STAIRCASE PRESSURIZATION CALCULATION
BUILDING DETAILS                                                                                         Required Data
          Building Height from Lowest Level of Fire Service Access Excluding Roof
      1.0
          Parapet                                                                                                       meters
      2.0 Type of Building
      3.0 Is Provision of Staircase Press. System Mandatory
                                                                                                                  Yes
      4.0 Is Sprinkler System provided for Fire Protection                                                        Yes
STAIRWELL DETAILS
      1.0   Length of Stairwell                                                                                         meter
      2.0   Width of Stairwell                                                                                          meter
      3.0   Total Height of Stairwell (including Basement where Applicable)                                             meter
      4.0   No. of Levels in Stairwell (including Basement where Applicable)
      5.0   Ceiling Height                                                                                              meter
      6.0   Pressure Difference Between Staircase & Adjacent Space                                                      Pa.
      7.0   Average Leakage Ratio for Walls (NFPA 92, Table A.4.4.4.3)                               1.10E-04
      8.0   Average Leakage Ratio for Floor/Ceiling (NFPA 92, Table A.4.4.4.3)                       5.20E-05
STAIRWELL DOOR DETAILS
   1.0 Number of Stairwell Door Per Floor
 Door No:                                A1         A2                    A3
Qty. of Doors
Door Size Width (m)
Door Size Height (m)
No. of Door Leaves
Total Door Opening Force (N)
Door Closer Force (N)
   2.0 Door Arrangement (Series or Parallel)                                                    Parallel
   3.0 Average Gap Between Door Leaf and Door Frame                                                                     mm
   4.0 Select 3 Doors Likely to be opened during Evacuation
        Exit Door -1 (indicate Door No.)
        Exit Door- 2 (indicate Door No.)
        Exit Door -3 (indicate Door No.)
   5.0 Distance of door knob to knob side of the door (d)                                                               m
                                                     CALCULATIONS                                                                      English Unit Conversion
      1.0 Leakage area of gaps in Stairwell Walls, Ceiling & Floor                                            0.000 sq. m.                         -    Sq. feet
      2.0 Leakage area of gaps around doors                                                                   0.000 sq. m.                         -    Sq. feet
      3.0 Total Leakage Area (A) of gaps in Building Construction and Doors                                   0.000 sq. m.                         -    Sq. feet
      4.0 Airflow Through Gaps in Building Construction & Doors (Q1)
            Q1 & Q2 = kf x A x (△P)^(0.5)                                                                    0.000 Cu.m/sec)                       -    CFM
            Where: Q1&Q2 = Flowrate (cu.m/sec)
                    Kf =Coefficient, 0.827
                    A = Total Leakage Area (Wall,Floor,Ceiling & Doors/Window), Sq.m.
                    △P = Pressure Differential between staircase & adjacent area, Pascal (Pa)
1/2                                              Stair Pressurization Calculation- Final.xlsx -07/04/23-5:17 AM              Prepared by Dr. Reynaldo B. Castillo, PME
                                       STAIRCASE PRESSURIZATION CALCULATION
      5.0 Effective Area of 3- Doors Open                                                                       0.00 sq. m.                      -   Sq.Ft.
      6.0 Airflow Through 3-Nos Open Doors (Q2)
            Q2 = A x v                                                                                          0.00 Cu.m/sec)                   -   CFM
            where: Q2 = Flowrate (cu.m/sec)
                   A = Total Effective Area (3-Doors), sq.m.
                   v = Maximum Velocity, 1.02 m/sec. (NFPA 92, Section 4.4.4.1.4)
      7.0 Total Airflow (Q1 + Q2 +Q3) =QT                                                                       0.00 Cu.m/sec)                   -   CFM
      8.0 Add Safety of Factor (10%)                                                                            0.00 Cu.m/sec)                   -   CFM
      9.0   Staircase Pressurization Calculated Airflow Rate:                                                   0.00 Cu.m/sec)               -       CFM
  10.0 Required Relief Airflow (Cu.m/Sec)= Q3- (Q1 + Q2) :                                                      0.00 Cu.m/sec)                   -   CFM
  11.0 Req. Size of Relief Damper = Qr/v-acceptable(10.2 m/sec)                                                 0.00 Sq.M                        -   Sq.Ft.
2/2                                            Stair Pressurization Calculation- Final.xlsx -07/04/23-5:17 AM            Prepared by Dr. Reynaldo B. Castillo, PME