BRICK AND BLOCK MASONRY
Quality Control Checklist
Building : ________________________________________ Floor : ___________________________________________
Room : ________________________________________ Contractor : ___________________________________________
Sr # Activity Encircle Remarks
PRE-BLOCK MASONARY CHECKS
Has the contractor/Team cleaned the entire floor before starting the
1 Y N N/A
line- out of masonry?
Has the job safety Analysis (JSA) being given and explained to the Y N N/A
2
supervisor and team?
Mortar mixer should be available; alternatively tray and shovels must
3 Y N N/A
be used to prepare mortar.
Required size of farmas/Mold (40cm X 35cm X 25cm), 4lit and 1 lit
4 water graduated plastic cans to control water cement ratio, racking Y N N/A
tool, broom, block cutting tools etc.
5 Has the Sand been sieved through 4.75mm sieve, if found coarse? Y N N/A
Has the required Quality, Size and Type of blocks are delivered to
6 Y N N/A
site as per architect's specification?
Have the Blocks (of approved quality) been soaked in water till the
7 Y N N/A
bubble ceases to come up?
Has the Setting out/alignment of the blockwork done as per
8 Y N N/A
Architectural drawings?
Check the dimensions and diagonals of room after laying first layer
9 Y N N/A
of blocks / Kicker.
10 Did the contractor/Team mark the locations of doors and openings? Y N N/A
Has the PPE (personal Protective equipment’s) available for the
11 Y N N/A
activity? If not, has it been ordered or brought to the
engineer/Supervisor notice?
Has a layer of Leveling Course PCC 1:3:6 (Kicker) provided, to adjust
13 Y N N/A
full size blocks, if the ground is not in level
DURING BLOCK MASONARY CHECKS
Check if the Mortar mix (mixed as per specification) is uniform and of
1 Y N N/A
optimum workability (Ease to work with)?
2 Has the quantity of mortar sufficient for the next 30 minutes mixed? Y N N/A
Block work should be in proper alignment and plumb with a
4 Y N N/A
systematic bond (English bond unless otherwise specified).
Has all the Vertical joints been staggered?
5 All Joints to be even and of about 10mm and Raked (8 to 10 mm) Y N N/A
out properly when the mortar is green
6 Ensure only 1.5m of block work is laid in a day & clean and neat Y N N/A
mortar lines in between blockwork (use wire brush).
At every 1m height, Is a band of concrete with chicken mesh
provided in between to avoid cracks is placed in half block masonry? Y N N/A
7
Ensure that the top layer, beneath the beam, contains a full
8 thickness block to allow good distribution of load. Otherwise fill the Y N N/A
gap with concrete
10 Check if the mortar is placed between edge of block and column? Y N N/A
11 Has all the voids in block joints filled with consistent grout? Y N N/A
Are Empty cement bags placed near to adjoining wall for collecting
12 Y N N/A
fallen mortar?
1 of 2
BRICK AND BLOCK MASONRY
Quality Control Checklist
Sr.No Activity Encircle Remarks
POST BLOCK MASONRY
CHECKS
Has all the dates of work done been marked on walls (to ensure
1 Y N N/A
curing time)
2 Are all courses of blockwork are aligned ( plumb, line & level)? Y N N/A
3 Are all door & window openings being as per the drawing provided? Y N N/A
4 Has the entire floor been cleaned after the work? Y N N/A
5 Has the Block work been Cured for a period of 07 days (minimum)? Y N N/A
Name of Site Supervisor: Name of Officer in Charge:
Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:
Date: Date: Date: Date:
2 of 2