ITEM NO PERTICULARS OF ITEMS NO NO LENGTH(M) BREATH(M)
1 EARTH WORK EXCAVATION
a.Abutment 2 5.1 0.7
b.Wing wall 4 1.2 0.7
2 CEMENT CONCRETE IN FOUNDATION
a.Abutment 2 5.1 0.7
b.Wingwall 4 1.2 0.7
3 BRICK WORK IN FOUNDATION AND SUPERSTRUCTURE
a.Abutment 2 4.8 0.4
b.Wingwall 4 1.2 0.4
c.Parapet
i.1st footing 2 4.7 0.4
ii.2nd footing 2 4.7 0.3
iii.Coping 2 4.9 0.4
d.Deduction for projection of slab on abutment 2 4.8 0.3
4 R.C.C. WORK IN SLAB 1 4.8 2.1
5 PLASTERING AND POINTING WORK
a.Facewall upto bottom of coping & 10c.m below ground level 2 4.7
b.Parapet inner side 2 4.7
c.Copping (inner,outer,top &bottom) 2 4.9
d.Sides of parapet and coping
i.Sides of parapet (1st footing) 4 0.4
ii.Sides of parapet (2nd footing) 4 0.3
iii.Sides of coping 4 0.4
e.Inner side of abutment 2 4.8
f.Deduction
i.For rectangular opening in face wall for water way 2 1.5
ii.Triangular porsion below earth slope 4 0.5×1.4×1.4
6 WEARING COAT 1 4 2.3
HEIGHT(M) QUANTITY EXPLANATORY NOTES
0.6 4.284 L=4.8+2×0.15=5.1
0.6 2.016 H=0.3+0.3=0.6
6.3
0.3 2.142
0.3 1.008
3.15
1.5 5.76 H=0.3+1+0.2=1.5
1.5 2.88 L=1.2-0.15+0.15=1.5
0.3 1.128 H=0.2+0.1=0.3
0.5 1.41 L=4.9-0.1-0.1=4.7
0.1 0.392 H=0.6-0.1=0.5
2.93
11.57
0.2 0.576
10.994
0.2 2.016 L=4+2×0.4=4.8
2.1 19.74 0.1+1.3+0.2+(0.5-0.1)=2.1
0.8 7.52 H=0.2+0.1+0.5=0.8
0.7 6.86 H=0.1+0.4+0.1+0.1=0.7
0.3 0.48
0.5 0.6
0.1 0.16
1.24
0.1 0.96 H=1+0.1=0.1
36.32
1.1 3.3 H=1+0.1=1.1
4 area of triangle porsion=0.5×1.4×1.4
7.3
29.02
0.1 0.92 B=1.5+2×0.4=2.3
23.38