Report No: QC/DP-01
INSPECTION REPORT Date
Page 01 OF 01
QULITY ASSURANCE & CONTROL
PROJECT CUSTOMER
PMC MAIN SUPPLIER
SUB SUPPLIER MANUFACTURER
PO NO. QAP NO
EQUIPMENT CLIENT DRG. NO.
BGR DRG. NO. TAG NO./ QTY.
D. P. TEST REPORT
Code Spec: ASME Sec VII Div1 & ASME Sec V Procedure No:
Examination Stage: Date of Examination:
Sr. No. Description of Job
1 Material Specification
2 Material Thk. & Type
3 Weld Details
4 Extent of Examination 100%
5 Light Intensity 1000 - 1200 lux
6 Surface Condition:-
Ground Machined As Welded
7 Application of Pentrant:-
Brushing Spraying Dipping
8 Surface Temprature Ambient (Deg C)
9 Dwell Time 10 Min.
10 Developing Time 10 Min.
11 Consumable Details: Batch No. Expiry Date
Cleaner
Dye Pentrant
Developer
12 Type of DP Material
Visible (Non-Fluoroscent) Water Washable
Fluoroscent Solevant Removable
Remarks:-
FOR SS FILTERS PVT. LTD. FOR CLINET/TPI