0% found this document useful (0 votes)
269 views36 pages

350T Crane

Uploaded by

Arun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
269 views36 pages

350T Crane

Uploaded by

Arun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 36
HYDRAULIC CRAWLER CRANE KOBELCO 7350222222 | - Specifications: Versatility of the Boom and Jib Boom, jib and minimal attachment changeover requirements accommodate many ‘operating configurations ranging from heavy-duty to luffing tower applications. Teta ele me et UT Ne ‘Superior hydraulic technology improves operating efficiency and safety. The high- speed winch provides fast 130m/min hoisting and lowering, and a shockless control ‘system enhances safely in hoisting and lowering the hook and boom. Translifter (Self-Erection System) Use the built-in, remote controlled Translifter (jack system) to the lift the machine clear trailer, then drive the trailer awar Pee ed The main body breaks down into 4 components, each overall width is within 3.0 m. This enables the machine with axles to be transported on a trailer. its men utr Wo, 7380-99E0101 Configuration and Style of Attachment ‘Style and Combination of Boom and Jib eeeduey cs a tara 2 | tution so | Latinas 19Ste tO | TSSte teem Gm | Mmsden tom | Famssem Taran as [ome WA | Common as (3) | Carmmon uso) Ta | So | oom re se | Cee | Somer ont Carmmen ane (1) NA cre Garrone [Game oe | Coma nn | 7 [eormen eo Taare Tk rr A | Baier aa [Goren ow | sist oe or x Sen oe Carmen we ‘emieri ok rs A | Gore ae (| Cer un Gh Gren os Comm se Gi Nove: 1, Figure in {} moans the numbers of the maximus asable boo rj) respactively. 2. MA= Not applicable Standard Crane HL Crane ‘SHL Crane Light-duty Crane Max, Lifting Capacity: Max. Lifting Capacity: Max. Lifting Capacity: Max. Lifting Capacity: 350 metrictonx6.0m — 36Qmetricton x 7.0m BSOmetrictonx19.0m 143.5 metric ton x44.0m Boom Length: Boom Length: Boom Length: Boom Length: 18m to 7am 30m to 78m 30m to 78m 30m to'96m 7350 MasterTech HL Luffing Jib Max. Lifting Capacity: eee od awa Boom + Jib Length: Boom + Jib Length: BCs BAc tS 78a SCOR 24m + 24m to 72m + S4m 30m + 24m to 72m + 66m 2 Specifications Power plant Macel ‘ . HINO K18C-UV* Type Water-cooled, diract injection with turbocharger, diesel No. of cylinders stn 6 Bore and stroke. 435 mm x 150 mm Displacement ........ 12.882 liters Rated power 295 KY at 2,000 mir (Gross) (isa09249-1989) Max. torque . 1.610 Nem at 1,400 min (Gross) (18009249-1989) Cooling system Liquid, recirculating bypass Startor : 24.V, 7.0 kW Generator ; coe BAY, BOA CYEIWS es aerate IA: Radiator sosusue COMUgALED TYPE COFe, thermostatically controlled Air cleaner... Dry type with replaceable paper element Fuel tank capacity... : 00 Batteries... Two 12V, 150 A-hr capacity battories, series connected Filtration ... van Full Mlow and by-pass type with replaceable paper Blamant Electrical system .... All wiring cordad tor easy servicing, individual fused branch circulls. “Mest Stage Il reters to European standards, Stage ll emmisions requirements. Hydraulic system Pumps: All ve pumps are driven by heavy duty pump efive, Three tandem variable displacement pumps are used. One of tandem variable displacement pumps is used in the front and rear hoist drum circuit and the propel circuit. One of ether tandem variable cisplacement pumps is used in boar hoist circuit and swing circutt. Another one of tandem variable displacement pumps is used in jb hoist circuit. In addition two gear pumps are used in the: control system and auxiliary equipment Control: Hydraulic control system for infinitely variable pressure to front ard rear drums, boom and jib holst drums, Coniorls respond instantly to the touch, deltvering smooth function operation. Pumped fluid is fitered before retuming Load hoist, boom holst and propel system... 31,9 MPa (825 kgtfem’) Swing system... 27.5 MPa (280 kgtionn®) Control system 5.4 MPa (SS kgticm) Reservoir tank capacity 870 liters Cooling .... Oikto-air heat exchanger Filtration snes Full How filters with replaceable Paper elements Load hoist system Front and rear drum for load hoist powered by one hydraulic axial piston motors, each through planetary reducers, Brakes: Hydraulic counterbalance valve mounted on jib hoist motor and disc type brake, spring set hydraulically release brake and release safety naw, Drums (Front and Rear): 630 mm P.C.D. x 1,019 mm wide drums, each groaved far 28:mm wire rope. Flope capacity of 670 m working length and 800 m storage length. Line speed: Single line on the first drum layer Hook hoist (Front drum) CC cones 910 130 mimin Lowering ... ann 310 130 m/min Hook hoist (Rear drum) Hoisting Be eerie 810-130 m/min Boom hoist system Powered by a hydraulic axial piston motor through a planetary reducer. Brakes: Hydraulic counterbalance valve and spring set hydraulically released multiple disc brake mounted on boom hoist motor.Externally rachet for locking drum Drum: Boom hoist drum: Double drums, grooved far 26 mm Gia, wire rope. Jib hoist drum: Grooved for 26 mm ois. wire rope: Line Speed: Single line on fifth drum layer Boom hoist Hoisting 2 to 22 m/min Lowering nen 2 122 MIN Cutting jit Hoisting ssa 210-28 mimin Lowering i .2 to 28 mvmin sity and mast hoist system (for HL and SHL) Powered by a hydraulic axial piston motor through a planetary reducer Brakes: Hydraulic counterbalance valve and spring set hydraulically released multiple disc brake mounted on bogm hoist motor. Externally rachet for locking drum, Drum: Groaved for 26 mm dia, wire rope. Line Speed: Hoisting... tonne BO BB mn Lowering... 2 to 2B mimin ‘Swing system ‘Swing unit: Powered by hydraulic axial piston motar driving through planetary Teducers (3 sets), the swing system provides 360° rotation. ‘Swing speed 2 a AB ani ‘Swing brake: A spring-set, hydraulically released muitiple-dise brake mounted on swing motor. Swing circle: Triple row roller bearing with an intemal, integral swing gear, ‘Swing lock: Four-position pin-in-hole lock (manually engaged) Operator's cab Independent removable RH cab tilts 15°. Full-vision cab fitted with safety glass, a fixed front window, and sliding LH/AH windows . A fuly agustable, Mh backed Seat wth a ead est sch tre cpecatr isa as! woreng pean, A ‘signal horn, cigarette lighter, windshield wipers, washers, and floor mat are standard features. Senecio an Sooty it conto A the operator's left are cansole-mounted swing control lever, knobs for front and rear drum, boom drum pawis, ‘engine starvstop key, individual speed shifts for front pn took rts besr drum, een and props beng Fea bunan tn on Soi bor {ighta: One ont load fg and one cab inside ight ‘Multi-display Monitor (Gauges and warming signs shown on Multi-dispiay moniter Gauges: Tachometer, hout meter. uel gauge ‘Warning signs: Battery charge, engine oil pressure, air Seanartaeie ok Er Conted eae prosours, era hydraulic oil temperature Controls At operator's right are console mounted Salety devices: Over load protective device | (iament limiter), function lack lever, hook 4 Over hoist shut aff, Boom over-naist limit, boom angie indicator, signal horn, boom haist drum lock, front and rear drum lock, swing look, swing alarm (buzzer), lamp for front, warming buzzer for swing and prope!, ausiliary platform (upper and lower structure), boom backstops, jib backstops, strut backstops: Tools FZ ‘howto centr fool and acoomection one using high-tensile steel chords and should be ragandiess of the boom length. Counterwelght 11-piece stack Total weight ‘Additional counterweight Weight... 7 Carbody counterweight 2-piece stack Total welght Pallete (Lift enhancer WIQHE ssn sone 120,000 kg $35,000 ka 47,000 kg ssn oe 50,000 kg (PBX) ‘Trans-Lifter Trans-Litter system allows quick and easy crawler side ‘frame removal and trailor laading. Four vertical cylinders itup the basic machine for sel-loading onto trailer. Optional equipment Reeving winch {with 8 mm dia x:350 m wire rope), air-conditioner, TW manitor for liting oad, one way call, mirror for monitoring drum, wind velocity indicator, ave! indicator for erane body, monitoring TY for tront and rear drum, boom foot pin cylinder, crawler fran installation cylinder, lawer transite cylinder, pads for raising boom, anemameter, exterior indication light for loading condition, front and rear hoist drum rotation indicator, sling materials foc assembling and disassembling, foot step for boom and jib, hard ral tor boom and jib Carbody: Steel-wolded carbody with axles, Crawier: Crawler assemblies designed wilh a quick disconnect feature for idevidual removal as a uni from the axles. Crawler bell tension is maintained by hydraulic jack force on the track-adjusting bearing block. Track rollers are sealed for maintenance-iree operatian. Crawler drive: Independent hydraulic propel drive is built into each side frame. Each drive consists of a hydraulic moter propelling a driving tumbler through & planetary gear box, Hydraulic motar and gear box are built into the crawler side frame. Crawler brakes: Spring-set, hydraulically reloased multiple-dise- parking brakes are built into each propel drive. Steering mechanism: The hydraulic propel system provides both skid steering (driving ane track only) and Counter-rotating steering (driving tracks in opposite directions). Track rollers: 14 lower rollers and 2 upper rollers are fitted to each side frame, sealed and maintenance-tree. Shoes: Number os 67 each side Standard flat shoe width 4,220 mm Max. travel speed: HIQR FANE sie . Low range. car Max. gradeability: 30% 21.0 kenvh fone 4 KR Weight Operating weight: Agprox. 345,000 kg (including base machine, 120 counterweights, 41 tearbody weights, 18 m heavy-duty boom and 3650-tan hook bloeke) Ground pressu 15 Nicm® (1.52 kglicm?), 150 kPa with 1,220 mm shoes. Crane Attachment | Hook blocks. ‘A range of hook blocks can be specified, ‘with a safety latch, Boom: 7A Welded lattice construction using tubular, PEE] ister tee chords wit pin connections betnean sections, Standard Grane Mac Ming capaci SEDO gat [Bask boom len im [Citar Bo ant aim Basic boom .... uns sants baat amnion Laas secceee 9M Tapered boom insert am Boom cap ... kal ET No. of poini sheave 34 (a) wit additional stop chaava HL Crane flax. iting eapacity 350,000 Wa at mm ‘Basie boom length 30m TMisx_boorn length 7am BASIC DOOM ose am Tapered boom insert 7am BOOM C8 seen renrennnrnrnnnntttrnnani ABM MaBhorionsnnn nn eee 3 No, of point sheave. 9+ (8° “swath additional 2-step shoave SHL Crane ‘Max Fine capacity 3su00o kg atm Basic boom length 30m (CiitabearnTarig Fem Basie BOOM soso am Tapered boom insert 7.8m Boom cap siaDiar ete Mast ase 2 80m No. of point sheave on enone nnn + (BY Weight of palete .... oe Max. 250 tons Position of palette iam (from the canter of rotation behind the crana) “with addtional 2-stap sheave Light-duty Crane ‘a ing eapaciy Basic boo iength ‘Max boar fongth 113,500 Kg at 14m 30m 36m Basic boom ‘Tapered boom insert. Boom cap hit No. of point sheave 0. Liting capacity ssoren | 2o0ton | 12010" No. cfsheaves | 9466). 8 5 wei (ko) ares | 6050 3.500 won | 35t0 Liting eapacy worn | 401 eae Ne, ef aheaves a i ° Weight (koh 100 | 2,000 650 Diameter of wire ropes ‘Standard: Hook hoist (Front . somone 28 TM Hook hoist (Fear) Boom hoist (32 parts of Boom guy tine (4 lines) 28 mm 25 mm 44mm Boom backstops Weight Standard Crane Required for all boom lengths, Operating weight: Approx. 380,000 kg (including base machine, 12011 countenseights, 41 tcarbody weights, 18 m heawy-duly boom and 30-ton hhook block} Ground pressur 15 Non? (1.52 kgtom?), 150 kPa with 1,220 mm shoes HL Crane Operating weight: ‘Approx. 270,000 kg (including base machine, 120 tcounterweights, 41 t carbady weights, 30 m heavy-duty boom and-350-ton hook block} Ground pressun 16 Nic? (1,63 kglfom®), 160 kPa with 1,220mm shoes SHL Crane (Operating weight: ‘Approx. 370,000 kg {including base machine, 120 t counterweights, 41 t carbady weights, 30 m heavy-duty boom and 350-ton. hook block} Ground pressure: 16 N/cm? (1.63 katfom®), 160 kPa with 1,220°mm shoes Light-duty Crane Operating weight: ‘Approx. 338,000 kg {including base machine, 120 t.countorweights, 41 t ‘carbady weights, 30 m heavy-duty boom and 120-ton hook block} Ground pressure: 15 N/cr? (1.5 kaolin’ 150 kPa with 1,220:mm shoes 7350 MasterTech Notes: 1, Operating radius is the horzental distance from the center ef rotation ta the center of gravity of the load. 2. Rated loads shown on the chars are the maximum allowable freely suspended loads at a givan boom length, boom angle and radius, and have been determined for the machine standing level on firm supporting sutface under Ideal ‘operating conditions. The user must limit of de-tate loads ta allow for adverse conditions (such as soft or uneven ground, aut-ot-level conditions. winds, side losds, pendulum action, jerking or sudden stopping of loads, inexperience of personnel, multiple machine lifts, and traveling with a load). 8, Capacities da nat exceed 75% of minimum tipping loads, Capacities based on factors other than machine stability such as structural competence are indicated by shaded area. Attempt to over load could damage the boom, jb and {rame, ete, without tipping, ‘The rated loads are determined in accordance with ANSI Code B30.5, ‘Areas on raled charts where no railing are shown, operation is not intended or appraved. Actual allowable loads of crane boom must not exceed elther the maximum load at the each number of reeving mentioned in the following article 8, of the rated Jaads for the beom length, Actual hoistable loads using ihe crane boom are-determined by déducting the weight of the load handling gear (Such as hook block, sings and cables) trom the ratings and should not exceed the ratings of the hook block. 7. For configurations of insert booms and quy' cable assembly, instructions In the operator's manual must be strictly observed. 8, Max, hoisting load by number of reeving Single Drum Double Drum Wa divelnema [1 [2 [es [2 fies woe on) | va8 fare | ae [aaa | His crowing | a | o | i | we tex eeeter) [eas [acs frana fiero [1595] 9, An auxiliary sheave can be fitted to Std crane of 18 m 10.78 m, and light-duty lit of 30 m to 96 m. 10.Rated loads for auxiliary sheave are determined by deducting the auxiliary sheave Weight (160 kg for Std crane; 550 kg for light-duty lift} and weight of hook block (650 kg} and load handling gear (sling and cables) from erane boom ratings, bul must nol exceed a maximum 13.5 ton 11. The maximum operating radius of an auxiliary sheave must not exceed the maximum operating radius of the erane boom in uso. The minimum operating radius of an auxiliary sheave is determined by the equivaient Boom angle at the minimum operating radius, 112. Fated loads for the crane-boom with an ausillary sheave attached are determined ky deducting the auxiliary sheave ‘woigh! {rom crane baom ratings. Where a 13 8-tan ball hook is fitted, the weight of the hook must algo be daducted 13. Actual allowable loads of the crane boom when an auxiliary sheave is attached are determined by deducting the ‘weight of the load handling gear (such a8. the main hook, slings and cables) from the ratings 60 determined in the article 14 14. Do not operate the main hook and auxiliary sheave haok simuttancously, 15. Refer to the aparator's manual for appropriate type of hook block and number of reeving at each boom length. 16. When using a light-duty boom af aver 84m, an intermediate suspensian cable must be used. 17. Always have the gantry fully raised and use the backstop during crane aperations, 18. Boom hoist reeving rmust be twenty parts of line. 19. In principle, the boom should be erected aver the front of the crawlers. The follewing conditions should be observed: Bid Boom cone | Horne | SHL-cane Countarenight i) i) a0 Carboy wait a a iow plates Tocrhten | Neased | Noneed | Nonaes Standard Crane Rated Chart 7350 Rated loads in metric toms for 360° working area (Counterweight 120 tons + Carbodyweight 41 tons, Double drum) Unit metric tone wo | 24a) ae | mn | 420 veo | sa | oan | go | ea | mo jim 3500 3185 AT mamas] ne | aes 620 860 8 en 2 |e [> |e | x |e ta ts * Denied ae auc io comply with ANSI Cade 630.5, Aatings shown [______] ne determined by the skeratho the boor or other toca components, Tha the rte fr able rom ‘Working Ranges: a oo Boom Arrangement Boom fenaih Boom arrangement * acs rom emcee ton 7am | pescbeccecs: ‘Save = 90, Oop Fae ery lor Rants Av Bim eaccredtient 721m 8~ 120m HL Crane Rated Chart 7350 Rated loads in metric tons for 360° working ar (Counterweight 120 tons + 35tons, Carbodyweight 41 tons, Double drum) ‘Unit: metric tons or ee "ei] sao | ma | an | seo | op | soo | mo | mo | 20 tia 6o 0] BB reso 1) ste | ae [ame a0. ss | aise | ata [oe [asm aa |e 2688 — mas ma ta Tai ae = tat ibs as 8 ws 2a 1 ral su 1 50 — sa S12 at sa asa 30 3 meh? 13 aa 3A a0 208 we = m4 20 au on aa tad ua _ “1 si Bawa we a8 1 E fener 48) 7 = = 2 2 = = = i 16 no 1 Despre ad aed cog wih ANG! Cade B05 ange hove [eo] ar tranny te etergih hw boom ana scan empanont The ete te arco com Working Ranges Boom Arrangement on =— % as em com | om Tam | Baw aGCGCBCa Tom Been aCCCCRCD Hag =00m_ Cap Piamnyany Cap] = 127 Ireete: A= Bide B lapored Donn)= Pain © = 120m Mast Arrangement Mast Mast arrangement en BuecTe al SHL Crane Rated Chart z330 Rated loads in metric tons for 360° working area (Counterweight 120 tons + Carbodyweight 41 tons, Pallete weight 250 tons x 13 m, Double drum) 5. natactone a consi wo | me | eo | we | sio | mo | mo | wo | ma ee oe cor " a0 1 S08 E s m4 rr si a a6 0 “an woo 0 io a0 mn ms i = we [ser i me 20 a no ar m0 a 0 oss tsea mo mime] om 8 [sansa rm ne we 60 40 sto — ry i om - - 7 = [ae [a ls ‘one 1 Gescnet and as cons ANSI Cade BD Raines near in [re desornedy the seth te bor ter sil omnis “hs aed or Glan Working Ranges Boom Arrangement ae lige # é (Boos ienath oomarranperent » - =e aso Ah S-Con, BaeO BCID / A le [am Ba ncecap A an Bam ANCE Base CCRC ‘en Bam Accs ca sm Baus AAC.C-8Cap Bane DS EBCap : Sts7t7 Ee 1 }—s i ~ ey Iners:he 8m, B opera Som Fm C= 120. 3 ‘ Mast Arrangement A Suse Bm Ty Bom Fen Ode Sea/ = es A Light-duty Crane Rated Chart g5° Light-dluty boom Counterweight 120 tons + Carbodyweight 41 tons Unit: matic tone mo | eo] a0 | so | wo | oo | no] rao | one | sao | son [PG 59 82 eamdenania ST sas |_t1n8 [famnae|iim was | vas [ins | ves | ss Bens sas [ams | tas [ors [ims | ras letenal cream nas [ts | mus [as [ims [mms | ims | me mas [tgs | ame | soe | ope 108 m3 | 962 [79 zea | a2 0s A 48 445 = = laren 780 ope be be te ee ee cons ss Dosoned ad nd meh i ANS Ce BSB. ‘aunge sno mn Jere dtoene by sen ol he oor other scl cngonarte. ‘Mise redo Goa ron Working Ranges Boom Arrangement Paes x o (Boom lonath ‘Baom arrangement r tae O-T | Baer AAD Tes Base CDTi 00 }- ase AC-D-Tio L Bee AAC-DT Base CDT 5 i "| BsoeA-C-E-0-Tip RaeCOOSTo / BaeeCCCOTp BMeAACGCO-Tp BCC CC OTS BHEAGEECOTD BMCACECCOETS PK hs om Sen-80m sate) Feore Aedam Covs0m b fomtupered tom = 8.6m pe E (Gem insert fe) = 6.0 m, F (12m insert a) = 12 mm = ates rote sean | 40 Luffing Jib Attachment 7350 MasterTech Lufting jib: Welded lattice: construction using tubular, , highstensiie steel chords with pin connections, Fal Lstfing jis ‘ax, ing eapaciy 113.5 tons at 16m Basic combinations ‘24m+ 24m (Wain boom + fo) ‘Max. combinations 7am+ 66m (Main boorn «joy ib base: dib tip . coe Max, fb lengthy vcs vesrnsnrencnr enone BA No: of point sheave. Ss HL Lutfing jib [fax lining capacity 773.5 tone at 16m [Basse combinations 30m+24m (Nain born + jib} ‘Max. combinations 7am + 6am {hiain boom + jib) ib base = a a am SI HP ano res ae am Max, jib length S 66m Mast... sass BO No, of paint sheave. SHL Lufting jtb ‘exiting capacity | Basic combinations | (Main boom + Ro) ‘Max. combinations T 119.5 tons at 16m 30me 24m ams oom (Main boom + ji) Jib base Tee ou HD UP sn Max. jib length ddr Mast No. of point sheave... Hook blocks |A. range of hook block can be specified, with @ safety latch c inpeeey, |e] Nedaeae [|e Waight (kg) 3500 | 8,100 Diameter of wire ropes Hook hoist (Front). Hook hoist (Fear) Boom hoist (32 parts of line reeving) lb hoist (14 parts of line reeving) Bloom guy line (4 tibes) Jib guy line (2 fines)... co Strut guy line (2 tines}. Boom backstop: Required for all boom lengths o™~ Luffing ib Operating weight: Approx. 385,000 kg {including 24 m boom, 24 m jib, and 120-ton hook block} 167 kPa (1.7 kgicm®) with 1,220 mm HL Luffing Jibs Operating weigh ‘Approx. 410,000 kg {including 36 m boom, 24 m jib, and 120-ton hook block) Ground pressure: 177 kPa (1.8 kgicm*) with 1,220 mm shoes SHL Luffing Jib Operating weil Approx, 410,000 kg {including 30 m boom, 24 m |i, and 120-ton nook block) Ground pressure: 177 kPa (1.8 kg/cm®) with 1,220 mm ‘shoes: " Notes: 41, Operating radius is the horizontal distance trom the center of rotation to the center of gravity of the loa. 12. sted loads included in the charts are the maximum allowable freely suspended loads at a given tower length and jb length, loom and jb angle, and radius, and have been determined for tha machine standing level on firm supporting surtace under Ideal operating conditions. The tiser must fmit or de-rate loads to alow for adverse conditions {such ax soft or uneven graund, outob-leval canditions, winds, side loads, pendulum action, jerking ar sudden stopping ef loads, inexperience of persannel, muitiple machine fits, and traveling with # load}, ‘J, Capacitias do nat exceed 75%% of minimum tipping loads. Capacities based on factors othor than machine stabilly Such a3 structural eompatance are indicated by shaded area. Attempt fo overload could damage the boom, jb and frarne, et. without tipping. 4. The rated loads aro determined in accordance with ANS! Code B30.5. 5. Arana on ratad charts whore no rang are shown, operation is not intended or approved, 1 Actual allowable loads of tower jt must not exceed eliher the maximum load at the each number of reeving mentioned in the {ollaying ance 9, oF the rated loads tor the boom length. Actual hoistable loads using the tower jb are determined by deducting the weight at he load-handling gear (gueh ag hepk block, slings and cablas) from the ratings and should net exceed the ratings {or the hook block. 7. For configurations of insert booms and guy ease sesemby, Instructions in the operator's manual must be strictly abeervod, 1B. When operating lufing boom, fi angie must be mainiained between 16° to 72° from the horizontal ine at the wach fbved tower ‘angle (66", 76° and 86") 8, Max. hoisting load by number of reeving, 10.An auxiliary sheave can bo fitled to luffing tower af 30 m tower +24 m ib, to 72 m tower + £4 mj, 11, Rated loads for auxilary sheave ara determined by deducting the auxilary sheave weight (560 kg) and weight of hook block (650 kg) and load handling gear (sling and cables) from lulfing lower valings, but must not exceed a mastimum 13.5 ton. 12, The maximum operating radius of an auniliary sheave must not exceed the maximum operating radius ofthe luting tower. The ‘minimum operating radius of tha ausiliary sheave is determined by the equivalent anglas of boorn and jit atthe minimum radius, 119. Rated loade for the tower jib with an auxiliary sheave attached are deteqnined by deducting the shaave weight rom lufing tower ‘aings. Where 2. 13.5-ton ball hook is ited, the waight of the hook rmust also be deducted. 14, Actual allowable loads of the tower jib when an auxiliary sheave is altiached are determined by deducting the weight ofthe load handling gear (auch az hook black, slings and cables) fram the ratings so determined in the article 12 15, De not operate the main hook and auxliary cheavo hook simufianeously 16, Ralerto the eperator's marwal fer appropriate type ol hook block and number of reeving at each luting tower langth, 17. Always have the ganny fuly ralsac and usa the backstop during lulfing tower operations, 1B, Boom hoist reeving must be twenty parts of ine. 19, Jb hoist reeving must be ten parts of tine, 20, The weights of standard counterweight and carbody counterweight are as follows: ‘Standard cauntanseight 120 tan + 36 ton ‘Standard earbody counterweight; 41 ton, 21. in princjpie, the boom should be eractad over the trant of the erswlers. 22. When tower length is ever 60 m, pillar plates for ¢rawters must G9 used for erection £23. Figuies shown by (ft inthe boom configuration are for reference ony, jaa | 270 | aon) 590] @55] 7a0| 00 | 1013/7135] 12 Lutfing Jib Working Ranges 7350 Working Ranges wid ml we (ase AAO-C-T-Cup, Baan GO-TO | | auenccorcay Bese CECT Cop cal Bese AEC ELT-COp Bare hhe- OCCT Gap x aimee ram Clem al fF { So Ke tise ££ Fb ip ase Fini | » Based FFs sim Bees EF Fm Bae PEER » ‘om Bas eeF Ibi 7 sem ree ase (obese = 807. Jb Tp 30 ip) = 0 thr OTE batagb need “Bam Ffetmg meee) = 20m Lotfing Boom and Jib Combinations ton ree sean] ee | ange _| i | ie | |e mm olope lo tole ore om oToToretotse = a 36m oepeteteLeLe asa eof 4 «= [x[olololojo}ofo| [ex ototoTototore im o. me) om x | o-- wm |e o-| vam [x [x 3 ala Je 3 sing 8 Se grail 13 Luffing Jib Rated Charts 7350 MasterTech (1)24 m luffing jib rated loads in metric tons for 360° working area (Counterweight 120 t +35 t, Carbody weight 41 t) ae T 240m from nesta Bani ae svat ion eng ‘ain ems aun wig coat arom ange uk tn) ee eae [ae ae ae ee ee ae [iiss 7 160 1s Tae ie wea | tor mt m7 8 383 way on ET za | si | ma ms i z0 ma | mes | mor az En Ho sa [os | at aa | a 0 0 mo | moo | we aun | a8 <7 m0 8 se | we | wae [ot ssa m0 En or [ar] on oz | es m0 a0 a7 aa_[ ma [oan [at 20 an [2 sez [as | ee [me ne 0 ea me | ma] ms | aa | wo 0 mea [ ar | no ao = wea 40 Toe i 3 = Z Tone © Dosip arcade cay win ANSI DE fatinge shown fx [————_] are dstcrigediythe trance ol te bom or or siruiunl componw is Unit: tc ton Tis tain Oparating 48 db 4 md eTry BE mde eating al osm ancl “Geom noe Bowe ale ‘Brom ange ein eh oe oe ae Dae [ee ee |e |e ae | ze | mt zo ma [rs TH Ho ma | we ro 0 Pre a2 = m0 eT Eo Bn owe | a? 2 mo sn [wa] ee za | =a m0 eu [es] 37 sa] ri au Mm co [se | mo | a | mo | me «0 ao | ms | me |e [wr | os | a ma | rm ET 4 aa 240 eet zor vr | is8 0 se va [er [ous [ee es | 8 Ta [#0 a iar | as | a1 | eo en aha {ao Tas 138 $60 row iu 22 | mo it vf 40 Fone 7 3 z 5 Fors | Designedandiated i copiy wih ANS! Coe B90 Aatngs shows [______] ate octet the srangvof 2 boc ot cer suet comonam “4 Luffing Jib Rated Charts 7350 MasterTech (2) 36 m lutfing jib rated loads in metric tons for 360° working area (Counterweight 120 t + 35 t, Carbody weight 41 t) Deere iea See mBaem Overtng Sinik, Sib nib. atin Oveaina raion Boom ae Dasma Tox araie “oom ine aus (ot wef ae ee ee ee eae |e ta wo [ara 180 wo | mea = m0 moan [ar za 20 | wus [8 “za | ue [nr | [Ca ay fo 20 | s50 [sa 1 2a mo | wa | a [sas aA zu soos | as ss os 26 ma ‘uo | 7 | os as | ar ea] wr on ua | mao mas | sea | mas aa 6 aun | ma | 20 seo [ms | | io | wa | ms | ats mo | ae a0 | uo za | | we [mea [ous] ma) me [aor] ms “| 00 | An zo | ws | ao | oe | ne soo | 0 | iss eo [7 |B 580 i | 88 we) as | sao 20 I I [ wa fo As a I a 7 g Fees 1 Dene un ated Some wh ABE: Code BOS Fang enone 2 dnaruneiy th sang of he tao a oer sil companies 3m Boon ng wine aan wonie paren res acm agit oem age Boemarai rie oh ee ee ee we oe ‘i 20 i 1 0 mo ma | I Er a0 | eer | on 280 m0 [ si [sar = | ae sao | 2 st su | 320 [we [as Tas] 0 T an sao | ana ma, = | 8 no | as m0 | a3 a2 20 wo [ans zoo | a zez_| 22 60 ac [ aa [an | tet | aor | wea | ven | to [ota sk se as | as | mes | ise | ven | wa | var | is | eee uo 122 vat [ isa [ow [van | wa [on ma in see [oz [wa na [ee | re ma | 32 wor | a2 | mn Tao | 13 [a0 no I 58 co Brows a a z anes 1 sige und act omply wah ANSI Cape 8303 Fainge bows in [—__] ra duiarsined ty ma strenge of rw boom oF athe scl comperares 15, Luffing Jib Rated Charts ERcaa (3) 48 m luffing jib rated loads in metric tons for 360° working area (Counterweight 120 t +35 t, Carbody weight 41 t) Unt: metric ton maar scaita ode Ent) inw = Bins Coeniba aus or aa a 29 ea te bere ‘cin a) [ae oe ee ae [oe ee ae oe ee ee | 11 me [ [ 188 mo) We = Ba mo my 73 Er me ma | wa 3 aa a a sso se 27 on a1 me sao | oe ast ssi] me son [seo | 2s | 38 su] sa mo as3 | 383 aa | WS 40 as mo mo ma ao [me sur ae m6 80 a0 ma ue | me ma] aay as | ms | om en ET ast | aur [eer | aut mi [aa] on 0 [ iar ma] wa us| we | ase | auz | su He a a2 | Te Cs 30 a Taz we | ws | so 20 [ ug. uo | na [eo ee | a5 | ma a I en | mo ene z a f a ons Besgpd a mind Gay wi ANI Gade BSS Facogn shown fy "Tae cerned by Be stat oh bam tar ruta coments aoanan ma aon Sat om aw at ah ee De |e Pe | L 20 a8 m0 100 m0 0 3 0 354 m0 a0 | 01 20 4g | mee | rea aT 283 ‘30 sao 51 |i 1 zr | a0 x0 [oes] irs “6 na | us “540 ao | ms | ss | m7 ws] Ho) a0 ee | aa) 33 | a ay 2a cn ie va | ee | 1ge [wo 60 m9) ver | va [anf a7 700 79 a Tat 740) rap sa tart 708 Teme 7 3 4 Tet 1 Deslgne ard eae econ wih AND! Cote a0 Fangs shown [Tat dete oye svengh fa Dom or ar sil corpora. 16 Luffing Jib Rated Charts 80 (4) 60m luffing jib rated loads in metric tons for 360" working area (Counterweight 120 t +36 t, Carbody weight 41 t) ‘un: metic ton wane on ab Zone EEE Ha osama ven ah Bom ag fe agi a Fn a = |e (ti) | 20 1 220 ant ast 260 ua] a0 00 us ats 340 us| ET 2k [aa us| aa aut 20 ] ns za | 02 ma | ws a0 [us nga a] ts 00 se ne [wa za | 67 [ar [isa 40 580 uz 151 | 95 [se ms_[ 14 se om [oan [es 3 +E Ts) [See 0 | 7 us| 60) m0 I I as | 70 8 Disignc and end to corgty mith AWS! Code B90 Range shown in [ave antarrned by me svengi athe oom ar athe situa components Unit metre tn anne Spratt ‘ini inl onion ir fea ao abe ti ae ae oe oe De ee | m0 [sar sa 2h aa0 [ato wn ae a0 | as 3 a0 m0 [er HE 3 ‘oo | ma mt mm 60264 a ‘1 soo [oa | a at | as “a so | ma | een me] 8 8 ‘a0 | us| a wt a seo [mr] ane ea] s 8 seo [os] ie [a0 8 70 1 | a Tau 7 5 a Teh ro mm Tea m0 2 i Tet z 4 Ferre 1 Designed and radio comply wim ANSI Gada B20 Range sen [———] we dtoreined by Pw er of he Booyah snciul crnporert 7 Luffing Jib Rated Charts 7350 MasterTech: (6) 72 m luffing jb rated loads in metric tons tor 360° warking area (Counterweight 120 t + 35 t, Carbody weight 41 t) ee into Owen Siete ana |e Sen ootang val Berns an me one Bevin fais Li) oe | ae ca ve |e ie ra me] ee (ea) zo [as os za mo [8 En ma m0 [we as m0 an | a a m0 —s0— [as ay me mas 22 a an [ma au ao es [7s | ae 20 2a ro ms on mi a sa we] | ma wo sea ii | ro ms Ha saa Hi 18 a 2 02 ss 2 bit ar | a5. | 0 700 ts | mo Fane 3 a z ‘ Tee * Designed an ate to corny with ANSI Gade 630.5, Fasrgs shown ia [_——_—_] a deiseminaby he engin ol the boom cer stual comecrerts 18 HL Luffing Jib Working Ranges 7350 MasterTech Working Ranges Boom Arrangement Beem aiangement “6 - |___Bese aT Gap, Boor ET -Cap ol | or = ¥ " ate Bie ACOCCT.Cap | 7m Base AAC CCCTCap * Tass 38019 Gi Boom Gel = 13m Nak hers accom Seremtst2om x Jib Arrangement Sto Ne, Weength Te arrangement aim faa ww % 30m Base-E-Ewts ie Base Fs Bo AAS Tee EE-FJe ip a | - centro Base EERE Fai Sage Yb base) = 8.0m. ab To Cg ya Ho Ba Irene FE huthog Joey == Om F lg RO oon) = 12.0% Luffing Boom and Jib Combinations = es 19 HL Luffing Jib Rated Charts Zes0 (1) 30 m luffing jib rated loads in metric tons for 360° working area {Counterweight 120 t + 35 t, Carhody weight 41 t) Unit: metic ton inka Operating oa ‘nh wa [is te 180 as Tm T ot 180 12 107.8 | 108 180 20 wis 1 wt a 200 zo [oa a wa ma mo | asa a m7 21 ao lee a oe a ao [as a0 = 0 7 sa | wa en mo ae ar | ae “eo | 2 a0 oH | a [oe [aa a Er} I us| Tene i H a a fem ' Desired and aed i comely wih ANSI Code 680.8 Filer heres [_———] we cetarming bythe sirens of fae Ban crue srulualompona Unit metric tan aaa Ta tia iia ua io in a ee Lar | a = 125} t es 0] aa | 8 9 ma as | ae we a sear ma meme cna [ms mo ms | oe me | me so mi te [cae [as [us ET 7 wom [want [a] | woe [io | is | isa 00 t m7 een J vag 70 i i 7 oj 1 Deignod and aac coma wit ANB Code 690.5 ‘atnge snowsin [———] ae etarminad by fe angina the boom acinar etsctual components, HL Luffing Jib Rated Charts MasterTech (1) 42 m luffing jib rated loads in metric tons for 360° working area (Counterweig ( nt 120 t + 35 t, Carhody weight 41 t) uaa = Histon ovat am ie oni Binie ini pect ae ionega team sige teanige rosin ee tm) a cd os et 1 oe at itt ea ee fre |e i 7a 00 [es om a zn wr oes ma 20 ma | ay Cr aan [0] 8 70 8 om 38 a0 ae | aa an ai) ae aa ae |e ws [ua ae 460 | 0 | aaa m2 aig as | 3 aa 460 7 I 2 22 [ar [see [a a. ET | ET | 222 3 2s 540 aa [ [m2] ao | ia ET 7 T as] wa_[ 20 an | 103, 56.0 7H i 708 en z @ 7 7 Tene "aegred and reais congiy wih ANI Come TOE Fung srown'n [=] dried by sae of boomor aa satu compere, Unit: nite ton oman esting unis Sinie Sreieg nae ‘en ame toon 3 ae tm ro er Te ae et Te er mh 20 | 0 ae a 7m a a2 a 20 8 a1 Sit 0 3 st ai 7 au cm 21 30 ee 3 en eo <0 so] ae oe 6 a mara m2 20 Sun a1 [MA He si “30 as [wa [et | ma ais [a 180 mE i maa [ma [ee [va [ws | mp ri ws [ome [set [me [at | te 7 ve as [ a [ 0 Tu uz we [ws | mo. me 08 | eo Tara a i 5 Tea ‘© Daugns and rainato comply wth ANSI Cave B30 ‘Raange shown in [————] are cess y he stegth of tre boc of her Eructual cormpanents a HL Luffing Jib Rated Charts 7350 MasterTech (2) 54 m luffing jib rated |oads in metric tons for 360° working area (Counterweight 120 t + 35 t, Garbody weight 41 1) salto aaa re iat ree aa aan st ae ets a aa Sade che te ee ae [eee | = P| aa [E | 7 0 le a =— en 220 52 | 2 7. T 20 MO as) a4 fi no 0 mone 7 i t m0 on et art tt a a ee oa set a = rE a rt fis a uo iT Gs ET si | we ae 30 420 | sso | as MS ae ue 73 333 20 a tr an a as saat ae as ar toe = ate ra as at ‘at sa me axe ae a a fn aa [ws eee ra om rie TCT = 4 oa a I wea | =a 5 7 7 i | Tiare aaa SA ‘ange semen [____] nt cotrrureciy the mwngth of the boom or oer sth companeris. Unit: metic ton onan Opeateg ern ce mos, Stetina aus ‘oon a oni ange ‘om amie ‘agi Un oe [ome [owe foe [ae [oe | ae [ee [oe im za | 8 BE 20 (ao [ea ev 280 soa | tos ae 200 ae) Bie ET 300 36) ma T as, |e 20 se | ET T 420 a0. 8 | a0 a | za | ao oo | ms | ss | aa | sh | sn se | er | m2 me | 234 seb oe | ze | a0 m2 580 [0 iat] ws 20 se wa 134 7 | as I 680 7a 1 163 | mt [ws [mo 7a 0 aa mo ms | a4 748, 7a ws a0 [ms [ea | _730. m0 a za_| a9 ie 5a _| a8 sa sz_|__s08 eos e t e he ‘Dose and aid a comply wth ANSI Boga 890.5; net sows [Tre caterer tne strat of boom oor cuts components. 22 HL Luffing Jib Rated Charts (3) 66 m luffing jib rated toads in metric tons for 360° working area (Counterweight 120 t + 35 t, Carbody weight 41 t) 7350 MasterTech ‘Unit: mete on a ta ‘etry Seo ani aaa aa Oreatre ‘nbz oan ae Tense omen on a ‘ai Ce wee De we [oe ae |e ome [| zo [ ne | 20 za | me Te m0 amo 119 = 20 a0 | mo 18 | =a a 0 | 8 aa maa sea m0 ao 48 | | S12 son Er | aaa | ose] ue a8 sa a0 [an] ne | aa 7 FT} rr] a maa] zt ma] an mu] aa 0 so [se | war ua ET 02 2u7 0 Bk [| Tas asa 2n7 m5 2 sa 0 I | 150 201 43 188 233 wr 0 ao | 5 20 a_| a vA eo m7 1 es us 163_|_ur rr cm] a 105 18 us [ss [700 em I | a | ae 7k I mma Tees @ = z oi Teer 9 Dears ar a Jo comely wih ANSE Coe Ratings shown in [are determined by the strength! the boom or other sinuctual component Unit: metric: fom mon own wats im a a0 T a 3 sae [as ee 38 ao we 7 ea us| i 38 8 200. a | aa | 223 s00 sao [aus | ma | si Et ae as_[a7 zs 0 20 208 6s [ies | te2 20 ows [53] [sa a 70 wo) as Dar | ns ma 7a as [ota 2 7a Ev] rr ra Ba a 1 1 Degree and alae Us compy with ANBICode B05 aangs shown in [____] are deter by the seungth lth boar or other sircual components HL Luffing Jib Rated Charts 7350 MasterTech (4) 72 m tuffing jib rated loads in metric tons for 360° working area (Counterweight 120 t + 35 t, Carbody weight 41 t) ae: Taga png Sate nh aan Om owe ‘aot or nl Toa Tearing Foin a ae oh [Tae ne [ee eee pee poe | 20 2 ze En np 20 T #5 = 20 [ sn is a T ss 8s x0 T om ar 20 EFI | 7 1 “a [ a0 za ata | ms] ET} 7] n ws | a] ma va] aa] a5 a0 me] at a] aa | aa] 2 san wae] ti me [as | a7 [ar | ser a 7 ae] as [ua so [es [v7 [ns 12 161 | ie ait i 7 iT mo at T ar 7 Mo | a3 | | 6s 740 aa l ar [ I rap _— © : z a — ‘8 eaignad and ale i comply wih ANSI Goce 650.5 ri ingeshown fy [———__] a determined uy Be srnyg af tha Doam or eter srsctua component na: matic tan cpwam [mie ‘om os a co) ae Te ma | es ma [ee ua | ee ano eh as | MO an [a zm] eo ao | ma 28 [—s0 maar] ae 28 30 seen | er asa | a on so [as | nr zi_| 70 0 en [m7 | en ses] 53, 0 80 ies | 45 a7] 7 60 m0 ra [ea ma 7 Tra [ou om a ro Te 7a ma [ay 0 ener i L t Te 1 Denied und aaa eam win AEE Code BaD & annge.shoun in [_____] a determined by tw arangt ofthe boom o ether srucual component. 24 SHL Luffing Jib Working Ranges MasterTech Working Ranges Boom Arrangement [Boom lenath ‘Boor arTangemoni 20 Cap, Base C-T-Cap ain Base-AC-T-Cap m -1-Ga9, Bae TCG m Bags AC-CT-Cap sm Base ACC. Cap, Baas COBT Cap un awe A.C-C-CCap tin BaeAAGCC TC Be ODOC Toe 7m Base ACCC ET Cap 7a Bee AAC ECE Cop ‘She - 207m Cap (Boom Cap) = 12m eet Ac ROm, B= 70mca 120m Jib Arrangement a SS om Sue SF FFIB ip ‘em HSER AFI Sana be) OT oT icy Whe) ioc Eh oma “eden Rana por) = 120m Luffing Boom and Jib Combinations Ban [aim lin] Mm | aa] ae |e eng | w]e) p |p “aon —|-o oO. atm [54m ‘tom ‘Luling 3 Cononatone Wich None 3 Comeinatena tach wo Ga UiRing ts continstore ae Plow a a. a a clelelolololoheg a oS = x|x}x]xlololololole SHL Luffing Jib Rated Charts 7350 MasterTech (1) 30 m luffing jib rated loads in metric tons for 360° working area (Counterweight 120 t + Carbody weight 41 t / Palette weight: 250 t x 13. m) Unit: metre: ton Bintan Sern “Hin Prem ine ein doar as Soom 08 om rl Bm ane Boman tas |e eee |e oe |e ee ee |e 0 ws [ss 7 wea Te — us waa “ane L ioe 1a ae [wa wr 8 ae 00 wr 8 wa Fa} 75 “es n ra En} 22 7a 8 7 250 732 7 8 ae 200 a3 ws | oe om 208 as ae as |i oe | sa] mo 2 wa | eee | az_|_ aa | a0 ur 7_[ es | ea | as a0 a0 | aa | se | as | ma | ao 31 za [us |e a 7 7 z asa sly wih SI Coae B50. Aatnge ener {ae ermine oy meng Pa oF a sta compat Unit metric ton Ton form Mona ita ‘wanm cnwrna ‘een can ange wea ‘ie Oc a 1 a 7 T aes | ort na | a my at ae 3 i 8 ma5_| me om 00 468 m0 a [ar a2 m4 ms wa_| om xr | ws aa | aa ab wa] ass ae mz |_wa mag | es 0 ss [a_[ oes [gears | aaa | as x00 wa | aoa | oa_| aa [ms [os | mor | ms | ma | me so we |za | wo | aa [ms | ara | mes | we | as | mr] seo. =r] me [ous [aa | at mr |e me | a | ee | me aa [air | wt | s | m7 | eo | wo |e | 2 | 0 m9 I wa 2 | va | a0 I T too] 700 7 a 5 7 eon ‘= Designed and atedto comply wth ANS Cod BOOS singe shown in [—__] at cotarmenaty te evangth ot he boa orethereruchal emperert SHL Luffing Jib Rated Charts 7350 Masterfech (2) 42 m lutfing jib rated loads in metric tons for 360° working area (Counterweight 1201 + Carbody weight 41 1 / Palette weight: 250 tx 13 m) eee ana ‘omin xe i sini on tea ae Tae tr rm e [To Toe ee wa | 20 -—_ 0 a 240 ms 20 | EA 280 co 300, ae 30 aE PY 80 | os os es | we 20 ae ae 45 ns | ws 28 = T me ET) va om a0 T 7 ms m2 | m7 | we 0 [ a6 mux [a7 iat t =] 0 | 3 a0 I [ i Tener 7 7 a * Designed we iad won wih ANSI Code BUS Fatnga shown [re cetriraaby he stent he boom oar shal reams Uni metic ton ‘a toen Smta Bains a0. tb ron ent us oun age eon se eos ae ate (oh ae Te ee fee eee ae De ee | uo 7a jt 20 ‘so ae = 20 moe | 20 a0 | | 200 uo | moan — 380 eo ae ae [ 7 mr] se =e a 60 ar ns m2 m3 mo 7 ms 0 me [mr Ta [| eo zie | ma m0 | wa | oso wae | wa was [ ee [no us ar | 1 is 0 | as |r ea [ wo = 3 H iweer |W Designed and raed comply wih ANE] Gade B20 ‘Ratings strawn in [——] are deterrined ty the strength the bcm ce ahr airuchaa! campanenits ar SHL Luffing Jib Rated Charts (3) 54 m luffing jib rated loads in metric tons for 360° working area (Counterweight 120 t + Carhodly weight 41 t / Palette weight: 250 t x 13 m) j Aiea omg a wane aime ain ona rae Se vee um ace es ee ee ee eee | oe] ee | oo ase mH [oT 0 [2a ny no no neo [ied 7a} — 7a a0 neo [ier Ce ra a is [mot a co ma a0 310 [ot Bi oH | MD sa sua a “| a az aa | wa oa a0 a En a3 | 2 aya eu ‘0 a aa [ws rae | ue a | = se ma eo a0 | au to mwa a 0 26 53 24S 208 sao as wi [ie | me Pa ira] tan ne isis fe z 7 = z inte " Desjed on na oy wt Gee BE fame coon h [ee] me vey erent bor ote scam compe Unt: metricton song soma ain Aika hae Beare ge ‘Woem angle acs ay me me we to wo | eon 60 10 a2 [ss mo oo =I es ma [se a [0 aa [as Tra a mn 7 a [ae ee Tio 70 ef 7A a a mo mo ry Bo a T #0 = I m0 | ies n z Tove | Desig and rate Wo cry win ANS! Ge B05, Fates eran [|] ar determined bythe rer oh boar eh vet eompanants 28 SHL Luffing Jib Rated Charts 7350 MasterTech_ (4) 66 m Iuffing jib rated loads in metric tons for 360° working area (Counterweight 120 t + Carbody woight 41 t/ Palette weight: 260 t x 13 m) ‘ Unit matric ton imiew paring ae sb eres Eres ore Spear vas “hone oom age Boom ale oor mse ae wi oe fe |e |e | om [oe | oe |e oe | ee oe tm zoo [ro | 2 za) Ti I 7 0 mea ro To Tae ET zo | 70 70 a8 a mo ao [ a i a0 sa Bh 20. mo | ms TC 5; [os 8 ET ao | 0 25 20 7 ae ua | «0 | aa 65 458 ‘ar = a [es | ass 01 | a 35) mu ‘a0 <0 aa ms | ma 330 | aoe ae | oe 450 ea 2h 26 ma] 2 mos | ms sk a0 | te 0 28 | tas zs | a3 a0 | m7 mi | we as Bi | na 0 [ 7 or wes | 148, 192 0 353 | id we | 105 is [ar 7a maa 1a so | us 7A ia oa | 740 70 i x | m0 0 as | _e0 Ponte 2 o . a ewes |= Deskgred ard ated lo cong ating shown tn [————] a omtnrina by he sownat ofthe boom oer src compart {Unit metre ton iinse Ooaraie Baik iin Sparen ae Tromso em sale ate to) Cae [we oe ae Tae ee] con [se | 200 208 [sea ae Em ee sia ae a0 son [4a 28 88 ee [a7 a8 om wen | ae En ‘0 son | -mua_[ ae Re En 50 wa_| 380 zt | ue ao | see [aes | a8 a | 8 7 een nae moa [6 ten wen [os ua |e in 78 ear] as [a8 ra 7 was | 08 us| as] va0 7 war | a uy 75 ran om 1 7 om 8 12 oa awe = 7 fear ‘5 Deaigned and ake cry wah ANGI Gos B30 Firs shown in [re dtr the srr of he boom or ae: snuctus cormponents SHL Luffing Jib Rated Charts 7350 MasterTech (5) 78 m luffing jib rated loads. in metric tons for 360° working area (Counterweight 120 t + Carhody weight 41 t / Palette weight: 250 t x 13 m) (W Designac ana rated Soy wah ANGI Case BO.H ating srcven in [are eerie rang fhe boom ero stu components a0 Les evi ton Taint ‘peating moa womsu Som erntiea a, ct ee ae pi s ie eee oe ee ee | = t oy a0 L PT t ary rn st | ai a 2e0 x00 I ae m0. m0 | os | 428 m0 BY 407 I 4 0 = | a 4 m7 a ee a ae 2 a a aE a a mi a a acta i sca ae one a zi ey ae Fs tas ar a a ia rn rm ee i ‘tt es a | if s a id 7 7 i is 7 ia] rao | Tt 7a0 ] ee I ay mo | = i i z | Gnehe maaan caer Ne oon ERE Elite a aes casein oh #KGiaR Kanaan ese Unt: mete ton aa tony iia iin oie ae rr Sark ea to w]e | = Te e om oh | 20 a mt a 7 oF i ais ea a as a ei m7 ue = a 7 a 560 701 ns 6 ao = ; er [oA ms = a tas a ro a rT a a a [| Tat 7 an eT os : a oo i : = Assembly & Transportation 7350 Standard Crane Self Assembly Upper-machine camry by a trailer Lift the Upper Trans-Lifter Assembled upper-machine and ‘Girbody cany by'a'ttaller carbody by quick conection Rise the mast Lift the lower Trans-Lifter a 7350 MasterTech Assemble the counterweights Lift the counterweight assembly

You might also like