The game buzzer control requirement:
1.   After the Host has finished with question.
   2.   The 3 players will press the switch in front of them to fight to be first to answer the question.
   3.   The buzzer will sound for 10 sec after any one of the players has touched the switch.
   4.   The light indicator in front of each player will light-up and only reset by the Host switch.
Input             Device                       Output                 Device
I1                PB1                          Q1                     Buzzer
I2                PB2                          Q2                     Player 1 light
I3                PB3                          Q3                     Player 2 light
I4                RST (reset)                  Q4                     Player 3 light
OPERATION
When PB1 (START Push Button) is pressed, the box conveyor moves. Upon detection of box present.
The box conveyor stops and the Apple conveyor start. Part sensor will count for 10 apples. Apple
conveyor stops and box conveyor starts again. Counter will be reset and operation repeats until PB2
(STOP Push Button) is pressed.
Input              Devices                                 Output               Devices
I1                 START Push Button (PB1)                 Q1                   Apple Conveyor
I2                 STOP Push Button (PB2)                  Q2                   Box Conveyor
I3                 Part Present (SE1)
I4                 Box Present (SE2)
I/O Assignments
Input              Devices                              Output             Devices
I1                 Start Button (PB1)                   Q1                 Water Supply Valve
                                                                           (MV1)
I2                 Stop Button (PB2)                    Q2                 Drain Valve (MV2)
I3                 Reset Button (PB3)                   Q3                 Stirring Motor (M)
I4                 Upper Level Switch (TLB1)            Q4                 End Indicator
I5                 Lower Level Switch (TLB2)            Q5                 Buzzer
Procedure
     1. As the PB1 is Pressed, MV1 opens and the water begins to fill the tank. At the same time, the
        stirring motor M starts operations.
     2. When the water level passes TLB2 and reaches TLB1, the MV1 closes and the stirring motor
        stops.
     3. Next, MV2 opens and starts draining the water, when the water levels drops below TLB2,
        MV2 Closes.
     4. When the cycle of operation has repeated four times, the operation END indicator
        illuminates, and the filling and draining operation will not restart even if PB1 is pressed.
I/O Assignments
Input              Devices                       Output              Devices
I1                 Start Button (PB1)            Q1                  (KM1)Main Magnetic
                                                                     Contact/FWD
I2                 Star-Delta Power CKT          Q2                  (KMY)Star Magnetic
                                                                     Contact
I3                 FWD-REV Power CKT             Q3                  (KM)Delta Magnetic
                                                                     Contact
                                                 Q4                  (KM2)REV Magnetic
                                                                     Contact
Operation
First ON the Toggle Switch. Then simulation start first main magnetic & Star Magnetic contact ON.
After 5 Second Star Magnetic contact OFF & Delta Magnetic contact ON
                                   Traffic light control
                                            Street # 2
                                                  Always On
                                                                  Street # 3
 Street # 4
              Street # 1
                           When Street # 2 Green
Input         Devices                    Output               Devices
I1            Start Button (PB1)         Q1                   Street # 2 Red Light
                                         Q2                   Street # 2 Yellow Light
                                         Q3                   Street # 2 Green Light
TRAFFIC LIGHT CONTROL
                                           Street # 2
                                                        Street # 3
Street # 4
             Always On
              Street # 1
                           When Street # 1 Green