0% found this document useful (0 votes)
661 views2 pages

DTR Foundation Drawing

Uploaded by

ermoolchand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
661 views2 pages

DTR Foundation Drawing

Uploaded by

ermoolchand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
So 2 . OFFICE OF THE CHIEF ENGINER, PROJECTS JPDCL ‘, Mohinder Mansion, Satellite Colony near Wave Mall, Bhatindi road, Jammu , J&K. Email: ceprojectwingjmu@gmail.com Telephone No.: 0191-2493853 No: - CEPI 621-26 Date: -23 .04.2022 M/s SRV Techno Engineering Pvt. Ltd. New Delhi ‘Sub:- Approval of foundation drawing for 630/400 KVA distribution transformer / transformer pad under PMDP-R scheme of Kathua, Samba & Bari Brahmana Towns Ref:-1) Your office letter no.:-SRV/JPOCL/PMDPR/05/2021-22/526 Dated:-16.03.2022 2) RECPDCL Letter No:-RECPDCL/IK/Jammu/1157 Dated: -22.03.2022 3) Executive Engineer, EPD-Kathua letter no.:-PDK/190 Datec 4) Superintending Engineer, Circle-1 PJ's letter No.:- SE/Project/1/34 Dated :- 18.04.2022 D/sir, In pursuance to your submission of foundation drawing for 630/400 KVA distribution transformer / transformer pad under PMDP-R scheme of Kathua, Samba & Bari Brahmana Towns ‘and on the recommendations for approval by RECPDCL (PMA), concerned Executive Engineer EPD; * Kathua and further recommendations of Superintending Engineer, Circle-1 Projects, clarificatio thereof and concurrence by Utility wing, approval is Hereby accorded to the following drawing subject to the conditions laid over the drawing: ‘S.No Drawing Title i fc Foundation drawing of transformer|pad/Plinth for 630/400 KVA_ I The Drawing approval shall be valid subject to cofrectness of detail and particulars provided with your recommendations. The approval does not absolve the contractor of his contractual obligations regarding correctness of design of the system subject to approved DPR, BOQ and LOA /agreement Stipulations and recommendation/observations of concern Project Division. Yours sincerely, Meloje:s roc. Copy to: 1. Principal Secretary, POD J&K ‘Managing Director, JPOCL Jammu for information, Superintending Engineer, Circle-l, and Projects forlinformation. | | i I Secretariat Jammu for Information. 2. 3 4. Executive Engineer Div-Kathua for information. 5. Bits BG (PMA) Jammu for information Pept Lo/00r/0SZ/AWd/LO/AYS ~ “ON “SUG mous sy ~'31¥9S. ava | Ag dAOuddv ‘Ag GaO3HO. Ag NMVEC, (11 “LAd ONINSANIONS ONHOAL AUS S/N] HoLoveLNOO| yao 0079 su Nvid dod HINTidlava wawsOSSNVEL JO ONIN NOLWGNNOS Izoz'z1'0¢ Galva 1z0z 19 sznoadrird/3o. ON VOT aLV1d LYSSNI 40 TIv1ada SONAGUA NAVE NIVAWHVaS ava 8 VES YrHLOI0 3NaHOS dons] LOBFOUd 7oad034 yw 1001001001 woo wer ‘TOddr @ x OSL , wy avy) [O4Zt Win OOLEDOST Lan se \ at Tu UNG] A — > L215, y Taqepune jo WeUROIS Ue) woHoa 0} wr og umRLANT (| Pee eae et @I1'S1$1¥64 38 GINOHS TALS INANGOUOIN | cad Sana C WD) 951 y MBean SivoNod Tv G3LON soWe3H0 SOzTNN} 2 pemmmmmmuwfers -____, 0S0¢ — WW NI 38v NOISN3WIO THY] “4 =:S8}0N| FYLXNV NOS * V-V NOILO3S % spies & ee Os LOS rear eee aoeg tp rainy oregon [MS TE a “on Ne ed=es =) Tt i aa spine? “Pea, soyspnao} ors OE NAT oof grenade Pr SY Shay ] 2g Pre HS Hoss ost sr” | wy seqene) ER V4 gv prerene 2g Son 588 Yt oo = a Sa a aaa se a 025 7 comet eee |e sel a MI ey | 0 eo 000 © BRERA jedan lapsorfesadated ws keeled ee [J a oosis tod ES NOLLWGNNOS Od 3ING3HOS ONIGNSE Uva Dig) ‘aiyid 1¥a6NI 40 1430 335:

You might also like