EST Front 3 Pages Ready

The document is a micro-project report submitted by two students, Tirth Patel and Vedant Ahire, on a waste management effluent treatment plant under the guidance of their professor Ravindra Govind. It includes an acknowledgement thanking those involved in the project and outlines some requirements for the system including general activities in a system development life cycle like preliminary study, defining the system, and designing and developing the system. Hardware requirements listed are an i-5 processor, 4GB RAM, and Windows XP/7.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views4 pages

EST Front 3 Pages Ready

The document is a micro-project report submitted by two students, Tirth Patel and Vedant Ahire, on a waste management effluent treatment plant under the guidance of their professor Ravindra Govind. It includes an acknowledgement thanking those involved in the project and outlines some requirements for the system including general activities in a system development life cycle like preliminary study, defining the system, and designing and developing the system. Hardware requirements listed are an i-5 processor, 4GB RAM, and Windows XP/7.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

A

Micro-Project Report
On
“Waste Management effluent treatment plant”

Submitted By:

Name of Student Enrollment No

1. Tirth .m. patel 1. 2105300269

2. Vedant.K.Ahire 2. 2105300271

Under the Guidance of


Prof. Ravindra.S.Govind

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION, Mumbai

Mahavir Polytechnic, Nashik.(0530)


DEPARTMENT OF COMPUTER ENGINEERING
MAHAVIR POLYTECHNIC, NASHIK.

DEPARTMENT OF COMPUTER ENGINEERING


Certificate
This is to certify that the Micro Project Report on“Waste Management
effluent treatment plant”is satisfactorily completed and submitted in the
partial fulfillment of the requirement for Subject "Environmental
Studies” in Third Year Computer Engineering in Semester Fifth of
Academic Year 2023-2024

Name of Student Enrollment No

1. Tirth .m. patel 1. 2105300269

2. Vedant.K.Ahire 2. 2105300271

Prof. R.S.Govind Prof: Anup Sonawane Prof. S.V.sagare

Subject Teacher Head of P


rincipal
Department
ACKNOWLEDGEMENT

It is my Proud privilege to express a deep sense of gratitude and regard to my


guide Prof. R.S.Govind ,Academic Co-ordinator of Mahavir polytechnic nashik. He
Initiative and Keep interest in every step provided a constant source of inspiration to our
group of intensive in this work.

I wish to place on record my sincere thanks to Prof. Anup Sonawane


H.O.D. of Computer Engineering Department, Mahavir polytechnic nashik who provided
the Valuable guidance and constant encouragement to complete this dissertation.

There were also some turning point where for a moment , I found myself little
depressed and at these very critical junctures, I am proud to confess our teacher staff,
which always appeared as a lamp post of live inspiration.

So my Sincere thanks to all Professors, Department teaching, Non-Teaching Staff &


my group Members , all my friends who directly or indirectly helped me in the
development & evolution of my thoughts in completing this work

Tirth Patel
Enrollment no: 2105300269
Vedant Ahire
Enrollment
no:2105300282
REQUIREMENT
This process is adopted when management of the system development, Personnel decide that the particular system

needs improvement. The system development life cycle is the set of activities, carried out by the analyst, designers

and users to develop and implement a system. The systems that are present in the nature follow common life cycle

pattern. For example consider the raining system. Initially the rain falls into the river, river flows into sea, the sea

water evaporates to form vapors, the vapors form clouds which again bring rain. Similarly consider a manmade

system initially a system is analyzed, designed and made operational by the efforts of system analysis. After

successful operation or a number of users, the system becomes less and less effective by change in the environment.

So these changes have to be incorporated in to the system by minor modifications. So the general activities from the

life cycle of the system are given below:

• Select ion and identification of the system to be studied

• Preliminary study

• Defining the system

• Design and development of the system

Hardware Requirements:

• i-5 Generation Processor

• 4 GB RAM

• Windows XP/7