Field Density Test Report: Taungoo Road

The document summarizes field density test results from two test locations according to the ASSHTO T-191 standard. It includes details of moisture content determination, mass measurements of wet soil, sand, cylinders before and after pouring, calculations of bulk density, dry density, and maximum dry density. The test results indicate that the sub-grade layer passed specifications with compaction percentages ranging from 95.02% to 97.77%.

Uploaded by

sohail khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views40 pages

Field Density Test Report: Taungoo Road

The document summarizes field density test results from two test locations according to the ASSHTO T-191 standard. It includes details of moisture content determination, mass measurements of wet soil, sand, cylinders before and after pouring, calculations of bulk density, dry density, and maximum dry density. The test results indicate that the sub-grade layer passed specifications with compaction percentages ranging from 95.02% to 97.77%.

Uploaded by

sohail khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 40

Field Density Test (Sand Replacement Method)

ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. EB-07 ST-02
Weight of wet soil+can g 89.73 87.93
Weight of dry soil+can g 78.65 77.45
Weight of moisture g 11.08 10.48
Weight of can g 19.88 20.11
Weight of dry soil g 58.77 57.34
Moisture Content % 18.85 18.28

Mass of wet soil from hole. kg 3.397 3.394


Mass.of Sand + Cylinder before pouring kg 5.602 5.6
Mass of Sand + Cylinder after pouring kg 2.017 2.015
Mass of sand in cone + Hole kg 3.585 3.585
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.42 2.42
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1927.77 1926.07
Dry density of soil kg/m3 1621.98 1628.44
Max.dry density kg/m3 1707 1707
Compaction % 95.02 95.40
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

DR-01 PY-03
92.31 87.69
80.40 76.35
11.91 11.34
19.24 19.98
61.16 56.37
19.47 20.12

3.389 3.399
5.612 5.608
2.113 2.101
3.499 3.507
1.1603 1.1603
2.34 2.35
1376 1376
0.002 0.002
1993.96 1993.02
1668.95 1659.23
1707 1707
97.77 97.20
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 16+160 16+200
Layer Sub-grade
Moisture content determination
Can No. X-02 W-01
Weight of wet soil+can g 92.54 88.90
Weight of dry soil+can g 80.65 78.90
Weight of moisture g 11.89 10.00
Weight of can g 18.32 21.25
Weight of dry soil g 62.33 57.65
Moisture Content % 19.08 17.35

Mass of wet soil from hole. kg 3.387 3.393


Mass.of Sand + Cylinder before pouring kg 5.622 5.608
Mass of Sand + Cylinder after pouring kg 2.105 2.019
Mass of sand in cone + Hole kg 3.517 3.589
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.36 2.43
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1977.56 1922.33
Dry density of soil kg/m3 1660.75 1638.17
Max.dry density kg/m3 1707 1707
Compaction % 97.29 95.97
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
5-May-19
4-May-19
Red Soil
16+140 - 16+300

3 4
16+240 16+290
Sub-grade

PI-02 JR-03
98.20 80.50
85.42 70.63
12.78 9.87
19.85 21.55
65.57 49.08
19.49 20.11

3.382 3.379
5.619 5.63
2.057 2.121
3.562 3.509
1.1603 1.1603
2.40 2.35
1376 1376
0.002 0.002
1937.64 1979.61
1621.58 1648.16
1707 1707
95.00 96.55
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 16+330 16+370
Layer Sub-grade
Moisture content determination
Can No. YR-04 SR-01
Weight of wet soil+can g 88.59 94.78
Weight of dry soil+can g 78.50 82.45
Weight of moisture g 10.09 12.33
Weight of can g 18.78 21.25
Weight of dry soil g 59.72 61.20
Moisture Content % 16.90 20.15

Mass of wet soil from hole. kg 3.388 3.399


Mass.of Sand + Cylinder before pouring kg 5.615 5.609
Mass of Sand + Cylinder after pouring kg 2.022 2.075
Mass of sand in cone + Hole kg 3.593 3.534
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.43 2.37
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1916.34 1970.35
Dry density of soil kg/m3 1639.36 1639.95
Max.dry density kg/m3 1707 1707
Compaction % 96.04 96.07
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
6-May-19
5-May-19
Red Soil
16+300 - 16+550

3 4
16+420 16+470
Sub-grade

TB-01 JR-02
78.25 90.72
67.97 79.66
10.28 11.06
19.35 19.98
48.62 59.68
21.14 18.53

3.393 3.385
5.621 5.618
2.086 2.056
3.535 3.562
1.1603 1.1603
2.37 2.40
1376 1376
0.002 0.002
1966.05 1939.36
1622.91 1636.15
1707 1707
95.07 95.85
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. CB-07 JR-01
Weight of wet soil+can g 102.35 97.80
Weight of dry soil+can g 89.55 85.65
Weight of moisture g 12.80 12.15
Weight of can g 15.35 18.55
Weight of dry soil g 74.20 67.10
Moisture Content % 17.25 18.11

Mass of wet soil from hole. kg 3.390 3.387


Mass.of Sand + Cylinder before pouring kg 5.620 5.615
Mass of Sand + Cylinder after pouring kg 2.012 2.105
Mass of sand in cone + Hole kg 3.608 3.510
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.45 2.35
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1905.72 1983.45
Dry density of soil kg/m3 1625.34 1679.36
Max.dry density kg/m3 1707 1707
Compaction % 95.22 98.38
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

HR-04 SL-01
82.97 95.55
73.20 84.25
9.77 11.30
21.25 19.98
51.95 64.27
18.81 17.58

3.389 3.385
5.619 5.605
2.063 2.025
3.556 3.580
1.1603 1.1603
2.40 2.42
1376 1376
0.002 0.002
1946.51 1924.93
1638.39 1637.10
1707 1707
95.98 95.90
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. BT-02 HP-01
Weight of wet soil+can g 87.90 105.88
Weight of dry soil+can g 76.00 91.65
Weight of moisture g 11.90 14.23
Weight of can g 16.35 18.55
Weight of dry soil g 59.65 73.10
Moisture Content % 19.95 19.47

Mass of wet soil from hole. kg 3.386 3.390


Mass.of Sand + Cylinder before pouring kg 5.609 5.605
Mass of Sand + Cylinder after pouring kg 2.055 2.102
Mass of sand in cone + Hole kg 3.554 3.503
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.39 2.34
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1946.42 1991.14
Dry density of soil kg/m3 1622.69 1666.69
Max.dry density kg/m3 1707 1707
Compaction % 95.06 97.64
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

DR-01 X-02
79.85 83.90
69.78 72.10
10.07 11.80
19.24 18.32
50.54 53.78
19.92 21.94

3.383 3.393
5.615 5.601
2.087 2.112
3.528 3.489
1.1603 1.1603
2.37 2.33
1376 1376
0.002 0.002
1966.05 2004.88
1639.40 1644.14
1707 1707
96.04 96.32
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. YR-04 DR-01
Weight of wet soil+can g 101.95 99.89
Weight of dry soil+can g 89.00 87.56
Weight of moisture g 12.95 12.33
Weight of can g 18.78 19.24
Weight of dry soil g 70.22 68.32
Moisture Content % 18.44 18.05

Mass of wet soil from hole. kg 3.389 3.387


Mass.of Sand + Cylinder before pouring kg 5.605 5.615
Mass of Sand + Cylinder after pouring kg 2.035 2.022
Mass of sand in cone + Hole kg 3.570 3.593
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.41 2.43
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1935.21 1915.78
Dry density of soil kg/m3 1633.88 1622.89
Max.dry density kg/m3 1707 1707
Compaction % 95.72 95.07
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

PY-03 W-01
87.25 96.85
75.95 84.58
11.30 12.27
19.98 21.25
55.97 63.33
20.19 19.37

3.390 3.385
5.610 5.620
2.115 2.055
3.495 3.565
1.1603 1.1603
2.33 2.40
1376 1376
0.002 0.002
1997.96 1936.94
1662.34 1622.57
1707 1707
97.38 95.05
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. JR-03 CB-07
Weight of wet soil+can g 75.25 89.20
Weight of dry soil+can g 65.90 79.35
Weight of moisture g 9.35 9.85
Weight of can g 18.78 15.35
Weight of dry soil g 47.12 64.00
Moisture Content % 19.84 15.39

Mass of wet soil from hole. kg 3.392 3.390


Mass.of Sand + Cylinder before pouring kg 5.620 5.625
Mass of Sand + Cylinder after pouring kg 2.125 2.010
Mass of sand in cone + Hole kg 3.495 3.615
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.33 2.45
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1999.14 1900.29
Dry density of soil kg/m3 1668.13 1646.83
Max.dry density kg/m3 1707 1707
Compaction % 97.72 96.48
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

HR-04 PI-02
105.45 92.96
92.55 80.77
12.90 12.19
21.25 19.85
71.30 60.92
18.09 20.01

3.387 3.389
5.607 5.610
2.025 2.110
3.582 3.500
1.1603 1.1603
2.42 2.34
1376 1376
0.002 0.002
1924.48 1993.10
1629.64 1660.78
1707 1707
95.47 97.29
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. BT-02 DR-01
Weight of wet soil+can g 86.45 95.85
Weight of dry soil+can g 75.45 83.95
Weight of moisture g 11.00 11.90
Weight of can g 16.35 19.24
Weight of dry soil g 59.10 64.71
Moisture Content % 18.61 18.39

Mass of wet soil from hole. kg 3.387 3.395


Mass.of Sand + Cylinder before pouring kg 5.607 5.620
Mass of Sand + Cylinder after pouring kg 2.035 2.058
Mass of sand in cone + Hole kg 3.572 3.562
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.41 2.40
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1932.46 1945.09
Dry density of soil kg/m3 1629.22 1642.95
Max.dry density kg/m3 1707 1707
Compaction % 95.44 96.25
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

SR-01 EB-07
78.59 103.65
68.45 89.85
10.14 13.80
21.25 19.88
47.20 69.97
21.48 19.72

3.392 3.389
5.617 5.603
2.098 2.107
3.519 3.496
1.1603 1.1603
2.36 2.34
1376 1376
0.002 0.002
1978.80 1996.52
1628.87 1667.62
1707 1707
95.42 97.69
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. CB-07 JR-01
Weight of wet soil+can g 97.80 88.25
Weight of dry soil+can g 83.45 76.95
Weight of moisture g 14.35 11.30
Weight of can g 16.35 15.35
Weight of dry soil g 67.10 61.60
Moisture Content % 21.39 18.34

Mass of wet soil from hole. kg 3.387 3.390


Mass.of Sand + Cylinder before pouring kg 5.615 5.607
Mass of Sand + Cylinder after pouring kg 2.120 2.017
Mass of sand in cone + Hole kg 3.495 3.590
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.33 2.43
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1996.19 1919.84
Dry density of soil kg/m3 1644.50 1622.25
Max.dry density kg/m3 1707 1707
Compaction % 96.34 95.04
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

X-02 CB-07
105.55 85.95
89.55 75.45
16.00 10.50
18.32 15.35
71.23 60.10
22.46 17.47

3.395 3.392
5.620 5.617
2.115 2.050
3.505 3.567
1.1603 1.1603
2.34 2.41
1376 1376
0.002 0.002
1992.37 1939.33
1626.93 1650.91
1707 1707
95.31 96.71
95 95

20.27 %
Mr. San Aye
Project Engineer
Field Density Test (Sand Replacement Method)
ASSHTO T-191

Name of Project: Taungoo - Leik Tho - Yardo Road Lab. Ref. No.:
Client: Ministry of Construction Proc. Ref. No.:
Department of Highway Reporting Date:
Contractor: Myanmar Shwe Tharaphu Co., Ltd. Testing Date:
(Joint Venture) Yaung Ni Oo Co., Ltd. Material Description:
Site Location:

Test No. 1 2
Test Location: Mile / meter 15+930 15+970
Layer Sub-grade
Moisture content determination
Can No. YR-04 W-01
Weight of wet soil+can g 76.35 96.85
Weight of dry soil+can g 67.55 84.45
Weight of moisture g 8.80 12.40
Weight of can g 18.78 21.25
Weight of dry soil g 48.77 63.20
Moisture Content % 18.04 19.62

Mass of wet soil from hole. kg 3.397 3.385


Mass.of Sand + Cylinder before pouring kg 5.625 5.610
Mass of Sand + Cylinder after pouring kg 2.025 2.065
Mass of sand in cone + Hole kg 3.600 3.545
Mass of sand in cone of pouring cylinder kg 1.1603 1.1603
Mass of sand in hole kg 2.44 2.38
Bulk density of sand kg/m3 1376 1376
Volume of hole. m3 0.002 0.002
Bulk density kg/m3 1915.92 1953.18
Dry density of soil kg/m3 1623.06 1632.82
Max.dry density kg/m3 1707 1707
Compaction % 95.08 95.65
Specifications (Sub-grade Layer) % 95 95

Remarks: □ □
Passed Failed
MDD 1707 kg/m3 OMC
Mr. Thet Htwe Cho Mr. Wilson M. Tablit Mr. San Aye
Lab. Tech. (Geologist) Sr. Lab. Tech. (QA/QC) Project Engine
Method)

ST-39
MY - P17 - DOH - 02
4-May-19
3-May-19
Red Soil
15+900 - 16+140

3 4
16+050 16+110
Sub-grade

SR-01 PI-02
108.25 78.85
95.45 67.90
12.80 10.95
21.25 19.85
74.20 48.05
17.25 22.79

3.390 3.387
5.605 5.620
2.035 2.150
3.570 3.470
1.1603 1.1603
2.41 2.31
1376 1376
0.002 0.002
1935.78 2017.80
1650.97 1643.31
1707 1707
96.72 96.27
95 95

20.27 %
Mr. San Aye
Project Engineer

You might also like