The report summarizes the completion of the construction project of concrete canal lining and terminal facilities of Wenaclean CIS in Sta. Magdalena, Sorsogon. It states that the project undertaken by MJJA Construction with a contract amount of 1,843,849.39 pesos was fully completed as of September 07, 2022 according to NIA's plans, drawings, and specifications. The contractor's claim of 100% completion is being supported. The statement of work accomplished from March 11, 2022 to September 07, 2022 is also attached, detailing the items of work, quantities, costs, and percentages completed.

Uploaded by

Rois Nopre
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views2 pages

02 Wenaclean SWA& Completion

The report summarizes the completion of the construction project of concrete canal lining and terminal facilities of Wenaclean CIS in Sta. Magdalena, Sorsogon. It states that the project undertaken by MJJA Construction with a contract amount of 1,843,849.39 pesos was fully completed as of September 07, 2022 according to NIA's plans, drawings, and specifications. The contractor's claim of 100% completion is being supported. The statement of work accomplished from March 11, 2022 to September 07, 2022 is also attached, detailing the items of work, quantities, costs, and percentages completed.

Uploaded by

Rois Nopre
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

National Irrigation Administration


Sorsogon-Masbate Irrigation Management Office

REPORT OF PROJECT / CONTRACT COMPLETION DATE

This is a report that the Construction of Concrete Canal Lining and Terminal
Facilities of Wenaclean CIS,Sta. Magdalena, Sorsogon under Contract No.
RREIS22-SR-02-22 being undertaken by MJJA Construction with Contract Amount
of. Php 1,843,849.39 has been fully completed as of September 07,2022 in
accordance with NIAs plans, drawing and specifications.

This is being issued to support the contractors’ claim of 100% completion of the
contract, and as reference in the submission of periodic report in the Online
Reporting Services System Management Division, NIA, Central Office and to other
line agencies.

Done this 28th day of September, 2022 at Buhatan, Sorsogon City.

Prepared by:

JONATHAN G. CASILAO
Project In-Charge

Recommending Approval:

SHERWIN ROIS R. NOPRE


Acting Head- EOS

Approved:

EMERLITA L. JERUSALEM
Acting IMO Manager

NIA-SMIMO-ENG’G SECTION
Buhatan,Sorsogon City,Sorsogon, Philippines
Cellphone No..: 09475209589
Email Address: r5.sorsogonmasbate-imo@nia.gov.ph
TIN: 000916415097 000

Master Doc ID: _______


PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
SORSOGON-MASBATE IRRIGATION MANAGEMENT OFFICE
BUHATAN, SORSOGON CITY

STATEMENT OF WORK ACCOMPLISHED (SWA)


From March 11,2022 to September 07,2022

Construction of Concrete Canal Lining and Terminal Facilities of


NAME OF PROJECT: Wenaclean CIS Date of Effectivity March 11, 2022
LOCATION: Sta. Magdalena, Sorsogon Original Contract Duration 180 CD
FUND SOURCE: RRECIS CY2022 Original Contract Expiry Date September 07,2022
NAME OF CONTRACTOR: MJJA Construction Revised Contract Expiry Date N/A
DATE OF COMPLETION: September 07, 2022 Contract Amount P 1,843,849.39
Revised Contract Amount None

STATEMENT OF WORK ACCOMPLISHED (SWA)


WORK ACCOMPLISHED WEIGHTED % ACCOMP.
CONTRACT PREVIOUS THIS PERIOD TO DATE % ACCOMP.
ITEMS OF WORK UNIT PROG. QTY. UNIT COST % WT. THIS TO
AMOUNT (March 11 to June 30, 2022) (July 01, 2022 - Sept. 07,2022) (March 11- Sept.07,2022) PREV Per Item
QTY AMOUNT QTY AMOUNT QTY AMOUNT PERIOD DATE
WENACLEAN CIS
CIVIL WORKS
I. CANALIZATION WORKS
1. Class B Concrete cu.m. 108.37 10,232.35 1,108,879.77 60.14% 62.37 638,191.67 46.00 470,688.10 108.37 1,108,879.77 34.61% 25.53% 60.14% 100.00%
2. RSB kg. 4,875.79 101.81 496,404.18 26.92% 2,769.32 281,944.47 2,106.47 214,459.71 4,875.79 496,404.18 15.29% 11.63% 26.92% 100.00%
3. Gravel Blanket cu.m. 34.24 2,134.49 73,084.94 3.96% 20.12 42,945.94 14.12 30,139.00 34.24 73,084.94 2.33% 1.63% 3.96% 100.00%
4. Common Excavation cu.m. 31.23 100.37 3,134.55 0.17% 15.65 1,570.79 15.58 1,563.76 31.23 3,134.55 0.08% 0.09% 0.17% 100.00%
5. Compacted Fill cu.m. 24.41 1,658.26 40,478.13 2.20% - - 24.41 40,478.13 24.41 40,478.13 0.00% 2.20% 2.20% 100.00%
II. TERMINAL FACILITIES - - -
1. Class B Concrete cu.m. 0.65 13,728.39 8,923.45 0.48% 0.65 8,923.45 - - 0.65 8,923.45 0.48% 0.00% 0.48% 100.00%
2. RSB kg. 37.84 106.05 4,012.93 0.22% 37.84 4,012.93 - - 37.84 4,012.93 0.22% 0.00% 0.22% 100.00%
3. Common Excavation cu.m. 0.93 1,685.31 1,567.34 0.09% 0.93 1,567.34 - - 0.93 1,567.34 0.09% 0.00% 0.09% 100.00%
4. Common Backfill cu.m. 0.36 2,247.41 809.07 0.04% - - 0.36 809.07 0.36 809.07 0.00% 0.04% 0.04% 100.00%
II. Construction Safety & Health Program unit 1.00 96,079.28 96,079.28 5.21% 1.00 96,079.28 - - 1.00 96,079.28 5.21% 0.00% 5.21% 100.00%
III. Project Billboard unit 1.00 10,475.75 10,475.75 0.57% 1.00 10,475.75 - - 1.00 10,475.75 0.57% 0.00% 0.57% 100.00%

GRAND TOTAL 1,843,849.39 100.00% 1,085,711.62 758,137.77 1,843,849.39 58.88% 41.12% 100.00%
STATEMENT OF WORK ACCOMPLISHED (SWA)
From March 11,2022 to September 07,2022
CONTRACT No.: RREIS-22-SR-02-22
Contract Description: Construction of Concrete Canal Lining and Terminal Facilities of Wenaclean CIS
Contractor: MJJA Construction
TOTAL PERCENTAGE OF ACCOMPLISHMENT
TOTAL ACCOMPLISHMENT --------------------------------------------------- 1,843,849.39
Previous Accomplishment --------------------------------------------------- 1,085,711.62
Accomplishment this Collection --------------------------------------------------- 758,137.77
Tax Base 676,908.72
5% VAT --------------------------------------------------- 33,845.44
2% EVAT --------------------------------------------------- 13,538.17
Less:
10% Retention ---------------------------------------------------
15 % Advanced Payment --------------------------------------------------- 17,266.09
Net amount due the Contractor --------------------------------------------------- 710,754.16

Prepared by: Concurred by: Inspected/Verified by: Recommended by: Approved by:

JONATHAN G. CASILAO MELINDA M. CIELO JULEI ANDREA L. ULMIDO SHERWIN ROIS R. NOPRE EMERLITA L. JERUSALEM
Project In Charge Contractor/Proprietor/Manager Engineer A Acting EOS Head Acting IMO Manager

You might also like