CK40N Costing Run

This document provides instructions for creating a cost estimate for materials using transaction CK40N in SAP. It outlines 11 steps to set up and execute a costing run, including selecting materials, running structural explosions and costing estimates, performing analysis, and releasing the results. The steps guide the user through defining parameters, saving values, and executing various nodes to complete the costing run.

Uploaded by

Madhumita Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
561 views18 pages

CK40N Costing Run

This document provides instructions for creating a cost estimate for materials using transaction CK40N in SAP. It outlines 11 steps to set up and execute a costing run, including selecting materials, running structural explosions and costing estimates, performing analysis, and releasing the results. The steps guide the user through defining parameters, saving values, and executing various nodes to complete the costing run.

Uploaded by

Madhumita Das
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 18

CONTROLLING

END USER TRAINING DOCUMENT

CK40N Costing Run

Purpose
This transaction is used to create cost estimate for materials enmasse.

Prerequisites
 Material Master, Bill of Materials, Routing, Raw Material Prices in Moving
Average Price or Plan Price 1 field should exist

Menu Path
To go to the Edit Costing Run screen, use the following menu path:
 Accounting è Controlling è Product Cost Controlling è Product Cost
Planning è Material Costing è Costing Run è Edit Costing Run

Transaction Code
 CK40N

Work Instructions

1. Update the following Required, Optional, and Conditional fields, as needed:


Field R/O/C Description/Action
Costing Run R Enter a suitable name for the costing run
Description R Enter a suitable description of the costing run
Costing Run Date R Enter the current date

Click on create

1
CONTROLLING
END USER TRAINING DOCUMENT

2. In the Create Costing Run screen

Update the following Required, Optional, and Conditional fields, as needed:


Field R/O/C Description/Action
Costing Variant R Enter the Costing variant ZPC1
Costing Version R Enter 1
Controlling Area R Enter Controlling Area as ‘1000’
Company Code R Enter Company Code as ‘1000’

Save

3. Click [Enter] button

Update the following Required, Optional, and Conditional fields, as needed:


Field R/O/C Description/Action
Costing Date From R The system will default the current day on which
the cost estimate is created. If required, the date
can be changed to a date in the future period

2
CONTROLLING
END USER TRAINING DOCUMENT

Field R/O/C Description/Action


Costing Date To R The system will default the last day of the current
period. If required, the date can be changed
Quantity Structure Date R The system will default the current date. If the cost
estimate is for a future period, enter that date. The
system will consider the BOM and Routing which is
valid on this date
Valuation Date R The system will default the current date. Enter the
date equal to the Quantity Structure date

4. Click on the Save button to save the Costing Run

3
CONTROLLING
END USER TRAINING DOCUMENT

5. Click on the ‘parameter’ icon which pertains to “Selection”

In the Costing Run: Selection – Change Parameters screen

Update the following Required, Optional, and Conditional fields, as needed:


Field R/O/C Description/Action
Material Number R Choose Multiple Selection and enter the list of
numbers. (If all the materials in the plant has to be
selected, leave the filed blank)
Plant R Enter the plant for which the costing run is created
Processing Mode O Enter the procession mode – Foreground or
Background

4
CONTROLLING
END USER TRAINING DOCUMENT

Click on the Save button

The message “Values of variant xxxxxxxxx saved” appears

Click [Back] to return the Edit Costing Run screen

5
CONTROLLING
END USER TRAINING DOCUMENT

Click on Execute button

6
CONTROLLING
END USER TRAINING DOCUMENT

Click Save

Click [Back] to return the Edit Costing Run screen

7
CONTROLLING
END USER TRAINING DOCUMENT

6. On the Edit Costing Run screen Click on the ‘parameter’ icon, which pertains to “Struct.
Explosion”

Click on Execute button for “Struct. Explosion”.

7. On the Edit Costing Run screen, Click on the ‘parameter’ icon, which pertains to
“Costing”. The screen Costing Run : Costing Estimate – Change Parameters appears.

8
CONTROLLING
END USER TRAINING DOCUMENT

Click on the Save button

The message “Values of variant xxxxxxxxx saved” appears

Click [Exit] to return the Edit Costing Run screen

Click on Execute button for “Costing”.

9
CONTROLLING
END USER TRAINING DOCUMENT

8. On the Edit Costing Run screen click on the ‘parameter’ icon which pertains to “Analysis”

This will result in the following screen

10
CONTROLLING
END USER TRAINING DOCUMENT

Select (Double click) SAP&11

11
CONTROLLING
END USER TRAINING DOCUMENT

In the Costing Run : Analysis – Change Parameters screen,

Click on the Save button

The message “Values of variant xxxxxxxxx saved” appears

Click [Exit] to return the Edit Costing Run screen

12
CONTROLLING
END USER TRAINING DOCUMENT

Click on Execute button for “Analysis”.

13
CONTROLLING
END USER TRAINING DOCUMENT

Click [Exit] to return the Edit Costing Run screen

9. On the Edit Costing Run screen click on the ‘parameter’ icon which pertains to “Marking” . If
marking is allowed, the following screen appears.

14
CONTROLLING
END USER TRAINING DOCUMENT

Click on the Save button

The message “Values of variant xxxxxxxxx saved” appears

Click [Exit] to return the Edit Costing Run screen

10. Click on Execute button.

15
CONTROLLING
END USER TRAINING DOCUMENT

In the Edit Costing Run screen, If there are no errors for marking, execute again in updation
mode.(After execution in updation run, the values of the marked cost estimates for materials will
be updated in the Future (Planned price) field of Costing View 2 in Material Master.

11. Click on the ‘parameter’ icon which pertains to “Release”

16
CONTROLLING
END USER TRAINING DOCUMENT

Click on the Save button

The message “Values of variant xxxxxxxxx saved” appears

Click [Exit] to return the Edit Costing Run screen

17
CONTROLLING
END USER TRAINING DOCUMENT

Click on Execute button.

Verify all the steps in the test mode and than run all the nodes.