Chart Title
12
10
0
     1   2   3                   4               5               6                7   8   9
                 Row 8   Row 9       Row 10   Row 11   Row 12   Row 13   Row 14
                                          Chart Title
12
10
0
     1   2   3                   4               5               6                7   8   9
                 Row 8   Row 9       Row 10   Row 11   Row 12   Row 13   Row 14
                                          Chart Title
12
10
0
     1   2   3                   4               5               6                7   8   9
                 Row 8   Row 9       Row 10   Row 11   Row 12   Row 13   Row 14
                                          Chart Title
12
10
0
     1   2   3                   4               5               6                7   8   9
                 Row 8   Row 9       Row 10   Row 11   Row 12   Row 13   Row 14
                                                    ESTIMATION OF A BITUMEN ROAD FOR PLOTED
                                               Overall lengthof road 160m
                                           MEASUREMENT SHEET
S.NO     Particulars of item                                         No        Length (m) Width (m)
   1                                                                          1 160 m             10.2
           Box Cutting in Road crust & consolidating & dressing
                 subgrade to specified grade & camber
   2                                                                      1        160       10.2
         Double brick flat soilingwith over burnt brick with break
                                   joints
   b.i                                                                    1        160       10
          Bottom layer,supplying overburnt brick metal at road
                         side at regular interval
   ii                                                                     1        160       10
           Labour for spreading & consolidation of stone metal
   ci
         Top layer supplying stone metal & stacked a road side at
                              regular interval
                                                                          1        160       10
   ii
           Labour for spreading & consolidation of stone metal            1        160       10
   3                           Wearing coat
    i
              supplying bitumen delivered & stacked at site               1        160       10
                                   Quantity of bitumen=40x2.45=98 tons
                                                          98 tonsx3.5%=3.43 Tons
       ii           supplying trap stoned chips 12mm delivered at site          1      160      10
                                                                                1      160      10
                  laying the premix uniformly with WBM surface applying
      iii              track coat & consolidating 25mm thick carpet
      4                  Brick on end edging with over burnt brick              2      160
                                QUANTITY OF MATERIAL
                 Over burn brick for single soiling @ 1/0.2x0.1 =50 Nos/m2. For double sharing 6000rpm @ 6000/0.1 =60
 1.         a                                                        =2460000+60000=2520000 Nos
    2            Over burn brick metal =3600 m3
    3            Trap stone metal =2688 m3
   4i            Bitumen =51.45 Tons
   4 ii          Trap stone chips = 600 m3
s.no             Particulars of item                         Quantity     Rate      Amount
                  Box Cutting in Road crust & consolidating
                  & dressing subgrade to specified grade &
      1                            camber                   652.8 m2      40        26,112
                 Base course ,Double brick flat soilingwith
      2              over burnt brick with break joints     1632 m2       2         3,264
                   Bottom layer,supplying overburnt brick
                    metal at road side at regular interval
      3                                                      240 m3       800       192,000
                 Labour for spreading & consolidation of
                4 stone metal                                240 m3       200       48,000
                 Top layer supplying stone metal &
                5 stacked a road side at regular interval    179.2 m3     150       268,800
      Labour for spreading & consolidation of
     6 stone meta                               179.2 m3   200    35,840
       Wearing coat
      supplying bitumen delivered & stacked at
7     site                                     40 m3       4000   160,000
      supplying trap stoned chips 12mm
     8 delivered at site                        40 m3      250    10,000
       laying the premix uniformly with WBM
       surface applying track coat &
     9 consolidating 25mm thick carpet          600 m2     100    6,000
    10 Brick on end edging with over burnt brick 320rpm    20     6,400
                                                 TOTAL AMOUNT=      756,416
ROAD FOR PLOTED LAYOUT
      Height (m) Quantity    Remarks
          0.4     652.8 m2
           -       1632 m2
                             100mm compacted
         0.15      240 m3       when loose
                                100+100/2
                                ht=150mm
         0.15      240 m3
                             75mm compacted
                                loose will
        0.112     179.2 m3    75+75/2=112.5
        0.025       40 m3
                              Density bitumen
                             mix as per design is
                               2.45t/m3 and
        0.025       40 m3     content is 3.5%
             0.025       40 m3
               -       1600 m2
                        320 rm
6000rpm @ 6000/0.1 =6000 Nos . Total brick required
Nos