Godrej & Boyce Mfg. Co. Ltd. is requesting permission from the National Highway Authority of India to lay two 110mm diameter water supply pipes through 200mm diameter casings across National Highway 4. The company agrees to various terms and conditions including not causing damage, renewing a bank guarantee, shifting the lines if required, indemnifying NHAI against damages, managing traffic during work, paying claims from the concessionaire, seeking approvals for work, paying expenses to repair highway damage, and relocating utilities for road improvements. The company signed the undertaking agreeing to all terms.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
735 views2 pages

Undertaking 4

Godrej & Boyce Mfg. Co. Ltd. is requesting permission from the National Highway Authority of India to lay two 110mm diameter water supply pipes through 200mm diameter casings across National Highway 4. The company agrees to various terms and conditions including not causing damage, renewing a bank guarantee, shifting the lines if required, indemnifying NHAI against damages, managing traffic during work, paying claims from the concessionaire, seeking approvals for work, paying expenses to repair highway damage, and relocating utilities for road improvements. The company signed the undertaking agreeing to all terms.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

5

t
L A R

FER OGREKPi
G.K.LAMBATUMAA
NOTARIALJ REGD.NCA NOTARIA NOTARARA
GREATER

G.
MUMBA1
ARIAAL

RFGDN. O.832i

www RNV
ERN A
ENT
O

UNDERTAKING
To,
The Project Director,
National Highway Authority of India
Dr. Manibhai Desai Nagar,
Warje, Pune 411058

Sub: Permission for drilling and


laying of water supply pipeline i.e. 2 pipes of 110mm diamete
each through casing of HDPE of 200mm diameter
each with drilling size 225 mm across
six laning of tK
Pune - Satara National Highway 4 at chainage Km 794.425 for crossing
National Highway 4 at Gut No.1340 and 1341 of
Village Shirwal, Taluka
-

District Satara.
-
-

Khandala,

This is to state that Godrej & Boyce Mfg. Co. Ltd. proposes to work in accordance with the terms
conditions for ang
laying water supply pipe line i.e. 2 pipes of 110mm diameter each through casing oß
HDPE of 200 mm diameter each across the six
laning of Pune - Satara National Highway 4 a
chainage Km. 794.425 for crossing National Highway 4 at Gut No.1340 and 1341 of Village
Shirwal, Taluka - Khandala, District- Satara. In this connection we hereby undertake as follows:

1. We shall not cause any damage to other utility and if damaged caused then, we agree to pay the
losses either to National Highway Authority of India or to the concerned agency.

2. We agree to the Bank Guarantee


renew
of Rs.1,00,000/- for each pipeline upto the copl
work.

3. We are confirming to all the standard conditions of National


Highway Authority
guidelines and we will take all the actions as prescribed in Ministry Circular No RVNH
of Ina ts
34066/7/2003 S&R (B) dated 17/09/2003 by the Ministry
of Road
Transport and Highvray
ensure conformity of these noms.

4. We undertake to shift the water supply line and when


as required by National HighwayAutlhörity
of India at our own cost.

We agree the shift the water supply pipe line as and when required by NationalHigtwy
Authority of India due to 6 laning/widening of National Highway.

6. We indemnify National Highway Authority of India against all damages and claims.

7 We agree to manage the Traffic movement on the NH-4 during laying water supply pipe line i.e.
2 pipes of 1Omm diameter each through casing of HDPE of200mm diameter each across the six
laning of Pune Satara National Highway 4 at chainage Km 794.425 for crossing National
Highway -4 at Gut No.1340 and 1341 of Village- Shirwal, Taluka - Khandala, District- Satara.

8 We agree to pay the reasonable amount if claimed by the concessionaire with the supporting
documents before completion of our work, if claim arising out of the work of laying of Water
Supply pipe line of our Company.

|1
9. We shall seek the approval of National Highway Authority of India before undertaking any work
of installation, shifting or repairs or alterations to the showing water supply pipeline located in
the National Highway right-of-ways.

10. We agree to pay the expenses if incurred by National Highway Authority of India while repairing
any damage caused to the National Highway by the laying, maintenance or shifting of the water
supply pipe line.

W e agree to move the utility line for any work improvement or repairs to the road if carried out
by National Highway Authority of India within a reasonable time (not exceeding 60 days
intimation given by them to us).

12. Certificate from the applicant in the following format.

i. Laying of water supply pipe line will not have any deleterious effect on any of the bridge
components and roadway safety for traffic; and

ii. For 6 laning "We do undertake that we will relocate service road/approach road/utilities at
our own cost notwithstanding the permission granted within such time as will be
stipulated by National Highway Authority of India" for fiuture six laning or other
development.

Yours faithfully,
For Godrej & Boyce Mfg. Co. Ltd.

Anup Mathew
Sr. Vice President & Business Head,
Godrej Construction

OTA
NOTED & REGISTERED BEFOR ME
Sr. No9S201 G.K.LAMBAT

GREATERMUMBAI
REGD.NO. 8321

. 1 1MÁR.2018
Datea.simiioddh. GAURA AANTBAT
NOTAR/PUBLLC
GOVIL F NDIA
1 1 MAR
2018

You might also like