Tank Sluice

This document provides an estimate for construction items for a tank sluice, including: 1) Excavation for foundations of the sluice tunnel chamber, head walls, and outlet chamber. 2) Masonry work with cement mortar 1:6 for the head wall with wings, tunnel, and outlet chambers. 3) Providing cement concrete 1:3:6 for the foundations, and cement plaster 1:3 for the exposed faces of the stone masonry. It includes a table with descriptions of items, dimensions, quantities, and an estimated total of 37.676 cubic meters of earthwork required.

Uploaded by

Thippeswamy Ph
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
407 views3 pages

Tank Sluice

This document provides an estimate for construction items for a tank sluice, including: 1) Excavation for foundations of the sluice tunnel chamber, head walls, and outlet chamber. 2) Masonry work with cement mortar 1:6 for the head wall with wings, tunnel, and outlet chambers. 3) Providing cement concrete 1:3:6 for the foundations, and cement plaster 1:3 for the exposed faces of the stone masonry. It includes a table with descriptions of items, dimensions, quantities, and an estimated total of 37.676 cubic meters of earthwork required.

Uploaded by

Thippeswamy Ph
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ESTIMATING, COSTING, SPECIFICATION AND

VALUATIKON
444

2.1Om
HAMKER
OUTLET
l.an
2.4m

:3

CM

lN
l:2:4
THlCK

MASONRY
STONE, 60cm:
75cm TUNNEL.
MASONRY
C.C.
20cm
20cm

56.00 2:
D/ 725m
THICK
SLOE
2:l SLAB BOTTOMSLAB
13.
TOP
OF
BUND LONGITUDINAL
SECTION 15cm
= B.S. 30cm
15)
1:2:4 AT WALL
(l.05x].2x0. 11.675m
WITH
MASONRY
TUNNEL PLAN
22.50m TUNNEL
C:C
SLUICE
lHICK HALF G-S.
CO
ON
OF l.8m
15cm LENGTH
BUND 15cm
i.Sm TANK
SLAB Cm b0aT

A AVERAGE
S
B
S0cm
Fig GROUN
TAKE
50cm

45

75n .0Sm
NG
15an
45
0.
om(5m STONE
REVEIMNI
13:1
U/S
KOUGH I
PACK
75-+
R.L.55.00
M.W.L.
ON
8.125m
5.725n
ELLY
1HICK 375mt
m
50.00
54.25
F.1.L.
6.675m J
IHICK
45an
-6.
B.S.
SLAB

30cm
IRRIGATION WORKS
:-
EEstimate of a Tank Sluice 445
for the following items of
work for the "Tank
Arample-Il
quantities
inexcVaion for foundation in hard gravelly soilfor wing Sluice"
EurthwonK
the
shownwalls,
walls, head in Fig.Masonry
11-7. tunnel
Arimste loundations of the tank sluice
chamber,(b) Laying with cement
inCM 1:6for head wall with wings, tunnel: and outlet chambers.1:3:6.(c)
sONImasonry concrete
(d) Providing cenent
otlet
ninting
gnd totneexpOsedfaces
of stone masonry with C.M. 1:3 and finished neatly with the required Construcing
Auinting
(B.TE. Karnalaka, i90)
Descriptionofitem No. L. B. H.
Im m m
Qty. Explaratory
foundationofthe
NO
Farthworkfor
sluicefor 11.675 2.40
a)Tunnelchamber 0.60 16.812
1 8.725 3.15
with wings 0.60 16490
b)Headwalls
chamber(cistern) 2.70 2.70 0.60 4.374
c Outlet Total = 37.676
CU m
for
2Cement concrete(1:3:6)
sluice for
foundation of the tank
a) Tunnel Chamber 1 11.675 2.40 0.60 16.812
1 8.725 3.15 0.60 16.490
)Head walls with wings
c) Outiet chamber 1 2.70 2.70 0.60 4.374 12.275 = ll.675
Total = 37.676 + 2x 0.30
Cu m
45 cm
3Size stone (S.S.) masonry in
|cement mortar (1:6) 0.75m
2 12.275 0.60 0.75 11.048
|2) Abutments of Tunnel
6) Headwalls with wings-... |4.25m
9K
0 l.754

0Longitudinal Head walls...


Top rectangular portions 1.75 0.45 0.75 1.181
2 Cm
10.041
Botom trapezium portions 2 1.75| (0.45+0.90) 4.25 4.05=55.00
2 1.519 50.00-0.75-0.20
(Cross Head wall 0.60 (0.45 +0.80) 4.05

|(ijWing walls Triangular part 2 6.375 (O+0.45)|


2
x 4.25 6.096

12.192
Core part
(c) Outdet chember 2 6.375| 0.45 x4.25
0) Longitudinal wals (0.75 +1.35) l.134
2 1.20 0.45
: 2
0) Cross 1.013|0.60=1.2-0.60
walls (Bits) 2x2 0.75 0.45 0.75
Total = 44.224
Cu m
446 ESTIMING, COSTING, SPECIFICATION AND VALUATION

Description of Item No. L. B. H.


Qty.
4, Providing cement pointing to the exposcd
m m m
ExplNoes
anatory
faces of Stonemasonry with cement
mortar (1:3) and finished neatly with the
roquired pointing
(a) Abutments of tunnel wall inside... 2 12.25 0.75 18.413
(b) Head walls with wings
() Longitudinal Head walls inside
Top rectangular portions 1.75 0.75 2.625
Bottom rapezium portions 1.75 4.25 14.875 Standing efer:
Top of abutments 2 1.75 0.75 2.625 for height is
(ii) Cross Head wall 1 0.60 4.05 2.43 negligible
-do-top 1 0.60 0.45
0.27| 6428=
(ii)Wing walls (insides triangular area) 26.428 1 x4.25 27.319|
Top of wing walls... 26.428 0.45 5.785 V6.37515
(c) Outlet chamber 1.20 (Q.75+1.35) 5.84
2
Top of chamber, Longitudinal walls 2 1.20 0.45 1.08
- do - Cross walls (Bits) 2x2 0.75 0.45 1.35
Totai= 82.612 sqm
112 AOUEDUCT:-In irigation engineering the term is confine rigation c