GLUT - Block Work Checklist

This document provides a quality control checklist for brick and block masonry work. It contains checks to be performed before, during, and after block masonry work. Some key checks include ensuring the work area is cleaned, proper materials are available, blocks are soaked, mortar mix meets specifications, bonding and joints are correct, and curing requirements are met. The checklist aims to ensure the block masonry work meets architectural drawings and specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
446 views2 pages

GLUT - Block Work Checklist

This document provides a quality control checklist for brick and block masonry work. It contains checks to be performed before, during, and after block masonry work. Some key checks include ensuring the work area is cleaned, proper materials are available, blocks are soaked, mortar mix meets specifications, bonding and joints are correct, and curing requirements are met. The checklist aims to ensure the block masonry work meets architectural drawings and specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BRICK AND BLOCK MASONRY

Quality Control Checklist

Building : ________________________________________ Floor : ___________________________________________

Room : ________________________________________ Contractor : ___________________________________________

Sr # Activity Encircle Remarks


PRE-BLOCK MASONARY CHECKS

Has the contractor/Team cleaned the entire floor before starting the
1 Y N N/A
line- out of masonry?

Has the job safety Analysis (JSA) being given and explained to the Y N N/A
2
supervisor and team?
Mortar mixer should be available; alternatively tray and shovels must
3 Y N N/A
be used to prepare mortar.

Required size of farmas/Mold (40cm X 35cm X 25cm), 4lit and 1 lit


4 water graduated plastic cans to control water cement ratio, racking Y N N/A
tool, broom, block cutting tools etc.

5 Has the Sand been sieved through 4.75mm sieve, if found coarse? Y N N/A

Has the required Quality, Size and Type of blocks are delivered to
6 Y N N/A
site as per architect's specification?

Have the Blocks (of approved quality) been soaked in water till the
7 Y N N/A
bubble ceases to come up?
Has the Setting out/alignment of the blockwork done as per
8 Y N N/A
Architectural drawings?
Check the dimensions and diagonals of room after laying first layer
9 Y N N/A
of blocks / Kicker.

10 Did the contractor/Team mark the locations of doors and openings? Y N N/A

Has the PPE (personal Protective equipment’s) available for the


11 Y N N/A
activity? If not, has it been ordered or brought to the
engineer/Supervisor notice?
Has a layer of Leveling Course PCC 1:3:6 (Kicker) provided, to adjust
13 Y N N/A
full size blocks, if the ground is not in level

DURING BLOCK MASONARY CHECKS

Check if the Mortar mix (mixed as per specification) is uniform and of


1 Y N N/A
optimum workability (Ease to work with)?

2 Has the quantity of mortar sufficient for the next 30 minutes mixed? Y N N/A

Block work should be in proper alignment and plumb with a


4 Y N N/A
systematic bond (English bond unless otherwise specified).
Has all the Vertical joints been staggered?
5 All Joints to be even and of about 10mm and Raked (8 to 10 mm) Y N N/A
out properly when the mortar is green

6 Ensure only 1.5m of block work is laid in a day & clean and neat Y N N/A
mortar lines in between blockwork (use wire brush).
At every 1m height, Is a band of concrete with chicken mesh
provided in between to avoid cracks is placed in half block masonry? Y N N/A
7

Ensure that the top layer, beneath the beam, contains a full
8 thickness block to allow good distribution of load. Otherwise fill the Y N N/A
gap with concrete

10 Check if the mortar is placed between edge of block and column? Y N N/A

11 Has all the voids in block joints filled with consistent grout? Y N N/A

Are Empty cement bags placed near to adjoining wall for collecting
12 Y N N/A
fallen mortar?

1 of 2
BRICK AND BLOCK MASONRY
Quality Control Checklist

Sr.No Activity Encircle Remarks

POST BLOCK MASONRY


CHECKS
Has all the dates of work done been marked on walls (to ensure
1 Y N N/A
curing time)

2 Are all courses of blockwork are aligned ( plumb, line & level)? Y N N/A

3 Are all door & window openings being as per the drawing provided? Y N N/A

4 Has the entire floor been cleaned after the work? Y N N/A

5 Has the Block work been Cured for a period of 07 days (minimum)? Y N N/A

Name of Site Supervisor: Name of Officer in Charge:

Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:

Date: Date: Date: Date: