Hi, the posting of Higg FSLM is overdue.
Will it affect the factory to select Higg as the AH of SLCP, if the factory did n
Linda Chen-Saintyear 03:08 PM
1/ Mill Higg FSLM self assessment finished in May, 2019; 3rd party verification in Nov.2019;
Then is the valid till May or Nov.2020?
2/ as Tier 2 mill是, do we need Inspectorio Rise only or both Rise and Sight? And is every year charge for each mill?
Tobey.Leung 03:12 PM
1-Nov-20
2/ only RISE, for the fee for Inspectorio platform, first year is free, the detailed fee information, please check with In
Oanh Nguyen 03:09 PM
We are a denim garment factory in Vietnam, how can we connect our Higg FEM account and Better Work to Inspec
Stephanie.Liao 03:11 PM
Hi, you would not need to connect Higg account or BW to Inspectorio. Please disclose the relevant information in In
Linda Chen-Saintyear 03:10 PM
yes, actually, we already did FSLM last year. And now is under new year self-assessment
Melinda.Chen 03:14 PM
Yes, please renew the new cycle of SLCP to share report by Nov. 2020
Tobey.Leung 03:15 PM
yes, please be reminded that after completing the self assessment, factory have 2 months time to initiate verificatio
Anonymous Attendee 03:10 PM
The factory has not purchase FSLM module for self-assessment at this moment, but planning to go for it.
Melinda.Chen 03:17 PM
If you are in the scope of SLCP that you are required to conduct FSLM & vFSLM (self-assessment & verification) then
Anonymous Attendee 03:12 PM
Is this totally different from Spark systhem and this is meant to be educated to write down something?
Tobey.Leung 03:16 PM
This is a totally different with Spark system
Surata Chakma 03:13 PM
Is it third party verification team for SLCP ?
Melinda.Chen 03:19 PM
We do not assign any 3rd party for verication, you can select the SLCP certified verify body on SLCP Gateway
Julian Lau 03:13 PM
Hi I have completed the 3 elearning modules but still awaiting for the code in order to create the gateway profile, w
Eunice.Cheung 03:15 PM
Hi we recommend you to contact SLCP using the Helpdesk for that, thanks.
Surata Chakma 03:14 PM
Third party means any kind of audit firm ?
Eunice.Cheung 03:16 PM
Please refer to the Gateway list for the accredited third parties: https://www.sumerra.com/programs/slcp/active-v
Tobey.Leung 03:16 PM
unless they are SLCP accredited verifiers
Anonymous Attendee 03:14 PM
We are a trim supplier operate in Bangladesh, Vietnam, Indonesia. Are we mandatory to join BW? Since we have us
Tobey.Leung 03:17 PM
BW is not mandatory, please continue to use SLCP
Oanh Nguyen 03:14 PM
We have joined Better Work, do we need to do FSLM or SLCP assessment?
Eunice.Cheung 03:15 PM
No you only need to join Better Work in this case, thanks.
Frans Mulja 03:14 PM
For the factory already join with Better work , and already has an inspectorio account, so how and who should requ
Vera.Huang 03:22 PM
Your vendor need to initiate disclosure in Inspectorio and invite your factory to complete Disclosure detail.
Tobey.Leung 03:22 PM
Vendor need to initiate disclosure request for factory, then factory need to login to Inspectorio to submit disclosure
Joe DeChamp 03:15 PM
I registered for Inspectorio, do I also need to register on SLCP Gateway? How do I access SLCP Gateway?
Eunice.Cheung 03:23 PM
Yes registration for SLCP Gateway is a must to proceed to SLCP self-assessment and verification. https://gateway.sl
Please note that only factories are required to register on the Gateway, thanks.
Frans Mulja 03:15 PM
We as factory can not find the RS compliance in the standard expetorio
Stephanie.Liao 03:17 PM
Hi , you could navigate from "standard" in Inspectorio and you cound find the card "RS compliance". If you still have
Linda Chen-Saintyear 03:16 PM
Thanks, Tobey. Yes, clear the fee during training, it will 50%discount 2nd year, i just want to know it is for each mill,
Stephanie.Liao 03:28 PM
Hi Linda, Please reach out to Rise support for help if any question related to fee or subscirption
Anonymous Attendee 03:18 PM
Hello. You said that all factory need to share SLCP verification report per schedule (from Oct 15 to Dec 15). If any pr
Melinda.Chen 03:25 PM
The extention of deadline to share report to us to Dec. 15 apply with the factories located in VN, BD, Indonesia. Th
Julie.Nguyen 03:26 PM
we expect business partners to complete the request timely. and you can reach out us to let us know if delay happe
Anonymous Attendee 03:18 PM
Hi, my factory has not purchase the FSLM, but the posting date for Higg FSLM is overdue. Will it affect the factory to
Thank you!
Tobey.Leung 03:24 PM
If it is overdue, you have to start a new FSLM module and initiate vFSLM (verification) in two months
Mohammad Abdul Jabbar 03:18 PM
As a tire 2 sedex and HIG FEM3 Varified factory what will our next step for SLCP Gateway registration?
Tobey.Leung 03:28 PM
Tier 2 supplier is required to register SLCP and complete FSLM and vFSLM module (unless you have already particip
Joe DeChamp 03:19 PM
Please snd me link to access SLCP Gateway.
Eunice.Cheung 03:21 PM
https://gateway.slconvergence.org/
Farida Nurro 03:19 PM
Do factory which is not nominated for SLCP program should submit the diclosure of RS Environmental Assessment a
Eunice.Cheung 03:21 PM
We invite factories within the scope of RS on a phased approach. Please submit disclosure when they are already n
Rupam Kanti Das 03:19 PM
We are also now register & payment completed with BW. Have we need to engaged with SLCP
Vera.Huang 03:20 PM
If your factory proceed with BW program and disclosure us BW reports, no need to have SLCP report.
Anonymous Attendee 03:21 PM
Is this mandatory to sign in SLCP kind of? I don't get it much sorry
Eunice.Cheung 03:26 PM
Yes if you are A&A, footwear or selected Tier-2 factory, you should join BW, if BW is unavailable, it is mandatory to
Yoonie Joh 03:22 PM
Please share us the exact due date of SLCP self-assessment and verification again. When I inquired if RS team would
Eunice.Cheung 03:30 PM
The deadline 12/15 is actually specified in the original invitation email, please check again and we will further remin
Anonymous Attendee 03:23 PM
Does it have deadline for disclosing better work? In case of Indonesia, Better Work Indonesia has postponed BW on
Eunice.Cheung 03:25 PM
Yes we are aware of delay in Indonesia, please let us know your situation via responsible.sourcing@target.com for
Anonymous Attendee 03:23 PM
as a factory we did not receive any disclosure yet wehen we wii receive it
Vera.Huang 03:24 PM
Please reach your vendor. The disclosure should be initiated by your vendor.
Sam Park 03:23 PM
I have a question for inspectorio. On that website, there are 2 kinds of service that inspectorio give, inspectorio sigh
Eunice.Cheung 03:27 PM
RISE for RS requirements, thanks.
Vera.Huang 03:27 PM
Inspectorio Sight is for PSQA.
Frans Mulja 03:24 PM
whether the vendor has to request for disclosure first , before the factory can find the RS comlliance in standard
Vera.Huang 03:26 PM
yes, vendor need to initiate the disclosure in Inspectorio. Then the factory you diclosured for will be able to comple
Anonymous Attendee 03:26 PM
Our factory planned to conduct ZDHC testing in Oct 2020. On Inspectorio Rise, for question # 2 of Product & Schem
Stephanie.Liao 03:31 PM
Hi, if you are not in scope of ZDHC, please answer "NO"for both questions. If you are in scope, please fill out your an
Anonymous Attendee 03:27 PM
Can you share the ppt via e-mail (sales3@jungwoovina.com)
Melinda.Chen 03:31 PM
Please refer to the previous webinar training material and video
Shunxin Wu 03:28 PM
If factory work 4 hours in the morning. And work for 5 hours in the afternoon.
Julie.Nguyen 03:29 PM
Shunxin, can you provide more detail of your questions.
Hong Nhung Ngo Thi 03:28 PM
Can you share Q&A Slide with us?
Melinda.Chen 03:33 PM
We are working on FAQ, we will not share this deck for now. Please refer to the prrevious webinar training deck & v
Galaxy A30s 03:28 PM
hi, our factory is at Vietnam. our factory deal with SLCP but there is still no authorized third party to verify? so how
Melinda.Chen 03:35 PM
There are more verify body under the certified process by SLCP and suppose to be posted in Sept., you can hold for
Shunxin Wu 03:30 PM
If factory work 4 hours in the morning. And work for 5 hours in the afternoon.
How many Attendancerecords should employees make? 4 or 6 times a day?
William.Weng 03:38 PM
we recommend worker to punch in/out for each shift
Mohammad Abdul Jabbar 03:31 PM
this link is for SLCP registration raight? but on which link i can compleate my disclosure on inspectorio?
Tobey.Leung 03:32 PM
Inpectorio will send you invitation email to register account
Anonymous Attendee 03:31 PM
when we will see options in the the audit standards page & when we will see active assessment as it is showing n
Stephanie.Liao 03:33 PM
Hi, could you please provide more detail about your question?
Galaxy A30s 03:32 PM
our factory filled in Higg index vFSLM
but how to link it to slcp?
Tobey.Leung 03:33 PM
if you already done in Higg. org you can share the report directly with Target Corporation on Higg.Org. No need to r
Surata Chakma 03:33 PM
Kindly can I get POL help link ? Please help us to recived link ?
Julie.Nguyen 03:34 PM
if you are Target vendor, you can access POL under your account. if you are the factory, pls. contact your vendor to
frank ha 03:34 PM
We are a Denim supplier in Vietnam, Tier 2. The 2019 FEM has been verified through Higg and the data is shared w
Regarding EQ, we have already WRAP Gold label certification which is similar to FSLM of Higg. Do we have to get ut
Tobey.Leung 03:36 PM
Currently Tier 2 supplier can only allowed to use SLCP or BW. WRAP is not one of our accepted EQ scheme
Jessy Han 03:36 PM
This is Inspectorio related question.
Melinda.Chen 03:38 PM
Please describe more on your question
Yoonie Joh 03:36 PM
In the original invitation we received, the deadline was specified as Oct 15.
Melinda.Chen 03:37 PM
If the factory located in Vietnam, Bangaladesh or Indonesia, we allow to extend the deadline to Dec. 15
Anonymous Attendee 03:37 PM
Can you asnwer to my inquires below?
1. Should all companies and factories be join in SLCP site?
2. What this system for?
3. How and when we should submit the scheme report to whom?
4. is there duedate to join in SLCP site?
This question has been answered live
Anonymous Attendee 03:37 PM
As a Sedex Pillar 2 & Higg's FEM Module posted stage, we are awaiting further steps through Invitation for Inspecto
Tobey.Leung 03:39 PM
Please complete SLCP FSLM and vFSLM module by 30 September and share with Target Corporation before you com
Stephanie.Liao 03:39 PM
Hi, please email to rise-support@inspectorio.com for help if any quetsion related to Inspectorio account set up.
Shunxin Wu 03:37 PM
If factory work 4 hours in the morning. And work for 5 hours continuously in the afternoon. The last hour is paid by
Is this situation accepatable? How many Attendancerecords should employees make? 4 or 6 times a day?
This question has been answered live
Anonymous Attendee 03:38 PM
Any level requirement of HIGG vFEM?
Echo.Li 03:39 PM
No
Bruce Zhang 03:39 PM
When is the lastest date to complete the disclosure?
Stephanie.Liao 03:40 PM
Hi, It's different for each wave/ phase. Please refer to the communication email from Target. Or email to RS mail bo
Anonymous Attendee 03:40 PM
So SLCP shall be through Sedex platform ?
Tobey.Leung 03:41 PM
Yes, you could use Sedex platform as the accredit host for SLCP
You 03:40 PM
in case the factory have already slcp that verified by BW and FEM already evrovied by 3rd party , do we need to con
Eunice.Cheung 03:42 PM
Yes because we will review the report and release Target RS rating using the Inspectorio Rise platform, your follow-
Jessy Han 03:40 PM
Hi, as per checking with our QA Team Tier 1 facilities had already Inspectorio Rise- standard ID and they are paying
- If we proceed with standard ID do we need to select a plan (monthly/year) ?
- How long will factories be using Inspectorio ID ? (for instance 1 time use 12~18 months)
Stephanie.Liao 03:42 PM
Hi Jessy, please reach out to rise-support@inspectorio.com for any questions related to account or subscription pla
You 03:40 PM
our factory can't join with BW for this year, what alternative factory can do for this do the factories need to have an
This question has been answered live
Hải Phan 03:41 PM
Can you answer for me question below?
Melinda.Chen 03:44 PM
As there are questions from the other attendees it will mix the sequences, please retype your COMPLETE questions
1gJ30btjmiCXCOb1S_901SwKgrWhFBbmRyb2lkU2hhcmVfNzM4 03:41 PM
as a factory when we will find the environmental questionnaire in our RISE account
Stephanie.Liao 03:44 PM
Hi, After you have set up account in Rise, please start to initiate disclosure by vendor, when fty fill out the disclosur
Yoonie Joh 03:41 PM
If the deadline for verification disclosure is Dec 15 for factories in Vietnam, Bangladesh and Indonesia, is the self-as
Stephanie.Liao 03:45 PM
Please email RS mail box with your factory VMM ID for support
Anonymous Attendee 03:42 PM
Our factory in vietnam have the audit sheduled in the last week of October. If we have VFEM result coming up on O
Stephanie.Liao 03:48 PM
Hi , if your VFEM could not be ready before given Disclosure deadline, please complete ENV quesionnaire and subm
Anonymous Attendee 03:42 PM
What is the impact to Vendor if their factory get Auto-fail rating?
This question has been answered live
Bruce Zhang 03:42 PM
OK noted. Thanks! Before the disclosure, should we have to finish Higg FEM?
Stephanie.Liao 03:45 PM
Yes. Otherwise you will fail to submit your disclosure
Jessy Han 03:46 PM
If our Tier 2 factories already were using BW but were nominated as SLCP by Target RS. Should we continue with BW
This question has been answered live
Anonymous Attendee 03:47 PM
If our factory in scope of ZDHC as target requirement, but has not conducted ZDHC testing, we do not have informa
Melinda.Chen 03:49 PM
Please email to Responsible.Sourcing@target.com your question.
Stephanie.Liao 03:50 PM
Hi, please select "i have not compliant with ZDHC..." so you will not be required to provide assessment date and rep
Anonymous Attendee 03:48 PM
if the factory got Auto-fail rating, how long they will be deactivated; it is immediately or the factory will have time t
This question has been answered live
wayan baswara
Hi, Our site is indonesia and we use Higg as AH SLCP. when we search for VB for FSLM, all the sugested VB (IAL &ICG
thank you
Vera.Huang 03:16 PM
Could you please send us email with your factory ID and issues facing? Our team will give specific instructions throu
Ngat Nguyen
for other factories that not in the nominated in this phase for complete SLCP or/and Enviroments questionnair in In
Tobey.Leung 03:31 PM
yes
Ngat Nguyen
Q3, - the rating Auto Fail also have follow up audit? plase advise in detail?
Julie.Nguyen 03:38 PM
factory will be out of Target matrix if Auto Fail result . if vendor wants to bring the audit fail to Target matrix again,
haivina kim lien
Hi, the top 10 questions will be sent to our email for reference?
Melinda.Chen 03:50 PM
We will not share the deck today. please refer to the previous training material and video
Sarah Sahara Agatha
Hii, when is the inspectorio assessment deadline?
Eunice.Cheung 03:39 PM
The deadline differs for different phases of invitation, please refer to your invitation email for the details, thanks.
Ngat Nguyen
Thank you Julie, Because I saw in the Q3 mentioned rating auto -fail and NI will be follow up audit within 6 months.
Julie.Nguyen 03:44 PM
yes, the new report that you can submit is follow report or new report that show you comply to allow for productio
Hii, when is the inspectorio assessment deadline?
Ngat Nguyen
Thank you Julie, Because I saw in the Q3 mentioned rating auto -fail and NI will be follow up audit within 6 months.
Sarah Sahara Agatha
what in the inspectorio get a score like the higg index?
Eunice.Cheung 03:47 PM
Yes each factory will get a rating and score with a list of all the issues called out by us, thanks.
AH of SLCP, if the factory did not purchase this module before?
ery year charge for each mill?
ormation, please check with Inspectorio
unt and Better Work to Inspectorio?
the relevant information in Inspectorio. If you are not clear about the process, please email to RS mail box for our training video
nths time to initiate verification
lanning to go for it.
ssessment & verification) then share report to Target.
down something?
body on SLCP Gateway
o create the gateway profile, when can I receive the code?
a.com/programs/slcp/active-vb-list/ thanks.
y to join BW? Since we have used HIGG FSLM for our factories in earlier 2020.
, so how and who should request for disclosure? vendor or factory.
lete Disclosure detail.
spectorio to submit disclosure report
ess SLCP Gateway?
erification. https://gateway.slconvergence.org/home
S compliance". If you still have questions, please reach out to Rise support by live chat or email
ant to know it is for each mill, right? as we have 3 of our own mill involved.
om Oct 15 to Dec 15). If any problem if we could not complete and post FSLM before August 31 and complete verification before Sep 15?
ated in VN, BD, Indonesia. The other factoires located in the other countires, will be required to follow the deadline. However, we would
s to let us know if delay happens and your challenge of unable to complete it. if there are no any notice from you and Target reminds yet n
due. Will it affect the factory to select Higg as the AH of SLCP, if the factory did not purchase this module at this moment?
in two months
way registration?
less you have already participated in BW program). Also you have to complete disclosure on Inspectorio
S Environmental Assessment and product scheme disclosure from RS compliance
osure when they are already nominated, thanks.
ave SLCP report.
navailable, it is mandatory to join SLCP to fulfil our RS compliance requirements.
hen I inquired if RS team would consider extending the deadline for the verification in case factories fail to schedule with any VB, their feed
gain and we will further remind the impacted factories if needed, thanks.
donesia has postponed BW on-site audit sicne March untill now.
ble.sourcing@target.com for us to adjust your deadline, thanks.
spectorio give, inspectorio sight and inspectorio rise. What kind of servies that we need to fulfill this requirement?
e RS comlliance in standard
ured for will be able to complete the disclosure details.
estion # 2 of Product & Scheme Disclosure part “Are you complaint with version 1.1 or 2.0 of Target MRSL policy?”, I select No (as your gui
n scope, please fill out your answer accordingly. You could also email to RS mail box if you are not sure if your factory is in scope of ZDHC
ious webinar training deck & video
d third party to verify? so how to verify?
sted in Sept., you can hold for now and look into it in Sept. Further, reach out to us if there still issues in Sept.
e on inspectorio?
assessment as it is showing no active assessment in rise
tion on Higg.Org. No need to register SLCP gateway
ry, pls. contact your vendor to get info.
Higg and the data is shared with Target by registering.
of Higg. Do we have to get ut again throug Target's SLCP program ? Can we replace it with Wrtap certification ?
accepted EQ scheme
eadline to Dec. 15
hrough Invitation for Inspectorio RISE - pls help with Invite & also next steps. (we are trims & packaging suppliers, part of Global chain loca
et Corporation before you complete disclosure in Inspectorio
nspectorio account set up.
noon. The last hour is paid by overtime standard.
? 4 or 6 times a day?
Target. Or email to RS mail box with factory VMM ID.
3rd party , do we need to connect on inspectorio as well?
rio Rise platform, your follow-up actions including CAP will take place on the platform as well, thanks.
ndard ID and they are paying on monthly basis. In this case for Target RS, which one should we use Inspectorio Pro or Standard ID?
to account or subscription plan
o the factories need to have an assessment from other party such as FFC / SEDEX in this year?
ype your COMPLETE questions. Thanks
when fty fill out the disclosure, you will see the ENV questionnaire. If you are not clear about the EQ process, please reach out to RS mail
h and Indonesia, is the self-assessment completion due also extended accordingly?
e VFEM result coming up on Oct, do we not need to complete Environmental questionnaire?
e ENV quesionnaire and submit disclosure before deadline to avoid business impact
S. Should we continue with BW or SLCP?
sting, we do not have information such as assessment date, report for attaching on Rise, so how can we complete the Product & Scheme
ovide assessment date and report as mandatory requirement
or the factory will have time to finish pending production?
, all the sugested VB (IAL &ICG) can't do verification in indonesia unti 2021. but TARGET timeline need to do verification in SEP 20. please g
give specific instructions through emails concerning your case. thanks.
Enviroments questionnair in Inspectorio, they will wait for email from Target in next phase , is that correct?
dit fail to Target matrix again, you need to submit a new report in next 6 months.
mail for the details, thanks.
low up audit within 6 months.
comply to allow for production. yet auto fail result will not allow for production and is out of matrix.
low up audit within 6 months.
or our training video
e verification before Sep 15?
deadline. However, we would encourge you to communicate to us (email RS inbox) for your questions/challenges.
m you and Target reminds yet no feedback then consequence will happen that we will deactive the factory.
his moment?
hedule with any VB, their feedback was that factories in Vietnam, Bangladesh and Indonesia will be allowed to extend the deadline of sha
olicy?”, I select No (as your guidance in training on August 40. However, in the next question, it still request for mandatory information abo
ur factory is in scope of ZDHC
pliers, part of Global chain located in India).
rio Pro or Standard ID?
s, please reach out to RS mail box for help
mplete the Product & Scheme Disclosure part. there is one mandatory question need to fill these information while we have not conduct Z
verification in SEP 20. please give any advice
to extend the deadline of sharing report till Dec 15, 2020 due to new process and verifier capacity. Will you send out official announceme
or mandatory information about ZDHC in order to complete this part. As inform above, we do not have this information to fill in due to we
n while we have not conduct ZDHC testing yet. Please check the question # 2 of Product & Scheme Disclosure part on Rise for clear my que
send out official announcement for the due extension?
nformation to fill in due to we do not have ZDHC testing until now. So how I can fill in this section to complete this part? Do we need to co
e part on Rise for clear my question.
te this part? Do we need to conduct ZDHC now to have info to fill in?