URVI 2 & 3 Pile Foundation

This document provides the design of a pile cap and pile. It includes load data, material properties, foundation geometry, calculations for reinforcement, shear checks, and pile design. Reinforcement and dimensions are provided to design a pile cap with two 300mm diameter piles to support an axial load of 27 tonnes.

Uploaded by

Mahesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
158 views17 pages

URVI 2 & 3 Pile Foundation

This document provides the design of a pile cap and pile. It includes load data, material properties, foundation geometry, calculations for reinforcement, shear checks, and pile design. Reinforcement and dimensions are provided to design a pile cap with two 300mm diameter piles to support an axial load of 27 tonnes.

Uploaded by

Mahesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 17

AHCEPL

PROJECT: Node No Lc-9 pile No column No


URVI ENTERPRISES 12 DL+LL P1 C1
TITLE: DESIGN OF PILE CAP

PILE CAP
I.LOAD DATA:
Unfactored forces
Max. axial load (Po) = 27.00 Ton
Max. Moment(Mx) = 0.00 T-m x
Max. Moment(My) = 0.00 T-m
Max.thrust (Fx) = 3.45 Ton y
Max.thrust (Fy) = 0.00 Ton

L1 = 2100.00
1500
II.MATERIAL DATA:

Grade of Concrete M 25 B1 1200


Grade of Steel Fe 415 600.00

III.FOUNDATION DATA :

CAPACITY OF PILE:
Dp (Dia of Piles) 300.00 500 dia 550 dia 600 dia
Axial Compression(Ton) = 16.62 NA NA NA
Shear (Ton)= 2.40 - - -

IV.GEOMETRY:
Pedestal
Depth of column/Pedestal (l2) = 600 mm
Width of column/Pedestal (b2) = 300 mm
Considering 300 dia piles
Capacity of pile = 16.62 Ton
Total load on each pile = 13.50 Ton
No. of piles provided = 2 Nos

Min c/c spacing of piles = 5.00 times the dia of pile


There fore c/c of piles req. = 1500 mm
User prefered spacing of piles (L) = 1500 mm
User prefered spacing of piles (B) = 600
Length of Pile cap required= 2100 mm
Width of pile cap required = 1200 mm

There fore Length(L1) of cap provided 2100 mm


Width(B1) of cap provided 1200 mm

Calculation of depth from


punching shear consideration :

Vertical rection of pile V= 27.00 Ton


ks= 1.00
Perimeter of the column p= 1800.00 mm
Depth required as per d = V/(ks*p*0.25*sqrt fck)
Depth required as per d = 176.6 mm

Assummed depth of pile cap D= 500 mm

PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE

TITLE: DESIGN OF PILE CAP(cont..)


CHECH FOR LOAD ON PILE
Axial load on each Pile P1= 13.50 Ton
Weight of Pile cap and Earth = 8.19 Ton
Additional load on each Pile Σy2 = 0.00 mm
due to Pile cap & Earth P2= 4.10 Ton Σx2= 1125000 mm
Load due to moment Mx & My P3= 0.00 Ton
Total axial load on each pile
P= (P1+P2+P3) = 17.60 Ton (Compression)
> 16.62 Ton
Shear on each Pile = 1.73 Ton < 2.40 Ton
(NOT O.K)
V.REINFORCEMENT:
column/pedestal pile cap

500

300
A)MAIN REIFORCEMENT(BOTTOM) dia piles
1)Bending Theory:

Max. moment about X-X = 0.00 Ton-m


Max. moment about Y-Y = 7.92 Ton-m 1*(load/pile)*(B/2-b2/2)
Dia of main reinforcement = 12 mm
Dia of reinforcement (sec) = 12 mm
Clear cover = 75 mm
Effective depth available = 407.00 mm

Factored moment Mx = 0.00 Ton-m


Factored moment My = 11.88 Ton-m
Design B.M. Value = 11.88 Ton-m
Area of steel required Ast= 815.89 sq.mm
Area of steel required/m Ast/m= 679.91 sq.mm (Total Ast/ B1)
Minimum steeel as per
IS 456-2000 0.120 %
Area of steel required/m Ast= 815.89 sq.mm

Required spacing of 12 dia bars @ 138.64


However provide 12 dia bars @ 125 mm c/c
Area of steel provided Astp= 904.90 sq.mm safe

PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE

TITLE: DESIGN OF PILE CAP(cont..)

VI.CHECK FOR SHEAR:

Percentage of steel provided pt= 0.222


b value(0.8fck/6.89pt) b= 13.06 av
PermissibleShear stress tc= 0.347 N/sq.mm 10.000 m
of the section
1)One-way shear beta=0.8*fck/(6.89*pt)
Tc=(0.85*(sqrt(0.8*fck))*((sqrt(1+5beta)-1))/(6*beta)
V =1*(load/pile) = 17.60 Tons
tv= V*1.5*9.81/(B1*d)
Nominal shear stress tv= 0.530 N/sq.mm unsafe provide shear reinf
Vus= 89.662 kN
dia of str= 10 mm
spacing reqd for 2 Leg Sv= 514.61 mm
Sv provided= 500.00 mm (O.K)

2)Two-way shear

Vertical rection of pile V= 27.00 Ton 300


po= 3428.00
Perimeter of the column p= 1800.00 mm 600
tv= V/(po*d)
Shear stress tv= 0.285 N/sq.mm
tc= 0.25*(sqrt(fck))
Permissible shear stress ktc= 1.250 N/sq.mm

> 0.285 N/sq.mm


(O.K)

Summary:
Provide Pile cap of Dimension 2.10 1.20 0.50
Provide 12 dia bars @ 125.00

PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE


TITLE: DESIGN OF PILE

Dia of Pile: 300.00 mm

Vertical Load 17.60 Ton say 17.70 Ton

Lateral load 1.73 Ton say 1.80 Ton


< 2.40
(O.K)
Grade of Concrete M 25.00 N/sq.mm
Grade of Steel Fe 415 N/sq.mm
Dia of Reinforcement for pile 12 mm

L1= 0 mm

Assuming the pile as fixed head pile as per I.S:2911(pasrt1/sec2)-1979


Fig. 2, Page No. 3 of Amendment No. 3)

Lf/T = 2.1

T=
¿
√ ¿ 5 ¿¿
Clause C-1.2 Page no. 2 of
Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

E= 25000.00 N/sq.mm

I= 397.66 X 10 6 mm 4

K1 = 0.04 kg/sq.cm K1 = 0.04 for normally loaded clay


Page no. 4 of Amendment No.3 of
T= 1473.28 mm I.S:2911(part1/sec2)-1979

Lf = 3093.89 mm

Deflection of Pile Head = Q(L1+Lf)3/(12*E*I)


Clause C-1.3 Page no. 3 of
Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

d= 4.38 mm
< 15.00 mm
(O.K)

PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE

TITLE: DESIGN OF PILE


Design for Compression and bending

Bending Moment m* Mf = (m*Q*Lf)/2 Clause C-2.1 Page no. 3 of


Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

m= 0.82
Fig. 3B Page no. 4 of
Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

B.M. = 2.283 Ton-m

Pu/fck*D2 = 0.12

Mu/fckD3 = 0.05
d' = 56.00 d'/D = 0.19

Refering Chart 58 0f sp:16


p/fck = 0.00

pt = 0.00 < 0.40 %

Ast = 282.78 mm2

No of 12 dia bars required are 2.50

Provide 6 No of 12 dia bars


Provide Tor 8 ties at 200 c/c
R0
SHEET No.
1
REMARKS/Referances

From STAAD
ANALYSIS

IS:2911(Part 3)-1980
Table 1 & cl B-1.5 (N<2)
Appendix B
L=3

IS:2911(Part 3)-1980
cl:5.2.7.2
SHEET No.
2

REMARKS/Referances

L*B*D*2.5+L*B*D*1.0

(Mx/(3*B*1))+(My/L*2)
SHEET No.
3

REMARKS/Referances

beta=0.8*fck/(6.89*pt)
k))*((sqrt(1+5beta)-1))/(6*beta)

provide shear reinf

d/2= 203.50 mm critical section (cs)


a= 953.50 mm cs from face of pedestal
sp+dp/2= 1650.00 mm max
sp-dp/2= 1350.00 mm min
x= 696.50 mm value bet min & max
factor= 2.32 if factor<1 then multiply with shear force

SHEET No.
4
REMARKS/Referances

SHEET No.

REMARKS/Referances
Cl 5.2.2.1
IS2911(part3)
AHCEPL R0
PROJECT: Node No Lc-9 pile No column No SHEET No.
urvi enterprises 11 DL+LL PF1 C5 1

TITLE: DESIGN OF PILE CAP& PILE REMARKS/Referances

I.LOAD DATA:
Unfactored forces
Max. axial load (Po) = 20.00 Ton From STAAD
Max. Moment(Mx) = 0.00 T-m X ANALYSIS
Max. Moment(My) = 0.00 T-m
Max.thrust (Hx) = 1.84 Ton Y
Max.thrust (Hy) = 0.00 Ton

600
II.MATERIAL DATA:
867.00 1500.00 1800.00
Grade of Concrete M 20 300.00
Grade of Concrete Fe 415 433.00 600.00

III.FOUNDATION DATA: 600.00 1500.00

1900.00

Dp (Dia of Piles) 300 dia 500 dia 450 dia 375 dia IS:2911(Part 3)-1980
Axial capacity of Pile(Ton) = 16.35 47.25 40.98 32.40 Table 1 & cl B-1.5 (N<2)
Lateral capacity of Pile(Ton)= 2.40 5.40 4.80 3.60 Appendix B
L=3
IV.GEOMETRY:

Depth of column/Pedestal (l2) = 300 mm


Width of column/Pedestal (b2) = 600 mm
Considering dia of piles = 300 dia piles
Capacity of pile = 16.35 Ton
No. of Piles requred = 1.22
No. of piles provided = 3

Min c/c spacing of piles = 5.00 times the dia of pile IS:2911(Part 3)-1980
There fore c/c of piles req. = 1500 mm cl:5.2.7.2
User prefered spacing of piles (L) = 1500 mm
User prefered spacing of piles (B) = 1500
Length of Pile cap required= 1900 mm
Width of pile cap required = 1800 mm

Calculation of depth from


punching shear consideration :

Vertical rection of pile V= 20.00 Ton


ks= 1.00
Perimeter of the column/pedesta p= 1800.00 mm
Depth required as per d = V/(p*ks*0.25*sqrt(fck))
Depth required as per d = 146.239 mm
PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE SHEET No.
2

TITLE: DESIGN OF PILE CAP(cont..) REMARKS/Referances

Assummed depth of pile cap D= 600 mm D >(2*Dp+100)

Weight of Pile cap and earth w1= 18.81 Ton L*B*D*2.5+L*B*D*2.0


Additional load on each pile Σy2 = 1126667.0 mm
due to moment My and Mx w2= 0.00 Ton Σx2= 1125000.0 mm (Mx/(Σy2)*y)+(My/Σx2)*x

Total axial load on each pile P= 12.94 Ton


< 16.35 Ton safe
V.REINFORCEMENT:
column/pedestal pile cap

600

300
A)MAIN REIFORCEMENT(BOTTOM) dia piles
1)Bending Theory:

Max. moment about Y-Y = 7.72 Ton-m 1*(load/pile)*(sp-l2/2+dp/10)


Max. moment about X-X = 4.22 Ton-m 2*(load/pile)*(sp-l2/2+dp/10)
Dia of main reinforcement = 16 mm
Dia of reinforcement (sec) = 16 mm
Clear cover = 75 mm
Effective depth available = 501.00 mm

Factored moment = 11.58 Ton-m

Area of steel required Ast= 637.96 sq.mm/m

Ptmin = 0.120 %
Ast min = 1296.0 sq.mm/m
Ast reqd= 1296.00 sq.mm/m
Ast/m width= 720.00 sq.mm/m

Required Spacing of 16 dia bars @ 279.29 sq.mm


However provide 16 dia bars @ 200 mm c/c
Area of steel provided Ast= 1005.44 sq.mm SAFE
PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE SHEET No.
3

TITLE: DESIGN OF PILE CAP(cont..) REMARKS/Referances

VI.CHECK FOR SHEAR:

Percentage of steel provided pt= 0.201


b value(0.8fck/6.89pt) b= 11.57 av
PermissibleShear stress tc= 0.327 N/sq.mm 8.000 m
of the section
1)One-way shear beta=0.8*fck/(6.89*pt)
Tc=(0.85*(sqrt(0.8*fck))*((sqrt(1+5beta)-1))/(6*beta)
V =1*(load/pile) = 12.94 Tons
tv= V*9.81*1000/(B1*d)
Nominal shear stress tv=0.211 N/sq.mm safe hence shear reinf is not reqd
Vus= -104.28 kN
dia of str= 8 mm
spacing reqd for 4 Leg Sv= -348.584 mm
Sv provided= 600.00 mm (NOT O.K)

2)Two-way shear

Vertical rection of pile V= 20.00 Ton


po= 3804.00
Perimeter of the column p= 1800.00 mm
tv= V/(po*d)
Shear stress tv= 0.154 N/sq.mm
tc= 0.25*(sqrt(fck))
Permissible shear stress ktc= 1.118 N/sq.mm > 0.154 N/sq.mm
(O.K)

Summary:
Provide Pile cap of Dimension 1.90 1.80 0.60
Provide 16 dia bars @ 200.00

PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE SHEET No.


4

TITLE: DESIGN OF PILE REMARKS/Referances

Dia of Pile: 300.00 mm

Vertical Load 12.94 Ton say 13.00 Ton

Lateral load 0.61 Ton say 1.00 Ton


< 2.40
(O.K)
Grade of Concrete M 20.00 N/sq.mm
Grade of Concrete Fe 415 N/sq.mm
Dia of Reinforcement for pile 12 mm

L1= 0 mm

Assuming the pile as fixed head pile as per I.S:2911(pasrt1/sec2)-1979


Fig. 2, Page No. 3 of Amendment No. 3)

Lf/T = 2.1

T=
¿
√¿ 5 ¿ ¿
Clause C-1.2 Page no. 2 of
Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

E= 22360.68 N/sq.mm

I= 397.66 X 10 6 mm 4

K1 = 0.04 kg/cm3 K1 = 0.04 for normally loaded clay Page no. 4


of Amendment No.3 of I.S:2911(part1/sec2)-
T= 1866.61 mm 1979

Lf = 3919.88 mm

Deflection of Pile Head = Q(L1+Lf)3/(12*E*I)


Clause C-1.3 Page no. 3 of
Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

d= 5.54 mm

PROJECT: DESIGNED BY CHECKED BY APPROVED BY DATE SHEET No.


5

TITLE: DESIGN OF PILE REMARKS/Referances

Design for Compression and bending

Bending Moment m* Mf = (m*Q*Lf)/2 Clause C-2.1 Page no. 3 of


Amendment No.3 of
I.S:2911(pasrt1/sec2)-1979

m= 0.82
Fig. 3B Page no. 4 of Amendment
No.3 of I.S:2911(pasrt1/sec2)-1979

B.M. = 1.607 Ton-m

Pu/fck*D2 = 0.106
Mu/fckD3 = 0.044
d' = 87.50 d'/D = 0.29

Refering Chart 58 0f sp:16


p/fck = 0.00

pt = 0.00 Ptmin 0.40 % Cl 5.2.2.1


IS2911(part3)
Ast = 282.78 mm2

No of 12 dia bars required are 2.50

Provide 6 No of 12 dia bars


Provide Tor 8 ties at 200 c/c
d/2= 250.50 mm critical section (cs)
a= 1000.50 mm cs from face of pedestal
sp+dp/2= 1650.00 mm max
sp-dp/2= 1350.00 mm min
x= 649.50 mm value bet min & max
factor= 2.17 if factor<1 then multiply with shear force