100% found this document useful (1 vote)
220 views2 pages

Application

This document contains an application for connecting a renewable energy generating system under net billing or net metering arrangements. It requests information such as the applicant's name and address, service connection details, renewable energy system capacity and inverter details, expected commissioning date, and test certificates. Upon receiving the application, an acknowledgement is provided with the applicant's details and application registration number.

Uploaded by

Pradeep khoja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
220 views2 pages

Application

This document contains an application for connecting a renewable energy generating system under net billing or net metering arrangements. It requests information such as the applicant's name and address, service connection details, renewable energy system capacity and inverter details, expected commissioning date, and test certificates. Upon receiving the application, an acknowledgement is provided with the applicant's details and application registration number.

Uploaded by

Pradeep khoja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Annexure II

Application for Renewable Generating System Connectivity Under Net Billing Arrangement or
Net Metering Arrangement
To,
The AEN (O&M),

Application No.
Date

1 Name of Applicant
2 Address of Applicant
3 Service Connection Number
4 Service Connection Tariff
5 Telephone Number(s)
6 Email Id
7 Renewable Energy Generating System Capacity (Kilo Watts)

8 Renewable Energy Generating System Grid Inverter make


and type

9 Renewable Energy Generating System grid inverter has


automatic isolation protection (Y/N)?

10 Has a Renewable Energy Generating System Meter been


installed (Y/N)?

11 Expected Date of Commissioning of Renewable Energy


System.

12 Details of test certificates Renewable Energy Generating


System/Inverter for standards required under the
regulations

Signature of Applicant:
Date:
Acknowledgement
Received an Application from ……………………………………………. for a Renewable Energy Net Billing
or Net Metering connection/installation Renewable Energy generating System of capacity of
………………………….. Kw as per details below:

Name:
Date:
Service Connection Number:
Application Registration No.:
Renewable Energy generating system capacity:

Name of Officer:
Signature:
Designation/ (Ajmer Discom)

You might also like