0% found this document useful (0 votes)
98 views4 pages

Painting Calculation

This document contains a bill of quantities for plastering and painting work. It lists 14 items with descriptions of walls, ceilings, beams, and other building elements. The quantities range from 10.03 square meters to 583.3625 square meters. The total area for plastering is 4696.666 square meters.

Uploaded by

Amir ctg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views4 pages

Painting Calculation

This document contains a bill of quantities for plastering and painting work. It lists 14 items with descriptions of walls, ceilings, beams, and other building elements. The quantities range from 10.03 square meters to 583.3625 square meters. The total area for plastering is 4696.666 square meters.

Uploaded by

Amir ctg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Out Side Plastering And Painting

sl no description nos Legth/Breadth Height/width


1 Columns At Grid- A, C, E 20 2.1 19.75
2 Columns At Grid- 1, 4, 10 11 1.7 19.75
3 3 Nos Tie Beam 3 120.2 0.9
4 1st & 2nd Floor Beam 2 120.2 1.05
5 3rd Floor Beam 1 120.2 0.9
6 Chajja & Elevated Jamb 98 4.5 0.6
7 Bottom Side of Top Slab Chajja 1 124.5 1.05
8 Unloading Platform Bottom 1 6.8 2.5
9 Unloading Platform Bottom 1 11.8 0.85
10 Waste Water Pit 19 2.4 0.6
11 Parapet Wall 1 125 1.2

Total=
qty unit
829.5 m2
369.325 m2
324.54 m2
252.42 m2
108.18 m2
264.6
130.725
17
10.03
27.36
150
0
0
0
0
2483.68 m2
Sl No Item Description Nos L B/W D/H
1 Ground Floor 230kv wall All Side 1 115.6 4.45
2 Ground Floor 230kv Ceiling 1 39.55 14.75
3 Ground Floor 132kv wall 1 79.5 4.45
4 Groumd Floor 132kv Ceiling 1 29.75 10
5 Beam Sides & Bottom (Grid-4,5,,6,7,8,9,10) 7 25.75 1.4
6 Beam Sides & Bottom (Grid-1,2,3) 3 14.75 1.4
7 Beam Sides & Bottom (Grid-A,C) 2 42.75 1.4
8 Beam Sides & Bottom (Grid-B) 1 42.75 1.2
9 Beam Sides & Bottom (Grid-D) 1 29.75 1.2
10 Beam Sides & Bottom (Grid-E) 1 29.75 1.4
11 Lift Core 1 10.5 23.15
12 Stair 1 22.54 22.35
13 Stair Waist Slab Bottom 10 4.275 1.458
14 Landing 5 4.5 3.285
11 Control room All Side Wall 1 115.6 4.8
12 Control Ceiling 1 39.55 14.75
13 Beam Side (Grid-A,B,C) 3 39.55 1.2
14 Beam Side (Grid-1-10) 10 14.75 1.5

Plaster And Painting=


Painting=
Qty Unit Remarks
514.42 Sqm Plaster and Painting
583.3625 Sqm Plaster and Painting
353.775 Sqm Plaster and Painting
297.5 Sqm Plaster and Painting
252.35 Sqm Plaster and Painting
61.95 Sqm Plaster and Painting
119.7 Sqm Plaster and Painting
51.3 Sqm Plaster and Painting
35.7 Sqm Plaster and Painting
41.65 Sqm Plaster and Painting
243.075 Sqm Plaster and Painting
503.769 Sqm Plaster and Painting
62.3295 Sqm Plaster and Painting
73.9125 Sqm Plaster and Painting
554.88 Sqm Painting
583.3625 Sqm Painting
142.38 Sqm Painting
221.25 Sqm Painting

3194.8 Sqm
1501.873 Sqm

4696.666