Safe Work Method Statement
Project Name: OLA Cell technologies private limited DATE:16.07.2023
Company Name
Address:
Office Contact No:
Project Manager Name Contact No:
ACIVITY : PCC & CONCRETING
The person who
Procedure (in steps) Possible Hazards Risk Control Measures will ensure this
Rating (Describe what action or procedure will be happens
(Break the job down into steps. Each step (Identify the hazards associated with (See taken to eliminate or minimize the risk of injury
should accomplish some major task and each step. Examine each to find below) or damage. Use the Hierarchy of Controls
be in logical sequence.) possibilities that could lead to an accident below as a guide
or potential harm arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Preparatory works & Use hand gloves while handling the
Manual handling of concrete Slippery surface & tripping hazard. material.
material Sharp edges/surfaces. Barricade the working area.
Length & weight of the material. Assess the wait to be lifted.
Loose grip, Slippery surface of material. Clean up water, grease, oil or similar
substances of slippery surface of
material.Hold the material firmly while
handling
Document Name: Version Correct as at:
SWMS for brickwork and plastering 01 11.01.2023
Safe Work Method Statement
The person who
Procedure (in steps) Possible Hazards Risk Control Measures will ensure this
Rating (Describe what action or procedure will be happens
(Break the job down into steps. Each step (Identify the hazards associated with (See taken to eliminate or minimize the risk of injury
should accomplish some major task and each step. Examine each to find below) or damage. Use the Hierarchy of Controls
be in logical sequence.) possibilities that could lead to an accident below as a guide
or potential harm arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Fall of machinery. Ensured the levelled and firm ground.
Fall of person. Collision or struck by Ensure to place the machinery 2 Mtrs away
vehicle may cause injury. from work area.
Provide safe access.
Placing of concrete mixture
Trained driver shall be engaged.
PTW to be ensured before initiate the
work.
Concrete Mixing Person injury. Ensure to cover the rotating parts with the
Dust. guards.
Unguarded gears, chains & rollers of Ensure to stay away from self loading
mixtures. machine.
Defective concrete bucket. All gears ,chains & rollers of the mixtures
Fall of material may cause injury. shall be properly guarded.
Deflection in props or shuttering material. Use mixture with hopper.
Extreme weather condition. Inspect the bucket prior to starting of
Collapse of the form work may. Fall of concrete operation.
material Ensure proper fastening & securing of
concrete pouring chute.
Inspection of self loading machine.
Ensure earthing of equipment’s and proper
functioning of electrical circuit before
commencement of work.
Document Name: Version Correct as at:
SWMS for brickwork and plastering 01 11.01.2023
Safe Work Method Statement
The person who
Procedure (in steps) Possible Hazards Risk Control Measures will ensure this
Rating (Describe what action or procedure will be happens
(Break the job down into steps. Each step (Identify the hazards associated with (See taken to eliminate or minimize the risk of injury
should accomplish some major task and each step. Examine each to find below) or damage. Use the Hierarchy of Controls
be in logical sequence.) possibilities that could lead to an accident below as a guide
or potential harm arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Use of Vibrator Vibration and noise. Avoid prolonged exposure Insist on shift
Splash of cement while use of vibrators. pattern.
Discomfort, Hearing loss due to continues Use hand gloves.
exposure. Contact with splash of cement Use ear protection.
may lead to eye irritation.
Curing & House keeping Slip and trip ,Fall of person due to wet surface & Clean up water or other similar substances
fire hazard. to prevent slippery surface.
Material to be stagnate at one place.
Leakage of pipes is to be avoided.
Concrete Pouring at Height. Fall of person. Area should be barricaded to prevent the
Fall of material. manpower near to the workplace.
Columns Fall of personFall of material. Ensure to use the all PPE's like helmet,
shoes, reflective jacket, hand gloves, nose
mask, goggles, safety full body harness,
etc.
Scaffolding staging only used.
Document Name: Version Correct as at:
SWMS for brickwork and plastering 01 11.01.2023
Safe Work Method Statement
Personnel Summary
SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name:
Experience:
Qualifications:
Prepared by: Signature: Date:
(Principle Contractor HSE Manager)
Reviewed by : Signature: Date:
(Principle Contractor Project Manager)
Reviewed by Signature Date:
(JLLSafety Manager)
Approved by
(JLL Project Manager) Signature Date:
Document Name: Version Correct as at:
SWMS for Brick work and plastering 01 11.01.2023