The document is a checklist for reinforcement and shuttering of a plinth beam. It lists 14 items to check for reinforcement including bar diameter, cover, tieing, and supports. It also lists 11 items to check for shuttering including access, formwork quality, dimensions, alignment, and supports. The checklist additionally includes 4 items for concrete pour details and 4 post-pour checking items such as dimensions, levels, curing, and shear keys. The checklist is to be signed off by the contractor, engineer, site engineer, QC engineer, and project manager/site in-charge after completion of the plinth beam work.

Uploaded by

kumarakash122392
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
4K views2 pages

Plinth Beam

The document is a checklist for reinforcement and shuttering of a plinth beam. It lists 14 items to check for reinforcement including bar diameter, cover, tieing, and supports. It also lists 11 items to check for shuttering including access, formwork quality, dimensions, alignment, and supports. The checklist additionally includes 4 items for concrete pour details and 4 post-pour checking items such as dimensions, levels, curing, and shear keys. The checklist is to be signed off by the contractor, engineer, site engineer, QC engineer, and project manager/site in-charge after completion of the plinth beam work.

Uploaded by

kumarakash122392
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

REINFORCEMENT & SHUTTERING CHECK LIST - PLINTH BEAM

Project :

Contractor :

Tower / Villa :

Ref Drawing No. :

Location/grid :

Date of Checking :

Quantity Required Quantity Consumed Strength Acheived for 7days / Required


Item of Work : Plinth Beam Reinforcement & Shuttering
S. No Description Of Item YES N/A Remarks

REINFORCEMENT

1 Check reinforcement dia as per detail

Number of bars as per structural details - Bottom Extra & Top


2
Extra
Check Whether Sufficient cover provided/ Cover Blocks for
3
designed concrete strength are provided

4 Check the reinforcement tested and passed

Have additional rings/stirrups provided above the Beam top


5
(Master Ring)

6 Check whether reinforcement tied properly

7 Check for the plumb of the Verticals above the Beam

Check Whether the Proper supports are provided for the


8
Reinforcement

SHUTTERING

1 Check for proper access provided

2 Check the quality of form work

3 Check for number of repetions of ply wood - thickness.

4 Center Lines Checked


Check Dimensions as per Architectural drawing
5
( Face To Face)
6 Check for alignment

7 Check for Verticality

8 Check for the Diagonal

9 Check supports are adequately provided

10 Check the Rigidity of support

11 Whether extra supports required, Specify location

1
CONCRETE POUR CARD

1 Check for the grade of the concrete

2 Check for the Slump

3 Check for the availability of the Vibrator

4 Check whether the Cubes are taken as per the requirement

POST POUR CHECKING

1 Check for the Dimensions of the Plinth Beam, bulges, finishing.

2 Check the Plinth Beam levels,

3 Check for Arrangement of the Curing and Marking of the date

4 Check for Shear Keys's


Comments:

CONTRACTOR ENGINEER SITE ENGINEER QC- ENGINEER P.M/ SITE INCHARGE