False Celling Hand Over

The document is a handing over protocol from Punjab Engineering Company detailing items being handed over for subsequent work. Item 1 listed is false ceilings for various locations on the first, second, and third floors according to provided drawings. Item 2 listed is 18 fire rated doors across ground, first, second, third floors and roof according to provided drawings. Signatures are required from the contractor and EIL to hand over and take over the items.

Uploaded by

PECO JOIL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views3 pages

False Celling Hand Over

The document is a handing over protocol from Punjab Engineering Company detailing items being handed over for subsequent work. Item 1 listed is false ceilings for various locations on the first, second, and third floors according to provided drawings. Item 2 listed is 18 fire rated doors across ground, first, second, third floors and roof according to provided drawings. Signatures are required from the contractor and EIL to hand over and take over the items.

Uploaded by

PECO JOIL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Punjab Engineering Company (Projet Division)

Assam Bio Refinery Projects, Numaligarh


Golaghat , Assam
Date :- 20.03.2023
HANDING OVER PROTOCOL
THE FOLLOWING ARE BEING HANDED OVER FOR SUBSEQUENT WORK:-
Sl. No.. DESCRIPTION OF EQUIPMENT FOUNDATION / STRUCTURE EQUIPMENT / STRUCTURE TAG NO

FALSE CEILING:
ALL DIMENSIONS, ELEVATIONS HAVE BEEN KEPT AS PER LATEST AFC
DRAWING NO.B215-000-8141-02201-R-1, B215-000-8141-02202-R-3 &
A/1/102
LOCATION DETAILS:
FIRST FLOOR CEILING : 1.EAST AIR LOCK LOBBY, 2.EAST
SIDE GENTS TOILET, 3.GIS ROOM, 4.WEST AIR LOCK LOBBY, 5. JANITOR, 6.WEST
SIDE LADIES TOILET.
SECOND FLOOR CEILING : 1.EAST AIR LOCK LOBBY, 2.EAST SIDE GENTS
TOILET, 3.RACK ROOM, 4.CONSOLE ROOM, 5.ENGG ROOM, 6.CORRIDOR, 7.LOBBY,
8.UPS/VFD ROOM, 9.MCC ROOM PRESURISED, 10.WEST AIR LOCK LOBBY,
11.JANITOR, 12.WEST SIDE LADIES TOILET.
THIRD FLOOR CEILING: 1.LOBBY/LOADING PLATFORM, 2.EAST
SIDE GENTS TOILET, 3.EAST SIDE P.C TOILET, 4.EAST SIDE LADIES TOILET,
5.RECEPTION CUM ENTRANCE FOYER, 6.OFFICE AREA, 7.CAFETERIA,
8.CONFERENCE ROOM, 9.MEETING ROOM-1, 10.VIP/TRANSIT ROOM-1, 11.FOD
1 ROOM, 12.VIP/TRANSIT ROOM-2 13.MEETING ROOM-2, 14.LIBRARY CUM READING FALSE CEILING
ROOM, 15.CABIN-1, 16.CABIN-2, 17.CABIN-3, 18.CABIN-4, 19.CABIN-5, 20.PANTRY,
21.WEST AIR LOCK LOBBY, 22.D.W,23.WEST SIDE GENTS & LADIES TOILET,
24.JANITOR.

ENCLOSURES: AS BUILT DRAWING NO.: B215-000-8141-02201-R-1 & B215-


000-8141-02202-R-3

HANDED OVER BY:

SIGNATURE OF CONTRACTOR SIGNATURE OF EIL (CIVIL)

TAKEN OVER BY:

OBSERVATIONS:-

SIGNATURE OF CONTRACTOR (CIVIL/ STRL) SIGNATURE OF EIL (CIVIL/ STRL)


SIGNATURE OF CONTRACTOR (CIVIL/ STRL) SIGNATURE OF EIL (CIVIL/ STRL)
FIRE RATED DOOR
ALL DIMENSIONS, ELEVATIONS HAVE BEEN KEPT AS PER LATEST AFC DRAWING
NO.B215-000-8141-02104-R-6 and B215-000-8141-02105-R-2
LOCATION & KEY DETAILS:
GROUND FLOOR:-25998 (EAST STAIR),
26404 (WEST STAIR) ,26366 & 26207 (MIDDLE STAIR).
FIRST FLOOR:- 26201 & 26365 (EAST STAIR & LOBBY),26252 &
26336 (WEST STAIR & LOBBY), 26403 (MIDDLE STAIR).
SECOND FLOOR:- 26180 (EAST STAIR), 26274 & 26281 (WEST STAIR &
LOBBY), 26222 (MIDDLE STAIR).
THIRD FLOOR:- 25958 (EAST STAIR), 25991 & 26281 (WEST STAIR & LOBBY),
26222 (MIDDLE STAIR). ROOF:-
26429 (MIDDLE STAIR). TOTAL DOOR : 18
NOS