Change Order Request List: PJ Code Project

Uploaded by

gialongmd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views6 pages

Change Order Request List: PJ Code Project

Uploaded by

gialongmd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Check

Design manager
CHANGE ORDER REQUEST LIST

PJ code Project Made by Vu Dinh Phien


Phuc Son Technology Phase 2
20-12-22 Date 2-Mar-2023
Title: PARKING - POST TENSIONED SLAB

From 3 FCV

Change Order
Item No. Description Requested by Date
1 S 01 COR 1 "Change due to architectural requirement" By architectural department 2-Mar-2023
2 S 02 COR 2 "Change due to architectural requirement" By architectural department 13-Mar-2023

Note Check Check


Super Viser (FCV) Site

date date

Page 1 COR list_Parking PST slab


Check
Design manager
Cover sheet for revised drawings No. S 02

PJ code Project Made by Vu Dinh Phien


Phuc Son Technology Phase 2
20-12-22 Date 16-Feb-2023
Title:

From 3 FCV Reason of Change order


Change due to architechtural requirment

Change Order
Item No. Description Reference drawing Original
(Before the change)
2 Change due to architechtural requirment 14-S-PT-03_R2 14-S-PT-03_R1
14-S-PT-03_R2 14-S-PT-03A_R1
14-S-PT-04_R2 14-S-PT-04_R1
14-S-PT-04_R2 14-S-PT-04A_R1
14-S-PT-05_R2 14-S-PT-05_R1
14-S-PT-05_R2 14-S-PT-05A_R1

Note Check Check


Super Viser (FCV) Site

date date
Fujita Corporation
Vietnam

R19 - 01, 19th Floor, Gelex Tower,


52 Le Dai Hanh Street, Hanoi

Project

Phuc Son II PJ

< STRUCTURE > DRAWING LIST Project No.

NUMBER TITLE ITEM ISSUE DATE REVISION NOTE


th
1 14-S-PT-01 GENERAL FOR PT SLAB (1) PARKING 25 / Aug / 2022 Rev.0
th
2 14-S-PT-02 GENERAL FOR PT SLAB (2) PARKING 25 / Aug / 2022 Rev.0 Manager
th of Implementation Unit
3 14-S-PT-03 2,3,4FL STRUCTURE PLAN PARKING 13 / Mar / 2023 Rev.2
th
4 14-S-PT-04 2,3,4FL TENDON PLAN PARKING 13 / Mar / 2023 Rev.2 Aoki Masashi
th
5 14-S-PT-05 2,3,4FL RE-BAR PLAN PARKING 13 / Mar / 2023 Rev.2
Person in charge of design

2 Drawing
Seto Yohei

Vu Dinh Phien

Note

【 OR CONSTRUCTION】

Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale

Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title

Số hiệu
Drawing No
Xb1 Xb2 Xb3

Fujita Corporation
Vietnam

Yb11 Yb11
R19 - 01, 19th Floor, Gelex Tower,
52 Le Dai Hanh Street, Hanoi

Project
1

2023.03.02-Change due to architechtural requirment 1


Phuc Son II PJ
Project No.
Yb10 Yb10

Manager
of Implementation Unit
Yb9 Yb9

Aoki Masashi
b b
Person in charge of design

Yb8 Yb8 Seto Yohei


Drawing

Vu Dinh Phien

Yb7 Yb7

Note
mÆt c¾t b-b
1 2023.03.02-Change due to architechtural requirment
section b-b 2 2023.03.13-Change due to architechtural requirment

Yb6 Yb6

Yb5 Yb5

Yb4 Yb4

Yb3 Yb3

【 OR CONSTRUCTION】
Yb2 Yb2
Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale
Yb1 Yb1
Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title

Xb1 Xb2 Xb3


MB KÕT CÊU tÇng 2,3,4
2,3,4 fl STRUCTURE PLAN
mÆt b»ng kÕt cÊu tÇng 2,3,4
2
2,3,4 fl structure plan Số hiệu
Drawing No
14-S-PT - 03
Xb1 Xb2 Xb3 Xb1 Xb2 Xb3

Fujita Corporation
Vietnam
Yb11 Yb11 Yb11 Yb11

R19 - 01, 19th Floor, Gelex Tower,


1 52 Le Dai Hanh Street, Hanoi

Project

Phuc Son II PJ
Yb10 Yb10 Yb10 Yb10 Project No.

Manager
Yb9 Yb9 Yb9 Yb9 of Implementation Unit

Aoki Masashi

Person in charge of design

Yb8 Yb8 Yb8 Yb8


Seto Yohei
Drawing

Vu Dinh Phien

Yb7 Yb7 Yb7 Yb7

Note
1 2023.03.02-Change due to architechtural requirment
2 2023.03.13-Change due to architechtural requirment

Yb6 Yb6 Yb6 Yb6

Yb5 Yb5 Yb5 Yb5

Yb4 Yb4 Yb4 Yb4

Yb3 Yb3 Yb3 Yb3

【 OR CONSTRUCTION】
Yb2 Yb2 Yb2 Yb2

Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale
Yb1 Yb1 Yb1 Yb1

Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title
Xb1 Xb2 Xb3 Xb1 Xb2 Xb3 mÆt b»ng c¸p tÇng 2,3,4
2,3,4fl tendon plan
mÆt b»ng c¸p ph­¬ng X TÇNG 2,3,4 mÆt b»ng c¸p ph­¬ng y TÇNG 2,3,4
2 2
2,3,4fl X- direction TENDON PLAN 2,3,4fl y- direction TENDON PLAN
Số hiệu
Drawing No
14-S-PT - 04
Xb1 Xb2 Xb3

Fujita Corporation
Vietnam
Yb11 Yb11
R19 - 01, 19th Floor, Gelex Tower,
1 52 Le Dai Hanh Street, Hanoi

Project

Phuc Son II PJ
Yb10 Yb10 Project No.

b b

Manager
Yb9 Yb9 of Implementation Unit

mÆt b»ng thÐp LíP trªn gia c­êng t¹i d¶i ®æ sau
TOP LAYER REBAR AT POUR DELAY STRIP Aoki Masashi
mÆt c¾t b-b
section b-b Person in charge of design

Yb8 Yb8 Seto Yohei


Drawing

1
2023.03.02-Change due to architechtural requirment Vu Dinh Phien

Yb7 Yb7

Note
1 2023.03.02-Change due to architechtural requirment
a 2 2023.03.13-Change due to architechtural requirment
mÆt b»ng thÐp LíP D¦íI gia c­êng t¹i d¶i ®æ sau
BOTTOM LAYER REBAR AT POUR DELAY STRIP

Yb6 Yb6
a

Yb5 Yb5

mÆt c¾t A-A


SECTION A-A

Yb4 Yb4

Yb3 Yb3

【 OR CONSTRUCTION】
Yb2 Yb2

Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale
Yb1 Yb1
Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title
Xb1 Xb2 Xb3 MB thÐp sµn tÇng 2,3,4
2,3,4fl re-bar plan

mÆt b»ng thÐp sµn TÇNG 2,3,4


2,3,4fl re-bar PLAN
2 Số hiệu
Drawing No
14-S-PT - 05