Drawings

The document is a set of drawings related to a construction project for the four-laning of a section of National Highway 1A (now NH-44) in Jammu and Kashmir, India. It includes an index map showing the project location, a typical cross section drawing of the twin tube tunnel design, and cross section drawings of the main tunnel and cross passages. The project involves the construction of twin tube tunnels between chainages 154+210 to 158+650 and 155+940 to 160+260 on the highway using an EPC contract model.

Uploaded by

vijyant2512
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
485 views92 pages

Drawings

The document is a set of drawings related to a construction project for the four-laning of a section of National Highway 1A (now NH-44) in Jammu and Kashmir, India. It includes an index map showing the project location, a typical cross section drawing of the twin tube tunnel design, and cross section drawings of the main tunnel and cross passages. The project involves the construction of twin tube tunnels between chainages 154+210 to 158+650 and 155+940 to 160+260 on the highway using an EPC contract model.

Uploaded by

vijyant2512
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 92

NATIONAL HIGHWAYS AUTHORITY OF INDIA

(Ministry of Road Transport and Highways)


Government of India

Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44),
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 (South Bound)
including Construction of Twin Tube Tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode

DRAWINGS

G-5 & G-6, Sector – 10, Dwarka, New Delhi – 110 075

March, 2021
Index Map
INDEX MAP

Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd.,
Client :- in Joint Venture with R0 March - 2021 Initial Plan
ALTINOK Consulting Engineering Inc. Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A
A-8, Green Park, New Delhi - 110016, India Revisions
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from
INDEX MAP
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube Drawing Title :- NHAI / RAM - BANI / INDEX MAP / 01 Rev.
AUTHORITY OF INDIA Sandip
R0
tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee
Prepared by Designed by Checked by Approved by Scale - N.T.S.
Typical Cross Section
60 60

( TCS - 1)
TYPICAL CROSS SECTION FOR TWIN TUBE TUNNEL

Note:-
1. All Dimensions are in mm, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt Ltd, R0 March - 2021 Initial Plan
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A A-8, Green Park, New Delhi - 110016
TCS - 1 Ph : 4086-3000, Fax 2685-5252 Revisions
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin TYPICAL CROSS SECTION Sandip Drawing Title :- NHAI / RAM - BANI / TCS / 01 Rev.
AUTHORITY OF INDIA FOR TWIN TUBE TUNNEL Shawal / Lalit Madhusudan Rao Manoj Kumar Bhattacharjee R0
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Prepared by Designed by Checked by Approved by Scale - 1:100 (on A2 Sheet)
MAIN TUNNEL MAIN TUNNEL
CROSS PASSAGE

CROSS PASSAGE SECTION A-A

THEORETICAL PRIMARY SUPPORT


EXCAVATION LINE (DEPENDING UPON ROCK
CLASS)
FINISHED LEVEL

300mm FINAL LINING


CONCRETE (M:30)

150mm
CONSTRUCTION
TOLERANCE

MAIN TUNNEL

C01
OF TUNNEL

CR

CR
OS

OS
SP

SP
AS

AS
SA

SA
GE

GE
NO FINES CONCRETE

MAIN TUNNEL

SIDE DRAIN PERFORATED


PART PLAN OF TUNNEL & CROSS PASSAGE

SECTION B-B FOR CROSS PASSAGE


SCALE (A1) 1: 60

Note:- 1. All Dimensions are in Millimeter.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd.,
in Joint Venture with R0 March - 2021 Plan
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
Revisions Date Description
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Revisions
AUTHORITY OF INDIA
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar
Sandip
Bhattacharjee
Drawing Title :- NHAI / RAM - BANI /
Rev.
Prepared by Designed by Checked by Approved by Scale - As shown (on A2 Sheet) R0
Plan and Profile
PLAN AND PROFILE
( NORTH BOUND )
TO RAMBAN TO BANIHAL
PLAN SURVEY
Road Centre Line SC - Spiral to Circular. HighTension Lines HT HT

Existing Road Centre Line


Carriageway (Edge) CS - Circular to Spiral.
Low Tension Line
Earthen Shoulder ST - Spiral to Tangent. Telephone Line TP TP

Right of Way (ROW) ROW ROW HIP - Horizontal Intersection Point Boundary/Fencing
Proposed Right of Boundary Water Body
PROW PROW Ew - Extra Widening
Way (PROW) Boundary River Bank River River

Building Permanent/Temporary
Viaduct (NB)
Existing Road Paved/Unpaved
LONGITUDINAL PROFILE Utility Buildings
Viaduct (SB) Pipe Line PIPE PIPE
Proposed Road Level
OFC Line
N
Existing Ground Water Pipe Line WPL WPL
North
W

Ground/Road Level Left Side (m) Control Point


S
Ground/Road Level Right Side (m) Temporary Bench Mark
R - Radius of Curve
Telephone Pole
Dc - Degree of Curvature Viaduct (NB) Lamp Post
Lc - Length of Circular Curve Viaduct (SB) OFC Pillar
Ts - Tangent Length G - Gradient % Tree-T6,T5,T4
Tree-T3,T2,T1
Es - Apex Distance Lv - Length of Vertical Curve
Well Well
LS - Length of Spiral Curve L - Length of Grade(m) Hand Pump
S - Shift of Curve R - Radius Control Point identification
TS(Deg) - Spiral Angle in Degree e - Superelevation (%) Municipal Tap
Gate
- Deflection Angle D - Straight Length of Horizontal Alignment
Manhole
V - Design Speed Km/Hr Lc - Length of Circular Curve Guard Post
e% - Superelevation Ls - Length of Spiral Curve (m) Flag Post

PC - Point of Curvature K - Ratio of Vertical Curve Length and the Transformer TRF

Difference of In & Out Gradient Statue


PT - Point of Tangent Survey Pillars
TS - Tangent to Spiral. Temple
Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA LEGEND
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB /P & P Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from HORIZONTAL INTERSECTION A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA POINT REPORT ( HIP )
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
NORTH BOUND CARRIAGEWAY RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI /HIP/NB Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS VERTICAL INTERSECTION POINT
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin REPORT ( VIP )
NORTH BOUND CARRIAGEWAY RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI /VIP /NB Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS PLAN & PROFILE FOR
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA TUNNEL (NORTH BOUND)
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
Km 154+415 to Km 156+400 RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB /P & P / 01 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 156+400 to Km 158+400
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 02 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 158+400 to Km 158+650
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 03 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Existing Ground/Road Level


at C/W Edge
Ground/Road Level at 10m Left
Ground/Road Level at 10m Right
Proposed Road Level
at C/W Edge

Datum =925

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 154+415 to Km 155+200
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 04 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Datum =925

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 155+200 to Km 156+200
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 05 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Datum =925

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 156+200 to Km 157+200
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 06 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Datum =925

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BONUD) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 157+200 to Km 158+200
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 07 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Existing Ground/Road Level


at C/W Edge
Ground/Road Level at 10m Left
Ground/Road Level at 10m Right
Proposed Road Level
at C/W Edge

Datum =925

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 158+200 to Km 158+650
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / NB/P & P / 08 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL
PLAN SURVEY
Road Centre Line SC - Spiral to Circular. HighTension Lines HT HT

Existing Road Centre Line


Carriageway (Edge) CS - Circular to Spiral.
Low Tension Line LT LT
Earthen Shoulder ST - Spiral to Tangent. Telephone Line TP TP

Right of Way (ROW) ROW ROW HIP - Horizontal Intersection Point Boundary/Fencing
Proposed Right of Boundary Water Body
PROW PROW Ew - Extra Widening
Way (PROW) Boundary River Bank River River

Building Permanent/Temporary
Viaduct (NB)
Existing Road Paved/Unpaved
LONGITUDINAL PROFILE Utility Buildings
Viaduct (SB) Pipe Line PIPE PIPE
Proposed Road Level
OFC Line
N
Existing Ground Water Pipe Line WPL WPL
North
W

Ground/Road Level Left Side (m) Control Point


S
Temporary Bench Mark
R - Radius of Curve Ground/Road Level Right Side (m)
Telephone Pole
Dc - Degree of Curvature Viaduct (NB) Lamp Post
Lc - Length of Circular Curve Viaduct (SB) OFC Pillar
Ts - Tangent Length G - Gradient % Tree-T6,T5,T4
Tree-T3,T2,T1
Es - Apex Distance Lv - Length of Vertical Curve
Well Well
LS - Length of Spiral Curve L - Length of Grade(m) Hand Pump
S - Shift of Curve R - Radius Control Point identification
TS(Deg) - Spiral Angle in Degree e - Superelevation (%) Municipal Tap
Gate
- Deflection Angle D - Straight Length of Horizontal Alignment MH MH

Manhole
MH

MH
MH

MH

MH
MH
MH
MH

MH
MH

MH
MH
MH

MH MH

V - Design Speed Km/Hr Lc - Length of Circular Curve Guard Post


e% - Superelevation Ls - Length of Spiral Curve (m) Flag Post

PC - Point of Curvature K - Ratio of Vertical Curve Length and the Transformer TRF

Difference of In & Out Gradient Statue


PT - Point of Tangent Survey Pillars
TS - Tangent to Spiral. Temple

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA LEGEND
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB /P & P Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS HORIZONTAL INTERSECTION
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA POINT REPORT ( HIP )
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
SOUTH BOUND CARRIAGEWAY RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / HIP / SB Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS VERTICAL INTERSECTION
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin POINT REPORT ( VIP )
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / VIP / SB Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SOUTH BOUND CARRIAGEWAY
R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS PLAN & PROFILE FOR
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA TUNNEL (SOUTH BOUND)
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
Km 156+070 to Km 158+000 RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB /P & P / 01 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (SOUTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 158+000 to Km 160+000
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 02 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (SOUTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 160+000 to Km 160+260
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 03 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Existing Ground/Road Level


at C/W Edge
Ground/Road Level at 10m Left
Ground/Road Level at 10m Right
Proposed Road Level
at C/W Edge

Datum =930

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (SOUTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 156+070 to Km 156+800
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 04 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Datum =930

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (SOUTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 156+800 to Km 157+800
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 05 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Datum =930

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (SOUTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 157+800 to Km 158+800
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 06 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Datum =930

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (NORTH BONUD) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 158+800 to Km 159+800
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 07 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
TO RAMBAN TO BANIHAL

Existing Ground/Road Level


at C/W Edge
Ground/Road Level at 10m Left
Ground/Road Level at 10m Right
Proposed Road Level
at C/W Edge

Datum =930

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A PLAN & PROFILE FOR ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TUNNEL (SOUTH BOUND) A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Km 159+800 to Km 160+260
RHS RC SWB Sandip Bhattacharjee Drawing Title :- NHAI / RAM-BANI / SB/P & P / 08 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. R0
Prepared by Designed by Checked by Approved by Scale:- H 1: 200, V 1: 200
INTERSECTION
TO RAMBAN TO BANIHAL

NORTH B
OU
TUNNEL ND

SOUTH BOUND
TUNNEL

NB N
BA
SB
RAM
TO

Note :-
PLAN FOR INTERSECTION 1. All Dimensions are in meter, unless otherwise specified.
(Scale :- 1 : 900) 2. *Varies From 2.0m To 5.0m.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from INTERSECTION A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Ch :-154+210 To Ch :-154+415
AUTHORITY OF INDIA
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. North Bound Sandip Drawing Title :- NHAI / RAM - BANI / IS / 01 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- as Shown (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note :-
TYPICAL CROSS SECTION FOR INTERSECTION 1. All Dimensions are in meter, unless otherwise specified.
(Scale :- 1 : 150) 2. *Varies From 2.0m To 5.0m.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from INTERSECTION A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Ch :-154+210 To Ch :-154+415
AUTHORITY OF INDIA
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. North Bound Sandip Drawing Title :- NHAI / RAM - BANI / IS / 02 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- as Shown (on A2 Sheet)
Culvert Drawings
CULVERT
900
500

300
RCC Crash
500 1500 1000
10mm Barrier 10mm
7000+ew Variable

Shoulder

Shoulder
900
1200 150
PCC Head c

150
Wall(M 20)
RCC Crash (500X500)
Barrier Stone Masonry Stone Masonry
Return Wall d b d Return Wall
a
1%(Min.) GL GL
e

B 100mm. THICK.

2000/3000
b P.C.C.(M15)

Sump
RCC
1%(Min.) (M-30)
50mm thick (CC M15) GABION
at 1.0m C/C
Gabion Wall
150mm Thick PCC (M-15)
150mm Thick Sand filling Compacted

150
6000 Stone Masonry Stone Masonry
GL
Natural Ground Level
SECTION A-A Return Wall Return Wall
DETAIL OF SUMP
3600/5250
SECTION B-B 3600/5250
300
50mm thick (CC M15) DETAIL-C
Gabion Wall
750 Thick

750
Stone Apron

750
500

300
500 1500 1000 900
7000+ew

750 750
750 Thick D
Stone Apron
Stone Masonry Wall
Stone Masonry
(600X1200)
Return Wall 6000 1500 1500 1500

Drain
RCC Crash PCC Head
600

Coping With
Barrier Wall(M 20)
Stone on Edge
NOTE:-
1. ALL DIMENSIONS ARE IN MILLIMETERS and levels are in meters
Weep Holes
4000/5000

UNLESS OTHERWISE SPECIFIED.


2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS
Filter Media SHALL BE FOLLOWED-
3. GRADE OF CONCRETE
BOX CELL STRUCTURE = M30
R R Stone Masonry in CRASH BARRIER = M40
1:3 Cement Sand Mortar SUMP = M30
C P.C.C M-15 Bedding PCC HEAD WALL = M20
600

Drain

4. ALL REINFORCEMENTS SHALL BE OF THERMO MECHANICALLY TREATED (TMT)


OR HIGH YIELD STRENGTH DEFORMED BARS (GRADE DESIGNATION FE-500D).
Stone Masonry DETAIL-D CONFORMING TO IS : 1786 -1985
(600X1200) Return Wall 5. THE SELECTED GRANULAR BACK FILL SHALL HAVE FOLLOWING
Stone Masonry Wall
Construction

100
Joint

100
BEFORE EXECUTION OF WORK THE ABOVE BEARING CAPACITY SHALL BE VERIFIED AS PER
STANDARD CODAL PROVISION

MEDIA SHALL BE PROVIDED BEHIND BOX / WALL AS PER APPENDIX - 6 IRC:78-2014


8. ROADWAY WIDTH AND CARRIAGEWAY WIDTH OF CULVERT SHALL BE MATCHED WITH
HIGHWAY CROSS SECTION AT THE PROPOSED LOCATIONS.
9. SOFT AND LOOSE PATCHES IN THE BEARING AREA ARE TO BE REPLACED BY COMPACTED
GRANULAR FILLS WITH LAYERS NOT EXCEEDING 300mm.
PLAN DETAIL-B 9. ew = REQUIRED EXTRA WIDENING.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DRAW FOR BOX CULVERT A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin FOR NB/SB TOWARDS HILL SIDE
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / CUL / 01 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
900
500

500
600
300

300
500 1500 500 1500 1000
7000+ew Variable 7000+ew Variable

Shoulder

Shoulder

Shoulder
PCC Head PCC Head
Wall(M 20) Wall(M 20)
(500X900) (500X500)

1%(Min.)

RCC Crash
b

Sump
Barrier
1%(Min.)

150mm Thick PCC (M-15)


150mm Thick Sand filling Compacted

50mm thick (CC M15)

Gabion Wall

6000
SECTION A-A
Natural Ground Level
GL
300

500
500

300

300
750 Thick 500 1500 600 500 1500 1000 900
Stone Apron 7000+ew Variable 7000+ew

Stone Masonry Wall


Stone Masonry
(600X1200)
Return Wall
Drain

Drain
RCC Crash PCC Head PCC Head
600

Barrier Wall(M 20) Wall(M 20)


NOTE:-
1. ALL DIMENSIONS ARE IN MILLIMETERS and levels are in meters
UNLESS OTHERWISE SPECIFIED.
4000/5000

2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED-
3. GRADE OF CONCRETE
BOX CELL STRUCTURE = M30
CRASH BARRIER = M40
SUMP = M30
C PCC HEAD WALL = M20
600

Drain

Drain
4. ALL REINFORCEMENTS SHALL BE OF THERMO MECHANICALLY TREATED (TMT)
OR HIGH YIELD STRENGTH DEFORMED BARS (GRADE DESIGNATION FE-500D).
Stone Masonry
CONFORMING TO IS : 1786 -1985
(600X1200) Return Wall
Stone Masonry Wall 5. THE SELECTED GRANULAR BACK FILL SHALL HAVE FOLLOWING

BEFORE EXECUTION OF WORK THE ABOVE BEARING CAPACITY SHALL BE VERIFIED AS PER
STANDARD CODAL PROVISION

MEDIA SHALL BE PROVIDED BEHIND BOX / WALL AS PER APPENDIX - 6 IRC:78-2014


8. ROADWAY WIDTH AND CARRIAGEWAY WIDTH OF CULVERT SHALL BE MATCHED WITH
HIGHWAY CROSS SECTION AT THE PROPOSED LOCATIONS.
PLAN 9. SOFT AND LOOSE PATCHES IN THE BEARING AREA ARE TO BE REPLACED BY COMPACTED
GRANULAR FILLS WITH LAYERS NOT EXCEEDING 300mm.
9. ew = REQUIRED EXTRA WIDENING.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DRAW FOR BOX CULVERT A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin FOR 4- LANE CARRIAGEWAY
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / CUL / 02 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
RCC Crash
10mm Barrier 10mm
1200 150

150
900
c
Construction

100
Joint

100
Stone Masonry Stone Masonry
Return Wall d b d Return Wall
a
GL GL

2000/3000
e
RCC
(M-30)
B 100mm. THICK.
P.C.C.(M15)

GABION
at 1.0m C/C DETAIL-B

150
DETAIL OF SUMP
Stone Masonry
Return Wall
Stone Masonry
Return Wall
DETAIL-C
3600/5250
SECTION B-B 3600/5250

50mm thick (CC M15) Coping With


Gabion Wall Stone on Edge
750

Weep Holes
750
750 750

Filter Media

R R Stone Masonry in
1:3 Cement Sand Mortar NOTE:-
750 Thick D
Stone Apron 1. ALL DIMENSIONS ARE IN MILLIMETERS and levels are in meters
P.C.C M-15 Bedding UNLESS OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS
6000 1500 1500 1500 SHALL BE FOLLOWED-
3. GRADE OF CONCRETE
DETAIL-D BOX CELL STRUCTURE = M30
CRASH BARRIER = M40
SUMP = M30
PCC HEAD WALL = M20
4. ALL REINFORCEMENTS SHALL BE OF THERMO MECHANICALLY TREATED (TMT)
OR HIGH YIELD STRENGTH DEFORMED BARS (GRADE DESIGNATION FE-500D).
CONFORMING TO IS : 1786 -1985
5. THE SELECTED GRANULAR BACK FILL SHALL HAVE FOLLOWING

BEFORE EXECUTION OF WORK THE ABOVE BEARING CAPACITY SHALL BE VERIFIED AS PER
STANDARD CODAL PROVISION

MEDIA SHALL BE PROVIDED BEHIND BOX / WALL AS PER APPENDIX - 6 IRC:78-2014


8. ROADWAY WIDTH AND CARRIAGEWAY WIDTH OF CULVERT SHALL BE MATCHED WITH
HIGHWAY CROSS SECTION AT THE PROPOSED LOCATIONS.
9. SOFT AND LOOSE PATCHES IN THE BEARING AREA ARE TO BE REPLACED BY COMPACTED
GRANULAR FILLS WITH LAYERS NOT EXCEEDING 300mm.
9. ew = REQUIRED EXTRA WIDENING.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DRAW FOR BOX CULVERT A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin FOR 4- LANE CARRIAGEWAY
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / CUL / 02a Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
Standard Drawings
NOTES:-
1. DRAWING IS NOT TO SCALE
2. ALL DIMENSIONS ARE IN mm UNLESS OTHER WISE SPECIFIED
3. FOR FURTHER DETAILS OF ROAD SIGNS REFER IRC CODE: 67-2012.
4. DIMENSIONS SHOWN ARE FOR NORMAL SIZED SIGNS.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt Ltd, R0 March - 2021 Initial Plan
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A A-8, Green Park, New Delhi - 110016
Ph : 4086-3000, Fax 2685-5252 Revisions
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from
DETAILS OF CAUTIONARY/ WARNING TYPE
Rev.
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin ROAD SIGNS
Shawal Sharma Madhusudhan Rao Manoj Kumar
Sandip
Bhattacharjee
Drawing Title :- NHAI / RAM - BANI / RS /01
R0
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Prepared by Designed by Checked by Approved by Scale :- N.T.S
GIVE
WAY

50 50 2m

3.5m
3 .5 NOTES:-
1. DRAWING IS NOT TO SCALE
2. ALL DIMENSIONS ARE IN mm UNLESS OTHER WISE SPECIFIED.
3. FOR FURTHER DETAILS OF ROAD SIGNS REFER IRC CODE:67-
2012 AND TYPE DESIGNS FOR INTERSECTIONS ON NATIONAL
HIGHWAYS ISSUED BY MORT&H.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt Ltd, R0 March - 2021 Initial Plan
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A A-8, Green Park, New Delhi - 110016
Ph : 4086-3000, Fax 2685-5252 Revisions
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Detail of Mandatory
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin Regulatory Type Road Signs Sandip Drawing Title :- NHAI / RAM - BANI / RS /02 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar R0
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Bhattacharjee
Prepared by Designed by Checked by Approved by Scale - Not to Scale
TO RAMBAN 2.5s/w
TO BANIHAL
1.5s/w 2.5s/w 2.5s/w 8s/w 1.5s/w
. 1.5s/w
1.5s/w 2.5s/w 2.5s/w
1.5s/w
1.5s/w .
2.5s/w 1.5s/w 1.5s/w
equal
2.5s/w
R2 s/w
3s/w
in Hindi 16s/w 8s/w in Hindi

English 0.4s/w
5.6s/w

2s/w
2s/w

4s/w

2s/w
3.5s/w
4s/w

1.5s/w
8s/w
English 27 8s/w

equal 2.5 s/w


1 s/w 1.5s/w 1.5s/w
Imaginary Text Tile R1.0 s/w
R1s/w 2.5s/w 1s/w

equal 16s/w 8s/w


in Hindi 8s/w
Width of Chevron (W) 2.5s/w
1 Line of Text = 3.5s/w
in Hindi R1s/w 2Lines of Text = 4s/w 8s/w in Hindi
in Hindi
English 67
3Lines of Text = 4.5s/w 8s/w
8s/w 4Lines of Text = 5s/w 8s/w

English
8s/w

English
8s/w

equal
R2.0s/w
R1 s/w x=4s/w

1.5s/w
1.5s/w

R3s/w

1.5s/w
1.5s/w
1.5s/w
1.5s/w
8s/w

1.5s/w
8s/w

1.5s/w
English
R1s/w 1s/w 1.5s/w 1.5s/w
1.5s/w 2.5s/w 2.5s/w .
1.5s/w 1.5s/w
1.5s/w 2.5s/w 1.5s/w
8s/w 16s/w equal

in Hindi
8s/w
8s/w

1.5s/w
x=4s/w English R1 s/w
equal
R2.0s/w

1.5s/w

1.5s/w 1.5s/w
.
1.5s/w
2.5s/w
. R3.0s/w

in Hindi 8s/w

English 8s/w

.
equal equal

12s/w
6s/w

L L

2/3 L R17.9 2/3 L

R10.4
1.66W
W W
1.66W

2.5s/w
2.5s/w

N.H.
R20.8

8s/w
in Hindi in Hindi 8s/w

8s/w
English English 8s/w

1.5s/w
1.5s/w

.
2.5s/w 6s/w 1.5s/w
(W)

Fig 16.06 WEIGHT BRIDGE AHEAD

1s/w
2.5s/w 2.5 s/w
2.5 s/w 2.5s/w
8s/w R4.0

2.5s/w

1.5 s/w in Hindi in Hindi

English English
16s/w
1.5 s/w

FIG 16.10 GANTRY MOUNTED ADVANCE DIRECTION SIGN


AHEAD OF A GRADE SEPARATED JUNCTION

Note: The figure nos. mentioned in the drawings are same as


mentioned in IRC:67:2012
Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
Revisions Date Description
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DETAILS FOR DIRECTION A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin INFORMATION SIGNS
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / RS/03 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
300 300

450
0
10

10
0

200
200
200
900

900

1200
1200

1200

200
200
G.L G.L G.L G.L G.L G.L

OHM-L OHM-R

400 300 450 300


BLACK
100
YELLOW

600
600

450

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March -2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India
CAUTIONARY SIGNS Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin
Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Madhusudhan Rao Manoj Kumar
Sandip Drawing Title :- NHAI / RAM - BANI /RS/04
R0
Shawal Sharma Bhattacharjee
Prepared by Designed by Checked by Approved by
Note:- 1. All Dimensions are in meter, unless otherwise specified.
Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
FINAL DETAILED PROJECT REPORT ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DETAILS OF OVER HEAD SIGNS A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin PORTAL TYPE FOR CANTILEVER
Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / RS/05
R0
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee
Prepared by Designed by Checked by Approved by
Table 1: Longitudinal Markings (LM) Table 4: Hazard Markings (HM)
Marking Type Length of Line Length of Width (mm) Colour Pattern Width(mm)
Abbreviation Segment (mm) Gap (mm) Marking Type Space (mm) Colour Pattern
3000 6000
Abbreviation Diagonal /
LM01 Broken 3000 6000 100 White 100 Longitudinal
Chevron
3000 6000

LM02 Broken 3000 6000 150 White 150


4000
100/150

HM10 Ladder 100/150 200


6000 3000 4000 White
LM04 Broken 6000 3000 100 White 100 Hatching
200
6000 3000

LM05 Broken 6000 3000 150 White 150


6000 100/150

3000 3000
HM11 Ladder 100/150 200 6000 White
LM11 Broken 3000 3000 100 White 100 Hatching 200

3000 3000
LM12 Broken 3000 3000 150 White 150
200 150 150
HM21 ZIG-ZAG 100 NA NA White
2000
500 500 100
LM19 Broken 500 500 100 White (Hazard) 600 300
100

LM23 Continuous NA NA 100 White 100 200 150 150


HM22 ZIG-ZAG 150 NA NA White
2000
250
Continuous (Hazard) 600
150 350
LM24 NA NA 150 White 150
Solid Raised
Profile
200 150 150
100/150/200 HM23 ZIG-ZAG 100 NA NA Yellow
2000
LM26 Continuous Two Solid Lines separated by Each Solid Line White 100
100 (Hazard) 600 300
(Two Lines) 100/150/200 mm of 100mm 100

200 150 150


2000
LM27 Continuous Two Solid Lines Each Solid Line White "x"mm HM24 ZIG-ZAG 150 NA NA Yellow 150
(Two Lines) separated by "x"mm of 100mm 100 (Hazard) 600 350

apart, "x" > 200mm 100

LM28 Continuous Continuous Each Line of White 1000 1000


Table 5: Transverse Markings (TM)
100
& Broken & Broken separated by 100mm Marking Type Length of Line Length of Width (mm) Colour Pattern
100
100mm 100mm
Abbreviation Segment (mm) Gap (mm)
TM03 Continuous (Two Each Solid White 300
LM29 Continuous Continuous Each Line of White 100mm Lines separated by 200
100 Two Solid Line Line of 200mm 200
& Broken & Broken separated by 100mm 100mm 100 300mm apart)
1000

FM14 600 300


Word

STOP
BUS
NA TM04 Broken 600 300 100 White 765
FM14 Message 1250 White
"BUS STOP" Broken(Two lines Each Broken 600 400
TM07 600 300 Lines of 200 White
separated by 300 200
mm apart) mm
X
300
Table 2: Block Markings (BM) 600
300
TM08 Bar Marking Across Full 6 Strips of 300mm wide, Yellow 600
Dimension (mm) Carrigeway 5mm high @ 600mm apart.
(One Set) X
Marking Type Gap in Between Colour Pattern 300 600
Abbreviation Length Breadth (mm)
SECTION AT X-X
500

BM01 Rectangular Block 2000 500 500 White 2000

500

1850
BM04 Triangular Block 750 1850 1000 White 750 Table 6: Arrow Markings (AM)
1000
Marking Type Length (mm) Width (mm) Colour Pattern
2500 Abbreviation
1500 Straight 3500
Chequer Block 500 500 AM01 3500 500 White 500
BM05 500 White 500 500 Arrow
500 500 500
Right & Left 3500
500 AM06 Arrow 3500 750 White 750

BM02 Rectangular Block 3000 500 500 White


3000 Deflection 4500
AM17 4500 1500 White 150 525
Arrow
1500
500
6000
500 Deflection 200
BM03 Rectangular Block 4000 500 500 White AM18
Arrow
6000 1500 White 700
2000
4000

500
Note : For Details Refer IRC:35:2015

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DETAILS FOR A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin PAVEMENT MARKING
I Sandip Drawing Title :- NHAI / RAM - BANI / RM/01 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
TO RAMBAN TO BANIHAL

NOTES:-
1 ALL DIMENSIONS ARE IN m UNLESS OTHERWISE SPECIFIED
2 FOR FURTHER DETAILS REFER IRC CODE:35-2015.
3. FOR DETAILS OF ROAD MARKING REFER DRAWING NO.
NHAI/LEEP/MP-5/HAL-KHA/RM/ 02

Note:- 1. All Dimensions are in meter, unless otherwise specified.


Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India
DETAIL OF PAVEMENT MARKING AT Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin II
Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI /RM/02
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
Solid Raised Profile
Marking (Typ.)

A
150 18m Spacing 18m Spacing 9m Spacing 9m Spacing 6mSpacing
150
6mSpacing
150 150
Paved Paved
6000 6000 6m Spacing

150 6m Spacing
150 NORMAL SECTION WARNING SECTION
A

6m Spacing

NO-OVERTAKING
2.0M
ES
Bi-directional 50mm from edge line SECTION
(Red-White) 6m Spacing
0.15m
Bi-directional
50mm
(Red-White)
Section at A-A

3.50m
3.40m
CARRIAGEWAY

Bi-directional
(Yellow-Yellow)
7.0M
0.10m

Bi-directional
(White-White) Bi-directional Road Stud (Red-White)
3.45m 3.5M
Bi-directional
Bi-directional Bi-directional Road Stud (White-White)
(White-Red)
(White-Red)
0.15m
Bi-directional Road Stud (Yellow-Yellow)
ES
2.0M

Uni-directional Road Stud (Red)

Uni-directional Road Stud (White) Optional

Uni-directional Road Stud (Yellow)

NOTE:
1. FOR FURTHER DETAILS REFER IRC CODE:-35-2015

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DETAILS FOR A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin LONGITUDINAL MARKING &
ROAD STUDS Drawing Title :- NHAI / RAM - BANI / RM/03 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar
Sandip
Bhattacharjee R0
III
Prepared by Designed by Checked by Approved by
TO RAMBAN TO BANIHAL

THE SEMI CIRCULAR PORTION OF THE SEMI CIRCULAR PORTION OF THE SEMI CIRCULAR PORTION OF THE SEMI CIRCULAR PORTION OF
KM SHALL BE PAINTED CANARY YELLOW KM SHALL BE PAINTED CANARY YELLOW KM SHALL BE PAINTED CANARY YELLOW KM SHALL BE PAINTED CANARY YELLOW
( I.S SHADE 309) ( I.S SHADE 309) ( I.S SHADE 309) ( I.S SHADE 309)

12 12

175

175

100
100

250

250
50 50
50

250
PLACE NAME
80

560

50
50 50

660
250
50

TERMINAL STATION

80
385

385
130

50
130

KILOMETERAGE

130
10 10
KILOMETRAGE

1075
75

1075
10 10
ROADWAY

50

695

695
LEVEL
100

100

130
80
50
350
370 KILOMETRAGE

130
150 150
ELEVATION ELEVATION

75
FACE -I FACE -II 10

600
(TOWARDS TRAFFIC DIRECTION) (OPPOSITE TO TRAFFIC DIRECTION)

130

130

130
CEMENT CONCRETE ROADWAY ROADWAY
(PCC M 20) LEVEL LEVEL
10

520

150
520
250

270

ELEVATION ELEVATION
FACE -I FACE -II
CEMENT CONCRETE

600
(PCC M 15) (TOWARDS TRAFFIC DIRECTION) (OPPOSITE TO TRAFFIC DIRECTION)
150 150
10 350 10 520
10

SIDE ELEVATION CEMENT CONCRETE


(PCC M 20) 500
370

150
SECTIONAL PLAN

250
270
TYPE DESIGN FOR ORDINARY KILOMETER STONE
SIDE ELEVATION CEMENT CONCRETE
(PCC M 15)
VARIES
100
SECTIONAL PLAN
50

6 TYPE DESIGN FOR THE 5TH KILOMETER STONE


80

350
350

CEMENT CONCRETE (PCC M 20)


(PCC M 20)
220

EACH 1400 mm LONG NOTES :-

1. ALL DIMENSIONS ARE IN MILLIMETERS.


100

100
2. FOR FURTHER DETAILS REFER IRC:8- 1980 AND IRC : 26 - 1967 FOR KILOMETER STONES
600

AND HECTOMETER STONES RESPECTIVELY.


300

300
300

100

EACH 375 mm LONG 3. THE BACKGROUND COLOR OF KILOMETER STONE AND


400

(PCC M 15) HECTOMETER STONES SHALL BE WHITE WITH BLACK LETTERS


AND NUMERALS FOR NAMES OF STATION & DISTANCES.
100

100 150 100


4. ROUTE NO. WRITTEN ON SEMI CIRCULAR PORTION SHALL BE IN
100 150 100 100 100 BLACK COLOR ON CANARY YELLOW AND WHITE BACK GROUND.
100

100

5. LETTERS AND NUMERALS ON KILOMETER STONES SHALL BE OF FOLLOWING SIZE:-


SECTIONAL PLAN (i) HEIGHT OF LETTERS FOR PLACE NAME - 80 MM
FRONT ELEVATION (ii) HEIGHT OF LETTERS FOR KILOMETERAGE - 130 MM
SCHEDULE OF REINFORCEMENT SIDE ELEVATION
(TOWARDS TRAFFIC DIRECTION) (iii) HEIGHT OF NUMERALS FOR ROUTE NUMBER - 100 MM
6. CONCRETE GRADE FOR KILOMETER STONES AND HECTOMETER STONE SHALL BE M20
7. HEIGHT OF NUMERALS IN HECTOMETER STONE SHALL BE 80MM
DETAIL OF HECTOMETER STONE CONFORMING TO IRC 26-1967

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from TYPICAL DETAIL OF A-8, Green Park, New Delhi - 110016, India Revisions
KILOMETER STONE
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin AND HECTOMETER STONE Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar
Sandip
Bhattacharjee
Drawing Title :- NHAI / RAM - BANI / KSHS / 01
R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 10 (on A2 Sheet)
Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India
TYPICAL DETAIL OF METALLIC Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin CRASH BARRIER
Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar
Sandip
Bhattacharjee
Drawing Title :- NHAI / RAM - BANI /CB/ 01
R0
Prepared by Designed by Checked by Approved by
150 600 150

250 700 250

125 500 125 GUARD POST

75 150 75 SLOPE

SLOPE
300

750
CEMENT CONC CEMENT CONC
M15 650 M15

50 STONE MASONRY IN CM 1:3


150 75
250
75 CEMENT CONC M15
75 CEMENT CONC M15
1050
1500
MEDIAN SIDE DRAIN
HILL SIDE DRAIN
100 RCC (M-20) GUARD POST
150
CAST MONOLITHICALLY WITH DRAIN
A A

750 100

PLAN
RCC M-20
25 CLEAR COVER

400 Extension for


Anchoring with Drain

150 SECTION A-A


SECTIONAL
ELEVATION

TYPICAL DETAILS OF GUARD POST


Note:- 1. All Dimensions are in mm, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from DETAILS OF DRAINS AND A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube GUARD POST
Drawing Title :- NHAI / RAM - BANI / DRAIN /01 Rev.
tunnels (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Vikram negi Manoj Kumar R0
Madhusudhan Rao Sandip Bhattacharya
Prepared by Designed by Checked by Approved by Scale :- NTS
500 500 500
500
500

4000
3000

5000

6000
1000 (MIN.)

7000
1000 (MIN.)
2100

1000 (MIN.)
2800

1001 (MIN.)
STONE MASONRY RETAINING WALL (3.0M HT.)
(VALLEY SIDE) 3500
SCALE 1:75 STONE MASONRY RETAINING WALL (4.0M HT.)

1000 (MIN.)
(VALLEY SIDE) STONE MASONRY RETAINING WALL (5.0M HT.)
SCALE 1:75 (VALLEY SIDE)
SCALE 1:75
4200

STONE MASONRY RETAINING WALL (6.0M HT.)


(VALLEY SIDE) 4900
SCALE 1:75
500
STONE MASONRY RETAINING WALL (7.0M HT.)
500 (VALLEY SIDE)
SCALE 1:75
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
METERS, UNLESS OTHERWISE SPECIFIED.
500
2. NO DIMENSION SHALL BE MEASURED, ONLY WRITTEN DIMENSIONS
ARE TO BE TAKEN AS CORRECT.
3. 150 DIA WEEP HOLES @ 1.0m c/c STAGGERED PATTERN SHALL BE
PROVIDED ABOVE GROUNG LEVEL.

4. BEFORE EXECUTION OF WORK, BEARING CAPACITY SHALL BE


8000

VERIFIED SITE.

9000
5. 1:4 CEMENT SAND MORTAR SHALL BE USED FOR STONE / BOULDERS
SHALL BE POINTED BY 1:3 CEMENT SAND MORTAR SPECIAL
PRECAUTION SHALL BE POINTING AT SIZE OR STEPS OF BACK SIDE

10000
WALL.

6. ALL STONE / BOULDERS SHALL BE CLEANED AND FREE FROM ANY


DUST / UNSUITABLE ORGANIC / UNORGANIC COVER.

7. AS PER IRC:- 78-2014 DEPTH OF FOUNDATION IS 1.5m IN SOFT ROCK


AND 0.60m IN HARD ROCK.
1000 (MIN.)

8. FOUNDATION OF RETAINING WALL SHALL BE PLACED ON FIRM


GROUND. IF FOUNDATION LEVEL IS NOT FIRM OR SUITABLE FOR
FOUNDATION THE EXCAVATION ISHALL BE CONTINUED UP TO FIRM
GROUND AND EXTRA DEPTH BELOW FOUNDING LEVEL SHALL BE

1000 (MIN.)
FILLED WITH PCC 1:3:6.
5600

9. ALL PCC SHALL BE M15 GRADE.


STONE MASONRY RETAINING WALL (8.0M HT.)
(VALLEY SIDE) 10. PROVIDE PCC OF 300mm THICK ON POOR FOUNDATION STRATA AS
SCALE 1:75 PER SITE CONDITION FOR STONE MASONRY RETAILING WALL, ELSE
6300
SHALL BE FOLLOWED AS PER INDICATED IN THE DRAWING.

1000 (MIN.)
STONE MASONARY RETAINING WALL ANALYSIS SUMMARY FOR VALLEY SIDE
HEIGHT DEPTH OF TOTAL FOUNDATION 11. PROVIDE CONSTRUCTION JOINT ARE 8.0m INTERVALS.
SL. NO. TOP WIDTH FRONT BUTTER INCLINATION STONE MASONRY RETAINING WALL (9.0M HT.)
ABOVE FRL FOUNDATION HEIGHT ANGLE (deg.) (VALLEY SIDE)
(m) (deg.) 12. BOULDER PITCHING HAD BEEN PROVIDED FOR THE TOE
(m) (m) SCALE 1:75

1 2.0 1.0 3.0 2.0 5.71 9.46 PROTEDTION IN CASE OF SOFT ROCK / SOIL 300mm THICK
IMPERVIOUS FILL SHALL BE APPLIED ON THE TOP OF THE BACKFILL
2 2.5 1.0 3.5 2.3 5.71 9.46 7000 AND FILTER MATERIAL.
3 3.0 1.0 4.0 2.6 5.71 9.46
4 3.5 1.0 4.5 2.93 5.71 9.46 13. ENSURE BEARING CAPACITY OF 30 TONS PER SQUARE METER.
STONE MASONRY RETAINING WALL (10.0M HT.)
5 4.0 1.0 5.0 3.25 5.71 9.46 (VALLEY SIDE)
SCALE 1:75 14. DRAINAGE PIPE SHALL BE HDP CLASS-II WITH DIA 200mm SEMI
6 5.0 1.0 6.0 3.90 5.71 9.46 PERFORATED AT TOP WITH OUTLET TO NEARBY STABLE STREAM OR
7 6.0 1.0 7.0 4.55 5.71 9.46 VALLEY.
8 7.0 1.0 8.0 5.20 5.71 9.46 15. HEIGHT ABOVE 10m AND UP TO 18m THE SOIL SHALL BE FILLED WITH
9 8.0 1.0 9.0 5.85 5.71 9.46 1.5, H:1V SLOPE ABOVE THE MASONRY WALL.
10 9.0 1.0 10.0 6.50 5.71 9.46
Note:- All Dimensions are in mm, unless otherwise specified.
Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS TYPICAL SECTION FOR
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
STONE MASONRY
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube
RETAINING Rev.
tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / SP/SMRB/ 01
R0
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee
Prepared by Designed by Checked by Approved by
1000

100
400

H
TYPICAL DETAIL OF GABION WALL (VALLEY SIDE)
SCALE 1:50

GABION WALL (VALLEY SIDE)


FOUNDATION GEOMETRY
SL. NO. HEIGHT OF RETAINING WALL DEPTH TOP WIDTH BOTTOM WIDTH nf
H (m) h(m) (m) (m) (m)

1 1 1.0 1.0 1.0 6 NOTES:


2 2 1.0 1.0 1.5 6 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
METERS, UNLESS OTHERWISE SPECIFIED.
3 3 1.0 1.0 2.0 6
2. NO DIMENSION SHALL BE MEASURED, ONLY WRITTEN DIMENSIONS
4 4 1.0 1.0 2.5 6 ARE TO BE TAKEN AS CORRECT.

5 5 1.0 1.0 3.0 6 3. GABION WALL SHALL BE PROVIDED IN CASE SLIDE / SLIDE PRONE
AREA, GABION WALL SHALL BE PROVIDED IN CASE OF POOR
6 6 1.0 1.0 3.5 6
FOUNDATION CONSIDERING DIFFERENTIAL SETTLEMENT AND SLOPE
MOVEMENT, IF ANY.
SCALE
0 .5 1 1.5 2 2.5m
4. GEOTEXTILE SHALL BE PROVIDED THE INTERFACE OF GABION WALL
1:50 & FILTER MATERIAL.

Note:- All Dimensions are in mm, unless otherwise specified.


Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India
TYPICAL DETAIL OF Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube
AUTHORITY OF INDIA GABION WALL
tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Sandip Drawing Title :- NHAI / RAM - BANI / SP /GW/ 02 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by
RIGID PAVEMENT TRANSITION SLAB FLEXIBLE PAVEMENT

1000 1000 1000 1000

ONE STEP EACH FOR 8X25mm GROVE FILLED WITH


SEALING GROOVE TO BE FILLED BY RUBBERIZED BITUMEN SEALANT
MATCHING BITUMINOUS
POLYSULPHIDE SEALING COMPOUND
PAVEMENT LAYERS SEALANT
EXPANSION JOINT BC

250 100 50
PQC DBM
280

PQC
WMM
200 150

DLC

200
GSB DLC GSB
GSB
500

500
SUBGRADE
SUBGRADE
SUBGRADE

PLASTIC SLEEVE

DOWEL BAR 8mm DIA DEFORMED POLYTHYLENE SHEET 125


BAR @150mm C/C MICRON THICK

DETAIL OF TRANSITION SLAB

Note:- 1. All Dimensions are in mm, unless otherwise specified.


Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin DETAIL OF TRANSITION SLAB
Drawing Title :- NHAI / RAM - BANI / TS/01 Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Shawal Sharma Madhusudhan Rao Manoj Kumar
Sandip
Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale - 1:15
Drainage Plan
Drainage Plan & Profile
With Drainage Schedule
TO RAMBAN TO BANIHAL

TO BA
TT
CHAS ERY
MA

NO
TU RT
NN H B
EL OU
ND
NB

SB

SO UNN
N
BA

T
UT EL
M
RA

HB
TO

OU
ND
Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Drainage Plan & Profile A-8, Green Park, New Delhi - 110016, India
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin North Bound
Rev.
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. South Bound Sandip Drawing Title :- NHAI / RAM - BANI / P & P/ DRAIN/01
Tara Rawat Ankur Maurya Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- as Shown (on A2 Sheet)
TO RAMBAN TO BANIHAL

1001

996

991

986

981

984 976 979


Proposed Road Level
at C/W Edge
979 Existing Ground/Road Level 971 Proposed Road Level 974
BOX CULVERT AT at C/W Edge at C/W Edge
CH. 154+290 Existing Ground/Road Level
Ground/Road Invert Level at C/W Edge
974 Proposal New construction 966 969 Proposed Road Level
Proposed Ground/Road Invert Level at C/W Edge
1 X 2 X 2m
Size Ground/Road Level at 10m Right Existing Ground/Road Level
969 961 964 at C/W Edge
Ground/Road Level at 10m Right Ground/Road Level at 10m Right

964 956 959 BOX CULVERT AT


EXISTING BOX CULVERT AT EXISTING BOX CULVERT AT CH. 154+290
CH. 154+345 CH. 155+930 Proposal New construction
959 951 954 Proposed 1 X 2 X 2m
Size

954 946 949

949 941 944

944 936 939


DATUM (m) DATUM (m) DATUM (m)
939 931 934

950.755
941.374

942.428

943.435

944.388

945.286

946.130

946.927
947.346

939.791

941.086

942.380

943.674

944.968
945.732
946.262

947.557

948.851

950.143
945.732
946.262

947.557

948.851

950.143

951.368

952.490

953.263

FRL FRL FRL/ Top Level


945.463
945.993

947.288

948.582

949.874

951.099

952.221
952.994

940.624
941.155

942.209

943.216

944.169

945.067

945.911

946.708
947.127
DRAIN TOP LEVEL DRAIN TOP LEVEL
944.463
945.089

946.341

947.592

948.846

950.099

951.182

951.994

938.741

940.072

941.404

942.735

944.066
944.732
945.262

946.546

947.830

949.114
939.575
940.081

941.094

942.107

943.119

943.958

944.796

945.634
946.053

949.755
DRAIN INVERT LEVEL (RHS) DRAIN INVERT LEVEL (RHS) 949.296 DRAIN INVERT LEVEL (RHS)

950.367

954.782

962.324

971.783

981.725

993.271

947.178

945.788

945.106

947.177

951.098

956.874

963.436

968.828

972.611
956.874

963.436

968.828

972.611

975.993

982.918

GROUND LEVEL AT 10M GROUND LEVEL AT 10M GROUND LEVEL AT 10M


OFFSET (RIGHT SIDE) OFFSET (RIGHT SIDE) OFFSET (RIGHT SIDE)

NB DRAIN ON RHS SIDE SB DRAIN ON RHS SIDE NB- MEDIAN DRAIN

Legends :-
154+290
154+300

154+320

154+340

154+360

154+380

154+400

154+415

155+930
155+940

155+960

155+980

156+000

156+020

156+040

156+060
156+070

154+200

154+220

154+240

154+260

154+280
154+290
154+300

154+320

154+340

154+360
154+370
Chainage (KM) Chainage (KM) Chainage (KM)
NB NORTH BOUND

SB SOUTH BOUND

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Drainage Plan & Profile A-8, Green Park, New Delhi - 110016, India
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin North Bound
AUTHORITY OF INDIA Rev.
South Bound Drawing Title :- NHAI / RAM - BANI / P & P/ DRAIN/02
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Tara Rawat Ankur Maurya Manoj Kumar
Sandip
Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- as Shown (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Drainage Schedule A-8, Green Park, New Delhi - 110016, India
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin North Bound
AUTHORITY OF INDIA Rev.
South Bound Drawing Title :- NHAI / RAM - BANI / SCH/DRAIN/03
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Tara Rawat Ankur Maurya Manoj Kumar
Sandip
Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :-Not to Scale (on A2 Sheet)
Signage Plan
SIGNAGE PLAN
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Road Signs
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin NB-Ch.154+210 To 155+000
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB-Ch.155+940 To 156+640 Sandip Drawing Title :- NHAI / RAM - BANI / SP / 01 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 750 (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Road Signs
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin NB-Ch.155+000 To 155+800
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. Drawing Title :- NHAI / RAM - BANI / SP / 02 Rev.
SB-Ch.156+640 To 157+450 Sandip
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 750 (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Road Signs
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin NB-Ch.155+800 To 156+600
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB-Ch.157+450 To 158+250 Sandip Drawing Title :- NHAI / RAM - BANI / SP / 03 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 750 (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Road Signs
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin NB-Ch.156+600 To 157+300
AUTHORITY OF INDIA
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB-Ch.158+250 To 159+000 Sandip Drawing Title :- NHAI / RAM - BANI / SP / 04 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 750 (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS Road Signs
(Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
AUTHORITY OF INDIA Ch.155+940 to Ch.160+260 (South Bound) including construction of twin NB-Ch.157+300 To 158+100
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB-Ch.159+000 To 159+770 Sandip Drawing Title :- NHAI / RAM - BANI / SP / 05 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 750 (on A2 Sheet)
TO RAMBAN TO BANIHAL

Note:- 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Plan
in Joint Venture with
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A Revisions Date Description
Road Signs ALTINOK Consulting Engineering Inc.
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin NB-Ch.158+100 To 158+650
AUTHORITY OF INDIA
tube tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB-Ch.159+770 To 160+260 Sandip Drawing Title :- NHAI / RAM - BANI / SP / 06 Rev.
Shawal Sharma Madhusudhan Rao Manoj Kumar Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale :- 1 : 750 (on A2 Sheet)
Utility Shifting Plan
UTILITY SHIFTING PLAN
(ELECTRICAL)
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT SHEP HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT

LT
LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-154+210 To Ch.-154+700)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-155+940 To Ch.-156+400) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 01 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole SHEP
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-154+700 To Ch.-155+200)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-156+400 To Ch.-156+900) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 02 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole SHEP
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-155+200 To Ch.-155+700)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-156+900 To Ch.-157+400) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 03 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole SHEP
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-155+700 To Ch.-156+200)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-157+400 To Ch.-157+900) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 04 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole SHEP
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-156+200 To Ch.-156+700)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-157+900 To Ch.-158+400) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 05 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole SHEP
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-156+700 To Ch.-157+200)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-158+400 To Ch.-158+900) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 06 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole SHEP
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-157+200 To Ch.-157+700)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-158+900 To Ch.-159+400) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 07 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT SHEP HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT

LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-157+700 To Ch.-158+200)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-158+400 To Ch.-159+900) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 08 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :-(Electrical)
Existing Road

Existing/Available Right of Way EROW

Proposed Right of Way PROW


HT HT

Electric Poles Transformer Electric Box


HT

HT

Existing HT Line & Pole HT HEPHT HEP


HT HT
HT

HT

HT HT

HT HT

HT SHEP HT SHEP
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Shifted HT Line & Pole
HT

HT
HT

HT

LT LT
No of Poles No of Poles No. of Poles No of Tansf. No of Tansf. No. of Tansf. No of Box No of Box No. of Box
Existing LT Line & Pole LT LT LT LT
0 0 0 0 0 0 0 0 0
LT

LT
LT

LT
LT

LT

Shifted LT Line & Pole LT SLEP LT LT SLEP LT


LT
LT

Existing Transformer
TRF Isolated Electric Poles
STRF
Shifted Transformer Existing Pylon
TRF Left Hand Side Right Hand Side Total
Existing Isolated Electric Poles Electric Box No of Post No of Post No. of Post
Note:-
Shifted Existing Pylon 0 0 0
Shifted solated Electric Poles SPIE Shifted Electric Box SEB 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), ALTINOK Consulting Engineering Inc.
PLAN & RELOCATION OF
from Ch.154+210 to Ch.158+650 (North Bound) and from Ch.155+940 to Ch.160+260 A-8, Green Park, New Delhi - 110016, India
NATIONAL HIGHWAYS UTILITIES (ELECTRICAL) Revisions
(South Bound) including construction of twin tube tunnel (Package-I) in the UT of Jammu & NB(Ch.-158+200 To Ch.-158+650)
AUTHORITY OF INDIA Kashmir on EPC Mode. SB(Ch.-159+900 To Ch.-160+260) Drawing Title :- NHAI / RAM-BANI / UTILITY SHIFTING /EP / 09 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
UTILITY SHIFTING PLAN
(WATER)
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-154+210 To Ch.-154+700)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-155+940 To Ch.-156+400) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 01 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-154+700 To Ch.-155+200)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-156+400 To Ch.-156+900) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 02 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-155+200 To Ch.-155+700)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-156+900 To Ch.-157+400) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 03 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-155+700 To Ch.-156+200)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-157+400 To Ch.-157+900) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 04 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-156+200 To Ch.-156+700)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-157+900 To Ch.-158+400) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 05 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-156+700 To Ch.-157+200)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-158+400 To Ch.-158+900) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 06 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-157+200 To Ch.-157+700)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-158+900 To Ch.-159+400) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 07 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-157+700 To Ch.-158+200)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-158+400 To Ch.-159+900) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 08 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500
TO RAMBAN TO BANIHAL

Legend :- Hand Pump, T ube W ell & Well , Municipal T ap,


Water Pipe Line,Sewerage Line/Manhole, Water Tank Water Pipe Line Hand Pump
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
Existing Road No. of Pump
Length of Pipe (m) Length of Pipe (m) Length of Pipe (m) No. of Pump No. of Pump
Shifted Building Water Tank SWT 0 0 0 0 0 0
Existing Right of Way EROW

Existing Water Pipe Line WPL WPL Tube Well & Well Municipal Tap
Proposed Right of Way PROW PROW
Left Hand Side Right Hand Side Total Left Hand Side Right Hand Side Total
SWPL SWPL
Existing Sewerage Line Shifted Water Pipe Line No. of Well No. of Well No. of Well No. of Tap No. of Tap No. of Tap
0 0 0 0 0 0
Existing Tube Well &Well
Shifted Sewerage Line SMH
Water Tank
Sewerage Line/ Manhole
Shifted Tube Well & Well STW SW
Left Hand Side Right Hand Side Total
Existing Hand Pump Left Hand Side Right Hand Side Total
Length of Line (m) Length of Line (m) Length of Line (m) No. of Tank No. of Tank No. of Tank
Existing Municipal Tap 0 0 0 0 0 0
Shifted Hand Pump
No. of Manhole No. of Manhole Total No. of Manhole Note:-
Existing Building Water Tank Shifted Municipal Tap
0 0 0 1. All Dimensions are in meter, unless otherwise specified.

Client :- Project Title :- Drawing Name :- Intercontinental Consultants & Technocrats Pvt. Ltd., R0 March - 2021 Initial Plan
PLAN & RELOCATION OF UTILITIES in Joint Venture with
Revisions Date Description
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A ( Hand Pump, T ube W ell & Well , ALTINOK Consulting Engineering Inc.
Municipal T ap, Water Pipe Line,
NATIONAL HIGHWAYS (Now NH-44), from Ch.154+210 to Ch.158+650 (North Bound) and from Sewerage Line/Manhole, Water Tank)
A-8, Green Park, New Delhi - 110016, India Revisions
Ch.155+940 to Ch.160+260 (South Bound) including construction of twin tube NB(Ch.-158+200 To Ch.-158+650)
AUTHORITY OF INDIA tunnel (Package-I) in the UT of Jammu & Kashmir on EPC Mode. SB(Ch.-159+900 To Ch.-160+260) Drawing Title :- NHAI / RAM-BANI /UTILITY SHIFTING/ WPL / 09 Rev.
(Viaduct & Tunnel North & South Bound) Vikram Negi Madhusudhan Rao Manoj Kumar Sandip Bhattacharjee R0
Prepared by Designed by Checked by Approved by Scale:- 1 : 1500