0% found this document useful (0 votes)
46 views9 pages

Road Construction Estimation Guide

The document contains a measurement sheet for estimating the costs of constructing a 160m bitumen road. It lists 10 items needed for the road including box cutting, brick soiling, supplying stone metal and chips, laying premix, and brick edging. The quantities of materials needed are calculated and listed along with rates and total estimated cost of 756,416 for the road project.

Uploaded by

Sonuatchu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views9 pages

Road Construction Estimation Guide

The document contains a measurement sheet for estimating the costs of constructing a 160m bitumen road. It lists 10 items needed for the road including box cutting, brick soiling, supplying stone metal and chips, laying premix, and brick edging. The quantities of materials needed are calculated and listed along with rates and total estimated cost of 756,416 for the road project.

Uploaded by

Sonuatchu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Chart Title

12

10

0
1 2 3 4 5 6 7 8 9

Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14


Chart Title
12

10

0
1 2 3 4 5 6 7 8 9

Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14


Chart Title
12

10

0
1 2 3 4 5 6 7 8 9

Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14


Chart Title
12

10

0
1 2 3 4 5 6 7 8 9

Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14


ESTIMATION OF A BITUMEN ROAD FOR PLOTED
Overall lengthof road 160m

MEASUREMENT SHEET

S.NO Particulars of item No Length (m) Width (m)

1 1 160 m 10.2

Box Cutting in Road crust & consolidating & dressing


subgrade to specified grade & camber

2 1 160 10.2
Double brick flat soilingwith over burnt brick with break
joints

b.i 1 160 10
Bottom layer,supplying overburnt brick metal at road
side at regular interval

ii 1 160 10
Labour for spreading & consolidation of stone metal

ci
Top layer supplying stone metal & stacked a road side at
regular interval
1 160 10

ii

Labour for spreading & consolidation of stone metal 1 160 10

3 Wearing coat

i
supplying bitumen delivered & stacked at site 1 160 10

Quantity of bitumen=40x2.45=98 tons


98 tonsx3.5%=3.43 Tons
ii supplying trap stoned chips 12mm delivered at site 1 160 10

1 160 10
laying the premix uniformly with WBM surface applying
iii track coat & consolidating 25mm thick carpet

4 Brick on end edging with over burnt brick 2 160

QUANTITY OF MATERIAL

Over burn brick for single soiling @ 1/0.2x0.1 =50 Nos/m2. For double sharing 6000rpm @ 6000/0.1 =60
1. a =2460000+60000=2520000 Nos
2 Over burn brick metal =3600 m3
3 Trap stone metal =2688 m3
4i Bitumen =51.45 Tons
4 ii Trap stone chips = 600 m3

s.no Particulars of item Quantity Rate Amount

Box Cutting in Road crust & consolidating


& dressing subgrade to specified grade &
1 camber 652.8 m2 40 26,112

Base course ,Double brick flat soilingwith


2 over burnt brick with break joints 1632 m2 2 3,264

Bottom layer,supplying overburnt brick


metal at road side at regular interval
3 240 m3 800 192,000
Labour for spreading & consolidation of
4 stone metal 240 m3 200 48,000
Top layer supplying stone metal &
5 stacked a road side at regular interval 179.2 m3 150 268,800
Labour for spreading & consolidation of
6 stone meta 179.2 m3 200 35,840
Wearing coat
supplying bitumen delivered & stacked at
7 site 40 m3 4000 160,000
supplying trap stoned chips 12mm
8 delivered at site 40 m3 250 10,000
laying the premix uniformly with WBM
surface applying track coat &
9 consolidating 25mm thick carpet 600 m2 100 6,000

10 Brick on end edging with over burnt brick 320rpm 20 6,400

TOTAL AMOUNT= 756,416


ROAD FOR PLOTED LAYOUT

Height (m) Quantity Remarks

0.4 652.8 m2

- 1632 m2

100mm compacted
0.15 240 m3 when loose
100+100/2
ht=150mm

0.15 240 m3

75mm compacted
loose will
0.112 179.2 m3 75+75/2=112.5

0.025 40 m3

Density bitumen
mix as per design is
2.45t/m3 and
0.025 40 m3 content is 3.5%
0.025 40 m3

- 1600 m2

320 rm

6000rpm @ 6000/0.1 =6000 Nos . Total brick required


Nos