VISIT REPORT
ON
“Visit a construction site and write a report on it.”
                     Submitted by
               STUDENT NAME :
           NIKITA SURESH GONNADE
                       Roll no. :
                         157
              III Sem. B.TECH. CIVIL
     DEPARTMENT OF CIVIL ENGINEERING
   K. D. K. COLLEGE OF ENGINEERING,
                NAGPUR
                          1
                          (2023- 24)
                        INDEX
       Topics                          page
1.   Aim & Objectives                    1
2.   Introduction                        2
3.   Enlist Visits                     3 - 17
4.   Conclusion                          19
                              2
AIM:-Visit a construction site and write a report on it.
OBJECTIVE:-
Students is to provide them with practical exposure and hands-on learning by
1 . To get an Understanding how the theoretical knowledge is fitted in practice .
2. To gain experience in building material science.
3. To develop our report writing skills.
5. To study the various construction materials type of structures type of Foundations
   and component of superstructure.
BUILDING SITE:-
The building I choose for for visiting was Residential building I was go there and
observed the building and asked some questions.
Name of building -Residential building.
Location: - plot No 165-166 Vidya Nagar Behind Indira Devi town Near NIT Ground
wathoda 35 Nagpur Maharashtra 440017 Bharat.
Structural Designer: - Sagar Balani
Site Engineer: - Prem Porkute
Date of Visit :- 25/09/2023
Status of work :-Under construction
Reasons for choosing this site
The main reason for choosing this site for observation process and to see the theoretical
knowledge being fitted in practice is that this construction site was Implementing all
that theory we have gone through at this stage eg. Use of bricks , use of different ratios
mortar and cement, use of different aggregates and concrete like pcc, rcc, etc.
Materials of Construction 1.Murum:-
For filling foundation surrounding and plinth filling , hard murum is used.
2.Bricks:
                                            3
For the construction of main and partition walls, second class bricks are used on the
site. When certain field observations are carried on the bricks, it will observed that the
bricks are of low quality and are not satisfying the Indian standard specifications.
3.Fine aggregates(sand):
For making concrete and mortar, artificial sand is used. It should be observed that , the
sand should not be uniformly graded( of uniform particle sizes) and dust content is also
high. Such sand tend to lower strength of concrete. Observation had proved that the
replacement of natural sand up to 38% with artificial sand will not affect the concrete
strength but more use will definitely reduces the strength of concrete.
4.Coarse Aggregates:
Around 70% strength of concrete is mainly due to the course aggregate the aggregate
used at site are having 12mm Size.
5.Cement:
Cement is a important ingredient of concrete. It do not have much strength but will acts
as a binder material for coarse and fine aggregates. Cement used at site is master
premium cement.
6.Steel:-
It is extensively used building material. On site, HYSD (High Yielding Deformed
Steel) bars and mild steel bars are used. Mild steel bars of 6 mm Ø are used as nominal
steel and HYSD with sizes 8 mm, 12 mm, 16mm, 20 mm, 25mm, 32mm are used as
main steel for various members of superstructure.
7.Concrete:
PCC and RCC are used on the site as per requirements and design standards. For
manufacturing of concrete, hand mixing and mechanical mixing (by tilting mixer)
process is adopted. It is observed that while mixing the concrete in the mixer, the
standard procedure is not followed and care should not be taken towards the grading
of concrete.
8.Formwork:
Formwork is a support and act as mould for placing and giving proper sizes to the
various concrete members. It is also act as abase for resting the reinforcement and help
the workers in various building activities.
9.Water:
                                            4
For the construction, potable water must be used. But on the site, it is observed that the
waste water is utilized for various processes which must be avoided.
10.Mortar:
For the construction of brick walls, and for plastering, the Mortar is used on the site
the Mortar will be prepared by hand mixing process from sand and cement.
Equipments Used
Various construction equipments are used on the site for the various
construction activities. Some of these that has been seen on site along with
their uses are as follows:-
1.Iron Pan (or Ghamela): For filling and placing the material at requires
place.
2.Line and Pins: For alignment of various building members.
3.Rammer: For compacting the soil surface and compacting the ground.
4.Travel: For placing, compacting or plastering by mortar in case of brick
masonry construction.
5.Plumb bob: For checking the verticality of various members
6.Spirit level: For checking horizontal level.
7.Kassi or Phawrah: For material filling or mixing.
8.Steel Tape: For vertical and horizontal measurement.
9.Mason’s square: For fixing and checking the building corners.
10.Tilting Mixer: For preparing concrete.
11.Plate Vibrator: For compacting plinth and the ground
12.Niddle Vibrator: For compacting the concrete in vertical and horizontal
members.
                                            5
                                  INTRODUCTION
I visited a residential building that building was Ground floor + 6 storey building
layout, but the work of that building was done till now till 2nd floor And the process
of constructive was going on it was not a house but a flat scheme.
This flat provides a 2 bedroom house and is also luxurious as per the Vastu plan. The
flat provides the convenience of dedicated parking and this is a key position. The
facility of lift is also available here and the environment here is very fresh.
Site distance near by
Petrol pump:- 0.5 km
Bhavans school: -0.5km
D-Mart:-0.5 Km
St. Xavier CBSE school: -0.5 km
KDK college: -0.5 km
Gym:-0.2 km
                                           6
Public garden :-0.1 km
Temple: -0.1 km
Metro station: -1.5 Km
Swaminarayan temple: -1.5 km
Future of that project.
This project will be in high demand in the future And will be very durable as the can
resist the earthquake.
Buildings of the Future will no longer be rigid structures that can’t change: by design,
they will adapt and their spaces will be adaptable without significant building
modifications. This could give rise to a greater degree of modular or off-site
construction. Printed buildings will be the future within 10 years.
The factors which created difficulties in work.
Inadequate risk management.
Lack of structures
Poor communication
Bad Forecasting
Delayed cash flow
Limited skills
A good design was provided In that building and I don’t think any problems will arise
in that building soon.
Some specification of site work:-
Structure :-RCC Frame Structure with earthquake resistance, Brickwork-External
wall 6” thick & Internal wall 4.5” thick & Smooth plain plaster internally & Externally.
Door :-Main Door Bajaj Be Secure & Internal Flush door.
Windows:- Aluminum frame glazed sliding window with MS grills.
Flooring:-Vitrified Tiles in all Rooms & Passage.
Kitchen:-Structure of Kitchen with Granite Top with SS sink Glazed tiles up to 4
Height[Semi-Modular Kitchen Below Otta only) POP:- POP in Hall.
Toilet:-Glazed Tiles on wall up to Lintel level.
                                           7
Electrical:- Concealed Electric fitting 3.5 point in each room, AC Point in M.
Bedroom, Power-Plugin Kitchen & Each Toilet.
Plumbing:-Concealed C, PVC Pipe Work Standard C.P. Fitting of “Jaquar” or
equivalent.
Painting:-Internal Paint Acrylic Emulsion with putting & External ACE paint as per
elevation given.
Lift:- Lift with Generator Backup.
Parking:- Sufficient covered parking for Two & Four Wheelers.
AS it is a three face road site, it has a great connectivity towards services.
They had made floors:
   1) Basement
   2) Lower
   3) Upper
   4) Floors
Reinforcement provided details 25 mm bar as main steel ( for heavy main beams), 16
mm bar as distribution and main steel in other beams. They have used 12mm bars as a
ring Reinforcement. They have used and M 20 grade of concrete of OPC cement SBC
of that land is 230 kilometer per meter square. All ties are binded with steel binding
wire. They have used iron as well as wood scaffolding according to their requirement
in the casting and de shuttering. They have provided chairs in slab at every Required
spacing.
Slab spacing of bars is of 10mm with 150 mm c/c spacing. They have provided
25,40mm of clear cover in all surfaces and beans, columns, slabs at every required
spacing.
NOTE: Additional Charges
Stamp Duty & Registration Fees | M.S.E.B. Meter deposite, Electrical Meter charges,
Transformer deposit, Water Meter & Connection Charges. Deposite & Expenses at
actual to be paid extra in advance. | G.S.T. or any such additional taxes will be charged
extra. Changes in the specification & plan will cost extra. Possession of the flat will be
given by the builder/Develer after clearance of all dues. Any Extra Work shall be
charged separately
Various work and things which we had seen on site:
                                            8
We had seen how the restoration of steel and concrete was done from the demolition
base slum. As they where using the restore or reuse process for steel and concrete by
crushing and moulding them.
They sad they are using the concrete in reuse for pavement in nearby areas.
For segregation of steel using of gas cutter, dumping trucks for debris, collectors for
piece of steel, etc.
Equipments of machine, workers, site explorers, and also some safety engineer’s,
fencing of steel sheets for no traffic approach.
Cost of Demolition
Demolition value was calculated for the work which they have to takeover there way
of work As the cost value for execution was around 2-3cr. And 1 cr around for steel
value.
Use of Advanced Machines
There was using of advanced Machines for demolition like
BIG excavators, with nummatic drills
Crusher
Dump trucks
Water pressure gun
Portable fuel station.
Small excavator for shops.
Backhoe loader
Future of use site:-
As the market is growing in that area and increase of business offices are required.
They had introduced with a luxury commercial complex which is very wider and full
of services.
Factor which affects working.
                                           9
Irregularities of labours as they have some problems toward coming, etc. The power
supply in that area and the covence for the material and it time managing. Weathering
action while concreting, placing and also on shutting. In completion of reinforcement
work to delay in decided way. Delay in payment management and communication.
Advanced machinery is used in the site:
They have used vibrators for Compacting concrete.
They have called concrete from RMC plant.
There workability of concrete is of 40 minutes.
They have used. Pumps for pumping the concrete from one place to another.
For curing their use spray gun for best curing.
For hammering they have used punching machine of nails.
For plastering they have used plastering machine.
For better binding they have used additional Adhesives.
They are using hand loaders for loading of operation work of bars etc.
And all other advanced tools as per there requirements.
PHOTO SITE:
                                           10
11
EXPANSION PROJECT OF RESIDENTIAL BUILDING
Process that involves the expansion, renovation, or construction of a new home or
spaces intended to be occupied for residential purposes. Residential construction can
be a complex process, with a lot of phases and stakeholders involved.
COST OF WORK
As it would be around 3-5 crore for the expansion construction of under pass of Central
railway.
Program outcomes: -
Engineering knowledge: - in site visit I have learn the various engineering aspect,
like reinforcement detailing, engineering plan , types of Foundations, etc.
Modern tool uses:- in site visit various machineries and tools used like dumping truck
, excavator, vibrator, Compacting machine, Concrete mixture machine etc.
Environment and sustainability: -
                                          12
The nearest natural    environment is very good and clean and having developed
sustainability.
Individual and team work :-
It is an individual work for every student to visit the site and collect the information
about it.
Problem Analysis: -
At construction site the main problem is availability of black cotton soil and a
requirement of skilled Labour and traffic conditions.
Future Scope:-The basic future of understanding sites work is to get knowledge and
experiences about how the work ware been executed and calculated using all kinds of
methods and material just me these all structures effective, economical and efficient
towards the user.
Conclusion: -
Form this all I would like to thank I. C. I for giving this opportunity to me that I can
analyse this sites and have a learning of how the work of construction in different
conditions are been carried out with all of it’s risk, safety, cost, benefits, trading and
future demand. From this report I wanted to express that how much difficult and
adventurous is the CIVIL ENGINEERING WORKS. This all teaches us that we should
be very loyal towards ethics of government and INDIAN STANDARDS because this
work is very vast and Peoplised.
                                            13
Thank you