0% found this document useful (0 votes)
221 views43 pages

Hynday

This document is a profile for Hyundai E&C, a construction company. It discusses Hyundai E&C's role as a total solution creator within the Hyundai Motor Group, offering innovative ideas and technologies. It highlights several of Hyundai E&C's major global infrastructure, building, housing and plant projects, showing its ability to create foundations, harmony, and power through advanced construction solutions. The profile emphasizes Hyundai E&C's vision of creating a better world through sustainable practices and a global network.

Uploaded by

Jaime Morales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
221 views43 pages

Hynday

This document is a profile for Hyundai E&C, a construction company. It discusses Hyundai E&C's role as a total solution creator within the Hyundai Motor Group, offering innovative ideas and technologies. It highlights several of Hyundai E&C's major global infrastructure, building, housing and plant projects, showing its ability to create foundations, harmony, and power through advanced construction solutions. The profile emphasizes Hyundai E&C's vision of creating a better world through sustainable practices and a global network.

Uploaded by

Jaime Morales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

2023 HYUNDAI E&C PROFILE

TOTAL SOLUTION CREATOR


CONTENTS

TOTAL SOLUTION
CREATOR
01
02
PROLOGUE
FEATURED PROJECTS
TOTAL SOLUTION CREATOR
10 HYUNDAI MOTOR GROUP Hyundai E&C creates new value and builds
11 HYUNDAI SPIRIT
a better world with creative ideas and passion,
12 CEO’S MESSAGE
offering a greater future with
14 TOTAL SOLUTION CREATOR
constant innovations and bold initiatives.
16 GLOBAL HDEC
18 TECHNOLOGY
20 ADVANCED TECHNOLOGY OF HDEC

WE CREATE 22 BUSINESS PORTFOLIO


A BETTER WORLD 24 INFRASTRUCTURE WORKS
36 BUILDING WORKS
48 HOUSING WORKS
60 PLANT WORKS

WE CREATE 72 MANAGEMENT PRIORITIES (E.S.G)


A SUSTAINABLE 74 SUSTAINABLE VALUE CREATION
WORLD 75 ENVIRONMENTAL
76 SOCIAL- SAFETY
77 SOCIAL- QUALITY ASSURANCE
78 SOCIAL- CONTRIBUTION
79 GOVERNANCE
80 GLOBAL NETWORK
81 HYUNDAI E&C HISTORY
Sheikh Jaber Causeway Bridge (Nov. 2013 ~ Oct. 2019)
Country | Kuwait
Client | Ministry of Public Works
Project Features | One of the world’s longest maritime bridge extending
36.14㎞ between Kuwait City and northern Subiyah.

INFRASTRUCTURE WORKS

CREATE FOUNDATION
The Jaber Causeway Maritime Bridge in Kuwait is a global landmark. The super-sized
maritime bridge linking Kuwait City, the capital city, and Subiyah, a new city in the north,
is an infrastructure project aimed at balancing the development of Kuwait. Hyundai E&C
has created a 36.14㎞ path on the ocean, drastically reducing the time and cost of traveling
between the capital and the provincial region, while also creating a national artery that
helps disperse the population and develop the country’s industry. Hyundai E&C creates
better lives and future value by building infrastructure where diverse industries can thrive.
National Museum of Qatar (Sep. 2011 ~ Mar. 2019)
Country | Qatar
Client | Qatar Museum Authority
BUILDING WORKS Project Features | An exhibition venue and commercial facility with one

CREATE HARMONY underground floor and five aboveground floors. The


unique exterior inspired by the ‘desert rose’ is seen
as the sublime of cutting-edge technologies using the
application of Building Information Modeling (BIM).
National Museum of Qatar, global cultural landmark, is a monument to modern
architecture featuring an innovative design inspired by the ‘desert rose,’ using 3D
BIM, -a state of the art-method. Hyundai E&C visualized an architectural structure
where Qatar’s tradition and modernity are harmonized by applying 316 circular
panels of eco-friendly materials from various angles. Hyundai E&C increases the
value of life and creates a harmonious tomorrow by leading the evolution of archi-
tecture with advanced technology.
THE H BANPO LACLASS (May 2018 ~ June 2021)
Country | Korea
Client | Association for Reconstruction of Samho Garden Mansion’s Third
Apartment Complex
Project Features | It is the first-ever complex built under the brand THE H
embodying Korea’s best premium lifestyle. The new complex
having rebuilt Samho Garden Mansion’s third apartment
complex accommodates a total of 848 households in 6
buildings with four underground floors and maximum 35
above-ground floors, offering differentiated exterior,
landscaping, and top quality community services.

HOUSING WORKS

CREATE EXCELLENCE
THE H BANPO LACLASS is the first-ever project implemented under the brand ‘THE H’
which has established itself as Korea’s top premium brand since its launch in 2015. It is a
premium residential complex that guarantees the comfort of being at a resort, boasting pri-
vate residential spaces that combine nature and art, a sky lounge with a view over the Han
River and Namsan Tower, and community facilities that provide one-stop services. It delivers
a healthy and rich premium living space, including curved exterior applied for the first time
in Gangnam, a grandiose atypical gateway, unique innovative design that offers a glimpse of
the technological evolution of Hyundai E&C, as well as landscape and complex environment
exhibiting art works by global artists.
Barakah Nuclear Power Plant (Mar. 2010 ~ Nov. 2023 scheduled)
Country | UAE
Client | Emirates Nuclear Energy Corporation (ENEC)
PLANT WORKS Project Features | Construction of four 1,400㎿ nuclear power plants and

CREATE POWER infrastructure located 270㎞ west of Abu Dhabi, UAE.

The Barakah nuclear power plant in the UAE is the first export of a Korean model nuclear
power plant. This project constructing four 3-generation nuclear power plants with a total
capacity of 5600㎿, is attracting attention as the first nuclear power plant in the Middle East.
With its technology and capability to perform nuclear power plant projects on its own,
Hyundai E&C is building the source of power to fuel the UAE. Hyundai E&C creates the
foundation for a better life and opens a new paradigm where respect for the environ-
ment and economic growth are simultaneously realized by providing highly efficient and
eco-friendly global plants and facilities.
Hyundai Hyundai E&C serves as one of the three key pillars of the Hyundai Motor
Group, along with the automobile and steel companies. It has led perfect Hyundai Spirit A dauntless determination and confidence based on the idea ‘We can
achieve whatever we imagine,’ creative wisdom, and a pioneering spirit

Motor Group synergy through cooperation and links between affiliates in the fields of
logistics, components, finance and IT. In addition, through the vast global
Realization of New Possibilities are Hyundai E&C’s foundation for thoughts and actions. The ‘Hyundai
Spirit’ that does not fear change is our greatest source of competitiveness
network of the Hyundai Motor Group, the company is accelerating its in leading the future.
Cooperation and Synergy
efforts to expand its high value-added fields, diversifying the market and
targeting new businesses.

ES Lif
I AT et
im
AU
TO
L
FI ks ion eP
M
AF twor fact ar
an tne OB
SE e tis
tN a Be A ILE
d r in
ER rfecmer
S
yo ut
V nd om
DI Pe to s ob
Cu il es
of

T
rts

Cr

WI
EN

ea
e Pa

ive
Together for a
eel

SD
tiv
LL

iat
f St

eI
otiv

nit
Better Future

OM
PE

nte
o

gI
S
utom

IM
Era

llig
T

on
PAR
EL

Str

en
New

HYUNDAI
in A

c
S TE

SPIRIT
erts
the

O
AUT
Exp
ding

ding
Lea

Lea

Determination
We Build Tomorrow

CONSTRUCTION VOLITION

AUTOMOBILE AUTO PARTS CONSTRUCTION STEEL DIVERSE WISDOM Creative Intelligence VOLITION Determination IMPELLENT Strong Initiative
AFFILIATES
Hyundai Motor strives to realize The automotive parts sector con- As a global provider of total engi- As an eco-friendly, resourcecircu- By strengthening the quality and We pursue a creative attitude and wisdom We pioneer the future with a strong sense We challenge changes and limitations with
optimal transportation capabilities tinuously strives to reach the top neering solutions, the construction lating company, Hyundai Motor service of each sector within the based on future-oriented thinking. of ownership and a positive attitude. a strong mind and driving force.
based on innovative human-centric global position and lead the world’s sector pursues organic coopera- Group’s steel sector will lead a new Hyundai Motor Group, the support-
and ecofriendly technologies and automotive industry by developing tion with related industries to build era in the steel industry by provid- ing sectors aim to provide a network
comprehensive services, to provide core automotive parts and man- the foundation for a better life by ing advanced products and services that is customer-oriented, delivering
new spaces that make customers’ ufacturing technologies. leading the convergence of future and realizing the world’s best com- maximum value and increased cus-
lives more convenient and happy. technologies and industries petitiveness based on cooperative tomer benefits.
relations with our stakeholders.

10 HYUNDAI ENGINEERING & CONSTRUCTION HYUNDAI MOTOR GROUP | HYUNDAI SPIRIT 11


CEO’s
Message
As a proud industry leader in Korea, we will take the lead in
the new era and build a happy future for all.

Since its foundation in 1947, Hyundai Engineering & Construction has been at the forefront of
every milestone in Korea’s remarkable growth. We have successfully carried out more than
870 overseas projects in 62 countries, demonstrating Korea’s construction prowess on the
global stage.

Even in the current period of uncertainty and changes, the Hyundai Spirit that has allowed us
to turn the impossible into the possible by building prosperous cities on barren wastelands
and bridges spanning the vast ocean, remains as keen as ever. Under the shared goal of
Hyundai Motor Group, ‘Together for a Better Future,’ Hyundai E&C is accelerating our growth
driver by bolstering our strengths and maximizing our competencies to solidify our leadership
in the global construction market.

To that end, we are building upon our core strength in EPC while expanding business scope
into investment projects and O&M to become a total solution creator in all areas of construc-
tion. In the meantime, we are also working to secure source technologies, automate the
construction process, and adopt smart city and eco-friendly methodologies to lead us into the
market of the future.

Recognizing that harmony and sustainability have become the spirit of the times, Hyundai
E&C will pave the way for the prosperity of both business and society by upholding ESG
(Environmental . Social . Governance) responsibilities and prioritizing safety, quality, coopera-
tion for co-prosperity, and righteousness management. In addition, we will further the trust
and pride we have won as the nation’s leading company that we have proudly maintained for
the past years.

We will continue to put customer value first and maintain open corporate culture based on
empathy and consideration. As a global player fully equipped with expertise and compe-
tencies, we will continue our endeavors toward the welfare and happiness of humankind by
providing higher value in construction.
Leading the global industry,
I humbly ask for your unwavering support and encouragement for Hyundai E&C.
we provide a total solution for
Thank you.
every area of construction.
Yoon Young-Joon
President & CEO, Hyundai E&C

12 HYUNDAI ENGINEERING & CONSTRUCTION CEO’S MESSAGE 13


Total Solution The construction industry is expanding beyond its conventional business
scope in step with the changing market trends and future. In response to

Creator the growing demands for a total solution creator beyond EPC, Hyundai
E&C is enhancing its competitiveness by combining our excellent project
execution capabilities accumulated from many large-scale global projects
Encompassing All Areas of Planning & Marketing
with the extensive network of Hyundai Motor Group. We will continue to
the Construction Business meet the needs of our customers as the leading reliable solution provider.

Hyundai E&C’s Total Service


Operation & Financing
Maintenance

Planning & In the planning stage, we establish a strategy to maximize profits and mini-
Marketing mize costs by thoroughly analyzing the feasibility and reviewing all matters.
In addition, we comprehensively consider the quality, the construction peri- TOTAL
od, and the safety in our business budget to derive the best-integrated solu-
tion that creates high added value.
SOLUTION
CREATOR
Financing We propose optimal financial structure and conditions by analyzing the
risks of all business processes from various angles. Hyundai E&C’s solid
credibility provides strong support in financial security.

Design & Based on our extensive project execution know-how that we have accumu-
Engineering lated through a balanced project portfolio, we provide optimal design and
engineering solutions that consider the successive phases of the project
(construction and operation). Construction Design &
Engineering
Procurement Hyundai E&C is building a global procurement system, constantly searching
for the best local suppliers. We also maximize purchasing efficiency through
partnerships with suppliers of materials and equipment, as well as procure-
ment experts.

Construction Through continuous technology and human resource development, we apply


the best solution to the situations and conditions appropriate at the site. This
provides the best quality to our customers with impeccable construction. Procurement

Operation & Hyundai E&C has accumulated various experiences in the construction indus-
Maintenance try, including complex facilities, transportation infrastructure, environmental
plants, and power plants. We strive to provide the highest level of operation
and maintenance (O&M) services in the world. As a leading global builder, Hyundai E&C provides
exceptional solutions for the entire construction process.

14 HYUNDAI ENGINEERING & CONSTRUCTION 15


Dow Jones Sustainability Indices ENR’s Top International Contractor Top Company in Carbon Management

Global HDEC Since Hyundai E&C first advanced into a foreign country in 1965, it has
performed more than 870 projects in 62 countries worldwide, growing
World Index of DJSI for 12 consecutive years International No.13 construction company
industry leader (2011, 2013~2018, 2020, 2021) (based on 2022 overseas sales revenue)
Platinum Club of CDP Korea (2021)
CDP Hall of Fame (2018~2021)
as a global leader. In addition, as a result of strengthening sustainable
Global Projects
management to improve global competitiveness, the company has
been recognized for its global achievements worldwide. Hyundai E&C
* As of Aug. 2022
will continue to create future value through world-leading construction.

15
EUROPE & CIS
Azerbaijan 1, Bulgaria 1, Netherlands 1,
Romania 1, Russia 4,
414 MIDDLE EAST
Bahrain 28, Iran 8, Iraq 40, Jordan 2,
58
NORTH AMERICA & PACIFIC
Antarctica 2, Australia 2, Canada 4,
Turkey 1, Turkmenistan 2,
Kuwait 67, Lebanon 1, Oman 4, Fiji 1, Guam 37,
UK 1, Uzbekistan 3
Qatar 25, Saudi Arabia 171, Papua New Guinea 5, USA 7
United Arab Emirates 55, Yemen 13

40 334 ASIA
Bangladesh 15, Brunei 1, China 21,
14
AFRICA
East Timor 1, Hong Kong 20, India 17, LATIN AMERICA
Indonesia 35, Japan 5, Macau 2, Malaysia 48,
Brazil 1, Chile 1, Columbia 2,
Algeria 4, Egypt 4, Ghana 2, Mongol 1, Myanmar 6, Nepal 8, Pakistan 7,
Uruguay 1, Venezuela 6,
Libya 26, Mozambique 1, Philippines 9, Singapore 93, Sri Lanka 5,
Panama 1, Peru 2
Republic of Cote d’Ivoire 1, Taiwan 3, Thailand 15, Vietnam 22
Tunisia 1, Uganda 1

Major
EUROPE & CIS MIDDLE EAST AFRICA ASIA LATIN AMERICA NORTH AMERICA & PACIFIC
Projects · Hotel Hyundai, Vladivostok, Russia · Arab Shipbuilding & Repair Yard · Azito Phase III Extension Project, · Bitexco Financial Tower, Vietnam · Bello Wastewater Treatment Plant, · Cable-stayed bridge over the Fraser River,
· Sofia Welfare Center for the Disabled, (ASRY), Bahrain Republic of Cote d’Ivoire · Jagorawi Toll Road, Indonesia Colombia Canada
Bulgaria · Aqaba Port, Jordan · Biskra Combined Cycle Thermal · Jamuna Multipurpose Bridge, · Chacao Bridge, Chile · Dredging works for Bunbury Port, Australia
· Talimarjan Power Plant, Uzbekistan · Dubai Eye, UAE Power Plant, Algeria Bangladesh · Panama Metro Line 3, Panama · Housing complex, Guam
· The Third Bosporus Bridge, Turkey · Hamad Medical City, Qatar · Four Seasons Hotel, Egypt · Pattani-Narathiwat Highway, Thailand · Punta del Tigre CCPP, Uruguay · Jang Bogo Antarctic Research Station
GLOBAL HDEC
· Jaber Causeway Maritime Bridge, Kuwait · Jinja Bridge, Uganda · Penang Bridge, Malaysia · Peru Chinchero International Airport · The Antarctic King Sejong Research Station
· Jubail Industrial Harbor, Saudi Arabia · Tunis Sports Center, Tunisia · Suntec City, Singapore · Yonki Hydroelectric Dam, Papua New
· National Museum of Qatar, Qatar · Zawia Combined Cycle Thermal Power · South Commuter Railway, Philippine Guinea
· South Pars Field Development, Iran Plant, Libya · Yamuna Bridge, India * in alphabetical order

16 HYUNDAI ENGINEERING & CONSTRUCTION GLOBAL HDEC 17


Advanced Technology Hyundai E&C is developing smart construction technologies that embrace the latest
fourth industrial revolution such as IoT, AI, big data, drones, and BIM. Based on an
in-depth analysis of megatrends including the urbanization energy transition, depletion

Technology Hyundai E&C has formulated a future transformation strategy in response to


the rapidly changing construction market environment. We are working to
of fuel and natural resources, water scarcity, and environmental pollution, we are
securing future-oriented source technologies that will be our new growth engines to
develop the base technology for advanced engineering, procurement, and
Building a Sustainable take the lead in the future innovation of the construction industry.
construction competitiveness while driving process innovation in conjunction
Technology Platform with digital transformation. At the same time, we are developing new growth
engines in dealing with the energy transition and carbon neutrality trends.
Smart Construction
Developing automated construction technology and digitalized project management system

BIM* Automated Construction Construction Robotics


Fundamental Technology Hyundai E&C is developing and applying differentiated technologies to projects from
· Process prediction through
Management Platform
· Robotics-based construction
the bidding stage. We take advantage of new technologies and innovative engineering 3D design · Integrating IoT information automation
techniques to identify improvements. It helps enhance our EPC competitiveness as · Reducing manpower & ·Digitalization of whole process · Established round-the-clock
well as product quality and productivity. construction periods on-site monitoring system

Smart City Utilization of Big Data OSC


·Developing technology to · Making data-based · Reducing construction periods
Core Technologies link smart homes and cars construction plans using a modularization
· Providing smart services · Predicting risks using · Add business values for
big data apartment building

Infrastructure Building ˙ Housing Plant


Developing new space concepts and Developing differentiated technologies Developing the fundamental technology and
new techniques to save time
supporting specialized design
New Growth Engines Hyundai E&C is preparing for the transition to a carbon-neutral society with several
R&D projects for green & energy technology, such as SMR, hydrogen, and CCUS. Our
Marine/Harbors Noise/Vibration Process
endeavors for new growth engines also include commercialization efforts of developed
· Pier design/Caisson method · Lowering floor noise · Cryogenic liquefaction process
· Floating structures and subsea · Noise isolation performance design technologies through demonstration projects, such as the organic waste-to-energy
space design test · CCUS* process optimization and restoration of contaminated soils.

Bridges/Structures Construction Materials Machinery/Piping


· Longspan bridge engineering · High performance/Special · Vibration evaluation & reduction
New Growth Engines
· Fast-manufacturing purpose concrete design
Securing core technologies to expand our business areas
technology · Crack-resistant, low-heat · Pipeline flow integrity assessment
technology · Heat/Fluid computational analysis
Nuclear Power Hydrogen CCUS*
Underground Spaces Architectural Structure Metal/Corrosion · Small modular reactor · Hydrogen production · CO2 capture (wet)
· Large-scale/Mega under- · Seismic/Windproof design · Material section · Decommissioning nuclear (water electrolysis) · CO2 utilization (chemical conversion)
ground space construction · OSC* design · Corrosion assessment and power plants · Hydrogen storage (liquefaction,
· TBM* design/Construction method planning ammonia, LOHC*)

Organic waste-to-energy Desalination/ Contaminated Soil Restoration


Ground/Foundation Green Energy Smart Plants Water Treatment
· Chungju Bio-energy Center · Soil remediation at Janghang
· New type foundation design · Building energy management · Digital Twin · Siheung Clean Energy Center · RO* desalination for Sihwa Lake Smeltery
· Offshore wind foundation technology · Smart diagnostics and control · Demonstration of the next- · Soil remediation at Camp Market
technology · Indoor air purification generation MBR* process in
technology Dongtan

* TBM : Tunnel Boring Machine * SMR : Small Modular Reactor


* OSC : Off-Site Construction * LOHC: Liquid Organic Hydrogen Carriers
* CCUS : Carbon Capture, Utilization, and Storage * RO : Reverse Osmosis
* BIM : Building Information Modeling * MBR : Membrane Bioreactor

18 HYUNDAI ENGINEERING & CONSTRUCTION TECHNOLOGY 19


New Growth Engines Smart Construction Core Technologies
1 Organic waste-to-energy 5 Photovoltaic power plant 8 Robotics & automation 13 Drones & 3D scanners 18 Nuclear power plant 23 E
 co-friendly smart hospitals

Advanced 2 C
 ontaminated soil
remediation
Seawater desalination
6 Sewage and
wastewater treatment
Tidal power generation
9

10
BIM
Big data
MG (Machine Guidance)
14

15
U
 AM vertiports
Smart highway
Smart farm
19

20
TBM
Undersea tunnel
Super long-span bridges
24

25
Smart buildings
Green energy buildings
Floor noise reduction

Technology
3 7 11 16 21 26

4 Offshore wind power 12 Modular buildings 17 Smart home 22 Super high-rise buildings

of HDEC

20 HYUNDAI ENGINEERING & CONSTRUCTION ADVANCED TECHNOLOGY OF HDEC 21


We
Create
A
Better
World
Hyundai E&C incorporates its profound expertise and experience from countless INFRASTRUCTURE BUILDING HOUSING PLANT
global projects with technology innovation to carry out civil engineering, WORKS WORKS WORKS WORKS
architecture, housing, plant engineering, power plants, energy plants, and
nuclear power plant projects for higher customer satisfaction. We will continue
to lead the industry in providing customized solutions with creative and out-
of-the-box thinking as we remain agile in the changing market environment.

22 HYUNDAI ENGINEERING & CONSTRUCTION BUSINESS PORTFOLIO 23


Infrastructure
Works
Based on its extensive experience in overseas construction, Hyundai E&C is lead-
ing overseas construction sites with attention centered on the Middle East and
Southeast Asia. Hyundai E&C’s unrivaled capabilities can be seen through various
projects, including the Jubail Industrial Port in Saudi Arabia, which is considered
one of the greatest construction projects of the 20th century, and the Third Bospo-
rus Bridge in Turkey which, upon its completion, set a record for being the first and
the highest bridge of its kind. Hyundai E&C will focus on diversifying its overseas
markets, including Africa and Latin America, and become a global construction
leader that breaks the boundaries of land and sea to create new value.

The Third Bosporus Bridge (June 2013 ~ Aug. 2016)


Country | Turkey
Client | Ictas-Astaldi JV
Project Features | A
 t 2,164m (main span of 1,408m), the world’s largest cable-stayed sus-
pension bridge that connects both sides of the Bosporus Strait in Turkey.

24 HYUNDAI ENGINEERING & CONSTRUCTION 25


01 02

03 04

01 Khalifa Port and Industrial Zone Offsites, UAE


(July 2010 ~ Dec. 2012) 
Large-scale construction of a 700,000㎡ container
terminal (annual capacity of 2.5 million TEU class).

02 Construction of an Oil Pier and Berthing Facilities,


Kuwait (Sep. 2000 ~ Feb. 2006)
05 06
A turnkey maritime port construction project com-

Marine, Offshore &


missioned exclusively to Hyundai E&C to build five
oil berths and dismantle the existing South Pier at
the Shuaiba Oil Pier.

Jubail Industrial Harbor, Saudi Arabia

Dredging Works
03
(June 1976 ~ Dec. 1979)
Coined as the biggest project in the 20th century, this
project consists of 1,100,000㎥ of concrete works
and mobilization of 2.5 million workers.

04 Big-O, 2012 Yeosu World Exposition, Korea


Hyundai E&C has maintained a steady stronghold in the Middle East, (July 2010 ~ Aug. 2012)
Construction of an O-shape structure and maritime
executing mega-projects such as the Jubail Industrial Port in Saudi Arabia, water fountain for a new media show; 130,630㎥ of
the Boubyan Port in Kuwait, and the Khalifa Port and Industrial Zone Offsites dredging and 355,704㎥ of shore bank works.

Samcheok Production Base Pier and Supplemen-


in the UAE. Fueled by these achievements, Hyundai E&C will continue to 07 08
05
tary Port Facilities, Korea (Aug. 2011 ~ June 2013)
expand its business from the Middle East to other countries and regions. Construction of a 127,000DWT class berth for a
liquefied natural gas wharf.

06 Pasir Panjang Container Terminal, Singapore


(Oct. 2007 ~ July 2014)
A container terminal with sixteen 120,000TEU class
berths; phase 1 caisson quay wall construction and
land reclamation.

07 CHEONG CHO Ocean Research Station, Korea


(Apr. 2011 ~ Oct. 2014)
Boubyan Sea Port, Kuwait (Oct. 2010 ~ Mar. 2014) Installation of offshore structures with a total height of
88m, a 1,555 tons jacket and a 1,150 tons deck.
A public mega-project commissioned by the Kuwaiti Ministry of Public Works to build
Terminal 9, Hong Kong (May 2000 ~ Oct. 2004)
a container terminal that can berth four 25,000TEU class container ships simultane- 08
Reclamation of 150ha of land and construction of a
ously and a 187ha pier. 2,012m container port with 6 berths and hinterland.

26 HYUNDAI ENGINEERING & CONSTRUCTION INFRASTRUCTURE WORKS 27


01
01 Subway System, Phase 3, Segment 931, Singapore (Apr. 2011~ Dec. 2016)
7.23㎞-long subway construction, applying the TBM method.

02 Segments 2-3, Honam High Speed Railway, Korea (Dec. 2009 ~ Sep. 2014)
Railway construction including a 3-span arch bridge, 9,315m of bridges.

03 The 2nd Youngdong Expressway, Segment 7, Korea (Nov. 2011 ~ Nov. 2016)
A private investment project for the expressway to link Gwangju and Wonju
(2nd Yeongdong).

04 The Road Works between Changwon and Busan, Korea (Feb. 2009 ~ Dec. 2015)
A 22.5㎞-long private investment project to link Changwon in Gyeongnam and
Gangseo-gu, Busan.

05 New Roadbed for Wonju ~ Gangneung Railway, Segment 3-1, Korea


(Apr. 2013 ~ Apr. 2018)
Established a railway network to link the Seoul metropolitan area and the east-
ern coast area for the PyeongChang 2018 Olympic Winter Games.

02 03

Highways,
Railways & Subways
Hyundai E&C’s first overseas work started with the Pattani-Narathiwat Highway
04 05
in Thailand in 1965. From building highways in Indonesia, Saudi Arabia, Kuwait,
Iraq and Malaysia to the Lusail Expressway in Qatar, Hyundai E&C’s achievements
can be found around the world. In addition, the company boasts leading
technology in the areas of highways, subways and railways, such as the
construction of the Taiwan High Speed Rail, phase 3 of Singapore’s subway
system (segment 931), and segments 2 and 3 of the Honam high-speed railway.

Qatar Lusail Expressway (May 2012~Oct. 2019)


It is a large-scale project consisting of 10 tunnels including large arch structures and 18-lane
roads, 4 bridges, and a microtunnel, together with various infrastructure. It employs an in-
telligent transportation system (ITS), i.e. a state-of-the-art technology that alerts vehicles to
accidents ahead and controls tunnel lighting automatically adjusted to the environment.

28 HYUNDAI ENGINEERING & CONSTRUCTION INFRASTRUCTURE WORKS 29


01 02

03 04

05 06

Bridges
Bridges are evidence of how Hyundai E&C has grown in the global market
as well as the company’s present status. Most large-scale bridges around
the world such as the Penang Bridge, the largest bridge in Asia, on the time
of completion in 1985, the Bosporous bridge in Turkey, the world’s first
hybrid bridge, and the Jaber Causeway bridge, the world’s largest bridge,
were completed by Hyundai E&C. In addition, Hyundai E&C designed and
constructed the Ulsan Bridge, the world’s third-largest single-span
suspension bridge, and the cable-stayed Machang Bridge on a turnkey
Sheikh Jaber Causeway Bridge, Kuwait (Nov. 2013 ~ Oct. 2019) Machang Bridge, Korea (Apr. 2004 ~ June 2008)
basis, earning Hyundai E&C recognition as a leader in the super-long span 01 02
One of the world’s longest 36.14㎞-long maritime bridge project 1,700m long, 21m wide (four-lanes) maritime cable-stayed bridge
bridge field. commissioned by the Kuwait government to connect connecting and access bridges.
Kuwait City and northern Subiyah.
04 Penang Bridge, Malaysia (Jan. 1982 ~ Sep. 1985)
03 Guri–Amsa Bridge, Korea (Apr. 2006 ~ Aug. 2016) Asia’s longest and the world’s third longest bridge at the time of
A 2.74㎞ long (bridge section 1.13㎞), 24 ~ 44m wide, 3-span con- completion in 1985. 14.5㎞ long, including 8.5㎞ of maritime sec-
tinuous half-through arch bridge with 4 to 6 lanes. tors. 1986 recipient of the Grand Award from the American Coun-
cil of Consulting Engineers, Washington.
05 Yamuna Bridge, India (Oct. 2002 ~ Oct. 2003)
Ulsan Bridge, Korea (May 2010 ~ May 2015) A cable-stayed bridge that includes a continuous bridge made of Jamuna Multipurpose Bridge, Bangladesh (Sep. 1994 ~ Oct. 1999)
06
concrete. Construction of the main bridge that crosses the Jamuna River
Construction of the world’s third-largest single-span suspension bridge (1,150m) and
(4.8㎞ long, 18.5m wide) as well as a 130m overpass and supple-
access bridges (1,820m). mentary facilities at both ends of the bridge.

30 HYUNDAI ENGINEERING & CONSTRUCTION INFRASTRUCTURE WORKS 31


01 Tarbela Hydroelectric Power Plant, Pakistan (May 1987 ~ July 1991) 02 Daechung Multi-Purpose Dam, Korea (Dec. 1976 ~ Dec. 1980)
Hyundai E&C’s first project in Pakistan. Power production after 1,234,000㎥ concrete gravity and rock-fill dam. Korea’s first multi-
completion became 1,730,000㎾ out of 3,480,000㎾ produced in purpose composite dam.
the entire nation.
04 Yonki Hydroelectric Dam, Papua New Guinea
03 Seletar Sewage Treatment Works, Singapore (Sep. 1986 ~ Aug. 1991)
(July 1995 ~ Dec. 2001) Constructing a 59m-high reservoir dam located in the alpine
Sewage treatment plant with 133,000㎥ capacity per day. areas of Yonki, 1,400m above sea level.

05 Soyang River Multipurpose Dam, Korea (Apr. 1965 ~ Dec. 1974)


A 123m-high, 530m-long dam with storage capacity of 2.9 billion
tons of water and a drainage area of 2,703km2. Along with the
Gyeongbu Expressway, Soyang Dam is regarded as one of the
two largest civil engineering projects in Korea in the 1960s.

01 02

03 04

Water Resource &


Environmental Systems
05
After building world-class hydroelectric dams in Asia and the Middle East,
Hyundai E&C is now helping sustainable growth for human coexistence with
nature through multiple projects by building sewage treatment plants and
upgrading resource recovery facilities. In particular, the Bello Sewage
Treatment Plant in Colombia shows the company’s competitiveness in this
sector and successfully diversified its market into Latin America.

Bello Wastewater Treatment Plant, Colombia (Sep. 2012 ~ June 2019)


Columbia’s largest wastewater treatment plant based on an activated sewage system
with a treatment capacity of 430,000 tons per day.

32 HYUNDAI ENGINEERING & CONSTRUCTION INFRASTRUCTURE WORKS 33


Jurong Underground Oil Storage Facility, Singapore (June 2009 ~ Oct. 2017)
The largest petroleum tank in Southeast Asia with 9.25 million barrels in the under-
ground bedrock of 130m below sea level.

01

02

Underground Space 03

Development
01 Boryeong ~ Taean Road, Segment 1, Korea
(Dec. 2010 ~ Dec. 2021)
Hyundai E&C has accumulated a variety of experience and differentiated Korea’s longest undersea tunnel (6.9㎞).
capabilities through the construction of subways, water conveyance tunnels, 02 Daegok ~ Sosa Private Double Track Railway, Korea
(June 2016 ~ 2023 scheduled)
and undersea tunnels both in Korea and abroad. Recently, it has been A 18.3㎞ double track railway project to link the Seohae and Gyeo-
ng-Ui Lines. It consists of 5 stations, 15.1㎞ of tunnels, and 3.2㎞ of
recognized for its technology and work quality by successfully completing
civil works.
the construction of the Jurong underground oil storage facility in Singapore. Underground Western Arterial Road in Seoul, Korea
03
In addition, the company has secured highly advanced TBM (Tunnel Boring (Mar. 2016 ~ Sep. 2021)
A 4-lane, 10.9㎞ underground highway to form an internal ring road
Machine) technology through continuous research and development. in the city.

34 HYUNDAI ENGINEERING & CONSTRUCTION INFRASTRUCTURE WORKS 35


Building
Works
Hyundai E&C has been constructing landmark buildings around the world, e.g. the
Saudi Ministry of Home Affairs, the King Fahad Medical City in Riyadh, the National
Museum of Qatar, the Four Seasons Hotel in Egypt, Changi International Airport and
Suntec City in Singapore and the Bitexco Financial Tower in Vietnam as well as the
Supreme Court Building, the Busan Asiad Main Stadium and the Asan Medical Center
in Korea. Hyundai E&C’s technical technology, design capabilities and project per-
formance capability instilled trust in clients, and led to other large-scale mixed-used
development projects. Hyundai E&C will continue to grow into a globally recognized
real estate developer and global leader in construction by providing state-of-the-art
multi-use spaces that will enrich the life of mankind.

Amorepacific Office Building (July 2014 ~ Nov. 2017)


Country | Korea
Client | Amorepacific
Project Features | D
 esigned by world-class architect David Chipperfield, the total floor area of
the building is 188,902㎡, with 7 stories below and 22 stories above ground.
Finished with exposed concrete and triple low-e glass, it is an eco-friendly
building that received a grade Green 1 of Green Architecture Rating and a
grade 1 of Building Energy Efficiency Rating, while also receiving the gold
level of the LEED certification.

36 HYUNDAI ENGINEERING & CONSTRUCTION 37


01 02

03 04

01 Hamad Medical City, Qatar


(Feb. 2011 ~ Apr. 2016)
The building that was used as the athletic village
during the Doha Asian Games in 2006 was remod-
eled into three high-tech medical centers (outpatient
ward, rehabilitation ward, and women’s ward).

02 Khoo Teck Puat Hospital, Singapore


(Mar. 2008 ~ Mar. 2010)
Two stories underground and ten stories above
ground with a 500-bed capacity, the hospital was
constructed with the theme of ‘natural healing.’ It
05 06
received Construction Excellence Awards and was
certified Platinum in eco-friendly Green Mark by the
Building and Construction Authority of Singapore.

03 Seoul St. Mary’s Hospital of the Catholic


University, Korea (May 2006 ~ Apr. 2009)
A new state of the art hospital and research center
with 22 above ground and 6 below ground floors

Medical, Educational &


designed to provide doctors, medical researchers,
and patients with optimum space and comfort.

04 Dongtan Sacred Heart Hospital, Hallym University,

Manufacturing Facilities
Korea (Aug. 2010 ~ Mar. 2013)
850-bed capacity hospital equipped with eco-friend-
ly technologies, including the solar-powered battery
system and IT technology.

05 Hana Global Campus, Korea


(Apr. 2017 ~ May 2019)
Hyundai E&C has been using its extensive experience and know-how to build large, On the large land area of 176,107㎡ and the total
landscaping area of 64,386㎡, we created a pleasant
state-of-the-art medical complexes and wards, large-scale research centers,
07 environment combined with various sculptures. This
universities and schools that enhance the comfort of users. It also has an exceptional group training center has state-of-the-art lecture fa-
cilities, hotel-like lodging, and various community
competitive advantage in cutting-edge facilities such as semiconductor cleanrooms, spaces.

and has built highly advanced semiconductor factories such as STATS ChipPAC 06 Fire and Disaster Prevention Education and
Research Complex, Korea (Dec. 2014 ~ Dec. 2018)
KOREA’s production & research facilities as well as future-oriented medical Good It has a total of 39 buildings and 4 structures, two
stories underground and 15 stories above ground. It
Manufacturing Practice (GMP) facilities, including the Khoo Teck Puat Hospital in is the largest eco-friendly education research com-
Singapore. plex in Asia powered with high-efficiency energy
storage system (ESS), geothermal heat, and solar
heat.
Eunpyeong St. Mary’s Hospital, of the Catholic University, Korea (Oct. 2016 ~ Apr. 2019) STATS ChipPAC KOREA, Korea
07
(Sep. 2013 ~ Nov. 2014)
The first university hospital in Korea to obtain the first rating in Building Energy Efficiency Rating A 6-story, state of the-art, semiconductor research
and the outstanding rating in G-SEED Certification, this eco-friendly smart hospital has introduced and clean room production facility located in the
Phase 2 Logistics Park of the Free Trade Zone in
voice recognition system, doctors’ rounds and guide robots, and the central interpretation system. Incheon International Airport; 109,044㎡ total floor
It is 7 stories below and 17 stories above ground with 808-bed capacity. area and 9-story, annex that includes a dormitory.

38 HYUNDAI ENGINEERING & CONSTRUCTION BUILDING WORKS 39


01 King Abdullah Sports City, Saudi Arabia (Dec. 2012 ~ Oct. 2015) 02 Incheon Asiad Main Stadium, Korea (June 2011 ~ Feb. 2015)
An indoor sports hall consisting of four floors with 9,366 seats, a The main stadium for the 2014 Incheon Asian Games consisting of 5
football stadium of 1,091 seats, and outdoor areas for track and field floors above ground and 1 basement-level floor and total ground
events. floor space of 113,619㎡.

03 Busan Port International Passenger Terminal, Korea 04 KINTEX Exhibition Hall 2, Korea (Jan. 2009 ~ Sep. 2011)
(July 2012 ~ Jan. 2015) Following the outstanding completion of KINTEX Exhibition Hall 1,
Asia’s largest port passenger terminal comprising of a 93,932㎡ total Hyundai E&C was awarded the construction of KINTEX Exhibition Hall
floor area on 6 floors (including 1 basement floor). Winner of the 2012 2, a world-class 108,761㎡ international exhibition space, the largest in
BIM Vision Award and Design Award. Korea, fourth largest in Asia, and the 35th largest in the world.

05 Hyundai Motor Studio Goyang, Korea (May 2013 ~ Apr. 2017)


This is Hyundai Motor’s car exhibition hall that has five underground
floors and nine aboveground floors with a total floor area of 63,878㎡. It
also features Korea’s largest-scale atypical anodizing panels, which
were used as finishing material. In 2016, it was the recipient of the
grand prize in the construction category at the BIM Awards.

01 02

03 04

Transportation,
Cultural Facilities & Stadiums
05
Hyundai E&C has acquired abundant experience and know-how in culture
and sports facilities, such as diverse museum, exhibition hall, and stadium
projects. In addition, it has a competitive advantage in building state-of-the-
art facilities that require advanced technology and human-oriented designs,
including airports, airport terminals, and transportation centers.

Finishing Work at Incheon Airport Passenger Terminal 2, Korea (May 2015 ~ Dec. 2017)
This is an airport facility consisting of two underground and five aboveground floors
with a total floor area of 390,000㎡. It is a large-scale building that can accommodate
18 million passengers. A total of 88,000 units of lighting equipment (120 types) were
used and a curved ceiling was made using thousands of louvers.

40 HYUNDAI ENGINEERING & CONSTRUCTION BUILDING WORKS 41


01 02

03

04 05

Public & Commercial


Buildings
Hyundai E&C is builds a wide range of landmarks, ranging from super high-
rise intelligent buildings to buildings with advanced technologies, such as
smart and eco-friendly technologies. The company generates added value
by constructing a wide variety of buildings, including the Korea Land and
Housing Corporation headquarters building and Nonghyup IT center, which The Federation of Korean Industries Tower, Korea Bitexco Financial Tower, Vietnam (June 2008 ~ Oct. 2010)
01 02
(July 2010 ~ Sep. 2013) A landmark tower in Ho Chi Minh City reminiscent of a freshly
is specialized with information and communications technology.
A building located in Yeouido, Seoul, the center of financial business sprouting lotus bud. It was the tallest (68 floors, 262m) building in
in Korea. The 50 story office building is an eco-friendly building built Vietnam at the time of completion.
with solar panels and geo-thermal generation and is the first in the
03 Hyundai Premium Outlet Gimpo, Korea (July 2013 ~ Feb. 2015)
country to employ 3 dimensional curved glass using cutting edge
A large-scale commercial facility with a total floor area of 153,777㎡,
Royal Palace Security Service & Administration Building (Heart of Doha, Phase 1), technology for the conference center.
and one which became a firm partner in the Hyundai Department
Qatar (May 2010 ~ Aug. 2015) 04 LH Headquater Building, Korea (Oct. 2012 ~ Mar. 2015) Store Group’s premium outlet business.
A landmark in Jinju, this 139,205㎡ energy efficient smart building
Nonghyup IT Center, Korea (Feb. 2014 ~ Jan. 2016)
Directly managed by the royal palace, the building consists of units for the royal pal- combines natural energy and advanced telecommunications infra- 05
This included the construction of a next-generation data center that
structure on 22 floors (including 2 underground floors), surpassing
ace’s security service, administration and national archive. It is a landmark in Doha Class 1 energy saving requirements by 50%.
is equipped with a cutting-edge, multiple five-step security system
and seismic isolation design. Tier III certification, an internationally
with high-end designs, emphasizing Qatar’s traditional elements, and LEED Platinum, recognized certification, was also acquired and a self-power supply-
an eco-friendly building certification. ing non-stop operating system has been applied to the center.

42 HYUNDAI ENGINEERING & CONSTRUCTION BUILDING WORKS 43


01 Asia Square Tower 1&2, Singapore (Jan. 2009 ~ Aug. 2013) 02 Orchard Gateway, Singapore (July 2010 ~ July 2014)
Hyundai E&C won the Singapore BCA Greenmark Platinum in This is a landmark located on Orchard Road in Singapore. It is com-
2009 and the U.S. LEED Award Platinum in 2014 for its green prised of a building with a total floor area of 84,888㎡ for a hotel (9F ~
technology that was used in the construction of a 43-story office 20F, 502 rooms) and shopping area (B2 ~ 8F) as well as another building
building (Asian Square Tower 1) and a 46-story commercial facil- with a total floor area of 12,920㎡ for offices (6F ~ 11F) and a shopping
ity & hotel (Asian Square Tower 2). The combined floor area of area (B2 ~ 5F). It has acquired SHARP (Safety & Health Award Recog-
both buildings is 335,580㎡. nition for Projects) and Green Mark Platinum certification.

03 Jang Bogo Antarctic Research Station, Antarctica 04 South Beach Mixed Development, Singapore
(Dec. 2010 ~ Feb. 2014) (Aug. 2011 ~ June 2018)
22 years after opening a new chapter with the construction of the This is a landmark development consisting of hotels, offices, apart-
King Sejong Antarctic Research Station in 1988, Hyundai E&C ments, and commercial facilities developed jointly by Singapore’s
built the Jang Bogo Antarctic Research Station using state-of- largest real estate development company, CDL, and Malaysian real
the-art environmentally friendly techniques. estate developer, IOI Group.

05 LEGOLAND® Korea Theme Park (Sep. 2019 ~ Apr. 2022) 06 Jeju Shinhwa World, Korea (Apr. 2016 ~ Sep. 2017)
It is the first global theme park in Korea that consists of eight With a site area of 280,000㎡ and a total floor area of 30,000㎡,
clusters housing 56 four-story buildings, spanning a total floor the theme park has 30 buildings in total and each building con-
area of 48,903.49㎡. sists of one underground floor and two aboveground floors. Three
theme zones and 15 kinds of rides are available.

01 02

04

Mixed-Use Developments &


Special-Purpose Projects
03

With its outstanding technological competitiveness and project quality,


Hyundai E&C has led the construction of super-sized multi-use buildings in
Singapore as it continues to win orders. In addition, the company has built
06
unique land-marks, including various architectural structures for special
purposes such as Asia Square Tower in Singapore and Jang Bogo Antarctic
05
Research Station in the Antarctic pole.

Marina One Project, Singapore (Aug. 2013 ~ Mar. 2018)


The large-scale mixed-use development project consist of construction of two office
buildings made up of 30 floors above ground and 4 floors underground and two
34-story residential buildings (1,024 units). The total floor area of the buildings is
520,000㎡. Hyundai E&C created this urban green space by optimally utilizing avail-
able land area and was awarded the Singapore BCA Greenmark Platinum in 2013.

44 HYUNDAI ENGINEERING & CONSTRUCTION BUILDING WORKS 45


01 Gangneung Seamarq Hotel (June 2013 ~ June 2015) 02 Vega City Nha Trang, Vietnam (May 2020 ~ Jan. 2024 scheduled)
The finest five-star hotel in Gangwon-do, it was designed by Richard This luxury hotel and 2-storied villa complex has created a name for
Meier, who received the Pritzker Architecture Prize, known as the itself as a high quality real estate development and construction
Nobel Prize for architecture. With 4 stories below and 15 stories above project in Nha Trang, central Vietnam. With 1 story below and 30 sto-
ground, it holds 149 rooms. ries above ground, it features 2 hotel buildings, a 2-storied villa with 99
households, a 3-storied shopping center with 173 households.
03 Lucky Tower Condominium, Singapore (May 2012 ~ May 2016)
It is the finest condominium near Orchard, Singapore’s main street. It 04 Sinarmas Lot 16, Indonesia (Aug. 2015 ~ Nov. 2018)
is a landmark among high-end residential complexes for its unique It is a high-class residence located in downtown Jakarta. This proj-
curved shape and is finished with a curtain wall. With 1 story below ect was highly praised by the client and neighboring developers for
and 24 stories above ground, it accommodates 174 households in 2 its use of advanced Korean construction method and materials. With
buildings. 3 stories below, 32 stories above ground in 1 building and 39 stories
above ground in 1 building, it accommodates 372 households.
05 Gangnam Bogeumjari Block A5 (Aug. 2012 ~ Apr. 2015)
This apartment complex has a European inner court designed by the
Dutch Royal architect Frits Van Dongen. With 3 stories below and 18
stories above ground, it accommodates 1,312 households in 5
buildings.

01 02

03 04

Accommodations &
Residential Buildings
Hyundai E&C uses environmentally friendly and state-of-the-art
technologies to provide comfortable housing through public and private
construction projects around the world that improve quality of life. Whether
05
hotels, resorts, or high-end villas and condominiums, all reflect Hyundai
E&C’s expert capabilities and quality control.

Jeju Myths and History Theme Park District R (Aug. 2015 ~ Apr. 2017)
As the first project of the ‘Jeju Myths and History Theme Park Development Works,’ it
has created the largest tourist complex in Jeju themed around Jeju’s world history and
myths. With 1 story below and 4 stories above ground, it features 96 townhouses and
villas accommodating 721 households.

46 HYUNDAI ENGINEERING & CONSTRUCTION BUILDING WORKS 47


Housing Works
Hyundai E&C has served as a trend setter of apartments in Korea since its completion
of Korea’s first apartment complex in 1964. It was the first to launch the apartment
brand ‘Hillstate’ in September 2006 and in April 2015 it launched the premium res-
idential brand ‘THE H’ for ‘Premium Lifestyles.’ Hyundai E&C will continuously lead
residential trends in Korea by prioritizing ‘Customer Satisfaction.’

THE H HONOR HILLS (Aug. 2016 ~ Sep. 2019)


Country | Korea
Client | Gaepo Jugong Complex 3 Reconstruction Association
Project Features | Global luxury furniture and art walls made of natural marble. Hyundai E&C’s
premium apartment includes a food waste transfer system and high-speed
elevators. 3 stories below and 33 stories above ground accommodating
1,320 households.

48 HYUNDAI ENGINEERING & CONSTRUCTION 49


01
01 THE H Xi GAEPO (July 2018 ~ July 2021)
This special residential complex is a new landmark in
Gaepo-dong at the heart of Gangnam, with convenient
transportation, excellent education and a wonderful
natural environment. With 4 stories below and 35
stories above ground, it accommodates 1,996 house-
holds in 15 buildings.

02 THE H BANPO LACLASS (May 2018 ~ June 2021)


Constructed in the key location of Banpo, this pres-
tigious residential complex is designed with a soft
curve, grand exterior, luxury landscaping and special
childcare facilities. With 4 stories below and 35 stories
above ground, it accommodates 848 households
across 6 buildings.

03 THE H FORECENT (Oct. 2018 ~ Jan. 2021)


This environmentally friendly residential complex is
where residents can enjoy high-quality community
space unique to THE H and a green park that is beau-
02
tiful in all four seasons. With 3 stories below and 22
stories above ground, it accommodates 184 house-
holds in 4 buildings.

04 THE H FIRSTIER I PARK


(June 2020 ~ Nov. 2023 scheduled)
Its location is excellent with adjacent major infra-
structure facilities, such as subway station, depart-
ment store, and hospitals. A colorful themed garden,
including trails and parks, will be placed within the
complex, so that residents can enjoy the nature. With
4 basement floors and 35 ground floors, it accom-
modates a total of 74 buildings and 6,702 households.

03

THE H (The High-end Prestige Complex)


‘THE H’ offers the finest premium housing in Korea that’s completely unlike
conventional apartments. THE H is a compound word of ‘THE,’ signifying ‘the
one and only,’ and ‘H,’ the first letter of Hyundai, standing for High-end and High
Society. Its full meaning is for ‘the one and only perfect prestigious life.’ THE H
features designer exteriors, a premium feel and outstanding interior design, while 04

also providing differentiated residential services, including an integrated control


platform exclusively for residents and a hotel concierge service.

THE H CLAEST (Construction scheduled to be started after 2023)


It is the largest reconstruction project in Korea that was done by a single construction
company. It is the best apartment complex along the Han River where residents can enjoy
hotel-like concierge service in the complex. With 4 stories below and 35 stories above
ground, it accommodates 5,440 households in 46 buildings.

50 HYUNDAI ENGINEERING & CONSTRUCTION HOUSING WORKS 51


01 Hillstate Dongtan (June 2016 ~ Feb. 2019) 04 Hillstate Unjeong (Jan. 2016 ~ July 2018)
This state-of-the-art secure complex enables smartphone-based The Modern Scape design, the logo of Hillstate, is sensuously imple-
facility control using IoT technology. With 3 stories below and 33 mented on the outside of the apartment, and the ‘Wave Carpet,’ a
stories above ground, it accommodates 1,479 households in 16 water landscaping space along the vast lawn plaza, is impressive.
buildings. The ‘Wave Carpet’ was one of the finalists at ‘IDEA,’ one of the top
three design awards of the world. With 1 story below and 29 stories
02 Hillstate Nokbeon (Feb. 2016 ~ Oct. 2018)
above ground, it accommodates 2,998 households in 25 buildings.
This new residential town in Gangbuk is close to Subway Line No.3.
With 3 stories below and 20 stories above ground, it accommodates
952 households in 13 buildings.

03 Hillstate Yeongtong (Jan. 2015 ~ Aug. 2017)


It is the ‘No. 1 kid-safe apartment’ in Yeongtong, Suwon – a place
where children can play safely thanks to CPTED (Crime Prevention
Through Environmental Design). With 1 story below and 29 stories
above ground, it accommodates 2,140 households in 21 buildings.

01 04

02

Hillstate (Premium Apartment Complex)


‘Hillstate’ is Korea’s foremost housing brand and the first in the industry to define
residential space as a ‘lifestyle platform.’ Hillstate is a compound word of ‘Hill,’ which
means a high-end residential complex, and ‘State,’ symbolizing high status and
dignity. Its energy-saving systems and digital convenience systems enhance the
innovative layouts and design to provide a comfortable living space.

03

Hillstate Lake Songdo I (Oct. 2015 ~ June 2019) Hillstate Lake Songdo II (Oct. 2016 ~ Jan. 2020)
The first zero-energy apartment complex in Korea, it is a state-of-the-art It is the first state-of-the-art apartment complex in Incheon Songdo
green residential complex and the first apartment complex to acquire International City to have IoT technology applied. With 2 stories below
zero-energy architecture grade 5 (energy self-sufficiency rate 23.37%). and 43 stories above ground, it accommodates 889 households in 9
With 2 stories below and 36 stories above ground, it accommodates buildings.
886 households in 9 buildings.

52 HYUNDAI ENGINEERING & CONSTRUCTION HOUSING WORKS 53


01

02

03

Mega Residential
Development
Hyundai E&C has created ‘a new residential town’ in Seoul’s metropolitan
area by constructing large residential complexes. It has delivered a series of
extra-large residential complexes featuring excellent business management
through customer-oriented product development, provision of innovative
services and strategic marketing activities, and outstanding technology.

01 Songpa Heliocity (Dec. 2015 ~ Dec. 2018)


It is a mammoth residential town that has a green space in excess of 127,000㎡, 5 shopping facilities, 2 schools,
7 childcare facilities and 5 libraries. With 3 stories below and 35 stories above ground, it accommodates 9,510
households in 84 buildings (HDEC 30%).

02 Godeok Artheon (Apr. 2017 ~ Feb. 2020)


The landscaping area exceeds 82,000㎡, and the nature-friendly residential town has a 500m-long street-type
park. With 3 stories below and 34 stories above ground, it accommodates 4,066 households in 41 buildings
Hillstate River City (Apr. 2018 ~ July 2020) (HDEC 50%, lead construction company).

It is a large premium apartment complex in Gimpo that offers all the lifestyle amenities 03 Hillstate The Unjeong (Oct. 2021 ~ Aug. 2025 scheduled)
With the main street extending from inside the complex and leading to the adjacent Unjeong Station and
of Seoul. With 2 stories below and 21 stories above ground, it accommodates 3,510 Unjeong Lake Park. 13 tall buildings as tall as 49 stories above ground and deeply rooted into 5 floors under-
households in 52 buildings (HDEC 100%). ground will accommodate 3,413 households.

54 HYUNDAI ENGINEERING & CONSTRUCTION HOUSING WORKS 55


01 Hillstate Samsong Station (Apr. 2016 ~ June 2019) 02 Hillstate Ijin Bay City (Dec. 2017 ~ May 2022)
It is a mixed-used residential building that has various communities This new landmark in the western part of Busan is blessed with an
near Samsong Station of Subway Line No. 3, which is expected to outstanding location on the coast of Songdo, Busan and an excel-
serve as the starting point of the extended Shinbundang Line. With lent transportation network. With 6 stories below and 69 stories
5 stories below and 49 stories above ground, it accommodates 976 above ground, it accommodates 1,368 households in 3 buildings,
studio apartments and 149 stores in 4 buildings. as well as one hotel with 308 rooms.

03 Hillstate Geumjeong Station (July 2018 ~ Mar. 2022) 04 Hillstate Songdo The Terrace (Aug. 2017 ~ Sep. 2020)
The large mixed-use residential facility includes apartments, studio This Songdo landmark is the first of its kind in Incheon Songdo
apartments and commercial facilities that include a hybrid shopping International City to feature a terrace in every room. With 4 stories
mall. With 6 stories below and 49 stories above ground, it accom- below and 49 stories above ground, it accommodates 2,784 studio
modates 843 households and 639 studio apartments in 5 buildings. apartments in 8 buildings.

01 02

High-Rise Mixed-Use
Residential Building 03 04

Hyundai E&C is a leader in high-rise mixed-use residential buildings that


showcase its advanced technical capabilities. High-rise apartments are a
luxury item in the Korean housing market as they provide stunning views and
attract landmark premiums. Hyundai E&C is building the best mixed-use
residential buildings that satisfy customers through its diverse special
construction methods and reinforced earthquake-resistant design.

Hillstate Artium City (Dec. 2016 ~ Apr. 2020)


This mixed-used culture complex integrates IoT technology and includes SM Town
(Changwon Multiplex Culture Town), a concert hall, star shops and an experience
studio. With 4 stories below and 49 stories above ground, it accommodates 1,132
households and 54 studio apartments in 5 buildings.

56 HYUNDAI ENGINEERING & CONSTRUCTION HOUSING WORKS 57


01

02 03

04

Knowledge Industry
Center
Hyundai E&C is focused on supporting the construction of knowledge
industry centers for hi-tech industries. With excellent construction capabilities
and a customized design, it provides a working environment that helps
tenants build connections and create synergies.

01 Hyundai Knowledge Industry Center Hangang Misa I 03 Dasan Hyundai Premier Campus (Sep. 2019 ~ June 2022)
(July 2017 ~ Sep. 2019) As the largest knowledge industry center in Korea, this industrial
From the beautiful panoramic view of the Han River and excellent cluster features various mixed-use cultural facilities, offices, campus
business infrastructure to its large shopping mall and multi-purpose dormitories and shopping malls. With 4 stories below and 10 stories
sports facilities, this blockbuster knowledge industry center allows above ground, it accommodates 2,246 knowledge industry offices
you to work and enjoy cultural life at the same time. With 3 stories and 456 stores in 5 buildings.
below and 10 stories above ground, it accommodates 1,114 knowl-
04 Munjeong District 7 Knowledge Industry Center
edge industry offices in 1 building.
(Jan. 2015 ~ Apr. 2017)
Hyundai Knowledge Industry Center Hangang Misa II (July 2018 ~ Jan. 2021) 02 Seongsu Station Hyundai Terrace Tower (July 2016 ~ Dec. 2018) It represents the heart of the new growth engine of Gangnam close
Featuring the first twin towers in Seongsu, Seoul, this state-of-the- to the Law Town and KTX Suseo Station. Nature and culture coexist
It is a business landmark of Hanam Misa Riverside City that shares the reputation of art knowledge industry center introduced a ‘drive-in’ system that in this future-oriented mixed-used business center. With 4 stories
enables vehicles to access the 2nd, 3rd and 4th floor. With 4 stories below and 15 stories above ground, it accommodates 914 knowl-
Hyundai Knowledge Industry Center Hangang Misa I. With 4 stories below and 10 below and 15 stories above ground, it accommodates 278 knowl- edge industry offices and 228 stores in 4 buildings.
stories above ground, it accommodates 1,742 knowledge industry offices in 4 buildings. edge industry offices and 21 stores in 1 building.

58 HYUNDAI ENGINEERING & CONSTRUCTION HOUSING WORKS 59


Plant Works
Because of the complex and large scale construction that requires extensive
precision and technology, plant construction is regarded as a form of multi-dis-
ciplinary art. Hyundai E&C has gained a competitive edge in the fields of oil, gas,
petrochemical, and nuclear power, and has become a leader in combined-cycle
power, thermal power, industrial power, power transmission and substation facilities.
Hyundai E&C is also actively participating in high value-added industries such as
LNG, and GTL core processes, and become the pioneer of future industries by
expanding our green business areas through new and renewable energy.

Kuwait Al-zour LNG Terminal (May 2016 ~ Apr. 2022)


Country | Kuwait
Client | KIPIC (Kuwait Integrated Petroleum Industries Company)
Project Features | Installing eight LNG tanks and LNG import berthing accommodation

60 HYUNDAI ENGINEERING & CONSTRUCTION 61


01 Karan Gas Facilities, Saudi Arabia (Mar. 2009 ~ Feb. 2012) 02 Western Libya Gas Project – Mellitah Plant, Libya
Saudi Arabia’s largest gas development project with capacity to (Nov. 2002 ~ Oct. 2006)
produce 1.8 billion cu. ft. of natural gas per day. Natural gas processing facilities to process gas flowing in from
Mediterranean gas fields to the Mellitah region.
03 Qatar General Petroleum Corporation, Qatar (NGL)
(Sep. 1999 ~ Nov. 2005) 04 New Ethane Recovery Plant at MAA , Kuwait
Revamping of existing facilities and construction of ethane, propane, (June 2005 ~ Nov. 2010)
butane, pentane and gasoline separation and production facilities. Construction of a large-scale plant to produce 5,273 tons of ethane
per day in the Mina Al-Ahmadi area of southeastern Kuwait.
05 Saudi Arabia Uthmaniyah Ethane Deep Recovery Facility
(Oct. 2016 ~ Nov. 2020) 06 UAE BRG3 XPLE Project (June 2016 ~ Dec. 2016)
Additional order as a result of excellent construction of Karan gas A construction project of cross-linked polyethylene (XLPE) produc-
processing facilities (completed in 2012) and Kurais gas processing tion facility and auxiliaries in the Borouge Petrochemical Complex of
facilities (completed in 2009) on schedule. Ruwais Industrial Complex.

07 UAE Saab Offshore Crude Oil & Gas Processing Facility Project 08 Hyundai Chemical MX Project (Nov. 2014 ~ Dec. 2016)
(May 2013 ~ Dec. 2018) Construction of a condensate oil refinery plant and a mixed xylene
Construction of a crude oil processing facility with daily production plant on the land of about 125,000m2.
capacity of 200,000 barrels and a gas processing facility with daily
production capacity of 35 million ft3.

01 02

03 04

Gas Processing, Oil Refinery, 05 06

Petrochemical Plants &


Industrial Plants
Hyundai E&C commands a wealth of experience in gas processing, oil refining, petrochemicals, and industrial
plant engineering. The GTL processing plant order from Qatar speaks volumes about our technological
prowess and project quality. We also successfully completed the South Pars Development Phases 4 & 5
07 08
Onshore Facilities Project within 35 months. Other on-schedule projects include: the Khurais Central
Processing Facilities, the Karan Onshore Gas Processing Facilities, and the Uthmaniyah Ethane Deep
Recovery Facilities in Saudi Arabia. Currently, the Karbala Refinery Plant Project in Iraq, an LNG Terminal
Project in Kuwait, and a HPC project for Hyundai Oil Bank are in the works.

South Pars Field Development Phases 4 & 5 Onshore Facilities, Iran (Mar. 2002 ~ Feb. 2005)
A large-scale natural gas processing facility with capacity to refine 2 billion ft3 (56.62 million㎥) of natural gas per day.
Hyundai E&C set the short-time record by completing a similar scale EPC project in 35 months.

62 HYUNDAI ENGINEERING & CONSTRUCTION PLANT WORKS 63


01

03
02

04

05

03 Ma’aden Alumina Refinery Project, Saudi Arabia


(Mar. 2012 ~ Feb. 2015)
An alumina refinery located in Ras Al-Khair, Saudi Arabia with
annual capacity to process 4.3 million tons of bauxite and produce
1.8 million tons of alumina.

04 Hyundai Steel 3rd Extension Plant, Korea


06 (Sep. 2011 ~ Dec. 2013)
A project to build a blast furnace, critical equipment in an inte-
grated steel mill. Upon completion of the third furnace, Hyundai
Steel will be reborn with capacity to produce 12 million tons of
crude steel every year.

05 Incheon LNG Storage Tank Units 11 and 12, Korea


01 Phases 5 and 6 of Fertilizer Plant Project, Qatar (Dec. 2007 ~ Sep. 2012) (Oct. 1997 ~ Oct. 2001)
The world’s largest fertilizer plant, including two ammonia plants with a production capacity of 2,300 tons per Mechanical, civil, and relaying station construction for two 140,000㎘ LNG
day each and two urea plants with a production capacity of 3,850 tons per day, utility facilities including a storage tanks and 180 tons/hr transmission facilities at the Incheon
power generator and a substation as well as supplementary facilities such as storage and transportation LNG production plant of Korea Gas Corporation.
facilities.
06 Oil-tanking KNOC Yeosu Oil Storage Facilities, Korea
02 Qatar Pearl GTL – Liquid Processing Unit (C5) Project, Qatar (Aug. 2006 ~ Jan. 2012) (Feb. 2011 ~ Mar. 2013)
A large-scale, GTL plant project for global energy giant, Royal Dutch Shell, to refine Qatari liquefied natural gas A project to build 4 tanks with a capacity to store 8.9 million barrels
and produce 140,000 barrels of clean energy per day. of oil.

64 HYUNDAI ENGINEERING & CONSTRUCTION PLANT WORKS 65


01

02

03

Nuclear Power Plants


Hyundai E&C has built nuclear power plants that deliver the highest level of
safety and quality in the world and completed 16 of 26 nuclear power plants
in Korea. The company also has a completely independent and a high level
of in-house construction technology specifically for nuclear power plants. In
2009, after competing with the most respected nuclear power plant
construction companies worldwide, Hyundai E&C was awarded the contract
for four units of the Barakah Nuclear Power Plant in the UAE. It was a
remarkable achievement for exporting Korean-type nuclear power plants for
the first time. Currently, Hyundai E&C is recognized for its technological
prowess as it leads the construction of 6 out of 8 nuclear power plants under 01 Shin-Kori Nuclear Power Plant, Units 3 & 4, Korea 03 Hanbit Nuclear Power Plant, Reactors 1 ~ 6, Korea
(Apr. 2007 ~ Aug. 2019) (Dec. 1980 ~ Dec. 2002)
construction at home and abroad. An eco-friendly nuclear reactor that uses the world’s first submarine With the successful construction of reactor 1 at the Kori Nuclear Power
coolant pumping and drainage system and a new model light-water Plant, Hyundai E&C was awarded the construction of reactors 1 and
reactor (APR 1400: Advanced Power Reactor 1,400㎿) that was stra- 2 at the Hanbit Nuclear Power Plant. Especially, reactors 3 and 4 at
Sinhanul Nuclear Power Plant, Units 1 & 2, Korea (Apr. 2010 ~ Sep. 2023 scheduled) tegically developed for export. Hanbit became the standard models for Korean light water reactors,
obtaining NA as well as NTP certification from the American Society
Construction of two 1,400㎿ pressurized water reactors in Buk-myeon, Uljin-gun, Gyeo- 02 Shin-Kori Nuclear Power Plant, Units 1 & 2, Korea
of Mechanical Engineers and achieving the feat of 100% in-house
(Feb. 2005 ~ July 2012)
ngbuk with the same reactor type as the Barakah Nuclear Power Plant in the UAE, construction technology.
Civil works, construction and installation of two 1,000㎿ pressur-
which was the first Korean model nuclear power plant to be exported. ized water reactors and facilities.

66 HYUNDAI ENGINEERING & CONSTRUCTION PLANT WORKS 67


01 02

01 Seosan PV Power Plant (Mar. 2018 ~ Aug. 2019)


The first Utility-scale PV plant with Battery storage(PV:
65㎿, Battery: 140㎿h) in Korea. As a total solution
provider, we have successfully performed the project 03 04
Development, EPC (Engineering, Procurement & Con-
struction) and O&M (Operation & Maintenance) of PV
Plant.

02 Qatar Ras Laffan C Independent Water and Power


Plant Project (May 2008 ~ Apr. 2011)
Mega power plant and desalination plant consisting of
a power generation facility of 2,728㎿ and desalination
capacity of 63MGD from eight gas turbines, eight heat
recovery steam generators (HRSG), and four steam
turbines.

03 UAE Mirfa Independent Water and Power Plant


Project (Oct. 2014 ~ Oct. 2017)
Construction of a combined plant of 1,600㎿ thermal
power plant and desalination capacity of 239,000 tons
per day, supplying Abu Dhabi with ten percent of pow-

Gas Power &


05 06
er and drinking water of the city’s supply.

04 Singapore WTE(Waste to Energy) Project


(Jan. 2013 ~ Aug. 2017)

Renewable Energy 
This large-scale waste incinerator with a total capacity
of 1,150t/day also supplies 400-degree 50 bar of steam
to industrial facilities within the industrial complex.

05 New Haripur 360㎿ Combined-Cycle Power Plant,


Bangladesh (Feb. 2011 ~ Mar. 2014)
Hyundai E&C has built a global reputation for technical process and project execution capabilities in A 412㎿ combined cycle power plant that marked
Hyundai E&C’s re-entry into Bangladesh after the
constructing thermal power plants and renewable energy plants at home and abroad. These include construction of the Haripur electric plant in 2001.

the Talimarjan TPP Expansion Project in Uzbekistan, the Ras Laffan C IWPP Project in Qatar, the Mirfa 06 Vietnam Mong Jeong l Thermal Power Plant
Project (Dec. 2011 ~ Dec. 2015)
IWPP Project in UAE, the Mong Duong 1 TPP Project in Vietnam, and the Hyundai Photovoltaic Power A project of building Vietnam’s single largest circu-
lating fluidized bed combustion (CFBC) thermal 07 08
Plant in Seosan, Korea. In the future, we aim to become a global leader in the gas power plant and power plant consisting of two 540㎿ power units
supplied to the Vietnam Electricity (EVN).
renewable energy businesses as per recent new movement of the global decarbonization and eco-
Goyang Samsong Collective Energy Facility,
friendly businesses. 07
Korea (Aug. 2008 ~ Nov. 2011)
Construction of a 99㎿ power generation and 98Gcal/h
heating facility to supply electricity and steam to 14,000
households in the area.
Uzbekistan Talimarjan TPP Expansion Project (June 2013 ~ Mar. 2017) Yulchon ll Combined-Cycle Power Plant, Korea
08
(Dec. 2011 ~ June 2014)
It is a turn-key project to build a combined cycle power plant in Talimarjan, southwest of Uzbekistan. It has two units A 946㎿ combined cycle power plant commissioned
of 450MW combined cycle power plant, each unit consisting of one gas turbine, one heat recovery steam generator after the successful construction of Yulchon I. Con-
struction was completed 2 months ahead of schedule,
(HRSG), and one steam turbine. Being the single largest combined cycle power plant project in Uzbekistan, it con- contributing to the stabilization of power supply and
tributed to resolving of the chronic power shortage in the region, accounting for 6.6% of total power supply. demand in the first year of completion.

68 HYUNDAI ENGINEERING & CONSTRUCTION PLANT WORKS 69


01 Saudi Arabia Haradh 380kV Transmission Line Project 02 Construction of Al-Sanabil 380/110/13.8 kV BSP, Saudi Arabia
(June 2018 ~ Oct. 2019) (Feb. 2012 ~ Nov. 2014)
Building a 95㎞ transmission line, It was a monumental project for Construction of a new substation in the vicinity of Jeddah, Saudi
winning a prize of appreciation from the client SEC(Sadui Electricity Arabia.
Company) because of the completion 7 months earlier than the con-
03 Al-Samir 380 kV Substation, Saudi Arabia
tractual requirement.
(Oct. 2014 ~ Dec. 2016)
A project commissioned by the Saudi Electricity Company (SEC) to
build a 380㎸ substation.

04 Yeongheung 345 kV Transmission Line, Korea


(July 1998 ~ June 2004)
The consruction of the first marine transmission tower in the world
with 78㎞ of route length and 137 Towers (Hyundai E&C’s portion :
32㎞ of route length and 55 towers).

01 02

03

Electric Power Networks &


Smart Grid 
Hyundai E&C has been an top leader in the global transmission line and
substation sector. In addition to constructing the 18,000km-long extra high
voltage power grid in Saudi Arabia, called ‘the heart of the Middle East,’ we
have successfully completed about 170 transmission line and substation 04

projects all over the world like UAE, Kuwait, Qatar, Myanmar, and Indonesia
etc. Based on full experience and expertise through loads of the projects in
19 different countries for last 50 years, we are contributing to the construction
of a global energy network by expanding our market from the Middle East
to Asia, Latin America, and Africa.

Saudi New Jubail 380kV Substation Project (July 2014 ~ June 2018)
Building the largest 380kV substation in Saudi Arabia and modifying the existing 30
substations, commissioned by the Saudi Electricity Company (SEC).

70 HYUNDAI ENGINEERING & CONSTRUCTION PLANT WORKS 71


We
Create
A
Sustainable
World
Hyundai E&C endeavors to realize the dream of humanity by creating a new ENVIRONMENTAL SOCIAL GOVERNANCE
future through consistent initiatives and creative thinking. Living up to our
name as a leading global company, we put ESG (Environmental . Social .
Governance) management into practice for sustainable growth. These envi-
ronmental management principles represent our respect for people and the
environment, our corporate social responsibility management meets global
standards, and our transparent management practices will deepen the trust
of our stakeholders for mutual growth. We are proudly blazing the trail toward
the prosperity of humankind.

72 HYUNDAI ENGINEERING & CONSTRUCTION MANAGEMENT PRIORITIES 73


Sustainable Hyundai E&C is working to internalize ESG management practices in four
sustainability management systems: prosperity, the planet, people, and Environmental Hyundai E&C employs multi-faceted environmental energy management
policies in line with our 2050 long-term roadmap to attain our vision of

Value Creation principles of governance. We aim to harness the driving force of the
renewable, eco-friendly future business to ensure the sustainable growth
Environmental Management becoming a ‘Global Green One Pioneer.’ We have created a management
system which promotes higher environmental efficiency and minimizes
of our company and humanity. In May 2020, we set long-term sustainability for Sustainability our environmental impacts associated with normal business activities
Sustainability Management
management goals for 2030 in line with the UN Sustainable Development to preserve the environment and the planet.
at Hyundai E&C Goals (SDGs). We established value decision principles and promotion
schemes to implement company-wide sustainability management practices.

Carbon Management Hyundai E&C is actively implementing carbon management practices by establishing
strategies to address climate change and reduce greenhouse gas emissions by
PROS- Against Climate Change 52.4% (including direct/indirect emissions and emissions from supply chains) by
PERITY
2050. These efforts earned us the honor of joining the Hall of Fame Platinum Club,
Core technologies and Discovering future Developing renewable energy/
service innovation growth engines Eco-friendly technologies
the highest grade of the CDP (carbon disclosure project) Korea, by scoring Leadership
points for the fourth consecutive year in a renowned global sustainability index. Our
Hyundai E&C continues to diversify its global project portfolio and
generate sustainable value based on differentiated technologies eco-friendly construction commitment also won accolades from authorities in
corresponding to megatrends. Singapore and Qatar, bringing us one step closer to our goal of becoming a global
green leader.

T
NE
Global Award

LA
P

Environmental and Addressing Protecting the ecosystem


energy management climate change around construction sites Platinum Club of GGBS Champion Award Qatar
the CDP Korea Hall of Fame at the Singapore BCA awards Green Angel Award
Guided by the environment and energy management vision of becoming
a ‘2050 Global Green One Pioneer,’ we lead innovations by minimizing
the environmental impact of our business activities.
Certifications
Based on the environmental energy management system,
we will continue to carry out eco-friendly management activities.
PEO

∙ ISO 14001 (Dec. 20, 1996 ~ Nov. 18, 2023)


LE ∙ ISO 50001 (Mar. 10, 2012 ~ Nov. 18, 2023)
P

Construction Shared growth Strategic approach to


site safety control with partners social contribution Eco-friendly As part of our commitment to minimizing our environmental impact, Hyundai E&C
has adopted an eco-friendly construction process which covers the entire
Hyundai E&C maintains a safety management competence on par with
other leading global builders and seeks to grow along with its partners and
Construction Process construction procedure.
local and international communities.

Eco-friendly Engineering Eco-friendly Procurement Eco-friendly Transportation


PLE

·D
 eveloping eco-friendly · Increasing eco-friendly · Minimizing the environ-
CI

engineering procurement practices mental impacts of


IN ·D
 eveloping environmental ·E stablishing an eco-friendly transportation
PR
ESG
remediation engineering supply chain · Maximizing energy efficiency
technology
Fortifying our ethics Strengthening ESG Running a
and compliance policy and risk sustainability
management framework management practices management council
Eco-friendly Construction Eco-friendly Operation Eco-friendly Demolition
·M
 inimizing the environ- · Increasing green-labeled · Reducing construction
Hyundai E&C fulfills its responsibilities while incorporating ESG mental impacts of construction buildings waste
responsibilities into our management framework to further trust in the ·M
 aximizing resource efficiency · Implementing eco-friendly · Establishing eco-friendly
company and create a sustainable habitat for all. construction demolition guidelines

74 HYUNDAI ENGINEERING & CONSTRUCTION SUSTAINABLE VALUE CREATION | ENVIRONMENTAL 75


Social Safety in the workplace is a value on which we refuse to compromise in
our management activities. We created the 12 Safety Golden Safety Rules Social Hyundai E&C works consistently to innovate and achieve flawless project
performance at the highest possible quality. Our activities to reinforce
- Safety accordingly, which serve as the underlying principles for establishing safety - Quality Assurance quality management include systematic and integrated process
practices within our corporate culture. We have also have completed a management, the adoption of quality control and warranty programs to
health and safety management system in compliance with international all domestic and international projects, and quality control training for
Safety Management for Quality Management to
standards. Additionally, we reinforce our safety control competitiveness suppliers to ensure that we are on the same page.
Sustainable Development through various campaigns, such as our Safety Culture Experience Center Maximize Customer Value
and the development of our own IoT-based smart safety control platform.

Establishing a Safety Culture Hyundai E&C realizes accident-free worksites thanks to our systematic Health and Quality Management System In 1993, Hyundai E&C became the first Korean builder to obtain the ISO 9001 Quality
Safety Management Systems (ISO 45001 and KOSHA-MS) as well as specialized Management System certification and to apply quality management to all of our
safety control practices. Periodic safety check day events and risk management processes. We take a global-standard quality assessment on our preventive quality
systems help keep our employees mindful of safety rules. In the meantime, seasonal control activities and performance measurements for all business areas from engineering,
safety check sessions focus on seasonal disaster risk factors, contributing to accident- procurement, and construction to pilot operation.
free worksites.

Global Award INPUT OUTPUT

1 PLAN  O
2D 3 CHECK
Quality Project Monitoring,
Planning Performance & Measurement,
Operation Analysis,
Client/ Assessment Customer
Gold prize of the Singapore Singapore Singapore HDB Construction Stakeholder
Satisfaction
Constructors Association Ltd. SHARP Award Safety Award Requirements
5 C onstruction Objects  CT
4A
(Products & Services) Leadership, Management
Accountability

INNOVATION/IMPROVEMENTS FEEDBACK
Certifications
We have built an international standard safety and health system that
proactively identifies and assess risk factors to minimize them.

∙ KOSHA MS (Nov. 22, 2021 ~ Nov. 21, 2024) Certifications


∙ ISO 45001 (Dec. 08, 2019 ~ Dec. 31, 2023)
To achieve our impeccable quality goals, we apply quality control and
quality assurance systems to all processes.

∙ ISO 9001 (July 1, 1993 ~ Dec. 31, 2023)


Smart Tech at Worksites Hyundai E&C became the first Korean builder to develop an IoT-based on-site safety ∙ ISO/TS 29001 (Aug. 12, 2019 ~ Dec. 31, 2023)
∙ ASME NA/NPT (May 23, 1982 ~ May 23, 2024)
management system, Hyundai IoT Safety System (HioS). HioS is an integrated
Safety Control platform that proactively eliminates potential risk factors based on data collected
∙ KEPIC MN/SN/EN/HN (Dec. 21, 1998 ~ Dec. 21, 2022)

from various sensors installed on construction sites, thereby enhancing safety control.
We were also the first in Korea to install a thermal facial recognition imaging access
control system called H-Gate at our construction sites to prevent the spread of Smart Quality Control Hyundai E&C is actively embracing fourth industrial revolution technologies in its quality
infectious diseases and promote the health and safety as well as the productivity of management for higher quality innovation and customer satisfaction. First introduced
our workers. in the Korean construction industry, the Q-Pocket is a smart integrated system that
monitors quality control on a real-time basis and makes this information available
seamlessly via the web and mobile application interfaces. Q-Pocket, which utilizes a
mobile app for real-time quality control. Q-Pocket covers on-site inspection planning,
structure finishing construction monitoring, and defect management. The defect
management function is patented. We also have in place an in-house developed BIM-
based AR quality management platform to improve construction quality monitoring
and inspection productivity at our construction sites.

76 HYUNDAI ENGINEERING & CONSTRUCTION SOCIAL-SAFETY | SOCIAL-QUALITY ASSURANCE 77


Social Hyundai E&C is committed to creating a sustainable future wherein we
can all grow together by strengthening sustainability through shared Governance Hyundai E&C has established a well-designed management system
based on its sound and transparent corporate governance. We are
- Social Contribution growth, making strategic social contributions that fulfill our social committed to transparency with our stakeholders, and our transactions
responsibilities as a global leader, and building local infrastructure to with business partners are based on fairness. Hyundai E&C pursues
create shared value worldwide. mutual growth with our business partners while reinforcing our own
Sharing Management for Transparent Management for
competitiveness by operating an updated ethics and compliance
a Better Future for All Mutual Growth management system.

Social Contribution Hyundai E&C was the first Korean builder to launch a social volunteer corps in 2009, Sharing Ethics Awareness | Under the vision of becoming a company in which our stakeholders take moral pride,
committed to bringing about a better world. In 2018, we systematically organized we actively established an ethics and compliance management system across the
our social contribution activities in line with the Six Moves that reflect Hyundai Motor
Ethics & Compliance company. For instance, we formed a company-wide compliance organization to
Group’s social responsibility vision and philosophy. Hyundai E&C’s programs include Management implement our ethics and compliance policies, and a compliance consultative body
mentoring youths and teens in becoming independent and volunteer activities in regularly monitors compliance within business operations. To raise awareness on
disaster relief and safety control areas. We contribute to local stakeholders and this topic, We provide our workforce with regular ethics and compliance training and
communities and global citizens in need through 49 programs in the 20 countries seeks an annual ethics pledge from its employees. We also operate an integrated
where we have a business presence. reporting channel called ‘H-Dudrim,’ to which any stakeholder may lodge a complaint,
and a Cyber Audit Office for reporting unethical practices. We have in place a
Compliance Program (CP) that promote fair and transparent business transactions.
DREAM MOVE NEXT MOVE

MORAL PRIDE IN HDEC


Hyundai E&C in Which all of Customers, Employees, and Suppliers Take Pride

3 Practical
Code of Conduct Supervisory Body Ethics Training
Elements
Establish a Carry out an Expand and Build Enhance
5 Areas of transparent in-depth training improve infrastructures the win-win

Mentoring the underprivileged go independent and Lending construction business acumen to social Implementation management system on ‘Clean management for ethical cooperation
on a global scale Company’ evaluation tasks management system
talent management contribution

HAPPY MOVE SAFE MOVE Win-Win Management | Hyundai E&C operates H-Together program, a win-win cooperation framework for
sustainable shared growth with partner companies in five areas: safety, quality control,
Mutual and Sustainable Growth transparency, and new technology. We are working to strengthen communication with
partner companies through regular general meetings and gatherings. In addition, we
offer favorable payment conditions, subsidize loan interests or guarantee fees, as
needed, to help our financially-distressed partners. More importantly, we also encourage
our partners’ commitment to sustainability and safety control in various ways. We
support partner companies for consulting with safety diagnosis specialist agencies as
Employees’ and customers’ volunteerism Promoting safety at construction sites and local
communities well as their recruitment and wages of safety officers. These efforts earned fair recognition
as we won the top grade in the Win-Win Index in 2022 for the fourth year in a row.

GREEN MOVE EASY MOVE

Environmental preservation & addressing climate Promoting mobility rights for the mobility-challlenged Overseas training program for our business partners Annual General Meeting of Partner Companies
change and socially underprivileged

78 HYUNDAI ENGINEERING & CONSTRUCTION SOCIAL-SOCIAL CONTRIBUTION | GOVERNANCE 79


HYUNDAI E&C History
Global Network
Hyundai E&C is targeting the global construction market 1940s - 1980s 2000s
with a localized, strategic network. 1947. 05 · Established as Hyundai Civil Works Company 2008. 12 · Awarded iF Design Awards in 3 categories for Hillstate
1958. 05 ·Completed restoration of the Han River Pedestrian Bridge in 2009. 11 · Incorporated into DJSI (Dow Jones Sustainability Index) Korea
Korea Top 20
1965. 11 ·Won the Pattani Narathiwat Highway Project in Thailand 2009. 12 · Won a contract for nuclear power plants in UAE (a first in Korean
overseas exports of nuclear plants)
(the first overseas project by a Korean construction company)
1970. 01 ·Hurricane Gulch Bridge Project in Alaska begins
1970. 06 ·Completed the Gyeongbu Highway in Korea
1978. 04 ·Completed the Kori Nuclear Power Plant Unit 1 in Korea
2010s - 2020s
1980. 12 ·Completed construction of Jubail Industrial Port, Saudi Arabia 2010. 05 · Conferred ‘Star’ (the highest tier rating) at the Green & Gracious
1982. 04 ·Completed Seosan reclamation project Builder Award by the Building & Construction Authority in Sin-
1985. 08 ·Completed construction of Penang Bridge, Malaysia gapore
1988. 02 ·Completed construction of King Sejong Station in Antarctica · Joined the UN Global Compact (UNGC)
2010. 12 · Awarded the Gold Tower Order of Industrial Service Merit by

Korea 1990s the Ministry of Knowledge Economy on the 1st Nuclear Power
Day held in 2010
1990. 12 ·Completed Changi International Airport Terminal 2 in Singapore 2011. 04 · Incorporated into the Hyundai Motor Group
Central Branch South Eastern Branch
1993. 07 ·Acquired ISO 9001 certification in all business fields (a first for 2012. 01 · Completed gas-to-liquid (GTL) plant project in Qatar
Fl. 7, Construction Hall, Fl. 17, Kyowon Busan Building
a Korean construction company) 2012. 03 · Obtained an order for Saudi Ma'aden Alumina Refinery project
54, Daedeok-daero 220beon-gil, 16, Jungang-daero,
Seo-gu, Daejeon, 345233 Dong-gu, Busan, 48733 1995. 12 ·Yonggwang Nuclear Power Plant Units 3, 4, selected as ‘Proj- 2013. 05 · Won prizes in 2 categories at Singapore’s BCA Construction
Republic of Korea Republic of Korea ect of the Year’ by Power Engineering, an American electrical Excellence Awards
Tel 82-42-488-2477 Tel 82-51-469-8083 power magazine 2013. 07 · Won a contract for the Third Bosphorus Bridge in Turkey
1996. 10 ·Awarded the Gold Tower Order of Industrial Service Merit for 2013. 11 · The first Korean construction company to exceed USD 100
the construction of Yonggwang Nuclear Power Plant Units 3 , billion in cumulative overseas contracts
4 and for achieving 100% self-reliance in nuclear power plant 2014. 02 · Completed the construction of the Jangbogo Research Station
Overseas construction technology in Antarctica
·Taean Thermal Power Plant selected as ‘Project of the Year’ by · Became Korea’s first company to enter the Chilean market by
1. United Arab Emirates/ 5. Qatar/Doha Branch 9. Bangladesh/Dhaka Branch 13. Algeria/Algiers Branch Power Engineering obtaining an order for the construction of the Chacao Bridge
Abu Dhabi Branch Alshoumoukh Towers Tower A, 6th Floor, Star Centre, Road-138, 2nd Floor, 16 Rue Hamdani Lahcene, 1997. 08 ·Entry into North Korea with the construction of the KEDO 2014. 06 · Obtained an order for expansion and facility improvement of
P.O. Box 46101, #1601, Makeen 5th Floor, C-Ring Road, Block-SE (C), Plot-2A, Gulshan Avenue, Cooperative Mohamed Boudiaf,
Nuclear Power Plant Units 1, 2 Puerto La Cruz Oil Refinery, Venezuela
Tower, Tourist club Area, Freej Bin Mahmoud, Area No. 23, Gulshan-1, Dhaka-1212, Bangladesh Sidi Yahia, Hydra, Alger, Algeria
Abu Dhabi, UAE Doha, Qatar (P.O.Box : 24466) Tel 88-02-5881-0433 Tel 213-550-35-0539 2015. 05 · Completed the Ulsan Bridge, the world’s third-largest sin-
Tel 971-2-643-2865 Tel 974-3359-9911
10. Philippines/Manila Branch 14. Panama/Panama City Branch
2000s gle-span suspension bridge
· Won prizes in 5 categories at Singapore’s BCA Construction
2. Iraq/Baghdad Branch 6. Singapore/ Unit 803, The Boni Prime Building, 41E de la Torre 1000 (No. 396814 del 2001. 04 ·Awarded Grand Prize at the 2001 Construction Excellence Excellence Awards
Baghdad Salhiya Karada Maryam Singapore Branch 20th Drive, McKinley Business Park, P.H. Oceanía Business Plaza
Awards by the Singapore Building and Construction Authority 2016. 01 · Completed the Mong Duong-I Thermal Power Plant in Vietnam
District No. (220) Lane No. (10) 9 Temasek Boulevard Suntec Bonifacio Global City, Fort Bonifacio, Sección de Propiedad Horizontal,
House No. (24). Baghdad, Iraq Tower 2, #09-04/05, Singapore Taguig City Provincia de Panamá) (BCA) for Parc Palais Condominiums 2016. 03 · Order to construct the Al-Zour LNG import terminal in Kuwait
Tel 964-780-303-7460/ Tel 65-6337-1577 Tel 63-2-5310-3489/ 63-917-823-6853 Tel 507-201-8609/ 507-631-896-57 2002. 08 ·No. 12 in the ENR International Contractor Rankings based on 2016. 08 · Completed of the Third Bosporus Bridge in Turkey
964-783-303-7450 overseas sales revenue (No. 1 in Asia) and No. 2 in the world 2017. 09 · DJSI Industry leader No. 1 for 5 consecutive years - A first in the
7. Indonesia/Jakarta Branch 11. Hong Kong/Hong Kong Branch 15. Peru/Lima Branch after Bechtel in electric power plants global construction industry (construction & engineering category)
3. Kuwait/Kuwait City Branch Office 8, 32nd Floor (Unit F), Jl. Jend. Room 801, 8/F, New Kowloon Plaza, #503, Av. Camino Real 1281, San
2003. 07 ·Maintained top ranking in performance in the Korean con- 2019. 03 · Completed National Museum of Qatar
P.O Box 24314 Safat 13104, Sudirman kav 52-53, SCBD Lot 28, 38 Tai Kok Tsui Road, Tai Kok Tsui, Isidro, Lima, Peru
State of Kuwait Jakarta, Indonesia Kowloon, Hong Kong Tel 51-999-564-612 struction industry for 42 consecutive years 2019. 09 · Incorporated into DJSI (Dow Jones Sustainability Index) World
Rumaithiya, Block No. 9, Street No. 97, Tel 62-21-571-3700 Tel 852-2905-1812 2004. 07 ·Received the Annual Safety Performance Awards for Goldenhill for 10 consecutive years
Villa No 16A, State of Kuwait 16. Uzbekistan/ Park Condominiums from the Singapore Land Transportation 2019. 10 · Completed Sheikh Jaber Causway of Kuwait
Tel 965-2228-2250 8. Vietnam/Hanoi Branch 12. China/Beijing Branch Tashkent Branch Authority 2020. 11 · Obtained an order for Panama metro Line 3
8th Floor, Viglacera Tower, No.1 Thang Room No. 1605, Tower 3-B, 5C-07 office, block-C, 107-B bldg.
2005. 04 ·Completed phases 4 & 5 of the South Pars onshore facilities con- 2021. 07 · Won the order for the construction of Chinchero International
4. Saudi Arabia/ Long Avenue, Me Tri ward, Nam Tu Wangjing SOHO, No.1 Futong East ‘International Business Center,’
Al Khobar Branch Liem dist., Hanoi, Vietnam Street, Chaoyang District, Beijing, Amir Temur Avenue, Tashkent, struction in Iran. Airport, Peru
P.O.Box 77249, Al-Mousa Tower Tel 84-24-3933-3970 China (100102) Republic of Uzbekistan 2006. 05 ·Awarded Grand Prize at the 2006 Construction Excellence 2021. 08 · Completed the Ain Dubai Ferris wheel, UAE
Office No. 203&204 Tel 86-10-8453-8032 Tel 998-71-140-9071 Awards by the Singapore Building and Construction Authority 2022. 03 · First Korean company to win a U.S. nuclear powerplant decom-
Prince Turkey Street, Al-Khobar,
Kingdom of Saudi Arabia
(BCA) for Goldenhill Park Condominiums missioning project
17. Japan/Tokyo
Tel 966-3-845-1088 2006. 09 · Launched a new apartment brand, ‘Hillstate’ in Korea 2022. 04 · Grand slam in the world’s top three design awards, including
TOK Ofc Room No. 912, Shin-Nisseki
Building, Marunouchi 3-4-2, Chiyo- 2007. 10 · Construction of Taean Corporate City in Korea begins Red Dot, iF, and IDEA
da-ku, Tokyo, Japan 2008. 02 · Received Grand Prize for ethical management at the Social 2022. 06 · Announced the roadmap for the next-generation nuclear pow-
Tel 81-90-6520-0906 Responsibility Management Awards in Korea erplant business
2008. 05 · The first Korean construction company to achieve USD 60 bil- 2022. 07 · Signed an agreement with Aramco, the world’s largest energy
lion in overseas orders company, on an exclusive partnership for new EPC projects

80 HYUNDAI ENGINEERING & CONSTRUCTION 81


Hyundai E&C 03058 Hyundai Bldg., 75, Yolgok-ro, Jongno-gu, Seoul, Republic of Korea en.hdec.kr

You might also like