DMM 16 9 2023
DMM 16 9 2023
ESP FIELDS
                                               Spark rate 1A6-6 , 765    Spark rate 2D6-7,
MAXIMUM SPARK
                                                       MA                    740MA
RATE / CURRENT
                                                       U#1                        U#2
                                Pass A1-
                                                        471                       375
                              >331/450/450
                               Pass A2-
                                                        420                       434
                              331/450/450
                               Pass B1-
                                                        368                       427
                              331/450/450
                               Pass B2-
   ADPH Shut off                                        346                       405
                              331/450/450
    Vacuum/ Line
   Vacuum(mmHg)                Pass C1-
                                                        427                       361
                              331/450/450
                               Pass C2-
                                                        331                       361
                              331/450/450
                               Pass D1-
                                                        412                       353
                              331/450/450
                               Pass D2-
                                                        420                       368
                              331/450/450
                                            U#1           U#2
Carbon % 15-Sep        Btm Ash <1.5         0.3           0.2
                       Fly Ash < 0.5        0.6           0.5
                      Hopper Temp.
      BA                                 26/29/28/49   46/46/52/31
                        A/B/C/D
                                                       Stage-1
                                           IAD -1        IAD -2
                                          9-Sep-23      9-Sep-23
                                            -34.2         -48.5
                    Chem (-)VE Value
 IA Dew point
                                             -60          -56.7
                    Online (-)VE Value
COC Turbidity
                         Stage-1              -             -
    15-Sep             Stage-2 <3.0         2.72           26
    15-Sep             Stage-3- 5.0         5.06           67
                                                                    Oil Chemistry
                         Moisture          Limits         U#1
25-Aug FRF-NAS 8 7
Units #1
                     BFP A                 100/50               53
                     BFP B                 100/50               68
   15-Sep
                     BFP C                 100/50               50
                                                              Limit
                    4-Sep-23            ID FAN#2A              100
                                        ID FAN#2B              100
                                        ID FAN#2C              100
                                                                 Chemistry Parameters
                  SILICA (ppb)
                                             150                10
                     (LAB)
                 Chloride-LAB
                                             500               141
                     (ppb)
                   pH (O/L)                9.0-9.6             9.37
                  ACC(µs/cm)                  -                1.03
                 D.O -O/L(ppb)/
                                            1-10             11.8/6.2
                   Lab(ppb)
                                    8.8-9.2 (st-1) 9.2-9.6
Feed /15-Sept       pH (O/L)                                   9.35
                                           (st-2&3)
                  SILICA(ppb)                  20               4
                  ACC(µs/cm)                  0.2             0.096
                 D.O -O/L(ppb)/
                                             20              37.7/14.0
                    Lab(ppb)
                   ACC(µs/cm)                 0.2             0.083
Condensate/
  15-Sept                           8.8-9.2 (st-1) 9.2-9.6
                    pH (O/L)                                   9.34
                                           (st-2&3)
                  SILICA(ppb)                  20               2
                 SODIUM(ppb)                    2              0.6
                 SODIUM(ppb)                    2              0.58
                  SILICA(ppb)                  20               4
Main steam
                                           8.8-9.2 (st-1) 9.2-9.6
    Main steam             pH (O/L)                                 9.37
                                                  (st-2&3)
                          ACC(µs/cm)                 0.2            0.06
                         CPU SERVICE                                 1B
                                        Stage-1                            Stage-2
 Bunker Floor fire
   water hydrant
                                          1.0                                4.0
 pressure(Kg /Cm2 )
               Total no. of
                Zones:120
            TP-20A/B to TP-25
                9/11/2023
9/11/2023
   EQMS
                   PH                  Temp                       TOC            TSS
43 33 58 66
46 32 51 60
                    45                      34                      52            68
       47                      33               59                  60
                                         Spark Rate:5A15-
                         Spark rate
Spark rate 3A24-5,                        5,5A22-5,B22-5,    Spark rate 6D11-
                       4A22-9, 246mA
     167mA                                 5C29-5,5C19-      8,6C17- 1959mA
                       4D24-9- 282mA
                                             1689mA
502
                 -                -                  1:6           1:10
               8.38              1.0                 1:4            1:8
               8.00              1.0                 1:4            1:7
      Oil Chemistry
                U#2             U#3                 U#4            U#5           U#6
49 268/149/190(15.09) 53 42 45
                41               43                  45             42            47
              468           1169         332(13.09)           956             1045
8 6 5 7 7
               47            44              46              45               48
               59            39        4316/3510/3968     599/224             51
                        Working/Lube   Working/Lube     Working/Lube        Working/
               65                                                            Lube
                            46/42          58/49             63/57           82/77
            Moisture         MI
              297            43.7
              349            49.7
              396            45.6
Chemistry Parameters
8 14 20 15 30
               5              6               5                 5              7
             0.103          0.11            0.15              0.09           0.076
               3              5               6                3               5
               0            0.34            0.24               0              0.19
               0            0.36            0.26               0              0.22
               5              6               5                4               6
          9.34    9.21             9.24   9.24   9.46
Stage-2 Stage-3
4.0 4.0
          TH-2    TH-3
          11.0    12.0
-1.28 -6.3
 -11.1       -8.4
                 Load                                 472
              Coal Flow                               294
15.09.2023
5A 0.6 90
                  5B                        0.2        96
                  5C
                  5D                        0.7        88
5E 0.4 94
                  5F                        0.5        92
                  5G                        0.1        96
                  5H
                   5J
472
294
1786
 /9.0/5.5
 15.4/9.0
 /9.0/5.5
15.6/11.0
            -200
            >70
68
78
66
74
            71
            80
                                      fjgUn lqij FkeZy ikoj LVs'ku                      fjgUn
                                                         esfUVusUl eSustesaV lfoZl ¼vuqj{k.k izcU/ku lsok½
                                                         izzpkyu ,oa vuqj{k.k dh izfrfnu lqcg dh la;kstu cSBd
Meeting duration: 00:30 hrs                                                                                              16-Sep-23
   Noti. No     Noti. Dt.                              Description                             Deptt.     Trgt Dt   REV-1
                                                                              UNIT#1
  106368427       1-Jul BFP-1A LEAK OFF V/V SWYD SIDE PASSING                               TMD
    PTW           9-Sep SOOTBLOWERS 5,8,42 BLANKED DUE TO PUPPET VALVE                      BMD           13-Sep    14-Sep
                  7-Sep LRSB STEAM ISOLATING VALVE SS 35 MOTORISED VV                       BMD
                                                                                                          15-Sep
                        PASSING
  106532164      14-Sep U#1 AEP 1A SEPERATOR TANK FLOAT V/V PASSING                         TMD           15-Sep
                                                                              UNIT#2
     PTW          8-Sep       Mill-2B under OH                                              BMD           20-Sep
                                                                       STAGE#1 Chemistry
  106504334       1-Sep CPU Stage 1 ARU vessel consep inspection                            OFS           12-Sep    30-Sep
    PTW          11-Sep DMP-1 Degassed water pump-3 gland leakage                           OFS           13-Sep    14-Sep
                                                                              UNIT#3
  106500994      31-Aug FIRE HYDRANT LKG NEAR BUNKER 3B                                     OFS
  PTW       14-Sep MILL+FEEDER 3C PM                                              BMD   15-Sep
            14-Sep MOT MOISTURE RUNNING HIGH I/L-318,O/L-164,TANK-180             TMD
                                                                         UNIT#4
            11-Sep HPCF TAN VALUE 0.40 LIMIT :0.2 REPORT DATED: 09/09/23          TMD
                     TD BFP 4B MAIN PUMP SEAL WATER LEAKAGE INCREASED             TMD
106529757   12-Sep                                                                      14-Sep
                                                                 STAGE#2: COMMON
            3-Aug SERVICE WATER P/P-2 VIBRATION HIGH PNDE(A)-18.9 MM/S            OFS
                                                                                        15-Sep   25-Sep
  PTW        5-Sep AWRS PUMP-5 HIGH VIBRATION MNDE H 84 MM/S                      AHD   15-Sep
  PTW       15-Sep AWRS PUMP-2 Abnormal sound                                     AHD
            11-Sep Stage-2 Service Building screw chiller-1 not taking start      C&I
                                                                         UNIT#5
  PTW       16-Sep MILL-5F U/P FOR PM                                             BMD
                                                                         UNIT#6
            5-Sep    GOODS LIFT NOT AVAILABLE DUE TO PULLEY PROBLEM               EMD   16-Sep
  PTW       14-Sep MILL/FEEDER-6B PM                                              BMD   15-Sep
                                                                 STAGE#3: COMMON
                   WASTE WATER P/Ps MODULE OFF FOR ETP CLARIFIER TURBO
            4-Sep                                                      OFS                   13-Sep
                   WORK
  PTW       13-Sep ASL-A LINE MAINTENANCE                              AHD                   15-Sep
  PTW       15-Sep CT FAN 6A2 GEAR BOX OIL SEAL REPLACEMENT            OFS
                                                                  STAGE#3 Chemistry
106413969   22-Jul   CPU REGENERATION ARU CONSEP REPLACEMENT                           OFS   30-Aug   30-Sep
STATION: COMMON
PTW required
PTW required
U/O
             Material N/A
  Emergency Available
OH required
                                                                   STAGE#2:CHP
Bunker roof exhaust fan not avaiable.                                        19-May              CHP-EM
                                                                   STAGE#3:CHP
CCTV camera T/H-3 NEW,T/H-1, WT HOPPER,34A/B H,33 A/B H,38 A/B H,39
                                                                              9-Sep              C&I
A/B TAIL not working.(Total 05 Nos) .
Camera cleaning reqd. T/H-3 BELOW MCC END ,38 H,39 T,46 T.                    9-Sep              C&I
S/R-3 Belt weigher not working .                                             16-Sep              C&I
                                                                   CHP-COMMON
PA System not working:
Stage-1: ALL OK.
                                                                             16-Sep              CHP-EMD
Stage-2: ALL OK .
Stage-3:04 37 H,39 H,40A H ,31 H worKing .
Sump p/p not working:
Stage-1:NIL (POPULATION 06)
                                                                             16-Sep
Stage-2:NIL(POPULATION-12)
Stage-3: NIL(POPULATION 12)
                                                                         MGR
                                 Description                                 Noti. Dt. Noti. No   Deptt.
MGR Station 3 staff quarters unsafe condition- Roof plaster is peeling off   12-Sep               CMP
                                                        Long Pending
                                                        STAGE#1:CHP
                                 Description                  Noti. Dt. Noti. No   Deptt.
Auto system to be revived.                                      9-Feb              MM/EMD
Dust suppression line not available in track hopper#1          19-Apr              CHP-MM
Conv11 B Return side idler required.                           25-May              MM
                                                        STAGE#2:CHP
                                 Description                  Noti. Dt. Noti. No   Deptt.
                                                        STAGE#3:CHP
                                 Description                  Noti. Dt. Noti. No   Deptt.
VCF-09 Duct damaged.                                           5-Nov               CHP- MM
LT Drives SOFT -TAG not working.                               9-Dec               CHP-C&I
UPS #1 not available since 13/09/2020.                              29-Jan              C&I
CHP CONTROL ROOM AC DUCT FAN MOTOR NOT WORKING 22-Apr CHP- EMD/MM
CCTV camera Conv33H,34H, WT Hopper, 39H & 40A Tail not working. 28-Sep C&I
                 5/18 balance
               (long pending)
          Available
Tar. Dt   Remarks
Trgt Dt       Remarks
                Spare N/A cash
              purchase to be done
                 Long Pending
    30-May       Long Pending
    July’22      Long Pending
Long Pending
Long
Trgt Dt       Remarks
                 Long Pending
                 Long Pending
              PO Placed
Long Pending
Spare N/A
Long Pending
Long Pending
Long Pending
Trgt Dt   Remarks
                      UNIT#1
Equipment
COLTCS
LRSB 212
Mill-1C
UNIT#2
Equipment
LRSB 211
MILL 2A
                  STAGE#1 COMMON
Equipment
H2 Compressor-A
CWP/P-1B
                      UNIT#3
Equipment
LRSB-105
                      UNIT#4
Equipment
MS ERV-SV-10
                  STAGE#2: COMMON
Equipment
DMP-2
PA System
                      UNIT#5
Equipment
LRSB-105
LRSB-124
                      UNIT#6
Equipment
                        STAGE#3: COMMON
Equipment
PA System
TAC-6C
H2 plant Compressor-A
H2 plantCompressor-B
                                              UNIT#1
Description                                                 Noti. Dt.   Noti. No
COLTS B2 bottom not closing fully                          1/20/2023
BLANKED                                                    3/7/2023
MILL & FEEDER 1C UNDER R&M                                 7/16/2023
UNIT#2
                                          STAGE#1 COMMON
Description                                                 Noti. Dt.   Noti. No
 H2 Compressor-A is out of order: Needs revival or
                                                            4/5/2023
replacement.
CWP/P-1B PUMP BRG ABNORMAL SOUND                           5/25/2023
                                              UNIT#3
Description                                                 Noti. Dt.   Noti. No
Lance bend                                                 9/17/2022
                                              UNIT#4
Description                                                 Noti. Dt.   Noti. No
Passing                                                    11/16/2022
                                        STAGE#2: COMMON
Description                                                 Noti. Dt.   Noti. No
                                              UNIT#5
Description                                                 Noti. Dt.   Noti. No
Lance bend                                                 4/29/2019
Lance bend                                                 12/31/2018
                                              UNIT#6
Description                                                 Noti. Dt.   Noti. No
                                         STAGE#3: COMMON
Description                                                 Noti. Dt.   Noti. No
Not available
TAC-6C MOTOR Bearing damaged                               3/29/2023
Compressor-A is out of order from more than 02 year. Its
                                                           4/5/2023
Unloader is not working.
TMD
OFS
EMD
TMD
 TMD
                                                      S/D Jobs
                                                      UNIT#1
Sr.No.   Description                                              Deptt.
   1     ESP FIELD 1D6 & 1D5 SHORT                                AHD
   2      ID FAN 1B COUPLING OIL PRESSURE LOW                     BMD
   3     COAL FEEDER 1E FEEDER 0/L GATE JAM                       BMD
   4     Discharge line of Drain pot near 25m HAID lE is narrow   BMD
         and choke, overflowing water falling continuously over
         cables
  5      ID 1C FAN DE/NDE SIDE OIL LKG                            BMD
  6      ID FAN1B GSWWATER LKG UNDERGROUND                        BMD
REMARKS
1   BCP 2B MOTOR ABNORMAL SOUND                          EMD/BMD
2   Boiler start up vent 5A stem bend, manually closed     BMD
3   ESP-2C FLUE GAS O/L GATE JAM                           BMD
Long pending
                                               S/D Jobs
                                               UNIT#3
Sr.No. Description                                           Deptt.
   1   CTT-3B2 & 3C2 CHECKING AS WHENEVER IN SERVICE SLOW    AHD
       ASH EVACUTION
  2   ALL CTT NOZZLES DEFECTIVE                               AHD
  3   U-3 CG LINE 3B2 AND 3A1 PASSING                         AHD
  4   CD CORNER 3 ATMOISING STEAM LKG                         BMD
  5   LRSB 105 JAMMING.                                       BMD
  6   NEAR MILL 3G HAD GRATING AND RAILING REQUIRED ,         BMD
      REPORTED IN SAFETY APP.
  7   SD -42 BONNET LEAKAGE                                   BMD
  8   GH Elevation Oil guns to be made available            BMD/C&I/
                                                              OPN
  9   ALL 4 O2 TRANSMITTERS CALIBRATIONS REQUIRED             C&I
 10   MAIN TURBINE PEDESTRAL AND SHAFT VIB 3Y HUNTING         C&I
 16   HPT 1st stage pressure txr spare point v/v passing    C&I/TMD
 17   SEAL OIL P/P-A TAKING AUTO-START. NRV PASSING         C&I/TMD
      SUSPECTED
 18   GT 3B BANK-C PUMP ABNORMAL SOUND                        EMD
 19   GT 3Y BANK-B PUMP ABNORMAL SOUND                        EMD
 20   GT-R D-BANK LOWER FAN ABNORMAL SOUND                    EMD
 21   ID FAN-3B MOTOR WATER LKG ALARM                         EMD
 22   SST-3A ODAT01 B-ph WINDING TEMP HUNTING                 EMD
 23   UAT-3A OIL LVL LOW, OIL LKG, WT ERRETIC IN OWS          EMD
 24   UAT-3B OIL LKG CONSERVATOR TANK                         EMD
 25   CPU v/v checking to be done                             OFS
 26   CPU-3A Flow restriction to be checked                   OFS
 27   Fire water leakage near Mill-3A                         OFS
      S/D
      S/D
      S/D
      S/D
S/D
Approach problem
Unsafe condition
 OPPORTUNITY
   Opportunity
Isolation problem
        S/D
      S/D
   Long Pend
      U/O
      U/O
      U/O
      O/H
       S/D
       S/D
       S/D
      Opp
       S/D
Over ground to be
      done
  Opportunity
   S/D Job
  Opportunity
     s/D
     S/D
   U/O, OH
Long Pending
                                                   S/D Jobs
                                          UNIT#4
S.No   Description                                            Deptt.
  1    CG- 4B2 SLUICE GATE PASSING                            AHD
  2    Bunker-4F liner damage 2 feet below bunker floor.      BMD
  3    Drum level validation system left side not working     BMD
  4    Drum safety valve RIGHT SIDE SV1 PASSING               BMD
  5    ERV SV10 passing                                       BMD
  6    Feeder-4G I/L chain gate free.                         BMD
  7    ID FAN-4A IGV DE-LINKED                                BMD
  8    LRSB 107 LANCE DAMAGE                                  BMD
  9    Mil-4H HAG jamming / inoperative.                      BMD
 10    Mill-4J HAD passing.                                   BMD
 11    PAPH 4A AIR O/L DAMPER ACTUATOR IN REMOVED CONDITION   BMD
      Y
      Y
      Y
                                                 S/D Jobs
                                        UNIT#5
S.No.   Description                                             Deptt.
  1     PA FAN 5A FAN VIBRATION X HIGH(7.26 mm/Sec)             BMD
  2     RH spray SD-17Passing 10T                               BMD
  3     SB C/V SD-24 PASSING                                    BMD
  4     GH Elevation Oil guns to be made available           BMD/C&I/OPN
  5                                                              C&I
        C&I DRAWOUT CONSOLE RELEASE BUTTON 'FALSE' FORCED.
  6     RH SPRAY BLOCK V/V SD-12 INOPERATIVE                    C&I
  7     TG Bearing & Shaft-2X Vib. Hunting                      C&I
  8     U#5 ALL CTT ASH I/L VLV LIMIT SWITCH BYP                C&I
  9     MS Pr at Boiler O/L(LHS) Impulse line lkg             C&I/BMD
 11     CPU v/v checking to be done                             OFS
 12     MOT COOLER B OIL SEEPAGE FROM TOP                      TMD
 13     SCS-A GEAR MOTOR ACTUAL OVERLOAD/TAKING HIGH           TMD
        CURRENT AS PER EMD
 14     Tur Exciter Brg Shaft vib-7x vib high (180MIC)          TMD
 15     TDBFP 5A CONIACL STRNR DRAIN LINE PASSING               TMD
  Remarks
  Remarks
 Opportunity
    S/D
 Opportunity
Long pending
     SD
   Opp
    S/D
  S/D Job
    Opp
  Spare N/A
S/D
    S/D
                             S/D Jobs
                    UNIT#6
S.No. Description                       Deptt.
Remarks
Contract for EQMS shifting                                       OFS/C&I
Long Pending
Committee required
for proposal initiation
                                  fjgUn lqij FkeZy ikoj LVs'ku                                       fjgUn
                                              esfUVusUl eSustesaV lfoZl ¼vuqj{k.k izcU/ku lsok½
                                              izzpkyu ,oa vuqj{k.k dh izfrfnu lqcg dh la;kstu cSBd
                                                                   UNIT#2
Equipment           Description                          Noti. Dt.    Noti. No           Deptt.
                                    STAGE#1 COMMON
Equipment           Description                   Noti. Dt.             Noti. No         Deptt.
DMP                 LP blower-1 poor discharge    28-Aug                                  OFS
EQMS                Contract for EQMS shifting     9-Aug                                OFS/C&I
LDO tank-1          Level transmitter erratic      25-Oct                 105189667       C&I
                    (EEMG: 2.87m/ ows: 18m/ local
                    gauge not working)
SAC-4               Alarm to be provided in CCR           21-Oct                          C&I
Raw water pump -2   Raw water pump -2 & 3 VFD             29-Dec                          EMD
                    not working
ESP PASS         ESP PASS EJECTORS VALVE          8-Feb                     AHD/C&I
EJECTORS         1B ,1H,2A&2C Inoperative
                 from remote.
                                                             UNIT#3
Equipment        Description                     Noti. Dt.       Noti. No    Deptt.
CRH NRV          CRH NRV STEAM LKG                25-Jul        105696356    TMD
U3 HPH-6B        EXT.NRV PARTLY CLOSD             4-Oct         105834585   TMD/C&I
                 SUSPECTED
SEAL OIL P/P-A   SEAL OIL P/P-A TAKING            11-Jan                    C&I/TMD
                 AUTO-START. NRV
                 PASSING SUSPECTED
SGECW 3A         SGECW 3A PUMP BEARING            8-Jun                       TMD
Mill-B,C,E,F     TEMP
                 MILL- RUNNING  HIGH
                       C VIBRATION                8-Jun                       BMD
                 RUNNING HIGH
TDBFP-3B         TDBFP-3B TURBINE VIB FJB         26-Jun                      TMD
                 & RJB VIBRATION
                 RUNNING HI
                                                             UNIT#4
Equipment        Description                     Noti. Dt.       Noti. No    Deptt.
MILLs            MILL 4C HAG OPEN                 20-Jun        105628837     C&I
                 FEEDBACK NOT COMING
                                                   STAGE#2: COMMON
Equipment        Description                     Noti. Dt.  Noti. No         Deptt.
DMP-2            MB blower-B poor discharge       12-Oct                      OFS
CW M/U-B         Not stopping from OWS            16-Oct                      C&I
Road             Road to be constructed           5-May                      Civil
                 between main road & CT 4B
CT4B             CT4B TRANSFORMER LT              8-Feb                     EMD/C&I
                 BRKR I/O FROM REMOTE
                                                           UNIT#5
Equipment        Description                     Noti. Dt.     Noti. No      Deptt.
U#5 ALL CTT SEGG U#5 ALL CTT SEGG VLV             11-Jun      105611867       C&I
                 LIMIT SWITCH BYP
MOT              MOT COOLER B OIL                 6-Jun         105600618     TMD
                 SEEPAGE FROM TOP
GH Elevation     Oil guns to be made available    25-Jun                    BMD/C&I/
                                                                              OPN
CT FAN 5B        CT FAN 5B AREA WATER            31-May                     PROJECT
                 LOGGING / PERIPHERAL
                 DRAIN CHOKED
FIRE HYDRANT               106289623             24-May       FIRE
LINE                                                          HYDRANT
                                                              LINE LKG
                                                              NEAR MILL
                                                              6E & 6B
GT-5R                       106213398                20-May     GT-5R HV
                                                                WINDING
                                                                TEMP
                                                                RUNNING
                                                                HIGH. (MAX
                                                                88 DEG)
                                                               UNIT#6
Equipment        Description                         Noti. Dt.     Noti. No     Deptt.
FIRE HYDRANT     Fire Hydrant Line Lkg Near           4-Jun       105597390      OFS
                 Feeder-6E
                                                        Stage-3 COMMON
                                                       STATION: COMMON
Equipment        Description                         Noti. Dt.  Noti. No        Deptt.
                 Cooling system for old and           12-Jul                    TMD
                 new Compressors in St-1, MRC
Trgt Dt         Remarks
              Long pending
              Long Pending
Long Pending
Long Pending
                                    TMD/EMD     LONG
                                              PENDING
                                     EMD         U/O
Trgt Dt Remarks
Long pen
Long pen
                                    TMD/EMD
                                              U/O LONG
                                              PENDING
Trgt Dt         Remarks
          Revised Offer awaited
          Material not available
          Long pending
Long Pending
           Committee required
          for proposal initiation
               Long Pend
              Long Pen
Trgt Dt       Remarks
          Over ground to be
           Longdone
                 Pending
Long Pending
            Long Pending
            Long Pending
Long Pending
Trgt Dt        Remarks
              Spare N/A
Trgt Dt       Remarks
            OEM support
              required
             Spare N/A
            Long pending
Long pending
Trgt Dt        Remarks
          Mat to be arranged
Spare N/A
Long pending
Long pending
                               OFS   Isolation
                                     required
                                       EMD
U/O
  Trgt Dt           Remarks
                   Not isolating
Long Pending
               Spare Problem
               PR-100224386
  Trgt Dt            Remarks
Current
 Temp
  30'C