Out Side Plastering And Painting
sl no          description                 nos      Legth/Breadth            Height/width
 1         Columns At Grid- A, C, E         20              2.1                  19.75
 2        Columns At Grid- 1, 4, 10         11              1.7                  19.75
 3             3 Nos Tie Beam               3              120.2                  0.9
 4          1st & 2nd Floor Beam            2              120.2                 1.05
 5             3rd Floor Beam               1              120.2                  0.9
 6         Chajja & Elevated Jamb           98              4.5                   0.6
 7      Bottom Side of Top Slab Chajja      1              124.5                 1.05
 8       Unloading Platform Bottom          1               6.8                   2.5
 9       Unloading Platform Bottom          1              11.8                  0.85
 10           Waste Water Pit               19              2.4                   0.6
 11             Parapet Wall                1               125                   1.2
                                         Total=
  qty      unit
  829.5    m2
 369.325   m2
  324.54   m2
  252.42   m2
  108.18   m2
  264.6
 130.725
    17
  10.03
  27.36
   150
     0
     0
     0
     0
2483.68    m2
Sl No             Item Description                   Nos    L      B/W     D/H
 1          Ground Floor 230kv wall All Side          1    115.6    4.45
 2             Ground Floor 230kv Ceiling             1    39.55   14.75
 3              Ground Floor 132kv wall               1     79.5    4.45
 4            Groumd Floor 132kv Ceiling              1    29.75     10
 5      Beam Sides & Bottom (Grid-4,5,,6,7,8,9,10)    7    25.75    1.4
 6         Beam Sides & Bottom (Grid-1,2,3)           3    14.75    1.4
 7          Beam Sides & Bottom (Grid-A,C)            2    42.75    1.4
 8           Beam Sides & Bottom (Grid-B)             1    42.75    1.2
 9           Beam Sides & Bottom (Grid-D)             1    29.75    1.2
 10          Beam Sides & Bottom (Grid-E)             1    29.75    1.4
 11                     Lift Core                     1     10.5   23.15
 12                        Stair                      1    22.54   22.35
 13             Stair Waist Slab Bottom              10    4.275   1.458
 14                      Landing                      5      4.5   3.285
 11            Control room All Side Wall             1    115.6    4.8
 12                  Control Ceiling                  1    39.55   14.75
 13              Beam Side (Grid-A,B,C)               3    39.55    1.2
 14              Beam Side (Grid-1-10)               10    14.75    1.5
                               Plaster And Painting=
                                        Painting=
 Qty       Unit       Remarks
  514.42   Sqm    Plaster and Painting
583.3625   Sqm    Plaster and Painting
 353.775   Sqm    Plaster and Painting
   297.5   Sqm    Plaster and Painting
  252.35   Sqm    Plaster and Painting
   61.95   Sqm    Plaster and Painting
   119.7   Sqm    Plaster and Painting
   51.3    Sqm    Plaster and Painting
   35.7    Sqm    Plaster and Painting
   41.65   Sqm    Plaster and Painting
 243.075   Sqm    Plaster and Painting
 503.769   Sqm    Plaster and Painting
 62.3295   Sqm    Plaster and Painting
 73.9125   Sqm    Plaster and Painting
  554.88   Sqm          Painting
583.3625   Sqm          Painting
  142.38   Sqm          Painting
  221.25   Sqm          Painting
3194.8     Sqm
1501.873   Sqm
4696.666