Owner : BP Berau Ltd.
Job Unit
Plant Location : 1244662 N/A
Bintuni by Papua - Indonesia QC Code QCP Refference
CIV-0004-02M TEP-900-SPE-CV-BP4-0003
Project Title : Tangguh Expansion Project
Report No. Sheet
1 of 1
Subcontractor : PT.Sinar Beton Sinar Perkasa RFI-012 TM-CBSP-Manado
Grading "B"
SIEVE ANALYSIS OF AGGREGATE
SNI 03 - 6388 - 2000
Source of Sample :
Bt. Size 30mm Sampling Date : 7-Jul-23
To be user for :
LPA Testing Date : 7-Jul-23
Sample From :
Quarry - Sungai Wailola Desa Bula Seram bagian Timur Maluku Tested by : Usman J.
Location Testing :
Laboratorium PT.CBSP Wailola INTERNAL
Weigth of dry sample 4,538.3 gr A Weigth of dry sample 4,538 gr B
Cumulative Cumulative
Sieve Individu Container Individu Container Avarage
mm Retained gr gr Retained Retained Passing Retained gr gr Retained Retained Passing
gr % % gr % %
2" 0 0 100 50
37.5 - - - - 100.00 - - 100.00 100.00
25.0 1,973.4 - 1,973.4 43.48 56.52 1,973.4 - 1,973.4 43.48 56.52 56.52
9.50 2,550.3 - 4,523.7 99.68 0.32 2,550.3 - 4,523.7 99.68 0.32 0.32
4.75 - - 4,523.7 99.68 0.32 - - 4,523.7 99.68 0.32 0.32
2.00 - - 4,523.7 99.68 0.32 - - 4,523.7 99.68 0.32 0.32
0.425 - - 4,523.7 99.68 0.32 - - 4,523.7 99.68 0.32 0.32
0.075 - - 4,523.7 99.68 0.32 - - 4,523.7 99.68 0.32 0.32
Remarks
0,075 0,425 2,00 4,75 9,50 25,4 50,8
100
90
80
70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
EQUIVALENT GRAIN DIAMETER (mm)
QC Construction Subcontractor Contractor Company Other
Name Name Name Name
Signature Signature Signature Signature
Date Date Date Date
Owner : BP Berau Ltd. Job Unit
Plant Location : 1244662 N/A
Bintuni by Papua - Indonesia QC Code QCP Refference
CIV-0004-02M TEP-900-SPE-CV-BP4-0003
Project Title : Tangguh Expansion Project
Report No. Sheet
1 of 1
Subcontractor : PT.Sinar Beton Sinar Perkasa RFI-012 TM-CBSP-Manado
Grading "B"
SIEVE ANALYSIS OF AGGREGATE
SNI 03 - 6388 - 2000
Source of Sample :
Bt. Size 20mm Sampling Date : 7-Jul-23
To be user for :
Type SP Testing Date : 7-Jul-23
Sample From :
Quarry - Sungai Wailola Desa Bula Seram bagian Timur Maluku Tested by : Usman J.
Location Testing :
Laboratorium PT.CBSP Wailola INTERNAL
Weigth of dry sample 3,523.3 gr A Weigth of dry sample 3,523.3 gr B
Cumulative Cumulative
Sieve Individu Container Individu Container Avarage
mm Retained gr gr Retained Retained Passing Retained gr gr Retained Retained Passing
gr % % gr % %
2" 0 0 100 50
50.8 - - - - 100.00 - - 100.00 100.00
25.0 - - - - 100.00 - - - - 100.00 100.00
9.50 2,656.3 - 2,656.3 75.39 24.61 2,656.3 - 2,656.3 75.39 24.61 24.61
4.75 843.8 - 3,500.1 99.34 0.66 843.8 - 3,500.1 99.34 0.66 0.66
2.00 4.4 - 3,504.5 99.47 0.53 4.4 - 3,504.5 99.47 0.53 0.53
0.425 1.6 - 3,506.1 99.51 0.49 1.6 - 3,506.1 99.51 0.49 0.49
0.075 5.4 - 3,511.5 99.67 0.33 5.4 - 3,511.5 99.67 0.33 0.33
Remarks
0,075 0,425 2,00 4,75 9,50 25,4 50,8
100
90
80
70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
EQUIVALENT GRAIN DIAMETER (mm)
QC Construction Subcontractor Contractor Company Other
Name Name Name Name
Signature Signature Signature Signature
Date Date Date Date
Owner : BP Berau Ltd. Job Unit
Plant Location : 1244662 N/A
Bintuni by Papua - Indonesia QC Code QCP Refference
CIV-0004-02M TEP-900-SPE-CV-BP4-0003
Project Title : Tangguh Expansion Project
Report No. Sheet
1 of 1
Subcontractor : PT.Sinar Beton Sinar Perkasa RFI-012 TM-CBSP-Manado
Grading "B"
SIEVE ANALYSIS OF AGGREGATE
SNI 03 - 6388 - 2000
Source of Sample :
Bt. Size 10mm Sampling Date : 7-Jul-23
To be user for :
Type SP Testing Date : 7-Jul-23
Sample From :
Quarry - Sungai Wailola Desa Bula Seram bagian Timur Maluku Tested by : Usman J.
Location Testing :
Laboratorium PT.CBSP Wailola INTERNAL
Weigth of dry sample 865.10 gr A Weigth of dry sample 865.1 gr B
Cumulative Cumulative
Sieve Individu Container Individu Container Avarage
mm Retained gr gr Retained Retained Passing Retained gr gr Retained Retained Passing
gr % % gr % %
2" 0 0 100 50
50.8 - - - - 100.00 - - 100.00 100.00
25.0 - - - - 100.00 - - - - 100.00 100.00
9.50 - - - - 100.00 - - - - 100.00 100.00
4.75 551.1 - 551.1 63.70 36.30 551.1 - 551.1 63.70 36.30 36.30
2.00 305.2 - 856.3 98.98 1.02 305.2 - 856.3 98.98 1.02 1.02
0.425 0.9 - 857.2 99.09 0.91 0.9 - 857.2 99.09 0.91 0.91
0.075 4.4 - 861.6 99.60 0.40 4.4 - 861.6 99.60 0.40 0.40
Remarks
0,075 0,425 2,00 4,75 9,50 25,4 50,8
100
90
80
70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
EQUIVALENT GRAIN DIAMETER (mm)
QC Construction Subcontractor Contractor Company Other
Name Name Name Name
Signature Signature Signature Signature
Date Date Date Date
Owner : BP Berau Ltd. Job Unit
Plant Location : 1244662 N/A
Bintuni by Papua - Indonesia QC Code QCP Refference
CIV-0004-02M TEP-900-SPE-CV-BP4-0003
Project Title : Tangguh Expansion Project
Report No. Sheet
1 of 1
Subcontractor : PT.Sinar Beton Sinar Perkasa RFI-012 TM-CBSP-Manado
Grading "B"
SIEVE ANALYSIS OF AGGREGATE
SNI 03 - 6388 - 2000
Source of Sample :
Abu Batu Sampling Date : 7-Jul-23
To be user for :
Type SP Testing Date : 7-Jul-23
Sample From :
Quarry - Sungai Wailola Desa Bula Seram bagian Timur Maluku Tested by : Usman J.
Location Testing :
Laboratorium PT.CBSP Wailola INTERNAL
Weigth of dry sample 677.4 gr A Weigth of dry sample 677 gr B
Cumulative Cumulative
Sieve Individu Container Individu Container Avarage
mm Retained gr gr Retained Retained Passing Retained gr gr Retained Retained Passing
gr % % gr % %
0 0 100 100 2" 0 100 100
50.8 - - - - 100.00 - - - - 100.00 100.00
25.4 - - - - 100.00 - - - - 100.00 100.00
9.50 - - - - 100.00 - - - - 100.00 100.00
4.75 1.2 - 1.2 0.18 99.82 1.2 - 1.2 0.18 99.82 99.82
2.00 157.5 - 158.7 23.43 76.57 157.5 - 158.7 23.43 76.57 76.57
0.425 273.8 - 432.5 63.85 36.15 273.8 - 432.5 63.85 36.15 36.15
0.075 201.9 - 634.4 93.65 6.35 201.9 - 634.4 93.65 6.35 6.35
Remarks
0,075 0,425 2,00 4,75 9,50 25,4 50,8
100
90
80
70
60
50
40
30
20
10
0
0.01 0.1 1 10 100
EQUIVALENT GRAIN DIAMETER (mm)
QC Construction Subcontractor Contractor Company Other
Name Name Name Name
Signature Signature Signature Signature
Date Date Date Date
Owner : BP Berau Ltd. Job Unit
Plant Location : 1244662 N/A
Bintuni by Papua - Indonesia QC Code QCP Refference
Project Title : CIV-0004-02M TEP-900-SPE-CV-BP4-0003
Tangguh Expansion Project Report No. Sheet
Subcontractor : 1 of 1
RFI-012 TM-CBSP-Manado
PT.Sinar Beton Sinar Perkasa Combined
COMBINED GRADING MATERIAL
SNI 03 - 6388 - 2000
Sample Type : Combined Material
To be user for : LPA
Sample From : Quarry - Sungai Wailola Desa Bula Seram bagian Timur Maluku
Location Test : Laborat PT.CBSP Bula
Tested by : Usman J. Testing Date : 7-Jul-23
% Passing Proportion
Sieve Specification
mm Abu Batu Bt 5/10 Bt 10/20 Bt 20/30 Combine Limit
Abu Batu Bt 5/10 Bt 10/20 Bt 20/30
23% 20% 15% 42% 100%
0 #DIV/0! 100 2" 0 #DIV/0! 100 100
37.5 100.00 100.00 100.00 100.00 23.00 20.00 15.00 42.00 100.00 100 - 100
25.4 100.00 100.00 100.00 56.52 23.00 20.00 15.00 23.74 81.74 79 - 85
9.50 100.00 100.00 24.61 0.32 23.00 20.00 3.69 0.13 46.83 44 - 58
4.75 99.82 36.30 0.66 0.32 22.96 7.26 0.10 0.13 30.45 29 - 44
2.00 76.57 1.02 0.53 0.32 17.61 0.20 0.08 0.13 18.03 17 - 30
0.425 36.15 0.91 0.49 0.32 8.31 0.18 0.07 0.13 8.70 7 - 17
0.075 6.35 0.40 0.33 0.32 1.46 0.08 0.05 0.13 1.72 2 - 8
Remarks
0,075 0,425 2,00 4,75 9,50 25,4 37,5
100
Hidrometer
90
80
70
60
Passing
%
50
Spec. Limid
40
30
20
10
0
0.0 0.1 1.0 10.0 100.0
Silt - Clay Fine Medium Rough Gravel
Sand
Construction Subcontractor Contractor Company Other
Name Name Name Name
Signature Signature Signature Signature
Signature Signature Signature Signature
Date Date Date Date