C
G A
H B
F
Warehouse Warehouse of
finished product raw material
Machine A:
Name: AMADA AE 2510 NT for turret punch
Process: CNC turret punch
Total Process time to produce one product that’s has 200 parts:
10 hours.
Input: 20 metal sheets
Output: 200 parts
Machine B:
Name: plasma machine
Process: cutting the sheets by heat
Process time to produce one product that’s has 50 part: 8 hours.
Input: 10 metal sheets
Output: 50 parts
Machine C:
Name: AMADA HDS 1303 NT press brakes
Process: bending machine
Input: 30 parts 15%
Output: 30 parts
Total process time: 3 hours
Machine D:
Name: LVD & Press Brake
Process: For bending and punch the sheets
Input: 50 parts of product A 25%
Output: 50 parts of product A
Total process time: 6 hours
-------------- for product B
Input: 10 parts of product B 10%
output: 10 parts of product B
Total process time: 2 hours
Machine E:
Name: bending machine
Process: bending machine
Input: 30 parts 15%
Output: 30 parts
Total process time: 4 hours
Machine F:
Name: shearing machine
Process: shearing machine
Input: 20 parts
Output: 20 parts
Total process time: 3 hours
Station G:
Name: manual welding Station 1
Process: welding for product A
Input: 200 parts
Output: 1 large finished product
Total process time: 12 hours
Station H:
Name: manual welding Station 2
Process: welding for product B
Input: 50 parts
Output: 1 large finished product
Total process time: 14 hours
More info
If a machine has 30 part as an output it dose not move to
the next machine until all 30 part are finished and the
material handling equipment is a forklift
10 hours per shift
1 shift pre day
Distance between machines and
stations in meters (m)
A to C 15
A to D 11
A to E 4
A to G 22
C to G 9
D to G 11
E to G 20
B to D 9
B to F 17
B to H 12
D to H 13
F to H 28