‘URd BRP) GOVERNMENT OF INDIA
‘Ya HATE) MINISTRY OF RAILWAYS
Yard ats) (RAILWAY BOARD)
No.2020/Tele/RCIL/1 Pt-lll (3326976) New Delhi, dated: 1¢ .09.2022
General Managers,
All Zonal Railways,
Production Units & CTls.
‘Telecom Circular No.09/2022
Sub: Fixation of rental charges for VC facility and Payments thereof to RailTel.
Sanction of Ministry of Railways is hereby communicated for fixation of monthly rental
charges for Video conference facility and payment to RCIL with following conditions:
4. The rental charges for VC facility has been finalized @Rs.18,000/- per month
(excluding DoT share @8% and Railway share @7% & GST) for offices and
Rs.14,000/- per month (excluding DoT share @8% and Railway share @7% & GST)
for Residential Camp Office. One time Installation charges is Rs.30,000/- per location.
Calculation Sheets of Annual charges are enclosed as Annexure-| & II respectively.
2. Payment for all VC units as per Annexure-Ill & IV to RCIL upto 31.03.2022 will be
made by Railway Board. From 01.04.2022, respective units may make payments to
RCIL directly for the video conferencing services being availed.
3. The payment shall be made quarterly basis to RCIL after availing services.
4, The present sanction is valid for Video Conferencing Services from RCIL upto
31.03.2023.
5. Other Terms & Conditions are attached as Annexure-V.
This issues with the concurrence of Finance Directorate and approval of Board
(Member!infra)..
Kindly acknowledge receipt. fice
(ws Re)
Preae) QTE
No.2020/Tele/RCIL/1 Pt-lll (3326976) New Delhi, dated: 19.09.2022
Copy to:
1. The Principal Financial Adviser, all Zonal Railways/PUs.
2. The Deputy Comptroller & Auditor General of India (Railways), Room No, 224, Rail
Bhavan, New Delhi.
me
For Member (Finance)/Rail Board
Copy to:
1. F(X)-I and Budget Branches, Railway Board.
2. Chief Signal & Telecom Engineers, Alt Indian Railways Production Units & CTIs.
3. Chairman & Managing Director, RailTel Corporation of India Ltd(RCIL), Plate-A,
6th Floor, Office Tower-2, East Kidwai Nagar, New Delhi-110023.Annexure-|
[Calculation Sheet for Provision of Video Conferencing facility at the Official
Chambers.
(Amount in Rupees)
[Sn]Description INO JUnit [Rental Charges
[End Point [charges for One Location
7 |Sakshat 600 service Package per month) Oi] 18,000) 2,16,000.01
(includes camera,codec,mic,24x7_ helpdes!
support, multipoint bridging/MCU for the no of
lsubscribed locations)
2 [Railway share @ 7% aii 17,789.00
[3 [DOT share @ 8% O71 20,329.01
| |One Time Installation Charges 01] 30,001 30,000.01
\5_[Total charges for 1" year (excluding GST) 2,84,118.00)
|Charges for 2™ year
[6 [Subscription charges Oi] 18,00 216,000.01
I7_ [Railway Share@7% 04 17,789.00]
Ig [DOT share@8% oF 20,329.00
9 | Total Charges for 2” year onwards 2,54,118.00|
(excluding GST)
Annexure.
[Calculation Sheet for Provision of Video Conferencing facility at the Residential
\Camp office.
(Amount in Rupees)
[Sn]Description INoofUnit [Rental Charges
IEnd Point [charges for One Location
Ht Sakshat 600 service Package per month] Oi 14,000) 7,68,00
(includes camera,codec,mic,24X7 helpdesk]
lsupport, multipoint bridging/MCU for the no of
Isubscribed locations)
[2 [Railway share @ 7% a7 73,835]
[3 [DOT share @ 6% 7 75,812]
la |One Time installation 01] 30,000] 30,00
5 [Total charges for 1™ year (excluding GST) 2,27, 647|
Charges for 2 year
[6 [Subsoription charges oi] 14,00 768,000)
[7 [Railway Share@7% u 73,83
Ig [DOT share@8% o7 15,812]
9 | Total Charges for 2 year onwards 1,97,647|
{excluding GST)
2 OWAnnexure-Il
Current Position of Video Conference equipment provided in General
Managers/DRMs/Production Units/CTIs locations are as under:~
[S.No.
Location
[Railways
a.
|General Manager's Official
Chamber
‘OR, SER, SECR, SWR, WR,
/OR, CR, ECoR, NCR, Kolkata|
Metro, ECR, NER, NFR(const.),
ISR (Total 14 Locations)
[DRMs Official Chamber
IDRM of Central Railway (5
locations), North Eastern
IRailway (3 locations), Southern
Railway (6 locations), South
\Central Railway (6 locations),
lSouth Eastern Railway (4
locations), Western Railway (6
locations) , East Central
[Railway (5 locations), East
ICoast Railway (3 locations) ,
INorth Central Railway (3
locations), South Eastern
ICentral Railway (3 locations),
lSouth Western Railway (3
locations), West Central
[Railway (3 locations) (Total 50
locations)
[Official chamber of Head of
IProduction Unit
IRDSO/Lko, RCF/Kapurthala,
IMCFiRaebereli, DMW/Patiala,
IBLW/Varanasi, RWFiBangalore,
ICF/Chennai,
|CLWiChittaranjan, C-TARA/
|Secunderabad Core(Allahabad)
land NAIR Vadodara (11
lLocations)
[Cis
IRISET, IRIEEN, IRICEN,
IRITM, JRRPFILko. (6
ns)
WAnnexure-IV
Current Position of Video Conference equipment provided in Office and Residential
Camp Offices at Railway Board Level:-
[SN [Location [Office Parliament Residential CampTotal
[Designation IHouse office _ office
[MR 1 1 7 3
2. IMOSRD 1 = 1 2
[3._ IMOSRJ 1 = 1 2
i4._ [CRB 1 = 1 Zi
5. [Member (T&RS) 1 - T (released from 2
member location &|
installed on
26.03.2020
\é__[Member (Infra) 7 : 1 2
[7 Member (0&BD) 1 = 1 2
\g._[Member (Finance) 4 = 1 2
ig. |PED/Gati Shakti 1 = = 1
[Conference Hall 1 = = 1
Room No.267)
0. [Committee Room 1 = - 7
Room No.237)
Hit. [Board Room! 7 = = 7
(Vimarsh-2)
H2. [Lunch Room| 1 - 7
Released —_ from
Imember location/DM|
IRoom)
13. Meeting Room (S| 1 = ~ 7
IFloor)
4. Vimarsh ___Room| 1 1
|(Room No.337)
(Total 15 1 8 24Other Terms & Conditions
Scope of Work
7. | Provision of Video Conference facility at Official Chamber & Residential Camp
Office at Zonal/Divisional/Pus/CTIs/Railway Level. i
Mis RailTel Corporation of India Ltd. will provide Video Conference facility at
Official Chamber & Residential Camp Office at Zonal/Divisional/Pus/CTIs/Railway
Level as per terms & conditions.
3. |The term Hiring shall include supply, installation, testing, preventive, corrective
maintenance & replacement of equipment’s and media i.e. total Video
Conferencing System. During the contract M/s RailTel Corporation of India Ltd.
shall be responsible for inspection and servicing of equipment regularly as
| required for 100% availability of the inspection on 24 x 7 basis. .
@. | Video end point units and other equipment’s such as router, codec, camera,
| microphones etc. should be provided and installed by M/s RailTel Corporation of
India Ltd. Video Conferencing will be provided with extended facility of
Documents/ Presentation sharing. It should be provided by M/s RailTel
Corporation of India Ltd. within the same cost. The same will be returned to M/s
_RailTel Corporation of India Ltd. on expiry of the same contract.
5. | The service shall be available on 24 x 7 basis. Any schedule shutdown for system
maintenance/up gradation will be done by M/s RailTel Corporation of India Ltd.
within 48hrs advance intimation to Reilways. Any maintenance work without
| advance intimation to Ralways will be treated as feillure and penalty will be
charged accordingly. Penalty will be deducted from the bills
Complaints shall be reported to M/s RailTel Corporation of India Ltd. over
telephone or e-mail. M/s RailTel Corporation of India Ltd should provide the
names, telephone numbers, e-mail IDs of the engineer responsible for maintaining
this system and he or they shall receive the call between any times of 24 hrs on all
days. List of officials of M/s RailTel Corporation of India Ltd. with level of
escalation will be as follows for complaint lodging. Every complaint will be
registered under a docket no. by M/s RCIL which will be communicated to
| | Railways.
Escalation Matrix
[ Northern Region/RCIL am
‘SN | Name of | Designation | Escalation] Office | Mobile No. | Email ID
‘Authority/R | of RCIL level | Address
| ciL official | _ Official
1 | HelpDesk [TPaaSNOC | Tier? | RCIL, ‘8000893279, | helpdesktpass
| | Northern | 9394968777, | @railtelindia.co |
as Region, 6" | 9100888910 | m
2 | Sh. Mohit | AGM/NOC | Tier-2 Floor, 3" | 9717644149 | mohitgupta@ra
Gupta Beyond 2 | Block, iitelindia.com
“hours __| Delhi
| [3 [sn JGM/NOC | Tier-3 Technology | 9717644204 | dharmendrak@ |
| | oharmendr Beyond 4 | Park, railtelindia.com |
|__| akumar hours _| Shastri
@ [Sh Rakesh | TM/Deihi | Tier-4 | Park, Delhi | 7815944855 | rakesh@railteli
| | | Ranjan Beyond @| nidia.com,
a hours
5 | Smt ED/NR Tier-4 8178305600 | vijaylaxmi@rail
| Vijaylaxmi Beyond 8 | | telingia.com
BeL_[kaushik hours ]
If the full Video Conferencing System fails and Video Conferencing is not possible |
from Railway Board to any end points, then the system should be made right
within 2 hours. For delayed restoration of every hour or part thereof beyond 2
hours will have two times (double) weightage for calculation of full system down
time.
In any individual end point failure at Delhi, Mumbai, Kolkata, Chennai &
Secunderabad, it shall be made right within 4 hours and for end points at other
locations, it shall be made right within 12 hours. For delayed restoration of every
hour or part then beyond 4 hours /12 hrs. (as the case may be) will have two times
(double) weightage for calculation of end points down time.
7] Mis RailTel Corporation of India Ltd. personnel will follow all security procedure
as prescribes by Railways for entry of the personnel and bringing in or taking out
of the materials spares conceming for the maintenance and repairing works of
the system provided by them
%. | Payment shall be quarterly in favour of “RailTel Corporation of india Ltd.”
Complete amount of one time commissioning charges (item no. 2) will be paid in
first quarter while payment for item no. 1 will be made quarterly. The bill will be
paid only after finalisation of penalty and deduction of the same from bill.
The equipment’s installed in Railway premises for the Video Conferencing
System cannot be released at any stage without prior approval. However on
mutual consent, service may be terminated with financial adjustment of payment
and service rendered for the Intermediate period.
Monthly rental cost of Rs.18,000/- (excluding DoT share @8% and Railway share @7%
& GST) for office location and Rs.14,000/- (excluding DoT share @8% and Railway
share @7% & GST) for residential camp office location. Z ce
70] Payment to Mis RailTel Corporation of India Ltd shail be based on the service
availability. Therefore, payment of hiring charges shall be regulated as under :-
ol
‘SN | UptimelAvallability of | Payment rate of Hiring charges (in %age)
|__| (in %age) a
1_| 99.5% to 100% 700%
2 | 99%<99.5% | - 99.5%
[3] 98% < 99% - 98% ce
| [4 Below 98% Reduction of each 1 % of availability will
|_reduce payment by 2 %.
Downtime to be calculated separately for each end point and not on total since
each end points are billed separately. |
If any failure rectified within 15 minutes, the downtime will not be considered for
calculation of Uptime/Availability.
Calculation of Uptime/Availability in % age ~
4. Total Number of end points= 'N’.
2. Hours in a month: number of days in that month x 24 hours.
3. Total ‘end point’ hour= H x N.
| 4. Total ‘end point’-time failed= 5 ET (e1 end point failed for t1 hrs, e2 end point
failed for 2 hrs, €3 end point failed for t3 hrs... So J ET=ettt +e2t2
+2313+..... )
So Uptime/Availability =HxN- 5 ET x 100%
HxN
71) No downtime will be recorded for circuits due to disruption of AC power supply, |
UPS, Display units and failure in last mile connectivity due to Railway works.42
Any further amendment that may be imposed time to time by the Government
during the contractual period of the contract and such amendments will be
applicable for recovery from the bill of M/s RailTel Corporation of India Lt.
13
14
15
Termination shall be made and penalty shall be imposed as per GCC-2017 as
amended up to date. : |
All disputes, differences and whatsoever shall arise between the parties hereto
during the continuance of the contract afterwards touching any clause or manner
herein contained or the rights duties and liabilities of either party in connection |
their will shall be referred to arbitration to be appointed by AM/Telecom Railway |
Board. All such arbitration proceedings shall be held at nominated place and shall
be in accordance with an subject to the provision of the Arbitration and |
Conciliation Act, 1996 or any statutory modification free enactments thereof for the
time being in force, so far as there are not repugnant to the provisions of G.C.C.-
2017,
All Notices, request, consent statement or other communication given or required
to be given on behalf of the party herein shall be in writing and shall be issued by
or delivered to by hand or mailing the same by Registered Post with A/D in the
case of Secretary (Telecom) Railway Board or M/s RailTel Corporation of India
Ltd. by or to :=
16
Railways Mis RaifTel Corporation of India|
| Ltd.
Secretary (Telecom) Room No. 124 | Executive Director, Northern Region,
Rail Bhawan, Ministry of Railway | M/s RailTel Corporation of India Ltd.,
Railway Board, New Delhi-110001 | 6th Floor, Block-IIl, Delhi IT Park, | |
Shastri Park, Delhi-110053 |
(17
| status or ordinance, order, action or regulations of the Government, local or other
FORCE MAJEURE: Neither Railways nor M/s RailTel Corporation of India Ltd,
shall bé liable to the other for delay in execution of failure of their respective
obligations under this contract caused by occurrence of events beyond the control
of Railways or M/s RailTel Corporation of India Ltd as the cause may be including
but limited to fire, explosion, flood, power shortage, acts of God, hostility, acts of
public enemy, wars, insurrections, riots, strikes, lockouts, sabotage, any law,
public authorities. Either party shall promptly but not later than fifteen days of the
commencement of occurrence of force majeure conditions, notify the other in
writing of such contingency of occurrence of force majeure conditions, notify the
other in writing of such contingency and prove that that such contingency is
beyond the control and effect the implementation of this contract adversely and
materially. Notice of cessation of force majeure condition will be given the party
immediately but not later than fifteen days. If such contingency continues beyond |
ninety days, both parties agree to discuss and agree upon an equitable solution |
for termination of this contract or otherwise decide the course of action to be
adopted. The respective obligations of parties shall be extended for the force
majeure provided notices required above are given in time and the contingency
Vv
established, if so, required by the other party.