This welding report summarizes welding work done on a flowline project. It details 26 welds made between various pipe and fitting materials using gas tungsten arc welding and shielded metal arc welding processes. Each weld is listed with the joint number, material specs, welding procedure used, dates, and non-destructive testing results. The majority of the welds were found to be acceptable based on visual and radiographic testing.

Uploaded by

Ro Diro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views8 pages

Welding Report Flowline Final

This welding report summarizes welding work done on a flowline project. It details 26 welds made between various pipe and fitting materials using gas tungsten arc welding and shielded metal arc welding processes. Each weld is listed with the joint number, material specs, welding procedure used, dates, and non-destructive testing results. The majority of the welds were found to be acceptable based on visual and radiographic testing.

Uploaded by

Ro Diro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT NO. TYPE OF JOINT WPS PQR FIT UP DATE WELDING DATE Acceptable Result REMARKS
BASE 1 BASE 2 BASE 1 BASE 2 ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT
1 J.CW 1 Butt Weld A105 A106 Gr. B Flange 2" Sch 80 WN.RF #600 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √ √ Acc
2 J.CW 2 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc
3 J.CW 3 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √ √ Acc
4 J.CW 4 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc
5 J.CW 5 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc
6 J.CW 6 Butt Weld A106 Gr. B A234 WPB Pipe 2" Sch. 80 Elbow 90 Deg. 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
7 J.CW 7 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc
8 J.CW 8 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 01 01 √ √ Acc
9 J.CW 9 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc
10 J.CW 10 Butt Weld A106 Gr. B A105 Pipe 2" Sch. 80 Flange 2" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 01 01 √ √ Acc
11 J.CW 11 Butt Weld A105 A234 WPB Flange 2" Sch 80 WN.RF #600 Elbow 90 Deg. 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
12 J.CW 12 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
13 J.CW 13 Butt Weld A106 Gr. B A105 Pipe 2" Sch. 80 Flange 2" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
14 J.CW 14 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √
15 J.CW 15 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √
16 J.CW 16 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √
17 J.CW 17 Butt Weld A106 Gr. B A234 WPB Pipe 2" Sch. 40 Elbow 90 Deg. 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √
18 J.CW 18 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
19 J.CW 19 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc
20 J.CW 20 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 01 01 √
21 J.CW 21 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc
22 J.CW 22 Threaded A105 A106 Gr. B SW X COUPLING NPT Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015
23 J.CW 23 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01 √ √ Acc
24 J.CW 24 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √
25 J.CW 25 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01 √
26
Note : Prepared / Witneseed by Witnessed and Approved by.
Company
PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Sign

Name Dadan Hamdani

Date
WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT NO. TYPE OF JOINT WPS PQR FIT UP DATE WELDING DATE
BASE 1 BASE 2 BASE 1 BASE 2 ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT
1 J.CW 01 Butt Weld A105 A 234 WPB Flange 4" Sch 80 WN.RF #600 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/30/2021 10/1/2021 GTAW SMAW 02 02 √ √
2 J.CW 02 Butt Weld A106 Gr. B A 234 WPB Pipe 4" Sch. 80 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/1/2021 10/2/2021 GTAW SMAW 02 02 √ √
3 J.CW 03 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/30/2021 10/1/2021 GTAW SMAW 02 02 √ √
4 J.CW 04 Butt Weld A106 Gr. B A 234 WPB Pipe 4" Sch. 80 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/1/2021 10/1/2021 GTAW SMAW 02 02 √ √
5 J.CW 05 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 02 02 √ √
6 J.CW 06 Butt Weld A 234 WPB A105 Straight Tee 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 02 02 √ √
7 J.CW 07 Butt Weld A106 Gr. B A 234 WPB Pipe 4" Sch. 80 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/2/2021 10/2/2021 GTAW SMAW 02 02 √ √
8 J.CW 08 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/2/2021 10/2/2021 GTAW SMAW 02 02 √ √
9 J.CW 09 Butt Weld A105 A 234 WPB Flange 4" Sch 80 WN.RF #600 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/30/2021 10/1/2021 GTAW SMAW 02 02 √ √
10 J.CW 10 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/30/2021 10/1/2021 GTAW SMAW 02 02 √ √
11 J.CW 11 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/1/2021 10/2/2021 GTAW SMAW 02 02 √ √
12 J.CW 12 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
13 J.CW 13 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
14 J.CW 14 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
15 J.CW 15 Butt Weld A106 Gr. B A 234 WPB Pipe 4" Sch. 80 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/30/2021 10/1/2021 GTAW SMAW 02 02 √ √
16 J.CW 16 Butt Weld A106 Gr. B A 234 WPB Pipe 4" Sch. 80 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/1/2021 10/3/2021 GTAW SMAW 02 02 √ √
17 J.CW 17 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/30/2021 10/1/2021 GTAW SMAW 02 02 √ √
18 J.CW 18 Butt Weld A106 Gr. B A 234 WPB Pipe 4" Sch. 80 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
19 J.CW 19 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/1/2021 10/3/2021 GTAW SMAW 02 02 √ √
20 J.CW 20 Butt Weld A105 A106 Gr. B Flange 4" Sch 80 WN.RF #600 Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 02 02 √ √
21 J.CW 21 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/29/2021 GTAW SMAW 02 02 √ √
22 J.CW 22 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
23 J.CW 23 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF #600 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/1/2021 10/1/2021 GTAW SMAW 02 02 √ √
24 J.CW 24 Fillet Weld A106 Gr. B A105 Pipe 4" Sch. 80 Threadolet 2"X4" 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
25 J.CW 25 Fillet Weld A106 Gr. B A105 Pipe 4" Sch. 80 Threadolet 1/2"X4" 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
26 J.CW 26 Fillet Weld A106 Gr. B A105 Pipe 4" Sch. 80 Threadolet 1/2"X4" 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √
27 J.CW 27 Fillet Weld A106 Gr. B A105 Pipe 4" Sch. 80 Threadolet 1/2"X4" 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √

Note : Prepared / Witneseed by Witnessed and Approved by.

PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Company

Sign
Name Dadan Hamdani

Date
Acceptable Result REMARKS

Witnessed and Approved by.

PT. PERTAMINA EP ASSET 4


WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT TYPE OF JOINT WPS PQR FIT UP DATE WELDING Acceptable Result REMARKS
NO. BASE 1 BASE 2 BASE 1 BASE 2 DATE ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT

1 J.CW 01 Butt Weld A105 A106 Gr. B Flange 4" Sch 80 WN.RF Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc
#600
2 J.CW 02 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc

3 J.CW 03 Butt Weld A106 Gr. B A105 Elbow 90 Deg. 4" Sch. 80 Flange 4" Sch 80 WN.RF 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc
#600
4 J.CW 04 Butt Weld A105 A106 Gr. B Flange 4" Sch 80 WN.RF Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 01 01 √ √ Acc
#600
5 J.CW 05 Butt Weld A106 Gr. B A106 Gr. B Pipe 4" Sch. 80 Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 02 02 √ √ Acc

6 J.CW 06 Butt Weld A106 Gr. B A234 WPB Pipe 4" Sch. 80 Elbow 90 Deg. 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc

7 J.CW 07 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 4" Sch. 80 Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc

8 J.CW 08 Butt Weld A106 Gr. B A106 Gr. B Pipe 4" Sch. 80 Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc

9 J.CW 09 GOLDEN JOINT A106 Gr. B A234 WPB Pipe 4" Sch. 81 Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √ √ Acc

10 J.CW 10 GOLDEN JOINT EXISTING A234 WPB EXISTING Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √ √ Acc

11 J.CW 11 GOLDEN JOINT EXISTING A234 WPB EXISTING Straight Tee 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 02 02 √ √ √ Acc

12 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTI EXISTIN
NG G
13 J.CW 13 Butt Weld A234 WPB A105 Elbow 90 Deg. 4" Sch. 80 Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc

14 J.CW 14 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 4" Sch. 80 Pipe 4" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc

15 J.CW 15 Butt Weld A106 Gr. B A105 Pipe 4" Sch. 80 Flange 4" Sch 80 WN.RF 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/22/2021 9/23/2021 GTAW SMAW 01 01 √ √ Acc
#600

Note : Prepared / Witneseed by Witnessed and Approved by.


Company
PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Sign
Name Dadan Hamdani

Date
WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT TYPE OF JOINT WPS PQR FIT UP DATE WELDING Acceptable Result REMARKS
NO. BASE 1 BASE 2 BASE 1 BASE 2 DATE ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT

1 J.CW 1 Butt Weld A105 A106 Gr. B Flange 2" Sch 80 WN.RF Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √ √
Acc
#600
2 J.CW 2 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √
Acc
3 J.CW 3 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √ √
Acc
4 J.CW 4 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √
Acc
5 J.CW 5 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √
Acc
6 J.CW 6 Butt Weld A106 Gr. B A234 WPB Pipe 2" Sch. 80 Elbow 90 Deg. 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
7 J.CW 7 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √ Acc
8 J.CW 8 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 01 01 √ √ Acc
9 J.CW 9 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 02 02 √ √
Acc
10 J.CW 10 Butt Weld A106 Gr. B A105 Pipe 2" Sch. 80 Flange 2" Sch 80 WN.RF 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 01 01 √ √
Acc
#600
11 J.CW 11 Butt Weld A105 A234 WPB Flange 2" Sch 80 WN.RF Elbow 90 Deg. 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √ Acc
#600
12 J.CW 12 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √
Acc
13 J.CW 13 Butt Weld A106 Gr. B A105 Pipe 2" Sch. 80 Flange 2" Sch 80 WN.RF 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √
Acc
#600
14 J.CW 57 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 80 Pipe 2" Sch. 80 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 01 01 √ √
Acc

Note : Prepared / Witneseed by Witnessed and Approved by.


Company
PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Sign
Name Dadan Hamdani

Date
WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT NO. TYPE OF JOINT WPS PQR FIT UP DATE WELDING Acceptable Result REMARKS
BASE 1 BASE 2 BASE 1 BASE 2 DATE ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT

1 J.CW 14 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √

2 J.CW 15 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √

3 J.CW 16 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √

4 J.CW 17 Butt Weld A106 Gr. B A234 WPB Pipe 2" Sch. 40 Elbow 90 Deg. 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √

5 J.CW 18 Butt Weld A234 WPB A106 Gr. B Elbow 90 Deg. 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √
Acc
6 J.CW 19 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √ √
Acc
7 J.CW 20 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 01 01 √

8 J.CW 21 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/23/2021 GTAW SMAW 01 01 √ √
Acc
9 J.CW 49 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/25/2021 GTAW SMAW 02 02 √ √
Acc
10 J.CW 50 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/25/2021 GTAW SMAW 02 02 √ √
Acc
11 J.CW 58 Butt Weld A106 Gr. B A106 Gr. B Pipe 2" Sch. 40 Pipe 2" Sch. 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/29/2021 GTAW SMAW 01 01 √

12 J.CW 59 Fillet Weld A106 Gr. B A105 Pipe 1" Sch. 160 Elbow 90 Deg. 1" NPT 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 01 01 √ √ Acc
#3000
13 J.CW 60 Fillet Weld A105 A106 Gr. B Elbow 90 Deg. 1" NPT Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 01 01 √ √ Acc
#3000
14 J.CW 61 Fillet Weld A106 Gr. B A105 Pipe 1" Sch. 160 SW X COUPLING NPT 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 01 01 √ √ Acc

15 J.CW 62 Fillet Weld A105 A106 Gr. B SW X COUPLING NPT Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/3/2021 10/3/2021 GTAW SMAW 01 01 √ √ Acc

Note : Prepared / Witneseed by Witnessed and Approved by.


Company
PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Sign
Name Dadan Hamdani

Date
WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT NO. TYPE OF JOINT WPS PQR FIT UP DATE WELDING Acceptable Result REMARKS
BASE 1 BASE 2 BASE 1 BASE 2 DATE ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT

1 J.CW 22 A105 A106 Gr. B SW X COUPLING NPT Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015
Threaded
2 J.CW 23 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01 √ √
Butt Weld Acc
3 J.CW 24 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √
Butt Weld
4 J.CW 25 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01 √
Butt Weld
5 J.CW 26 A106 Gr. B A 234 WPB Pipe 1" Sch. 160 Elbow 90 Deg. 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 01 01 √
Butt Weld
6 J.CW 27 A 234 WPB A106 Gr. B Elbow 90 Deg. 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02 √ √
Butt Weld Acc
7 J.CW 28 A106 Gr. B A 234 WPB Pipe 1" Sch. 160 Straight Tee 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 01 01 √ √
Butt Weld Acc
8 J.CW 29 A106 Gr. B 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 02 02
Butt Weld A 234 WPB Straight Tee 1" Sch. 160 Pipe 1" Sch. 160 √

9 J.CW 30 A 234 WPB A106 Gr. B Straight Tee 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 01 01 √
Butt Weld
J.CW 31 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 01 01 √
10 Butt Weld
J.CW 32 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01 √ √
11 Butt Weld Acc
J.CW 33 A106 Gr. B A105 Pipe 1" Sch. 160 SW X COUPLING NPT 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015
12 Threaded
J.CW 34 A105 A106 Gr. B SW X COUPLING NPT Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015
13 Threaded
J.CW 35 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01 √ √
14 Butt Weld Acc
J.CW 36 A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02 √
15 Butt Weld
J.CW 37 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01
16 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 √

J.CW 38 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 01 01


17 Butt Weld A106 Gr. B A 234 WPB Pipe 1" Sch. 160 Elbow 90 Deg. 1" Sch. 160 √

J.CW 39 A106 Gr. B 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 02 02


18 Butt Weld A 234 WPB Elbow 90 Deg. 1" Sch. 160 Pipe 1" Sch. 160 √

J.CW 40 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 02 02


19 Butt Weld A106 Gr. B A 234 WPB Pipe 1" Sch. 160 Straight Tee 1" Sch. 160 √

J.CW 41 A106 Gr. B 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/28/2021 9/28/2021 GTAW SMAW 02 02


20 Butt Weld A 234 WPB Straight Tee 1" Sch. 160 Pipe 1" Sch. 160 √

J.CW 42 A106 Gr. B 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/24/2021 GTAW SMAW 01 01


21 Butt Weld A 234 WPB Straight Tee 1" Sch. 160 Pipe 1" Sch. 160 √ √ Acc
J.CW 43 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 02 02
22 Butt Weld A106 Gr. B A 234 WPB Pipe 1" Sch. 160 Straight Tee 1" Sch. 160 √

J.CW 44 A106 Gr. B 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 02 02


23 Butt Weld A 234 WPB Straight Tee 1" Sch. 160 Pipe 1" Sch. 160 √

J.CW 45 A106 Gr. B 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/28/2021 GTAW SMAW 02 02


24 Butt Weld A 234 WPB Straight Tee 1" Sch. 160 Pipe 1" Sch. 160 √

J.CW 46 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/29/2021 9/29/2021 GTAW SMAW 01 01


25 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 √

J.CW 47 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/23/2021 9/24/2021 GTAW SMAW 01 01


26 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 √ √ Acc
Note : Prepared / Witneseed by Witnessed and Approved by.
Company
PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Sign
Name Dadan Hamdani

Date
WELDING REPORT

CUSTOMER : PT. PERTAMINA EP CEPU ZONA 11 WEM. No

PROJEC PEMBANGUNAN FLOWLINE SKW 39-X REPORT NO


T
CONTRACTOR : PT. ELNUSA FABRIKASI KONSTRUKSI PAGE

MATERIAL SPEC MATERIAL SIZE WELDING PROCESS WELDER STAMP NDT


NO. JOINT TYPE OF JOINT WPS PQR FIT UP DATE WELDING Acceptable Result REMARKS
NO. BASE 1 BASE 2 BASE 1 BASE 2 DATE ROOT FILL/CAP ROOT FILL/CAP VISUAL PT RT

1 J.CW 48 Threaded A105 A106 Gr. B SW X COUPLING NPT Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015

2 J.CW 51 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/25/2021 GTAW SMAW 01 01 √ √ Acc
3 J.CW 52 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/25/2021 GTAW SMAW 01 01 √ √
Acc
4 J.CW 53 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/24/2021 9/25/2021 GTAW SMAW 01 01 √ √
Acc
5 J.CW 54 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/25/2021 9/25/2021 GTAW SMAW 01 01 √ √ Acc
6 J.CW 55 GOLDEN JOINT A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 10/4/2021 10/4/2021 GTAW SMAW 02 02 √ √ √
Acc
7 J.CW 56 Butt Weld A106 Gr. B A106 Gr. B Pipe 1" Sch. 160 Pipe 1" Sch. 160 008/WPS/ASME/EFK/VI/2015 008/PQR/ASME/EFK/VI/2015 9/27/2021 9/29/2021 GTAW SMAW 02 02 √

Note : Prepared / Witneseed by Witnessed and Approved by.


Company
PT. ELNUSA FABRIKASI KONSTRUKSI PT. PERTAMINA EP ASSET 4

Sign
Name Dadan Hamdani