT DESCRIPTION


Kebakaran di Transformer Furnace

2
MAJOR  Financial Loss > 1,000,000 RESPONSE
POTENTIAL  Process disturbation LEVEL
RISK  Loss manpower

EMERGENCY TOTAL SPECIAL TOTAL MINIMUM RESPONDER


EQUIPMENT EQUIPMENT
REQUIRED
Detection System 10 Suppression System
Alarm Control q
Room Manual : 1 orang
Suppression 12
system CRO: 2 Orang

MAIN CAUSES OF EMERGENCY EVENTS LOCATION INCIDENT


1. Arching listrik 3rd Fl of Furnace
2. Oil leaking
3. Ventilation Failure

FAKTOR RISIKO UTAMA: AREA INCIDENT


RESPOSE COMMANDER
(IRC)
RISIKO  Fatality KONTROL Suppression AREA IRC: L1 Shift
RISIKO System
activated ALTERNATE: OMA

TACTICAL PRIORITY
1. SIZE UP
 Luasan exposure kebakaran
 Effectiveness suppression system

2. INITIATE RESPONSE PLAN
 Hubungi Utilities Operator
 Shutdown aliran listrik 33KV dari Utilities
 Tekan tombol aktivasi suppression system

3. RESCUE OPERATION
 Keluarkan korban jika dalam kondisi aman
 Hububgi FES tentang lokasi korban, kondisi korban dan access

5 AREA EVACUATION PLAN
 Area evakuasi menuju lantai 4 menuju Furnace 1
 Menuju Muster Point di area Prostek

6 OTHER PLAN REQUIRED (SAFETY, SHUTDOWN, ISOLATED, AREA RESTRICTION


PLAN)

SHUTDOWN BUTTON  Listrik 33KV berada Utilities

ISOLATED VALVE  NIL

MUSTER POINT  Prostek 


 Packaging Area
TOTAL PERSONNEL  10 Orang
NEED TO EVACUATED
OTHER INFORMATION Operasional Haulmaster dihentikan di Furnace pada area kejadian


DETAIL TASK / RINCIAN TUGAS
OPERATOR (CRO) FURNACE Y

NOTIFIKASI INSIDEN
 HUBUNGI EMERGENCY CALL CENTRE (KEJADIAN, LOKASI, JUMLAH
KORBAN) 
 HUBUNGI UTILITIES OPERATOR, MATIKAN LISTRIK 33KV 
 HUBUNGI ATASA 
 
 
TANGGAP DARURAT AWAL

 PERINTAHKAN EVAKUASI PADA AREA KEJADIAN 


 AKTIFKAN SUPPRESSION SYSTEM 
 PERIKSA EFEKTIFITAS PEMADAMAN DI TEMPAT KEJADIAN 
 PERIKSA KEMUNGKINAN KORBAN 
 
PELAPORAN INSIDEN
 LAPORKAN KONDISI KEBAKARAN PADA PETUGAS FIRE YANG TIBA
PERTAMA 
 ARAHKAN FES MENUJU TKP 
 
 
 