0% found this document useful (0 votes)
96 views30 pages

Sanathal Quantity

1. The document is a measurement sheet for dismantling, scarification, box cutting, embankment, subgrade, and granular sub-base works along the Ahmedabad-Bamanbore-Rajkot National Highway from chainage 166+780 to 170+214. 2. It lists 6 items of work with their lengths, widths, depths, quantities and total quantities in cubic meters or square meters. 3. The total quantities of work estimated are 4916 cubic meters of dismantling, 23141 square meters of scarification, 28069 cubic meters of box cutting, 41797 cubic meters of embankment, 36759 cubic meters of subgrade work and an unspecified quantity of granular sub

Uploaded by

Riya Jenner
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views30 pages

Sanathal Quantity

1. The document is a measurement sheet for dismantling, scarification, box cutting, embankment, subgrade, and granular sub-base works along the Ahmedabad-Bamanbore-Rajkot National Highway from chainage 166+780 to 170+214. 2. It lists 6 items of work with their lengths, widths, depths, quantities and total quantities in cubic meters or square meters. 3. The total quantities of work estimated are 4916 cubic meters of dismantling, 23141 square meters of scarification, 28069 cubic meters of box cutting, 41797 cubic meters of embankment, 36759 cubic meters of subgrade work and an unspecified quantity of granular sub

Uploaded by

Riya Jenner
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

AHMEDABAD - BAMANBORE - RAJKOT NATIONAL HIGHWAY

MEASUREMENT SHEET

Sr. No. Item Description No. Length Width Height/ Quantity Total Quantity Remarks
Depth
1 Dismantling of flexible pavements
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 2098.80
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 0.20 780.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 0.20 493.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 0.20 1309.00
5% extra 234.1
Total 4915.37 4916 Cum
2 Scarification
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 3900.00
Main carriage way 2 390.00 11.70 9126.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 2467.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 6545.00
5% extra 1101.9
Total 23140.43 23141 Sqm
3 Box cutting
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)

> Service Road


Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.50 6510.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.50 4998.00

> Slip Road


Ch. 167+170 to Ch. 168+000 2 830.00 7.00 0.50 5810.00 Including
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90 Separator
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.50 700.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.50 990.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.50 2860.00

> Bus lay 2 105.00 6.50 1.055 1440.08

5% Extra 1336.58
Total 28068.10 28069 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
4 Embankment
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 1.00 1560.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 1.00 1621.50 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 1.00 3335.00 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 1.00 966.00
(Merge with service road)

> Service Road


Ch. 167+170 to Ch. 168+100 2 930.00 7.00 1.00 13020.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 1.00 -317.80
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 1.00 9996.00

> Slip Road


Ch. 167+170 to Ch. 168+000 2 830.00 7.00 0.30 3486.00 Including
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.30 -95.34 Separator
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.30 420.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.30 594.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.30 1716.00

> Bus lay 2 105.00 6.50 1.00 1365.00

> Island
Ch. 167+170 to Ch. 167+411 2 241.00 1.20 0.60 347.04
Ch. 167+411 to Ch. 168+000 2 589.00 1.20 0.60 848.16
Ch. 169+558 to Ch. 169+840 2 282.00 1.20 0.60 406.08
Ch. 169+840 to Ch. 170+214 2 374.00 1.20 0.60 538.56

5% Extra 1990.31
Total 41796.51 41797 Cum
5 Subgrade
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.50 6510.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.50 4998.00

> Slip Road


Ch. 167+170 to Ch. 168+000 2 830.00 7.00 0.50 5810.00 Including
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90 Separator
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.50 700.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.50 990.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.50 2860.00
0.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 1 360.00 25.00 0.50 4500.00
Ch. 169+558 to Ch. 169+840 1 282.00 14.00 0.50 1974.00
> Ramp
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.50 1600.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.50 960.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
> Bus lay 2 105.00 6.50 0.50 682.50

5% Extra 1750.40
Total 36758.35 36759 Cum
6 GSB
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.20 312.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.20 324.30
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.20 667.00
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.20 193.20
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.20 2604.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.20 1999.20
0
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 7.00 0.20 2324.00 Including
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56 Separator
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.20 280.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 396.00

> Bus lay 2 105.00 6.50 0.200 273.00

5% Extra 462.28
Total 9707.86 9708 Cum
7 WMM
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.25 390.00
Ch. 169+558 to Ch. 169+840 1 282.00 4.55 0.25 320.78
Ch. 169+840 to Ch. 170+130 2 290.00 4.55 0.25 659.75
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.25 241.50
(Merge with service road)

> Profile Correction


Ch. 166+780 to Ch. 167+170 2 390.00 5.00 0.20 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 8.75 0.25 616.88
Ch. 169+840 to Ch. 170+130 2 290.00 8.75 0.25 1268.75
Ch. 170+130 to Ch. 170+214 367.50
2 84.00 8.75 0.25
(Merge with service road)

> Service Road


Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.25 3255.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.25 -79.45
Ch. 169+500 to Ch. 170+214 2 714.00 7.30 0.25 2606.10
0
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 5.50 0.25 2282.50
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.25 -62.43
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.25 350.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.25 495.00

> Bus lay 2 105.00 6.50 0.250 341.25


Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

5% Extra 691.66
Total 14524.78 14525 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

8 CTSB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.20 1144.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 1 360.00 25.00 0.20 1800.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.20 902.40
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.20 640.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.20 384.00
5% Extra 243.52
Total 5113.92 5114 Cum
9 CTB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.14 800.80
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.14 1285.20
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.14 631.68
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.14 448.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.14 268.80
5% Extra 171.72
Total 3606.20 3607 Cum
10 AIL
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.10 572.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.65 0.10 910.80
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.10 451.20
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.10 320.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.10 192.00
5% Extra 122.30
Total 2568.30 2569 Cum
11 Primer coat
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 3666.00
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 7540.00
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 2436.00
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 7.00 5460.00
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 13020.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 -317.80
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 9996.00
0
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 5.50 9130.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 -249.70
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 1400.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 1980.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 5720.00

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.50 9000.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 4512.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 3200.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 1920.00

> Bus lay 2 105.00 6.50 1365.00


5% Extra 3988.88
Total 83766.38 83767 Sqm
12 Tack coat for Binder course
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 3666.00
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 7540.00
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 2436.00
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 7.00 5460.00
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 13020.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 -317.80
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 9996.00
0
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 5.50 9130.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 -249.70
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 1400.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 1980.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 5720.00

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.50 9000.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 4512.00
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 3200.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 1920.00

> Bus lay 2 105.00 6.50 1365.00

5% Extra 3988.88
Total 83766.38 83767 Sqm
13 Tack coat for Wearing course
Quatntity as per above item 83767 Sqm

14 DBM
> Widening / Exisitng carriage way
Ch. 166+780 to Ch. 167+170 2 390.00 11.70 0.065 593.19
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.065 238.29
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.065 490.10
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.065 158.34
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 7.00 0.065 354.90
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.065 846.30
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.065 -20.66
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.065 649.74
0
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 5.50 0.065 593.45
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.065 -16.23
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.065 91.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.065 128.70
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.060 343.20

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.50 0.060 540.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.060 270.72
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.060 192.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.060 115.20

> Bus lay 2 105.00 6.50 0.065 88.73


5% Extra 282.85
Total Qty in Cum 5939.82
Considering 2.42 MT/Cum 14374.35 14375 MT
15 40mm thick BC
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.04 146.64
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.04 301.60
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.04 97.44
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.04 62.40
Ch. 167+170 to Ch. 168+100 2 930.00 7.00 0.04 520.80
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.065 -20.66
Ch. 169+500 to Ch. 170+214 2 714.00 7.00 0.04 399.84
0
> Slip Road
Ch. 167+170 to Ch. 168+000 2 830.00 5.50 0.04 365.20
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.04 -9.99
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.04 56.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.04 79.20

> Bus lay 2 105.00 6.50 0.040 54.60

5% Extra 102.65
Total Qty in Cum 2155.73
Considering 2.48 MT/Cum 5346.21 5347 MT
16 50mm thick BC
Ch. 166+780 to Ch. 167+170
Existing Service road 2 390.00 5.00 0.05 195.00
Main carriage way 2 390.00 11.7 0.05 456.30

> Slip Road


Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.05 286.00

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.50 0.05 450.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.05 225.60
> Ramp
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.05 160.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.05 96.00
5% Extra 93.45
Total Qty in Cum 1962.35
Considering 2.48 MT/Cum 4866.62 4867 MT
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
17 Thermoplastic paint
> main carriage way incl. bridge approach
Edge line 4 1404 0.15 842.40
Center line 4 156 6.00 0.15 561.60
> Service Road
Edge line 4 2034 0.15 1220.40
Center line 2 226 6.00 0.15 406.80
> Slip Road
Edge line 4 1020 0.15 612.00
Center line 2 114 6.00 0.15 205.20
> Ramp
Edge line 2 800 0.15 240.00
Center line 1 89 6.00 0.15 80.10
> Existing ROB with approaches
Edge line 4 790 0.15 474.00
Center line 2 88 6.00 0.15 158.40
> Bus lay 2 123 0.60 0.1 14.76
Add 10 % Extra for Arrows & Pedestrian
crossing, Chevron marking, Diagonal 481.57
marking etc

Total 5297.23 5298 Sqm

18 Cat eyes
main carriage way incl. bridge approach 8 1404 '@every 18 m 624.00
Service Road 6 2034 '@every 18 m 678.00
Slip Road 6 1020 '@every 18 m 340.00
Ramp 3 800 '@every 18 m 133.00
Existing ROB with approaches 6 790 '@every 18 m 263.00
Bus lay 2 110 73.00
Add 10 % Extra 212.00
Total 2323.00 2323 No.
19 Road furniture
Hazard board 8 8 8 No.
Hazard with direction 6 6 6 No.
90 cm equilateral triangle lile junction,
round about, give way. Left-right, merge 24 24 24 No.
traffic etc.

Single chevron 7 7 7 No.


Double chevron 4 4 4 No.
Advance Direcrion board 4 4 4 No.
Compulsory keep left 2 2 2 No.
Pertol pump 2 2 2 No.
Route marker 8 8 8 No.
Bus stop 2 2 2 No.
Bus lay 2 2 2 No.
Over head traffic sign 2 2 2 No.

Kilometer stone 6 6 6 No.


5th kilometer stone 2 2 2 No.
Hectometer stone 28 28 28 No.
Boundary stone 36 36 36 No.
Indicator stone 140 140 140 No.

20 Precast Kerb
Ch. 167+170 to Ch. 168+000 6 830.00 4980.00
Ch. 169+558 to Ch. 170+130 4 572.00 2288.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 748.00
5% Extra 400.80
Total 8416.80 8420 Rmt
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
21 Kerb marking
Ch. 167+170 to Ch. 168+000 6 830.00 0.20 996.00
Ch. 169+558 to Ch. 170+130 4 572.00 0.20 457.60
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 0.20 149.60
5% Extra 80.16
Total 1683.36 1684 Sqm
22 Metal beam crash barrier
Ch. 166+780 to Ch. 168+000 2 1220.00 2440.00
Ch. 169+558 to Ch. 170+130 2 572.00 1144.00
Ch. 169+840 to Ch. 170+214 (median) 1 374.00 374.00
Total 3958.00 3960 Rmt
23 150mm dia PVC pipe for drainage at 5.0m interval

Ch. 167+170 to Ch. 167+530 2 166.00 1.5 498.00


Ch. 169+558 to Ch. 169+840 2 115.00 1.5 345.00
Ch. 169+840 to Ch. 170+214 (median) 1 75.00 1.5 112.50
5% Extra 47.78
Total 1003.28 1010 Rmt
24 Precast drain including jali/cover
Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 169+558 to Ch. 169+840 1 282.00 282.00
Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 400.00
Ch. 168+690 to Ch. 168+850 1 160.00 160.00
Total 1562.00 1570 Rmt
25 P.C.C. M15
RCC Drain 4272.00 2.20 0.10 939.84 940 Cum

26 RCC Drain
Ch. 166+780 to Ch. 167+170 2 390.00 780.00
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 167+530 to Ch. 168+000 2 470.00 940.00
Ch. 168+190 to Ch. 168+450 2 260.00 520.00
Ch. 169+558 to Ch. 169+840 2 282.00 564.00
Ch. 169+840 to Ch. 170+214 2 374.00 748.00
Total Length = 4272.00

Base slab 1 4272.00 2.00 0.20 1708.80


wall 2 4272.00 1.25 0.20 2136.00
Top Slab 1 4272.00 2.00 0.20 1708.80

Total 5553.60 5560 Cum


27 Iron grating
428 20 Kg per grating 8560.00 8560 Kg
28 Utility Duct
8 8.00 8 No.

29 NP4 RCC pipe (Minimum 600 dia)


4 60 240.00 240 Rmt

30 Excavation for shelter foundation


8 1.21 1.21 1.50 17.57 20 Cum
31 P.C.C. 1:4:8
8 1.15 1.15 0.10 1.06 2 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
32 Concrete work for Shelter 0.00
Footing 8 1.00 1.00 0.35 2.80
Column 8 0.30 0.23 3.55 1.96
Plinth beam 4 4.90 0.23 0.40 1.80
4 3.04 0.23 0.40 1.12
Total 2.92
Grade slab 2 5.04 3.04 0.075 2.30
Roof beam 4 4.90 0.23 0.45 2.03
4 3.04 0.23 0.45 1.26
Total 3.29
Chajja 10 1.20 0.45 0.10 4.55
Roof slab 2 5.04 3.04 0.100 3.06
Total 27.09 30 Cum
33 Reinforcement
RCC Drain 0.100 Mt/cum 5553.60 555.36
Shelter 0.100 Mt/cum 27.09 2.71
Total 558.07 560 MT
34 Brick masonry work
long wall 2 4.90 0.23 2.100 4.73
short wall 4 3.04 0.23 2.100 5.87
Parapet wall 2 18.00 0.23 0.300 2.48
Seating 30 0.45 0.115 0.475 0.74
Step 2 2.00 0.400 0.400 0.64
2 2.00 0.400 0.200 0.32
Total 14.79 15 Cum
AHMEDABAD - BAMANBORE - RAJKOT NATIONAL HIGHWAY

MEASUREMENT SHEET

Sr. No. Item Description No. Length Width Height/ Quantity Total Quantity Remarks
Depth
1 Dismantling of flexible pavements
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 2098.80
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 0.20 780.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 0.20 493.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 0.20 1309.00
5% extra 234.1
Total 4915.37 4916 Cum
2 Scarification
Ch. 166+780 to Ch. 167+170
Exi. Service road 2 390.00 5.00 3900.00
Main carriage way 2 390.00 11.70 9126.00
Ch. 169+558 to Ch. 169+840
Main carriage way 1 282.00 8.75 2467.50
Ch. 169+840 to Ch. 170+214
Main carriage way 2 374.00 8.75 6545.00
5% extra 1101.9
Total 23140.43 23141 Sqm
3 Box cutting
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)

> Service Road


Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.50 2520.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.50 3990.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.50 2380.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.50 2618.00

> Slip Road


Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.50 2520.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90 Including
Separator
Ch. 167+530 to Ch. 168+000 2 470.00 7.00 0.50 3290.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.50 700.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.50 990.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.50 2860.00

> Bus lay 2 105.00 6.50 1.055 1440.08

5% Extra 1336.58
Total 28068.10 28069 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
4 Embankment
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 1.00 1560.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 1.00 1621.50 Including
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 1.00 3335.00 Separator
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 1.00 966.00
(Merge with service road)

> Service Road


Ch. 167+170 to Ch. 167+530 2 360.00 7.00 1.00 5040.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 1.00 -317.80
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 1.00 7980.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 1.00 4760.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 1.00 5236.00

> Slip Road


Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.30 1512.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.30 -95.34 Including
Separator
Ch. 167+530 to Ch. 168+000 2 470.00 7.00 0.30 1974.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.30 420.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.30 594.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.30 1716.00

> Bus lay 2 105.00 6.50 1.00 1365.00

> Island
Ch. 167+170 to Ch. 167+411 2 241.00 1.20 0.60 347.04
Ch. 167+411 to Ch. 168+000 2 589.00 1.20 0.60 848.16
Ch. 169+558 to Ch. 169+840 2 282.00 1.20 0.60 406.08
Ch. 169+840 to Ch. 170+214 2 374.00 1.20 0.60 538.56

5% Extra 1990.31
Total 41796.51 41797 Cum
5 Subgrade
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.50 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.50 810.75
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.50 1667.50
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.50 483.00
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.50 2520.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.50 -158.90
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.50 3990.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.50 2380.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.50 2618.00

> Slip Road


Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.50 2520.00
7.00 0.50 -158.90 Including
Deduction minor bridge @ Ch. 167+271 -2 22.70 Separator
Ch. 167+530 to Ch. 168+000 2 470.00 7.00 0.50 3290.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.50 700.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.50 990.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.50 2860.00
0.00
> Bus lay 2 105.00 6.50 0.50 682.50

5% Extra 1298.70
Total 27272.65 27273 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
6 GSB
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.20 312.00
Ch. 169+558 to Ch. 169+840 1 282.00 5.75 0.20 324.30
Ch. 169+840 to Ch. 170+130 2 290.00 5.75 0.20 667.00
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.20 193.20
(Merge with service road)
0
> Service Road
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.20 1008.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.20 1596.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.20 952.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.20 1047.20
0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.20 1008.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.20 -63.56 Including
Separator
Ch. 167+530 to Ch. 168+000 2 470.00 7.00 0.20 1316.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.20 280.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.20 396.00

> Bus lay 2 105.00 6.50 0.200 273.00

5% Extra 462.28
Total 9707.86 9708 Cum
7 WMM
> Widening Road
Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.25 390.00
Ch. 169+558 to Ch. 169+840 1 282.00 4.55 0.25 320.78
Ch. 169+840 to Ch. 170+130 2 290.00 4.55 0.25 659.75
Ch. 170+130 to Ch. 170+214 2 84.00 5.75 0.25 241.50
(Merge with service road)

> Profile Correction


Ch. 166+780 to Ch. 167+170 2 390.00 5.00 0.20 780.00
Ch. 169+558 to Ch. 169+840 1 282.00 8.75 0.25 616.88
Ch. 169+840 to Ch. 170+130 2 290.00 8.75 0.25 1268.75
Ch. 170+130 to Ch. 170+214 367.50
2 84.00 8.75 0.25
(Merge with service road)

> Service Road


Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.25 1260.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.25 -79.45
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.25 1995.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.30 0.25 1241.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.30 0.25 1365.10
0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 5.50 0.25 990.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.25 -62.43
Ch. 167+530 to Ch. 168+000 2 470.00 5.50 0.25 1292.50
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.25 350.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.25 495.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
> Bus lay 2 105.00 6.50 0.250 341.25

5% Extra 691.66
Total 14524.78 14525 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

8 CTSB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.20 1144.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.20 1836.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.20 902.40
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.20 640.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.20 384.00
5% Extra 245.32
Total 5151.72 5152 Cum
9 CTB
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.14 800.80
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.14 1285.20
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.14 631.68
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.14 448.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.14 268.80
5% Extra 171.72
Total 3606.20 3607 Cum
10 AIL
> Slip Road
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.10 572.00
> Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.10 918.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.10 451.20
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.10 320.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.10 192.00
5% Extra 122.66
Total 2575.86 2576 Cum
11 Prime coat
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 3666.00
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 7540.00
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 2436.00
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 7.00 5460.00
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 5040.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 -317.80
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 7980.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 4760.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 5236.00
0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 5.50 3960.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 -249.70
Ch. 167+530 to Ch. 168+000 2 470.00 5.50 5170.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 1400.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 1980.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 5720.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.75 9180.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 4512.00
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 3200.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 1920.00

> Bus lay 2 105.00 6.50 1365.00


5% Extra 3997.88
Total 83955.38 83956 Sqm
12 Tack coat for Binder course
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 3666.00
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 7540.00
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 2436.00
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 7.00 5460.00
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 5040.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 -317.80
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 7980.00
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 4760.00
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 5236.00
0
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 5.50 3960.00
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 -249.70
Ch. 167+530 to Ch. 168+000 2 470.00 5.50 5170.00
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 1400.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 1980.00
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 5720.00

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.75 9180.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 4512.00
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 3200.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 1920.00

> Bus lay 2 105.00 6.50 1365.00

5% Extra 3997.88
Total 83955.38 83956 Sqm
13 Tack coat for Wearing course
Quatntity as per above item 83956 Sqm

14 DBM
> Widening / Exisitng carriage way
Ch. 166+780 to Ch. 167+170 2 390.00 11.70 0.065 593.19
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.065 238.29
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.065 490.10
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.065 158.34
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 7.00 0.065 354.90
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.065 327.60
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.065 -20.66
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.065 518.70
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.065 309.40
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.065 340.34
0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 5.50 0.065 257.40
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.065 -16.23
Ch. 167+530 to Ch. 168+000 2 470.00 5.50 0.065 336.05
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.065 91.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.065 128.70
Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.060 343.20

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.06 550.80
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.06 270.72
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.06 192.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.06 115.20

> Bus lay 2 105.00 6.50 0.065 88.73


Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

5% Extra 283.39
Total Qty in Cum 5951.16
Considering 2.42 MT/Cum 14401.80 14402 MT
15 40mm thick BC
> Widening / Exisitng carriage way
Ch. 169+558 to Ch. 169+840 1 282.00 13.00 0.04 146.64
Ch. 169+840 to Ch. 170+130 2 290.00 13.00 0.04 301.60
Ch. 170+130 to Ch. 170+214 2 84.00 14.50 0.04 97.44
(Merge with service road)

> Service Road


Ch. 166+780 to Ch. 167+170 2 390.00 2.00 0.04 62.40
Ch. 167+170 to Ch. 167+530 2 360.00 7.00 0.04 201.60
Deduction minor bridge @ Ch. 167+271 -2 22.70 7.00 0.065 -20.66
Ch. 167+530 to Ch. 168+100 2 570.00 7.00 0.04 319.20
Ch. 169+500 to Ch. 169+840 2 340.00 7.00 0.04 190.40
Ch. 169+840 to Ch. 170+214 2 374.00 7.00 0.04 209.44
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

0
> Slip Road
Ch. 167+170 to Ch. 167+530 2 360.00 5.50 0.04 158.40
Deduction minor bridge @ Ch. 167+271 -2 22.70 5.50 0.04 -9.99
Ch. 167+530 to Ch. 168+000 2 470.00 5.50 0.04 206.80
Ch. 168+000 to Ch. 168+100 2 100.00 7.00 0.04 56.00
(Merge with service road)
Ch. 168+100 to Ch. 168+190 (Junction) 2 90.00 11.00 0.04 79.20

> Bus lay 2 105.00 6.50 0.040 54.60

5% Extra 102.65
Total Qty in Cum 2155.73
Considering 2.48 MT/Cum 5346.21 5347 MT
16 50mm thick BC
Ch. 166+780 to Ch. 167+170
Existing Service road 2 390.00 5.00 0.05 195.00
Main carriage way 2 390.00 11.7 0.05 456.30

> Slip Road


Ch. 168+190 to Ch. 168+450 2 260.00 11.00 0.05 286.00

> Bridge approach


Ch. 167+170 to Ch. 167+530 2 360.00 12.75 0.05 459.00
Ch. 169+558 to Ch. 169+840 1 282.00 16.00 0.05 225.60
> Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 8.00 0.05 160.00
Ch. 168+450 to Ch. 168+690 1 240.00 8.00 0.05 96.00
5% Extra 93.90
Total Qty in Cum 1971.80
Considering 2.48 MT/Cum 4890.05 4891 MT
17 Thermoplastic
> main carriage way incl. bridge approach
Edge line 4 1404 0.15 842.40
Center line 4 156 6.00 0.15 561.60
> Service Road
Edge line 4 2034 0.15 1220.40
Center line 2 226 6.00 0.15 406.80
> Slip Road
Edge line 4 1020 0.15 612.00
Center line 2 114 6.00 0.15 205.20
> Ramp
Edge line 2 800 0.15 240.00
Center line 1 89 6.00 0.15 80.10
> Existing ROB with approaches
Edge line 4 790 0.15 474.00
Center line 2 88 6.00 0.15 158.40
> Bus lay 2 123 0.60 0.1 14.76
Add 10 % Extra for Arrows & Pedestrian
crossing, Chevron marking, Diagonal 481.57
marking etc

Total 5297.23 5298 Sqm

18 Cate eyes
main carriage way incl. bridge approach 8 1404 '@every 18 m 624.00
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
Service Road 6 2034 '@every 18 m 678.00
Slip Road 6 1020 '@every 18 m 340.00
Ramp 3 800 '@every 18 m 133.00
Existing ROB with approaches 6 790 '@every 18 m 263.00
Bus lay 2 110 73.00
Add 10 % Extra 212.00
Total 2323.00 2323 No.
19 Road furniture
Hazard board 8 8 8 No.
Hazard with direction 6 6 6 No.
90 cm equilateral triangle lile junction,
round about, give way. Left-right, merge 24 24 24 No.
traffic

Single chevron 7 7 7 No.


Double chevron 4 4 4 No.
Advance Direcrion board 4 4 4 No.
Compuisory keep left 2 2 2 No.
Pertol pump 2 2 2 No.
Route marker 8 8 8 No.
Bus stop 2 2 2 No.
Bus lay 2 2 2 No.
Over head traffic sign 2 2 2 No.

Kilometer stone 6 6 6 No.


5th kilometer stone 2 2 2 No.
Hectometer stone 28 28 28 No.
Boundary stone 36 36 36 No.
Indicator 140 140 140 No.

20 Precast Kerb
Ch. 167+170 to Ch. 167+530 6 360.00 2160.00
Ch. 167+530 to Ch. 168+000 6 470.00 2820.00
Ch. 169+558 to Ch. 169+840 3 282.00 846.00
Ch. 169+840 to Ch. 170+130 4 290.00 1160.00
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 748.00
5% Extra 386.70
Total 8120.70 8130 Rmt
21 Kerb marking
Ch. 166+780 to Ch. 167+170 2 390.00 0.20 156.00
Ch. 167+170 to Ch. 167+530 4 360.00 0.20 288.00
Ch. 167+530 to Ch. 168+000 4 470.00 0.20 376.00
Ch. 169+558 to Ch. 169+840 3 282.00 0.20 169.20
Ch. 169+840 to Ch. 170+130 4 290.00 0.20 232.00
Ch. 169+840 to Ch. 170+214 (median) 2 374.00 0.20 149.60
5% Extra 68.54
Total 1439.34 1440 Sqm
22 Metal beam crash barrier
Ch. 166+780 to Ch. 167+170 2 390.00 780.00
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 167+530 to Ch. 168+000 2 470.00 940.00
Ch. 169+558 to Ch. 169+840 2 282.00 564.00
Ch. 169+840 to Ch. 170+130 2 290.00 580.00
Ch. 169+840 to Ch. 170+214 (median) 1 374.00 374.00

Total 3958.00 3960 Rmt


Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
23 150mm dia PVC pipe for drainage at 5.0m interval

Ch. 167+170 to Ch. 167+530 2 72.00 1.5 216.00


Ch. 167+530 to Ch. 168+000 2 94.00 1.5 282.00
Ch. 169+558 to Ch. 169+840 2 57.00 1.5 171.00
Ch. 169+840 to Ch. 170+130 2 58.00 1.5 174.00
Ch. 169+840 to Ch. 170+214 (median) 1 75.00 1.5 112.50
5% Extra 47.78
Total 1003.28 1010 Rmt
24 Precast drain including jali/cover
Bridge approach
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 169+558 to Ch. 169+840 1 282.00 282.00
Ramp
Ch. 168+450 to Ch. 168+850 1 400.00 400.00
Ch. 168+690 to Ch. 168+850 1 160.00 160.00
Total 1562.00 1570 Rmt
25 Excavation
RCC Drain 940.00 2.20 1.60 3308.80 3310 Cum
26 P.C.C. M15
RCC Drain 4272.00 2.20 0.10 939.84 940 Cum

27 RCC Drain
Ch. 166+780 to Ch. 167+170 2 390.00 780.00
Ch. 167+170 to Ch. 167+530 2 360.00 720.00
Ch. 167+530 to Ch. 168+000 2 470.00 940.00
Ch. 168+190 to Ch. 168+450 2 260.00 520.00
Ch. 169+558 to Ch. 169+840 2 282.00 564.00
Ch. 169+840 to Ch. 170+214 2 374.00 748.00
Total Length = 4272.00

Base slab 1 4272.00 2.00 0.20 1708.80


wall 2 4272.00 1.25 0.20 2136.00
Top Slab 1 4272.00 2.00 0.20 1708.80

Total 5553.60 5560 Cum


28 Iron grating
428 20 Kg per grating 8560.00 8560 Kg
29 Utility Duct
8 8.00 8 No.

30 NP4 RCC pipe (Minimum 600 dia)


4 60 240.00 240 Rmt

31 Excavation for footing (2 shelter)


8 1.21 1.21 1.50 17.57 20 Cum
32 P.C.C. 1:4:8
8 1.15 1.15 0.10 1.06 2 Cum
33 Concrete work 0.00
Footing 8 1.00 1.00 0.35 2.80 3.00 Cum
Column 8 0.30 0.23 3.55 1.96 2.00 Cum
Plinth beam 4 4.90 0.23 0.40 1.80
4 3.04 0.23 0.40 1.12
Total 2.92 3.00 Cum
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks

Grade slab 2 5.04 3.04 0.075 2.30 3.00 Cum


Roof beam 4 4.90 0.23 0.45 2.03
4 3.04 0.23 0.45 1.26
Total 3.29 4.00 Cum
Chajja 10 1.20 0.45 0.10 4.55 5.00 Cum
Roof slab 2 5.04 3.04 0.100 3.06 4.00 Cum
34 Reinforcement
RCC Drain 0.100 Mt/cum 5553.60 555.36
Shelter 0.100 Mt/cum 24.00 2.40
Total 557.76 560 MT
Height/
Sr. No. Item Description No. Length Width Depth Quantity Total Quantity Remarks
35 Brick masonry work
long wall 2 4.90 0.23 2.100 4.73
short wall 4 3.04 0.23 2.100 5.87
Parapet wall 2 18.00 0.23 0.300 2.48
Seating 30 0.45 0.115 0.475 0.74
Step 2 2.00 0.400 0.400 0.64
2 2.00 0.400 0.200 0.32
Total 14.79 15 Cum
12660

170214

Bus lay 12618


170172

90 cm equilateral triangle 6
Junction with merging 10
Round about 2
Give way 4
u turn 2
16000 3340