ALIGNMENT PLAN
PORTBLAIR BARATANG
APPROACH ROAD WITH RIGID PAVEMENT (Length= 580.0m) LENGTH OF VIADUCT (Length= 960.000m) APPROACH ROAD WITH RIGID PAVEMENT (Length= 423.0 m)
PORTBLAIR PSC BOX GIRDER
PSC BOX GIRDER PSC BOX GIRDER BARATANG
AND SLAB PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER
AND SLAB AND SLAB PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER
AND SLAB AND SLAB AND SLAB AND SLAB AND SLAB AND SLAB AND SLAB AND SLAB AND SLAB PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER PSC BOX GIRDER
AND SLAB AND SLAB AND SLAB AND SLAB
A1 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 A2
DWG TITLE :-
PROJECT :-
DRAWING No :
SCALE :- CEC PROJECTS PVT.LTD
IN JV WITH CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR REHABILITATION AND UPGRADING TO 2 LANE/2 LANE WITH DATE : MARCH 2014 Revision: R0
1 : 1500 Chaitanya Projects Consultancy Pvt. Ltd.
C-5, IInd Floor, R.K.Tower, Sector-4
PAVED SHOULDERS CONFIGURATION AND STRENGTHENING OF PORTBLAIR - MAYABUNDER - DIGLIPUR SECTION DRAWN BY DESIGNED BY CHECKED BY
Vaishali, Ghaziabad, U.P.
(KM 0.00 TO KM 61, KM 104 TO KM 142 & KM 333) OF NH-223 IN THE UNION TERRITORY OF ANDAMAN & NICOBAR ISLANDS (PACKAGE NO. SP/B/1) P.K.SHUKLA N.K.SINHA S.K.SINHA
NOTE: Figures of FRL, OGL and Chainage may be referred from GAD, These figures are tentative.
FRL Line
EGL Line
60,57
R5 R4 R3 R2
Chainage 106+590 106+653 106+713 106+773 106+833 106+893 106+953
FRL 27.346 27.368 27.405 27.431 27.458 27.484 27.51
23,94
R1 A1 P1
P2
PC1
PC2 PC3
107+013 107+073 107+133 107+193 107+253 107+313 107+373 107+433
11 27.542 27.574 27.606 27.798 27.865 27.865 27.865 27.865
P7 P8 P9 P10 P11
P6
PC5
PC4
107+493 107+553 107+613 107+673 107+733 107+793 107+853 107+913
27.865 27.865 27.835 27.537 26.923 25.999 24.989 23.980
FRL Line
EGL Line
15,99
J1 J2 J3
P13 A2
P12
107+973 108+033 108+093 108+153 108+213 108+273 108+368 108+553
22.959 21.881 20.739 20.214 19.688 19.163 18.287 16.973
Pier Support
S-1(FX)
S-2(FX)
S-3(FX)
S-4(FX)
S-5(FX)
S-6(FX)
S-7(FX)
S-8(FX)
S-9(FX)
S-10(FX)
S-11
SINGLE-SPAN
S-10(FR)
Mirror-Image
S-9(FR)
S-8(FR)
S-7(FR)
S-6(FR)
S-5(FR)
S-4(FR)
S-3(FR)
S-2(FR)
S-1(FR)
Pier Support
9 BEAR N
0 Ex CAR 2 0 ( ARCS
625 HOLE (
DRONAL SECON
BEABNO/DAPAAC SPAN
500
F0OPAT
57 68 68)
FOOEAT
RCC DECK LVL PLAN TOP OF DECK
82) sa) $11 14 S5
L13221 SOFFT LVLPLAN
(sCALK
NA ASUL
ATT TA s OS
sTAMA
-
NOTES
osuPAS.cTuaI
cONSTRUCTION SPECcFCATIONS
12oct
L 200
oSPIstRCTukt
CAT
5K0
TAS)
200
vES
SECTION AAT
sECTON
CAT
AT
DETAL AT 3
ANNrar nne mwi u AVw
M 104 vo PO KM 1NOF MI 21N 1 UNIO Tno
S
) D USI100n sMD 190N Ow JO NOLnMLNG CCoG
w
NL
.IV V20
C
OGGE
I V NOuoa9
0
-
Aww.vev: CeCC
S3LON
oPENG
OUTWARD
ORUSiON
E WATAA
LE 140)
SECTIoNAL ELEVATON
EAE 4 0 )
YP t(TYP) SPTSRUCtURE
2007 S S
s00 P ALDMEONS
12 (pPJ
95
REFERENCE DRAWNGS
O SOt
193
81 O (sPAN SOD t
0PEN NG
ouTWARD SHOWAG Dv
PROTRUSION SURFAL SCALE T0)
E)
AST-
cOSNECYON
SEC1ON AT C-C
170
DETAILA SECTION AT DETAL DETAIL AT A
ECTIONAT DO
ANA OSD2a
N
4ANDS
Ta O R N
195
1
95
193
ROROD OTRUBION
187
00 4000-
WATAA
SECTIONAL ELEVATION
NOTES
20 AC 2
FERENCE DRAWINOS
O 186
AL
SECTON AT E E
DETAIL AT 1
EWATB-B
$3) ARD
DETAIL AT DETAL
L40 1500
14e00
SECTION AT CC
sCA
$1) WARD
pROTRUSKON
AAG
NA iy TANTAUTIIN IMiNIU M
aATRTUR ww.M
o MAO aDGt oVR MooLL ITAT CREETWEIN
E , M RAWI ND Tw
OUTWARDD
PHOTMUDKN POTUIO
T.
CAE
14839 MCTOBLVATO
OTES
REFERENCe pa
AT44
DETALA
000 SCAL
EA
84eccvo
www
DETA D oETAAAT
CAE
sECTION AT CG
$2 PBOTRUSHON
cosTHUCToN o MAO AaD4 OVIR MOeI A cS I
S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24